CN203296115U - Temporary sanitation system in building - Google Patents
Temporary sanitation system in building Download PDFInfo
- Publication number
- CN203296115U CN203296115U CN2013203005879U CN201320300587U CN203296115U CN 203296115 U CN203296115 U CN 203296115U CN 2013203005879 U CN2013203005879 U CN 2013203005879U CN 201320300587 U CN201320300587 U CN 201320300587U CN 203296115 U CN203296115 U CN 203296115U
- Authority
- CN
- China
- Prior art keywords
- building
- interim
- communicated
- metope
- health department
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 26
- 238000009434 installation Methods 0.000 claims description 12
- 238000007789 sealing Methods 0.000 claims description 3
- 230000007613 environmental effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 230000001174 ascending effect Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000003651 drinking water Substances 0.000 description 1
- 235000020188 drinking water Nutrition 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000008014 freezing Effects 0.000 description 1
- 238000007710 freezing Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000005381 potential energy Methods 0.000 description 1
Images
Landscapes
- Domestic Plumbing Installations (AREA)
Abstract
The utility model relates to a sanitation system in a building, in particular to a temporary sanitation system in the building. The temporary sanitary system comprises a water supply device and a water outlet pipe communicated with the water outlet end of the water supply device. A pipeline, located on one side of the building, of the water outlet pipe rises upwards along a temporary wall surface built for the temporary sanitation system of the building, the water outlet pipe is communicated with branch pipes on each floor, and the other end of each branch pipe is connected with a sanitation facility, and the temporary sanitation system is low in cost, environmentally friendly and convenient to disassemble and assemble.
Description
Technical field
The utility model relates to the health department in building, is specially the interim health department in a kind of building a building.
Background technology
At present, in the building constructions process, particularly high-rise building, outside the constructor often need to go, go to toilet, and the supply of living water use is all very inconvenient.
Notification number is that the Chinese utility model patent of 201554076U discloses a kind of Household circulating water sanitary system, although efficiency is high, relatively environmental protection, saving water resource, but the cost of building is higher, if as the temporary system in building a building, cost is relatively too high, and installation and the dismounting in later stage in early stage are all not too easy.
The utility model content
The purpose of this utility model is to provide that a kind of cost is little, the interim health department in the building a building of environmental protection, easy accessibility.
Above-mentioned technical purpose of the present utility model is achieved by the following technical programs: the interim health department in building a building, comprise water supply installation, the outlet pipe that is communicated with the water side of water supply installation, the pipeline that outlet pipe is positioned at the building side upwards rises along the interim metope that building aims at this interim health department building, the position that outlet pipe is positioned at each floor is communicated with arm, and the other end of arm is connected with sanitary fittings.
In technique scheme, interim metope is for this temporary system, to design specially, in order not destroy the overall structure of building, and this design can also be the pipe laying in temporary system, comprise the dismounting in later stage, a platform easily is provided, can not produce extra larger cost, by the water supply of water supply installation, be used for meeting the sanitary fittings of Interim use in floor.
As of the present utility model preferred, sanitary fittings comprise the feed tank that is communicated with arm, the sanitaryware that are communicated with feed tank, with the outlet of sewer of sanitaryware, be communicated be arranged on the blow-off pipe in building.
Above-mentioned optimal way provides a sanitary fittings of practicality relatively at a low price.
As of the present utility model preferred, the position of feed tank is arranged on the last layer of sanitaryware place floor, and the feed tank that is communicated with top sanitaryware is arranged on the building top.
Above-mentioned optimal way makes the glassware for drinking water of feed tank that higher potential energy be arranged, and when sanitaryware use, can reach enough hydraulic pressure, the convenient use.
As of the present utility model preferred, be arranged in floor feed tank, sanitaryware packaged type.This optimal way can make feed tank, sanitaryware to move freely, because the construction that builds a building is not at each layer, to carry out simultaneously, it is ascending manner in layer, so after the floor completion of lower floor, can be on feed tank, sanitaryware, moving, easy disassembly, also can save cost, without every layer, all goes to install.
As of the present utility model preferred, outlet pipe passes the retainer ring that may be fixedly attached to interim metope and is fixed on interim metope, and retainer ring is with the tip that can insert interim metope.This optimal way makes building particularly high-rise, when pipeline has current, can produce very large energy, causes larger rocking, so need the retainer ring of interim design to be fixed, dismounting is also more convenient.
As of the present utility model preferred, on interim metope, also be provided with spacing button that can supply outlet pipe to pass.This optimal way be at temporary system, stop using or in winter for prevent pipeline get rusty, freezing etc., pipeline need to be split and put, spacing button has been arranged, can allow pipeline remain near original position and can lean on firmly.
As of the present utility model preferred, spacing button and interim metope can surround the zone of a sealing.
As of the present utility model preferred, water supply installation is with automatic control equipment.This optimal way can be according to the demand of system, and water supply operation, water-saving and environmental protection are controlled in automation.
The beneficial effects of the utility model are: this interim health department installs conveniently, the cost of cost is little, relatively environmental protection, can use for the life of the constructor in building a building, do not need to go to the building outside, reduced a lot of troubles, this temporary system is less on the impact of building building itself in addition, and the later stage dismounting is also fairly simple.
The accompanying drawing explanation
Fig. 1 is the structural representation of the utility model embodiment 1;
Fig. 2 is the perspective view of the retainer ring of the utility model embodiment 1;
Fig. 3 is the perspective view that the spacing button of the utility model embodiment 1 is combined with interim metope.
In figure: 1, water supply installation, 2, outlet pipe, 3, interim metope, 21, arm, 61, feed tank, 62, sanitaryware, 63, blow-off pipe, 33, retainer ring, 34, tip, 4, spacing button.
The specific embodiment
Following specific embodiment is only to explanation of the present utility model; it is not to restriction of the present utility model; those skilled in the art can make to the present embodiment the modification that there is no creative contribution as required after reading this manual, but as long as in claim scope of the present utility model, all are subject to the protection of Patent Law.
Embodiment 1, as shown in Figure 1, 2, 3, interim health department in building a building, comprise water supply installation 1, the outlet pipe 2 that is communicated with the water side of water supply installation 1, the pipeline that outlet pipe 2 is positioned at the building side upwards rises along the interim metope 3 that building aims at this interim health department building, and the position that outlet pipe 2 is positioned at each floor is communicated with arm 21, and the other end of described arm 21 is connected with sanitary fittings.Water supply installation 1 is with output water pump, automatic equipment etc., sanitary fittings comprise the feed tank 61 that is communicated with arm 21, the sanitaryware 62 that are communicated with feed tank 61, with the outlet of sewer of sanitaryware 62, be communicated be arranged on the blow-off pipe 63 in building.The position of feed tank 61 is arranged on the last layer of sanitaryware 62 place floors, and the feed tank 61 that is communicated with top sanitaryware 62 is arranged on the building top.Be arranged in floor feed tank 61, sanitaryware 62 packaged types.Outlet pipe 2 passes the retainer ring 33 that may be fixedly attached to interim metope 3 and is fixed on interim metope 3, and retainer ring 33 is with the tip 34 that can insert interim metope 3.On interim metope 3, also be provided with and can spacingly buckle 4 for what outlet pipe 2 passed.Spacing button 4 and interim metope 3 can surround the zone of a sealing.Sanitaryware 62 comprise Mobile toilet seat, washbasin etc.
Claims (8)
1. the interim health department in building a building, it is characterized in that: comprise water supply installation (1), the outlet pipe (2) that is communicated with the water side of described water supply installation (1), the pipeline that outlet pipe (2) is positioned at the building side upwards rises along the interim metope (3) that building aims at this interim health department building, the position that outlet pipe (2) is positioned at each floor is communicated with arm (21), and the other end of described arm (21) is connected with sanitary fittings.
2. the interim health department according to claim 1 building a building is characterized in that: described sanitary fittings comprise the feed tank (61) that is communicated with described arm (21), the sanitaryware (62) that are communicated with described feed tank (61), with the outlet of sewer of described sanitaryware (62), be communicated be arranged on the blow-off pipe (63) in building.
3. the interim health department according to claim 2 building a building, it is characterized in that: the position of described feed tank (61) is arranged on the last layer of described sanitaryware (62) place floor, and the feed tank (61) that is communicated with top sanitaryware (62) is arranged on the building top.
4. the interim health department according to claim 3 building a building is characterized in that: be arranged in floor described feed tank (61), sanitaryware (62) packaged type.
5. the interim health department according to claim 1 and 2 or 3 or 4 described building a building, it is characterized in that: described outlet pipe (2) passes the retainer ring (33) that may be fixedly attached to described interim metope (3) and is fixed in described interim metope (3) above, and described retainer ring (33) is with the tip that can insert interim metope (3) (34).
6. the interim health department according to claim 5 building a building is characterized in that: on described interim metope (3), also be provided with spacing button the (4) that can pass for described outlet pipe (2).
7. the interim health department according to claim 6 building a building is characterized in that: described spacing button (4) and described interim metope (3) can surround the zone of a sealing.
8. the interim health department according to claim 1 and 2 or 3 or 4 or 6 or 7 described building a building, it is characterized in that: described water supply installation (1) is with automatic control equipment.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203005879U CN203296115U (en) | 2013-05-29 | 2013-05-29 | Temporary sanitation system in building |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2013203005879U CN203296115U (en) | 2013-05-29 | 2013-05-29 | Temporary sanitation system in building |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203296115U true CN203296115U (en) | 2013-11-20 |
Family
ID=49572137
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2013203005879U Withdrawn - After Issue CN203296115U (en) | 2013-05-29 | 2013-05-29 | Temporary sanitation system in building |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203296115U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103276770A (en) * | 2013-05-29 | 2013-09-04 | 浙江泰合建设有限公司 | Temporary sanitation systems in building buildings |
-
2013
- 2013-05-29 CN CN2013203005879U patent/CN203296115U/en not_active Withdrawn - After Issue
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103276770A (en) * | 2013-05-29 | 2013-09-04 | 浙江泰合建设有限公司 | Temporary sanitation systems in building buildings |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201972190U (en) | Water-saving fire water supply/drainage system | |
| CN203296115U (en) | Temporary sanitation system in building | |
| CN204968863U (en) | Pig house drainage | |
| CN103272351A (en) | Temporary fire-fighting system used in building | |
| CN202430780U (en) | Improved assembly of indoor water drainage system | |
| CN206279616U (en) | A kind of rainwater-collecting water-storing device | |
| CN203291426U (en) | Temporary fire extinguishing system for buildings | |
| CN205389801U (en) | Plant spray truck | |
| CN202544033U (en) | High-rise building water saving system | |
| CN203296162U (en) | Buried prefabricated pump station | |
| CN103276770B (en) | Temporary sanitation system of building | |
| CN203939094U (en) | A kind of domestic waste water circulating device | |
| CN203129252U (en) | Multistory building rainwater and domestic water utilization device | |
| CN205954739U (en) | Sanitary wastewater cyclic utilization device | |
| CN201865158U (en) | Water-saving device for wash basin | |
| CN103276768B (en) | Rainwater reusing temporary system in process of high-rise building construction | |
| CN204040128U (en) | Residence toilet washes utilizes system | |
| CN201908354U (en) | Telescopic water-saving toilet | |
| CN201687049U (en) | Household water saving device | |
| CN204058205U (en) | upper and lower combined plastic septic tank assembly | |
| CN203846570U (en) | Sanitary wastewater recycling device | |
| CN202248115U (en) | Household water-saving system | |
| CN202181570U (en) | City water supply system | |
| CN202492709U (en) | Washing machine with washing tank | |
| CN202745138U (en) | Secondary utilization device for domestic water |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20131120 Effective date of abandoning: 20141126 |
|
| RGAV | Abandon patent right to avoid regrant |