[go: up one dir, main page]

CN203239299U - Packing device for gravel packing in horizontal well pipe - Google Patents

Packing device for gravel packing in horizontal well pipe Download PDF

Info

Publication number
CN203239299U
CN203239299U CN 201320153549 CN201320153549U CN203239299U CN 203239299 U CN203239299 U CN 203239299U CN 201320153549 CN201320153549 CN 201320153549 CN 201320153549 U CN201320153549 U CN 201320153549U CN 203239299 U CN203239299 U CN 203239299U
Authority
CN
China
Prior art keywords
filling
cylinder
pipe
packing
tool
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320153549
Other languages
Chinese (zh)
Inventor
陈大钊
孙厚利
张建军
吕民
陈磊
丛志新
宗伟
徐路
赵雅丽
张鑫
于晓溪
李学良
邵占辉
任艳子
吴爽
沈军
胡祎
马丽丽
孟雪
屈振哲
王斐
李洪斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Petrochina Co Ltd
Original Assignee
Petrochina Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Petrochina Co Ltd filed Critical Petrochina Co Ltd
Priority to CN 201320153549 priority Critical patent/CN203239299U/en
Application granted granted Critical
Publication of CN203239299U publication Critical patent/CN203239299U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

A packing assembly for gravel packing within a horizontal well tubular, the packing assembly comprising: the in-pipe filling service tool is provided with a plurality of first filling holes along the circumferential direction; the intraductal filling tool, its inside is connected with above-mentioned intraductal filling service tool, intraductal filling tool includes top connection, fills switch module, overcoat, holding ring and lower clutch, upper and lower clutch connect respectively the left and right both ends of intraductal filling tool, fill the left end of switch module and connect the top connection, fill the right-hand member of switch module and connect the overcoat, the lower clutch connect the right-hand member of overcoat, the holding ring is connected on the overcoat, and is located the left side of lower clutch, fill the switch module including filling a section of thick bamboo, sliding sleeve and a plurality of second filling hole, the sliding sleeve is located the radial inboard in second filling hole, first, second filling hole correspond; the sliding sleeve is axially slidable by the action of the filling service tool in the tube to open or close the second filling hole.

Description

用于水平井管内砾石充填的充填装置Packing device for gravel packing in horizontal well pipe

技术领域technical field

本实用新型涉及采油工程中的防砂专业,特别是涉及一种用于水平井管内砾石充填的充填装置。The utility model relates to the field of sand control in oil production engineering, in particular to a filling device for gravel filling in horizontal well pipes.

背景技术Background technique

套管射孔完井、筛管防砂完井是水平井主要完井方式,随着生产的进行,一旦油井出砂,则需要进行水平井管内防砂。水平井管内砾石充填防砂技术是水平井管内防砂技术之一,具有防砂效果突出、防砂有效期长的特点。应用该技术能有效的防止油井出砂,尤其是对细粉砂有良好的防治效果,并能使油井充分发挥生产能力。Casing perforation completion and screen sand control completion are the main completion methods for horizontal wells. With the progress of production, once the oil well produces sand, it is necessary to carry out sand control in the horizontal well pipe. The sand control technology of gravel packing in the horizontal well pipe is one of the sand control technologies in the horizontal well pipe, which has the characteristics of outstanding sand control effect and long effective period of sand control. The application of this technology can effectively prevent oil wells from sanding, especially for fine silt sand, and can make oil wells fully exert their production capacity.

目前,水平井管内砾石充填防砂技术所采用的充填工具大多安装在顶部(水平井脚跟处的技术套管内),而且充填工具常与封隔器复合在一起形成水平井管内充填装置,该种装置含有坐封、悬挂、丢手、填砂、反洗等功能机构,结构复杂、外径大,在施工过程中有下入困难和功能机构失效的问题,造成填砂失败。At present, most of the packing tools used in the gravel packing sand control technology in horizontal well pipes are installed on the top (in the technical casing at the heel of the horizontal well), and the packing tools are often combined with packers to form a horizontal well pipe packing device. It contains functional mechanisms such as setting, suspension, hand throwing, sand filling, and backwashing. The structure is complex and the outer diameter is large. During the construction process, there are problems such as difficulty in loading and failure of functional mechanisms, resulting in failure of sand filling.

实用新型内容Utility model content

本实用新型的目的是,提供一种用于水平井管内砾石充填的充填装置,其结构简单,降低了充填施工的难度,可实现水平井管内循环砾石充填和挤压砾石充填。The purpose of the utility model is to provide a filling device for gravel filling in the horizontal well pipe, which has a simple structure, reduces the difficulty of filling construction, and can realize circulating gravel filling and squeezing gravel filling in the horizontal well pipe.

本实用新型的上述目的可采用下列技术方案来实现:Above-mentioned purpose of the utility model can adopt following technical scheme to realize:

一种用于水平井管内砾石充填的充填装置,所述充填装置包括:管内充填服务工具,其上沿周向设有多个第一填充孔;管内充填工具,其内部连接着上述管内充填服务工具,所述管内充填工具包括上接头、充填开关组件、外套、定位环和下接头,所述上、下接头分别连接在所述管内充填工具的左、右两端,所述充填开关组件的左端连接上接头,充填开关组件的右端连接所述外套,所述下接头连接在所述外套的右端,所述定位环连接在外套上,并位于所述下接头的左侧,所述充填开关组件包括充填筒、滑套和多个第二填充孔,所述充填筒的左端连接所述上接头,所述充填筒的内部的左端连接有密封圈,充填筒的右端连接所述外套,所述充填筒上设有所述第二填充孔,所述滑套位于第二填充孔的径向内侧,所述第二填充孔与第一填充孔相对应;通过所述管内充填服务工具,所述滑套可轴向滑动地连接于充填筒的内侧,以打开或关闭第二填充孔。A packing device for gravel packing in a horizontal well pipe, the packing device includes: an in-pipe filling service tool, on which a plurality of first filling holes are arranged along the circumference; an in-pipe filling tool, which is connected to the above-mentioned in-pipe filling service tool, The filling tool in the pipe includes an upper joint, a filling switch assembly, a jacket, a positioning ring and a lower joint. The upper and lower joints are respectively connected to the left and right ends of the filling tool in the pipe, and the left end of the filling switch assembly is connected to The upper joint, the right end of the filling switch assembly is connected to the jacket, the lower joint is connected to the right end of the jacket, the positioning ring is connected to the jacket and is located on the left side of the lower joint, the filling switch assembly includes A filling cylinder, a sliding sleeve and a plurality of second filling holes, the left end of the filling cylinder is connected to the upper joint, the inner left end of the filling cylinder is connected to a sealing ring, the right end of the filling cylinder is connected to the outer jacket, the filling The cylinder is provided with the second filling hole, the sliding sleeve is located on the radial inner side of the second filling hole, and the second filling hole corresponds to the first filling hole; the service tool is filled in the tube, and the sliding sleeve The sleeve is axially slidably connected to the inner side of the filling cylinder to open or close the second filling hole.

如上所述的用于水平井管内砾石充填的充填装置,所述滑套具有圆筒体和滑套突起,所述滑套突起连接在圆筒体的右端,所述外套的内部连接有弹簧,所述弹簧的两端分别顶抵于滑套突起和所述定位环。As mentioned above, the packing device for gravel packing in the horizontal well pipe, the sliding sleeve has a cylindrical body and a sliding sleeve protrusion, the sliding sleeve protrusion is connected to the right end of the cylindrical body, and a spring is connected to the inside of the outer casing, The two ends of the spring respectively bear against the protrusion of the sliding sleeve and the positioning ring.

如上所述的用于水平井管内砾石充填的充填装置,所述充填开关组件还包括套管保护器,所述套管保护器连接所述充填筒的右端,并位于所述外套的左方。According to the packing device for gravel packing in the horizontal well pipe as mentioned above, the filling switch assembly further includes a casing protector connected to the right end of the packing cylinder and located on the left of the casing.

如上所述的用于水平井管内砾石充填的充填装置,所述充填筒包括相互连接的第一筒体和第二筒体,所述第一筒体位于第二筒体的左侧,所述第一、二筒体之间设置所述第二填充孔,所述第二筒体的内侧面与第一筒体的内侧面平齐,第二筒体的外侧面向外突出于第一筒体的外侧面,所述套管保护器的右端连接在第二筒体的外部,套管保护器的左端与第一筒体的外部具有开口。As mentioned above, the packing device for gravel packing in the horizontal well pipe, the packing cylinder includes a first cylinder body and a second cylinder body connected to each other, the first cylinder body is located on the left side of the second cylinder body, and the The second filling hole is set between the first and second cylinders, the inner surface of the second cylinder is flush with the inner surface of the first cylinder, and the outer surface of the second cylinder protrudes outward from the first cylinder The right end of the sleeve protector is connected to the outside of the second cylinder, and the left end of the sleeve protector has an opening with the outside of the first cylinder.

如上所述的用于水平井管内砾石充填的充填装置,所述管内充填服务工具包括充填管和导杆,所述充填管上设有所述第一充填孔,所述充填管的右端外部设有台阶,充填管的右端内部螺纹连接所述导杆,且所述导杆的左端位于第一充填孔的右方,导杆的右端呈锥体状;随着所述管内充填服务工具设入所述管内充填工具内,所述台阶推动所述滑套向右移动,以打开所述第二充填孔。According to the packing device for gravel packing in the horizontal well pipe as mentioned above, the pipe filling service tool includes a packing pipe and a guide rod, the first filling hole is provided on the packing pipe, and the right end of the packing pipe is provided with a There are steps, the right end of the filling tube is internally threaded to the guide rod, and the left end of the guide rod is located on the right of the first filling hole, and the right end of the guide rod is in the shape of a cone; as the filling service tool in the tube is set into In the tube filling tool, the step pushes the sliding sleeve to move to the right to open the second filling hole.

如上所述的用于水平井管内砾石充填的充填装置,所述导杆的左端设有圆锥体。According to the above-mentioned packing device for gravel packing in the horizontal well pipe, the left end of the guide rod is provided with a cone.

如上所述的用于水平井管内砾石充填的充填装置,所述导杆的右端沿周向设有多个导向体,各导向体之间设有定位槽,所述定位环上设有定位键;在所述管内充填服务工具插设于所述管内充填工具的状态下,所述定位键插设于定位槽内。As mentioned above for the filling device for gravel filling in the horizontal well pipe, the right end of the guide rod is provided with a plurality of guide bodies along the circumference, positioning grooves are provided between each guide body, and positioning keys are provided on the positioning ring; When the tube filling service tool is inserted into the tube filling tool, the positioning key is inserted into the positioning groove.

本实用新型的特点和优点是:Features and advantages of the utility model are:

1、本充填装置外径尺寸小,可安装在水平井底部,不影响管内砾石充填防砂管柱内通径。1. The packing device has a small outer diameter and can be installed at the bottom of a horizontal well without affecting the inner diameter of the sand control string for gravel packing in the pipe.

2、本充填装置无需坐封、悬挂、丢手等机构,结构简单,降低了充填施工难度。2. The filling device does not need mechanisms such as setting, hanging, and throwing away, and has a simple structure, which reduces the difficulty of filling construction.

3、本充填装置适用性强,可用于水平井管内循环砾石充填和挤压砾石充填,尤其适用于稠油热采水平井管内砾石充填防砂。3. The packing device has strong applicability and can be used for circulating gravel packing and extruding gravel packing in horizontal well pipes, especially for gravel packing and sand control in horizontal well pipes for heavy oil thermal recovery.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例中的技术方案,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention, the accompanying drawings that need to be used in the description of the embodiments will be briefly introduced below. Obviously, the accompanying drawings in the following description are only some implementations of the present invention. For example, those of ordinary skill in the art can also obtain other drawings based on these drawings on the premise of not paying creative efforts.

图1是本实用新型实施例的用于水平井管内砾石充填的充填装置的管内充填工具的半剖示意图;Fig. 1 is the semi-sectional schematic diagram of the filling tool in the pipe of the packing device for gravel packing in the horizontal well pipe according to the embodiment of the present invention;

图2是本实用新型实施例的用于水平井管内砾石充填的充填装置的管内充填服务工具的半剖示意图;Fig. 2 is a half-sectional schematic diagram of the filling service tool in the pipe of the filling device for gravel packing in the horizontal well pipe according to the embodiment of the present invention;

图3是本实用新型实施例的用于水平井管内砾石充填的充填装置的半剖示意图;Fig. 3 is a half-sectional schematic diagram of a packing device for gravel packing in a horizontal well pipe according to an embodiment of the present invention;

图4是采用了本实用新型实施例的管内砾石充填工艺实现过程示例图;Fig. 4 is an example diagram of the implementation process of the in-pipe gravel packing process using the embodiment of the present invention;

图5是图1的A-A线剖面示意图;Fig. 5 is the A-A line sectional schematic diagram of Fig. 1;

图6是图1的B-B线剖面示意图;Fig. 6 is the B-B line sectional schematic diagram of Fig. 1;

图7是图2的C-C线剖面示意图;Fig. 7 is the C-C line sectional schematic diagram of Fig. 2;

图8是图2的D-D线剖面示意图;Fig. 8 is a schematic cross-sectional view of the D-D line of Fig. 2;

图9是图3的E-E线剖面示意图;Fig. 9 is the E-E line sectional schematic diagram of Fig. 3;

图10是图3的F-F线剖面示意图。FIG. 10 is a schematic cross-sectional view taken along line F-F of FIG. 3 .

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present invention will be clearly and completely described below in conjunction with the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only part of the embodiments of the present invention, not all of them. example. Based on the embodiments of the present utility model, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the scope of protection of the present utility model.

本文中的左右位置关系是针对充填装置在水平井中的使用状态(即图3中的位置关系)而言的。The left-right positional relationship in this article is for the use state of the filling device in the horizontal well (ie the positional relationship in Figure 3).

如图1至图10所示,本实用新型实施例提出的用于水平井管内砾石充填的充填装置,其包括管内充填服务工具1和管内充填工具2。所述管内充填服务工具1,其上沿周向设有多个第一填充孔1a。所述管内充填工具2的内部连接着上述管内充填服务工具1,所述管内充填工具2包括上接头2a、充填开关组件2b、外套2c、定位环2d和下接头2e。所述上、下接头2a、2e分别连接在所述管内充填工具2的左、右两端,所述充填开关组件2b的左端连接上接头2a,充填开关组件2b的右端连接所述外套2c,所述下接头2e连接在所述外套2c的右端,所述定位环2d连接在外套2c上,并位于所述下接头2e的左侧,所述充填开关组件2b包括滑套2b1、多个第二填充孔2b2和充填筒2b3,滑套2b1位于第二填充孔2b2的径向内侧,所述第二填充孔2b2与第一填充孔1a相对应;通过所述管内充填服务工具1的作用,所述滑套2b1可轴向滑动,以打开或关闭第二填充孔1a。As shown in FIG. 1 to FIG. 10 , the packing device for gravel packing in a horizontal well pipe proposed by the embodiment of the utility model includes an in-pipe filling service tool 1 and an in-pipe filling tool 2 . The pipe filling service tool 1 is provided with a plurality of first filling holes 1a in the circumferential direction. The inside of the tube filling tool 2 is connected to the tube filling service tool 1, and the tube filling tool 2 includes an upper joint 2a, a filling switch assembly 2b, a jacket 2c, a positioning ring 2d and a lower joint 2e. The upper and lower joints 2a, 2e are respectively connected to the left and right ends of the in-pipe filling tool 2, the left end of the filling switch assembly 2b is connected to the upper joint 2a, and the right end of the filling switch assembly 2b is connected to the jacket 2c, The lower joint 2e is connected to the right end of the jacket 2c, the positioning ring 2d is connected to the jacket 2c, and is located on the left side of the lower joint 2e, and the filling switch assembly 2b includes a sliding sleeve 2b1, a plurality of first The second filling hole 2b2 and the filling cylinder 2b3, the sliding sleeve 2b1 is located on the radial inner side of the second filling hole 2b2, and the second filling hole 2b2 corresponds to the first filling hole 1a; through the action of the filling service tool 1 in the tube, The sliding sleeve 2b1 can slide axially to open or close the second filling hole 1a.

所述充填筒2b3的左端连接所述上接头2a,充填筒2b3的右端连接所述外套2c,所述充填筒2b3上设有所述第二填充孔2b2,所述滑套2b1可轴向滑动地连接于充填筒2b3的内侧,以打开或关闭第二填充孔2b2。The left end of the filling cylinder 2b3 is connected to the upper joint 2a, the right end of the filling cylinder 2b3 is connected to the outer casing 2c, the filling cylinder 2b3 is provided with the second filling hole 2b2, and the sliding sleeve 2b1 can slide axially ground connected to the inside of the filling cylinder 2b3 to open or close the second filling hole 2b2.

其中,所述定位环2d通过固定销钉2d1卡套在所述外套2c内;所述上接头2a用于连接管内砾石充填防砂管柱3,下接头2e用于连接管内砾石充填防砂管柱3。Wherein, the positioning ring 2d is clamped in the casing 2c through the fixing pin 2d1; the upper joint 2a is used to connect the gravel-packed sand control string 3 in the pipe, and the lower joint 2e is used to connect the gravel-packed sand control string 3 in the pipe.

本实施例中,当管内充填服务工具1进入管内充填工具2内时,其推动管内充填工具2的滑套2b1做轴向向右运动,使第二填充孔2b2打开,而第一、二填充孔1a、2b2相对应,可实现水平井管内的砾石充填。当填砂结束,管内充填服务工具1与管内充填工具2分离,滑套2b1失去了管内充填服务工具1的作用而做轴向向左运动,使第二填充孔2b2关闭。In this embodiment, when the tube filling service tool 1 enters the tube filling tool 2, it pushes the sliding sleeve 2b1 of the tube filling tool 2 to move axially to the right, so that the second filling hole 2b2 is opened, and the first and second filling holes The holes 1a and 2b2 correspond to each other, and can realize gravel packing in the horizontal well pipe. When the sand filling is finished, the pipe filling service tool 1 is separated from the pipe filling tool 2, and the sliding sleeve 2b1 loses the function of the pipe filling service tool 1 and moves axially to the left, so that the second filling hole 2b2 is closed.

所述充填开关组件2b还包括套管保护器2b4,所述套管保护器2b4连接所述充填筒2b3的右端,并位于所述外套2c的左方。进一步而言,所述套管保护器2b4为圆筒状,其螺纹连接于充填筒2b3的右端,其将经由第一、二充填孔1a、2b2流出的液体的径向运动转变为向左的轴向运动,避免了液体直接冲击完井管柱5,对完井管柱5起到保护作用。The filling switch assembly 2b also includes a bushing protector 2b4, the bushing protector 2b4 is connected to the right end of the filling cylinder 2b3 and is located on the left side of the casing 2c. Further, the sleeve protector 2b4 is cylindrical, and it is screwed to the right end of the filling cylinder 2b3, which converts the radial movement of the liquid flowing out through the first and second filling holes 1a, 2b2 to the left. The axial movement prevents the liquid from directly impacting the completion string 5, and protects the completion string 5.

所述充填筒2b3包括相互连接的第一筒体2b5和第二筒体2b6,所述第一筒体2b5位于第二筒体2b6的左侧,所述第一、二筒体2b5、2b6之间设置第二填充孔2b2,所述第一筒体2b5螺纹连接于上接头2a,第二筒体2b6螺纹连接于外套2c。其中,所述第二筒体2b6的内侧面与第一筒体2b5的内侧面平齐,即位于同一轴面上,第二筒体2b6的外侧面向外突出于第一筒体2b5的外侧面,所述套管保护器2b4的右端连接在第二筒体2b6的外部,套管保护器2b4的左端与第一筒体2b5的外部具有开口。The filling cylinder 2b3 includes a first cylinder body 2b5 and a second cylinder body 2b6 connected to each other. The first cylinder body 2b5 is located on the left side of the second cylinder body 2b6. A second filling hole 2b2 is arranged between them, the first cylindrical body 2b5 is screwed to the upper joint 2a, and the second cylindrical body 2b6 is screwed to the outer casing 2c. Wherein, the inner surface of the second cylindrical body 2b6 is flush with the inner surface of the first cylindrical body 2b5, that is, on the same axial plane, and the outer surface of the second cylindrical body 2b6 protrudes outward from the outer surface of the first cylindrical body 2b5. , the right end of the sleeve protector 2b4 is connected to the outside of the second cylinder 2b6, and the left end of the sleeve protector 2b4 has an opening with the outside of the first cylinder 2b5.

根据本实用新型的一个实施方式,所述滑套2b1具有圆筒体2b7和滑套突起2b8,所述滑套突起2b8连接在圆筒体2b7的右端,所述外套2b1的内部连接有弹簧2f,所述弹簧2f的两端分别顶抵于滑套突起2b8和所述定位环2d。其中,所述滑套2b1在弹簧2f的作用下,可简单、稳固地滑动设置于充填筒2b3的内侧。According to one embodiment of the present utility model, the sliding sleeve 2b1 has a cylindrical body 2b7 and a sliding sleeve protrusion 2b8, the sliding sleeve protrusion 2b8 is connected to the right end of the cylindrical body 2b7, and a spring 2f is connected inside the outer sleeve 2b1 , the two ends of the spring 2f abut against the sliding sleeve protrusion 2b8 and the positioning ring 2d respectively. Wherein, under the action of the spring 2f, the sliding sleeve 2b1 can be simply and firmly slidably disposed inside the filling cylinder 2b3.

所述充填筒2b3的内部的左端连接有密封圈2h。所述密封圈2h对充填筒2b3内表面与管内充填服务工具1的外表面之间的配合间隙起到密封作用。A sealing ring 2h is connected to the inner left end of the filling cylinder 2b3. The sealing ring 2h plays a role of sealing the fitting gap between the inner surface of the filling cylinder 2b3 and the outer surface of the in-pipe filling service tool 1 .

根据本实用新型的一个实施方式,配合图7所示,所述管内充填服务工具1包括充填管1b和导杆1c,所述充填管1b上设有所述第一充填孔1a,所述充填管1b的右端外部设有台阶1d,充填管1b的右端内部螺纹连接所述导杆1c,且所述导杆1c的左端位于第一充填孔1a的右方,导杆1c的右端呈锥体状,以起到引导所述管内充填服务工具1在井内下入的作用;随着所述管内充填服务工具1设入所述管内充填工具2内,所述台阶1d推动所述滑套2b1向右移动,以打开所述第二充填孔2b2。According to an embodiment of the present utility model, as shown in FIG. 7 , the pipe filling service tool 1 includes a filling pipe 1b and a guide rod 1c, the filling pipe 1b is provided with the first filling hole 1a, and the filling There is a step 1d on the outside of the right end of the tube 1b, the inside of the right end of the filling tube 1b is screwed to the guide rod 1c, and the left end of the guide rod 1c is located on the right of the first filling hole 1a, and the right end of the guide rod 1c is in the shape of a cone shape, so as to play the role of guiding the filling service tool 1 in the well; as the filling service tool 1 is set into the filling tool 2, the step 1d pushes the sliding sleeve 2b1 to Move right to open the second filling hole 2b2.

本实施例中,当管内充填服务工具1装入管内充填工具2时,台阶1d推动滑套2b1轴向向右滑动,在滑套2b1的左侧面越过充填筒2b3的第二筒体2b6的左侧面时,第二充填孔2b2处于完全打开状态,如图3所示;当管内充填服务工具1离开管内充填工具2时,滑套2b1失去台阶1d的推动力,并进一步在弹簧2f的作用下,滑套2b1轴向向左滑动,在滑套2b1的右端的滑套突起2b8的左侧面与第二筒体2b6的右侧面相接触时,即滑套2b1处于运动左极限状态,此时第二充填孔2b2处于关闭状态,如图1所示。In this embodiment, when the tube filling service tool 1 is installed into the tube filling tool 2, the step 1d pushes the sliding sleeve 2b1 to slide axially to the right, and passes over the second cylinder body 2b6 of the filling cylinder 2b3 on the left side of the sliding sleeve 2b1 On the left side, the second filling hole 2b2 is fully open, as shown in Figure 3; when the tube filling service tool 1 leaves the tube filling tool 2, the sliding sleeve 2b1 loses the driving force of the step 1d, and further moves under the spring 2f. Under the action, the sliding sleeve 2b1 slides axially to the left. When the left side of the sliding sleeve protrusion 2b8 at the right end of the sliding sleeve 2b1 contacts the right side of the second cylinder 2b6, the sliding sleeve 2b1 is in the left limit state of movement. At this time, the second filling hole 2b2 is in a closed state, as shown in FIG. 1 .

所述充填管1b的左端加工有油管内螺纹,用于连接填砂管柱4;充填管1b的右端加工有内螺纹,与导杆1c相连接。The left end of the filling pipe 1b is processed with an oil pipe internal thread for connecting the sand filling pipe string 4; the right end of the filling pipe 1b is processed with an internal thread for connecting with the guide rod 1c.

根据本实用新型的一个实施方式,所述导杆1c的左端设有圆锥体1e,对携砂液和砾石起到导向作用,利用反射效应,使充填管1b内携砂液和砾石的向右轴向流动转变为径向流动。According to one embodiment of the present utility model, the left end of the guide rod 1c is provided with a cone 1e, which guides the sand-carrying liquid and gravel, and uses the reflection effect to make the sand-carrying liquid and gravel in the filling pipe 1b move to the right. Axial flow is converted to radial flow.

配合图2、图6和图8所示,所述导杆1c的右端沿周向设有多个导向体1f,各导向体1f之间设有定位槽1g;所述定位环2d上设有定位键2d2,在管内充填服务工具1插设于管内充填工具2的状态下,所述定位键2d2插设于定位槽1g内,起到定位作用。As shown in Figure 2, Figure 6 and Figure 8, the right end of the guide rod 1c is provided with a plurality of guide bodies 1f along the circumference, and a positioning groove 1g is provided between each guide body 1f; a positioning key is provided on the positioning ring 2d 2d2, when the tube filling service tool 1 is inserted into the tube filling tool 2, the positioning key 2d2 is inserted into the positioning groove 1g to play a positioning role.

下面说明本实用新型实施例的工艺原理。The process principle of the utility model embodiment is described below.

如图4所示,所述管内充填工具2随管内砾石充填防砂管柱3一起先下入,下在水平井的底部。管内充填服务工具1安装在填砂管柱4的底部,随填砂管柱4一起下入。将管内充填服务工具1插入管内充填工具1内腔,在管内充填服务工具1的开启作用下,管内充填工具2的第二充填孔2b2打开,管内充填服务工具1的第一充填孔1a与管内充填工具2的第二充填孔2b2正对。As shown in FIG. 4 , the in-pipe filling tool 2 is lowered together with the in-pipe gravel-packed sand control string 3 at the bottom of the horizontal well. The pipe filling service tool 1 is installed at the bottom of the sand-filling pipe string 4 and is lowered together with the sand-filling pipe string 4 . Insert the in-pipe filling service tool 1 into the inner cavity of the in-pipe filling service tool 1. Under the opening action of the in-pipe filling service tool 1, the second filling hole 2b2 of the in-pipe filling tool 2 is opened, and the first filling hole 1a of the in-pipe filling service tool 1 is connected to the The second filling hole 2b2 of the filling tool 2 faces directly.

利用该充填装置可以实现水平井管内循环砾石充填和水平井管内挤压砾石充填。The packing device can realize circulating gravel packing in the horizontal well pipe and squeezing gravel packing in the horizontal well pipe.

以水平井管内循环砾石充填为例:打开地面套管闸门,在地面向填砂管柱4内泵注携砂液和砾石,携砂液带着砾石向下流动,依次经过管内充填服务工具1充填孔和管内充填工具2充填孔,流到完井管柱5与管内砾石充填防砂管柱3之间的环形空间;携砂液一边携带着砾石往防砂封隔器6的方向运动,一边向管内砾石充填防砂管柱3过滤,依次经管内砾石充填防砂管柱3与填砂管柱4之间的环形空间、技术套管7与填砂管柱4之间的环形空间返回到地面。而砾石则沉积于完井管柱5与管内砾石充填防砂管柱3之间的环形空间。从而实现水平井管内循环砾石充填。Take circulating gravel packing in a horizontal well pipe as an example: open the ground casing gate, pump sand-carrying fluid and gravel into the sand-packing pipe string 4 on the ground, the sand-carrying liquid flows downward with the gravel, and then pass through the pipe filling service tool 1 in sequence The filling hole and the filling tool 2 in the pipe flow into the annular space between the completion string 5 and the gravel-packed sand control string 3 in the pipe; the sand-carrying fluid moves toward the sand control packer 6 while carrying the gravel, The in-pipe gravel-packed sand control string 3 is filtered, and then returns to the ground through the annular space between the in-pipe gravel-packed sand control string 3 and the sand-packed string 4, and the annular space between the technical casing 7 and the sand-packed string 4. The gravel is deposited in the annular space between the completion string 5 and the gravel-packed sand control string 3 in the pipe. In this way, the circulating gravel packing in the horizontal well pipe is realized.

填砂结束,将填砂管柱4上提,管内充填服务工具1与管内充填工具2分离,使第二充填孔2b2关闭;从地面向技术套管7与填砂管柱4之间的环形空间泵注反洗液,反洗液向下运动,由于第二充填孔2b2关闭,反洗液只能经管内砾石充填防砂管柱3与填砂管柱4之间的环形空间流到管内充填服务工具1的第一充填孔1a,经管内充填服务工具1的第一充填孔1a进入填砂管柱4内,沿着填砂管柱4返回到地面,从而实现反洗。After the sand filling is completed, the sand filling string 4 is lifted up, the pipe filling service tool 1 is separated from the pipe filling tool 2, and the second filling hole 2b2 is closed; The backwash liquid is pumped into the space, and the backwash liquid moves downward. Since the second filling hole 2b2 is closed, the backwash liquid can only flow into the pipe for filling through the annular space between the gravel-packed sand control string 3 and the sand-packed string 4 in the pipe. The first filling hole 1a of the service tool 1 enters the sand-filling pipe string 4 through the first filling hole 1a of the service tool 1, and returns to the ground along the sand-filling pipe string 4, thereby realizing backwashing.

其中,完井管柱5的上端具有完井工具8。Wherein, the upper end of the well completion string 5 has a well completion tool 8 .

以上所述仅为本实用新型的几个实施例,本领域的技术人员依据本申请文件所公开的内容可以对本实用新型实施例进行各种改动,变型或组合而不脱离本实用新型的精神和范围。The above are only a few embodiments of the present utility model, and those skilled in the art can make various changes, modifications or combinations to the embodiments of the present utility model according to the contents disclosed in the application documents without departing from the spirit and spirit of the present utility model. scope.

Claims (7)

1.一种用于水平井管内砾石充填的充填装置,其特征在于,所述充填装置包括:1. A packing device for gravel packing in a horizontal well pipe, characterized in that, the packing device comprises: 管内充填服务工具,其上沿周向设有多个第一填充孔;The filling service tool in the pipe is provided with a plurality of first filling holes along the circumference; 管内充填工具,其内部连接着上述管内充填服务工具,所述管内充填工具包括上接头、充填开关组件、外套、定位环和下接头,所述上、下接头分别连接在所述管内充填工具的左、右两端,所述充填开关组件的左端连接上接头,充填开关组件的右端连接所述外套,所述下接头连接在所述外套的右端,所述定位环连接在外套上,并位于所述下接头的左侧,所述充填开关组件包括充填筒、滑套和多个第二填充孔,所述充填筒的左端连接所述上接头,所述充填筒的内部的左端连接有密封圈,充填筒的右端连接所述外套,所述充填筒上设有所述第二填充孔,所述滑套位于第二填充孔的径向内侧,所述第二填充孔与第一填充孔相对应;通过所述管内充填服务工具,所述滑套可轴向滑动地连接于充填筒的内侧,以打开或关闭第二填充孔。An in-pipe filling tool, which is connected to the above-mentioned in-pipe filling service tool, the in-pipe filling tool includes an upper joint, a filling switch assembly, a jacket, a positioning ring and a lower joint, and the upper and lower joints are respectively connected to the inner pipe filling tool Left and right ends, the left end of the filling switch assembly is connected to the upper joint, the right end of the filling switch assembly is connected to the jacket, the lower joint is connected to the right end of the jacket, the positioning ring is connected to the jacket, and is located On the left side of the lower joint, the filling switch assembly includes a filling cylinder, a sliding sleeve and a plurality of second filling holes, the left end of the filling cylinder is connected to the upper joint, and the inner left end of the filling cylinder is connected with a sealing The right end of the filling cylinder is connected to the jacket, the filling cylinder is provided with the second filling hole, the sliding sleeve is located on the radial inner side of the second filling hole, the second filling hole is connected to the first filling hole Correspondingly: through the tube filling service tool, the sliding sleeve can be axially slidably connected to the inner side of the filling cylinder to open or close the second filling hole. 2.根据权利要求1所述的用于水平井管内砾石充填的充填装置,其特征在于,所述滑套具有圆筒体和滑套突起,所述滑套突起连接在圆筒体的右端,所述外套的内部连接有弹簧,所述弹簧的两端分别顶抵于滑套突起和所述定位环。2. The packing device for gravel packing in a horizontal well pipe according to claim 1, wherein the sliding sleeve has a cylindrical body and a sliding sleeve protrusion, and the sliding sleeve protrusion is connected to the right end of the cylindrical body, A spring is connected to the inside of the outer sleeve, and the two ends of the spring abut against the protrusion of the sliding sleeve and the positioning ring respectively. 3.根据权利要求1所述的用于水平井管内砾石充填的充填装置,其特征在于,所述充填开关组件还包括套管保护器,所述套管保护器连接所述充填筒的右端,并位于所述外套的左方。3. The packing device for gravel packing in a horizontal well pipe according to claim 1, characterized in that, the filling switch assembly further comprises a casing protector connected to the right end of the packing cylinder, and located to the left of said jacket. 4.根据权利要求3所述的用于水平井管内砾石充填的充填装置,其特征在于,所述充填筒包括相互连接的第一筒体和第二筒体,所述第一筒体位于第二筒体的左侧,所述第一、二筒体之间设置所述第二填充孔,所述第二筒体的内侧面与第一筒体的内侧面平齐,第二筒体的外侧面向外突出于第一筒体的外侧面,所述套管保护器的右端连接在第二筒体的外部,套管保护器的左端与第一筒体的外部具有开口。4. The packing device for gravel packing in a horizontal well pipe according to claim 3, wherein the packing cylinder comprises a first cylinder and a second cylinder connected to each other, and the first cylinder is located at the second On the left side of the second cylinder, the second filling hole is arranged between the first and second cylinders, the inner surface of the second cylinder is flush with the inner surface of the first cylinder, and the inner surface of the second cylinder is The outer surface protrudes outward from the outer surface of the first cylinder, the right end of the sleeve protector is connected to the outside of the second cylinder, and the left end of the sleeve protector has an opening with the outside of the first cylinder. 5.根据权利要求1所述的用于水平井管内砾石充填的充填装置,其特征在于,所述管内充填服务工具包括充填管和导杆,所述充填管上设有所述第一充填孔,所述充填管的右端外部设有台阶,充填管的右端内部螺纹连接所述导杆,且所述导杆的左端位于第一充填孔的右方,导杆的右端呈锥体状;随着所述管内充填服务工具设入所述管内充填工具内,所述台阶推动所述滑套向右移动,以打开所述第二充填孔。5. The packing device for gravel packing in horizontal well pipe according to claim 1, characterized in that, the service tool for packing in pipe comprises a packing pipe and a guide rod, and the packing pipe is provided with the first packing hole , the right end of the filling pipe is provided with a step outside, the right end of the filling pipe is internally threaded to the guide rod, and the left end of the guide rod is located on the right of the first filling hole, and the right end of the guide rod is in the shape of a cone; As the in-pipe filling service tool is set into the in-pipe filling tool, the step pushes the sliding sleeve to move to the right to open the second filling hole. 6.根据权利要求5所述的用于水平井管内砾石充填的充填装置,其特征在于,所述导杆的左端设有圆锥体。6. The packing device for gravel packing in a horizontal well pipe according to claim 5, wherein a cone is provided at the left end of the guide rod. 7.根据权利要求5所述的用于水平井管内砾石充填的充填装置,其特征在于,所述导杆的右端沿周向设有多个导向体,各导向体之间设有定位槽,所述定位环上设有定位键;在所述管内充填服务工具插设于所述管内充填工具的状态下,所述定位键插设于定位槽内。7. The packing device for gravel packing in a horizontal well pipe according to claim 5, characterized in that, the right end of the guide rod is provided with a plurality of guide bodies along the circumference, and positioning grooves are arranged between each guide body. A positioning key is provided on the positioning ring; when the in-tube filling service tool is inserted into the in-tube filling tool, the positioning key is inserted in the positioning groove.
CN 201320153549 2013-03-29 2013-03-29 Packing device for gravel packing in horizontal well pipe Expired - Fee Related CN203239299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320153549 CN203239299U (en) 2013-03-29 2013-03-29 Packing device for gravel packing in horizontal well pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320153549 CN203239299U (en) 2013-03-29 2013-03-29 Packing device for gravel packing in horizontal well pipe

Publications (1)

Publication Number Publication Date
CN203239299U true CN203239299U (en) 2013-10-16

Family

ID=49316609

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320153549 Expired - Fee Related CN203239299U (en) 2013-03-29 2013-03-29 Packing device for gravel packing in horizontal well pipe

Country Status (1)

Country Link
CN (1) CN203239299U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291255A (en) * 2013-03-29 2013-09-11 中国石油天然气股份有限公司 Packing device for gravel packing in horizontal well pipe
CN104879099A (en) * 2015-04-28 2015-09-02 中国海洋石油总公司 Gravel packing pipe column and gravel packing method
CN105484708A (en) * 2015-12-30 2016-04-13 中国石油天然气股份有限公司 Rotary Sleeve Bottom Packing Device for Gravel Packing

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291255A (en) * 2013-03-29 2013-09-11 中国石油天然气股份有限公司 Packing device for gravel packing in horizontal well pipe
CN104879099A (en) * 2015-04-28 2015-09-02 中国海洋石油总公司 Gravel packing pipe column and gravel packing method
CN104879099B (en) * 2015-04-28 2017-11-10 中国海洋石油总公司 Gravel fills tubing string and gravel pack methods
CN105484708A (en) * 2015-12-30 2016-04-13 中国石油天然气股份有限公司 Rotary Sleeve Bottom Packing Device for Gravel Packing

Similar Documents

Publication Publication Date Title
CN103291255A (en) Packing device for gravel packing in horizontal well pipe
CN203285408U (en) High pressure layered water injection string
CN204252931U (en) A water injection packer
CN108386155B (en) Double-eccentric integrated packer for water injection well of oil field
CN203239299U (en) Packing device for gravel packing in horizontal well pipe
CN201650147U (en) Hydraulic casing centralizer
CN204252969U (en) Sand control string and production string
CN105464609A (en) Well flushing valve
CN204457580U (en) Composite packer
CN104074487B (en) Drawing type packer
CN206830131U (en) A kind of sand settling constant pressure check valve for water injection well
CN205297410U (en) a well flushing valve
CN207177825U (en) Bypass valves and fracturing strings used in fracturing strings
CN206309331U (en) Casing hanger
CN106321035B (en) A full wellbore anti-reflection layered water injection string
CN205669389U (en) One exempts from brill formula cementing device
CN105221100B (en) A kind of non-tubing string motion is repeatable to set deblocking packer
CN108590596A (en) Layered sand control pipe string and sand control method for vertical wells
CN203394467U (en) Horizontal Well Segmented Gravel Pack Service Tool
CN204646205U (en) Thermal production well separate-layer fracturing sand control string
CN217176566U (en) Cementing plug slide valve and cementing plug tubular column
CN103132944A (en) Hydraulic Small Diameter Packer for Sand Control
CN206957637U (en) Sand-retaining packer combination for sand control in water injection wells
CN111502608A (en) Preset downhole filter and water filtering method
CN204113214U (en) An oil-jacket communication switch valve

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20131016

Termination date: 20210329

CF01 Termination of patent right due to non-payment of annual fee