CN203392312U - 组合式混凝土试模搬运工具 - Google Patents
组合式混凝土试模搬运工具 Download PDFInfo
- Publication number
- CN203392312U CN203392312U CN201320516575.XU CN201320516575U CN203392312U CN 203392312 U CN203392312 U CN 203392312U CN 201320516575 U CN201320516575 U CN 201320516575U CN 203392312 U CN203392312 U CN 203392312U
- Authority
- CN
- China
- Prior art keywords
- concrete test
- combined concrete
- carrying tool
- test mould
- mould carrying
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 14
- 239000010959 steel Substances 0.000 claims abstract description 14
- 239000000725 suspension Substances 0.000 claims description 5
- 230000000694 effects Effects 0.000 abstract description 4
- 238000010276 construction Methods 0.000 abstract description 3
- 239000002699 waste material Substances 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 3
- 238000005266 casting Methods 0.000 description 1
- 239000004568 cement Substances 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 229920003023 plastic Polymers 0.000 description 1
- 239000004033 plastic Substances 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
本实用新型涉及施工用搬运装置,具体为一种组合式混凝土试模搬运工具,解决了现有多组混凝土试模搬运时受环境影响存在费时费力、效率低下且成本较高的问题。组合式混凝土试模搬运工具,包括竖直设置且相互平行的两根钢杆,两根钢杆的上端均连接有与其一体且交叉铰接的夹紧杆,夹紧杆的上端均固定有吊环,两根钢杆的内侧固定有左右位置对应的若干对卡销。本实用新型结构设计合理可靠,节省劳动时间的同时,不影响混凝土试块的成型效果,而且成本较低,使用过程中,方便快捷,具有结构简单、加工方便的优点。
Description
技术领域
本实用新型涉及施工用搬运装置,具体为一种组合式混凝土试模搬运工具。
背景技术
目前工地上使用的混凝土试模已经基本采用塑料试模,以100×100×100的三联装为主。这种试模具有重量轻,在内表面涂好脱模剂的条件下易于拆除试块的优点。但在实际的工程使用当中,也暴露出一些不足之处。
在做好试块之后(未达到初凝),试模周围的外边搬运起来不舒适、不方便。而且按照试验的标准,每浇筑100立方米的混凝土至少要制作一组。这还不算同养、拆模和同养转标养的试块。而且工地浇筑混凝土的地点的地理位置也不尽相同。例如在坡底、施工作业面狭窄的地方,都不适合用小平车及其它工具进行搬运。
发明内容
本实用新型为了解决现有多组混凝土试模搬运时受环境影响存在费时费力、效率低下且成本较高的问题,提供了一种组合式混凝土试模搬运工具。
本实用新型是采用如下技术方案实现的:组合式混凝土试模搬运工具,包括竖直设置且相互平行的两根钢杆,两根钢杆的上端均连接有与其一体且交叉铰接的夹紧杆,夹紧杆的上端均固定有吊环,两根钢杆的内侧固定有左右位置对应的若干对卡销。
进行搬运时,将每组混凝土试模的上端外缘放置在一对卡销上,随后手提吊环,在夹紧杆的作用下,钢杆自动向内侧自动锁紧,实现人工搬运,克服了现有多组混凝土试模搬运时受环境影响存在费时费力、效率低下且成本较高的问题。
本实用新型结构设计合理可靠,节省劳动时间的同时,不影响混凝土试块的成型效果,而且成本较低,使用过程中,方便快捷,具有结构简单、加工方便的优点。
附图说明
图1为本实用新型的结构示意图。
图中:1-钢杆,2-夹紧杆,3-吊环,4-卡销。
具体实施方式
组合式混凝土试模搬运工具,包括竖直设置且相互平行的两根钢杆1,两根钢杆1的上端均连接有与其一体且交叉铰接的夹紧杆2,夹紧杆2的上端均固定有吊环3,两根钢杆1的内侧固定有左右位置对应的若干对卡销4。
具体实施过程中,卡销4的数量为三对,也就是说以三组试模为一组,理由如下:1、按一方混凝土的平均重量2400kg来计算,每个试块的体积为100mm×100mm×100mm,为0.001方,重量0.001×2400=2.4kg,九个总共重量达到21.6kg,是一般人员能够承受的重量。
相邻两对卡销4的竖向距离大于每组试模的高度,为了避免收好面的试块在试模组装叠放时,被上部试模的下底粘到,影响表面的效果。
Claims (1)
1.一种组合式混凝土试模搬运工具,其特征在于:包括竖直设置且相互平行的两根钢杆(1),两根钢杆(1)的上端均连接有与其一体且交叉铰接的夹紧杆(2),夹紧杆(2)的上端均固定有吊环(3),两根钢杆(1)的内侧固定有左右位置对应的若干对卡销(4)。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320516575.XU CN203392312U (zh) | 2013-08-23 | 2013-08-23 | 组合式混凝土试模搬运工具 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201320516575.XU CN203392312U (zh) | 2013-08-23 | 2013-08-23 | 组合式混凝土试模搬运工具 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203392312U true CN203392312U (zh) | 2014-01-15 |
Family
ID=49903859
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201320516575.XU Expired - Lifetime CN203392312U (zh) | 2013-08-23 | 2013-08-23 | 组合式混凝土试模搬运工具 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203392312U (zh) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105253515A (zh) * | 2015-10-16 | 2016-01-20 | 河北中建工程有限公司 | 一种搬运工具 |
| CN110775513A (zh) * | 2019-11-27 | 2020-02-11 | 深圳市明信测试设备有限公司 | 一种快速取放装置 |
-
2013
- 2013-08-23 CN CN201320516575.XU patent/CN203392312U/zh not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105253515A (zh) * | 2015-10-16 | 2016-01-20 | 河北中建工程有限公司 | 一种搬运工具 |
| CN110775513A (zh) * | 2019-11-27 | 2020-02-11 | 深圳市明信测试设备有限公司 | 一种快速取放装置 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203700962U (zh) | 预制空心板梁简易伞型抽拉内模 | |
| CN202265310U (zh) | 多用途组合吊具 | |
| CN203392312U (zh) | 组合式混凝土试模搬运工具 | |
| CN204772928U (zh) | 水泥花桶浇筑用内模 | |
| CN203334680U (zh) | 混凝土浇筑用上返梁吊模 | |
| CN202910964U (zh) | 预制箱梁腹板附着式混凝土振捣器 | |
| CN202946193U (zh) | 一种隧道中心水沟模板 | |
| CN201834656U (zh) | 一种水泥管预制外模起吊装置 | |
| CN202742489U (zh) | 一种箱梁内模 | |
| CN203376194U (zh) | 混凝土类材料柱状成型装置 | |
| CN203156929U (zh) | 手动脱模器 | |
| CN203316532U (zh) | 一种直管整口模具 | |
| CN203237909U (zh) | 水泥板成型吊装装置 | |
| CN103774844A (zh) | 建筑物中混凝土预留孔模具 | |
| CN203666706U (zh) | 简易双轮杠杆运输工具 | |
| CN202572634U (zh) | 立式成型玻璃钢复合管模具 | |
| CN202910972U (zh) | 用于墙顶处角部砌块的预制模具 | |
| CN209504423U (zh) | 一种灯柱固定座预制件的模具 | |
| CN203993863U (zh) | 玻璃钢弯头切割划线器 | |
| CN202985769U (zh) | 带操作平台的管道模具 | |
| CN203983024U (zh) | 高压互感器浇注模具装配台 | |
| CN205620192U (zh) | 一种混凝土试块拆模辅助装置 | |
| CN202040269U (zh) | 一种管片生产线用隔振平台 | |
| CN203171795U (zh) | 一种叠合箱 | |
| CN203636957U (zh) | 泡沫混凝土砌块模具 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information |
Inventor after: Song Lei Inventor after: Guo Shuai Inventor after: Lv Feng Inventor before: Guo Shuai Inventor before: Lv Feng |
|
| COR | Change of bibliographic data |
Free format text: CORRECT: INVENTOR; FROM: GUO SHUAI LV FENG TO: SONG LEI GUO SHUAI LV FENG |
|
| CX01 | Expiry of patent term |
Granted publication date: 20140115 |
|
| CX01 | Expiry of patent term |