CN203223203U - Hanging packer for open hole completion pipe string - Google Patents
Hanging packer for open hole completion pipe string Download PDFInfo
- Publication number
- CN203223203U CN203223203U CN 201320199426 CN201320199426U CN203223203U CN 203223203 U CN203223203 U CN 203223203U CN 201320199426 CN201320199426 CN 201320199426 CN 201320199426 U CN201320199426 U CN 201320199426U CN 203223203 U CN203223203 U CN 203223203U
- Authority
- CN
- China
- Prior art keywords
- ring
- sleeve
- rubber
- cone
- piston
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Landscapes
- Earth Drilling (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及油气田裸眼水平井多段压裂技术领域,特别涉及一种裸眼完井管柱用悬挂封隔器。 The utility model relates to the technical field of multi-stage fracturing of open-hole horizontal wells in oil and gas fields, in particular to a suspension packer for an open-hole completion pipe string.
背景技术 Background technique
裸眼水平井多层压裂技术是一项先进的完井技术,是低压、低渗透油气藏开发的重要增产措施之一,它具有封堵效果好、井下工具少、作业针对性强、施工成本低等优点。裸眼完井可以更好地实现全水平段的泄油气,该技术目前已在国外得到广泛应用。水平裸眼井多级压裂目前已经是北美页岩气压裂开采主要技术手段。 The open-hole horizontal well multi-layer fracturing technology is an advanced well completion technology and one of the important production stimulation measures for the development of low-pressure and low-permeability oil and gas reservoirs. low merit. Open hole completion can better realize oil and gas drainage in the entire horizontal section, and this technology has been widely used abroad. Horizontal open-hole multi-stage fracturing is currently the main technical method for shale gas fracturing in North America.
裸眼水平井多级压裂技术一般采用裸眼封隔器分段封隔。根据页岩气储层开发的需要,使用封隔器将水平井段分隔成若干段,水力压裂施工时水平段最尾端滑套为压力开启式滑套,其它滑套通过投球打开,从水平段尾端第二级开始逐级投球,进行有针对性的压裂施工。 Open-hole horizontal well multi-stage fracturing technology generally uses open-hole packers to isolate in stages. According to the needs of shale gas reservoir development, a packer is used to divide the horizontal well section into several sections. During hydraulic fracturing, the sliding sleeve at the end of the horizontal section is a pressure-opening sliding sleeve, and the other sliding sleeves are opened by throwing a ball. The second stage at the end of the horizontal section began to throw balls step by step for targeted fracturing construction.
在裸眼压裂完井管柱中,悬挂封隔器在悬挂整个尾管串的同时还要保证其在直井段套管内耐温耐压性能,达到悬挂尾管重量和密封的目的,同时悬挂封隔器需要保持最大内通径以便尽可能多的通过压裂球达到压裂的层数最大化。 In the open-hole fracturing completion string, the hanging packer must not only suspend the entire liner string, but also ensure its temperature and pressure resistance in the casing of the vertical well section, so as to achieve the purpose of hanging the liner weight and sealing. The spacer needs to maintain the largest internal diameter so that as many frac balls as possible can pass through the frac ball to maximize the number of fractured layers.
而普通的封隔器的产品性能不能满足悬挂尾管及密封大尺寸套管和保持最大内通径的要求。为此,研制了适用于裸眼水平井完井管柱直井段新型的悬挂封隔器,使其在裸眼水平井分段压裂改造中更具实用性。 However, the product performance of ordinary packers cannot meet the requirements of hanging the liner, sealing the large-size casing and maintaining the maximum internal diameter. For this reason, a new type of suspension packer suitable for the vertical section of the completion string in open-hole horizontal wells has been developed to make it more practical in the staged fracturing of open-hole horizontal wells.
发明内容 Contents of the invention
本实用新型的目的在于克服上述不足,提供一种裸眼完井管柱用悬挂封隔器,其锚定性能可靠,保证封隔器耐高温高压,能可靠地密封大尺寸套管,最大内通径能保证通过20个压裂球达到压裂层数最大化。 The purpose of the utility model is to overcome the above-mentioned shortcomings, and provide a suspension packer for open hole well completion strings, which has reliable anchoring performance, ensures that the packer can withstand high temperature and high pressure, can reliably seal large-size casing, and has the largest internal passage. The diameter can ensure that the number of fracturing layers is maximized through 20 fracturing balls.
为实现上述技术目的,本实用新型提供的方案是:一种裸眼完井管柱用悬挂封隔器,包括中心管和设置于中心管上的胶筒,其中,所述中心管的下端与下接头螺纹连接,并且用紧盯销钉固定;中心管和下接头连成的整体从上到下依次装有上导环、上卡瓦、上锥体、上外背圈、上内背圈、下内背圈、下外背圈、下锥体、下卡瓦、锁环套、上活塞、劈环套、劈环、下活塞、上坐封套、下坐封套和下导环;所述上导环与中心管螺纹连接且用紧盯销钉固定;所述上卡瓦和上锥体轴向套在中心管上,上卡瓦一端接触上导环和中心管台阶,另一端与上锥体接触,上锥体通过剪切销钉固定在中心管上;所述中心管和胶筒之间设有承留环,该承留环在胶筒中部且与中心管用“O”型圈密封,胶筒两端分别套入上内背圈、下内背圈、上外背圈、下外背圈构成胶筒总成,该胶筒总成套于中心管上,上外背圈与上锥体接触,下锥体和下卡瓦轴向套在中心管上,下锥体一端与下外背圈接触且通过剪切销钉固定在中心管上;所述锁环套通过锁环与中心管连接,并由剪切销钉与中心管固定,锁环套上端面与下卡瓦端面接触;所述上活塞与中心管之间通过“O”型圈滑动密封连接;所述劈环套与下活塞通过劈环固定在中心管上,下活塞通过“O”型圈密封中心管;所述上坐封套与上活塞螺纹连接,上坐封套、上活塞和下活塞均通过“O”型圈与中心管滑动密封连接;所述下坐封套与上坐封套螺纹连接,下坐封套与上坐封套、下接头之间均为滑动密封连接;所述下导环与中心管螺纹连接且用紧盯销钉固定。 In order to achieve the above technical purpose, the utility model provides a solution: a suspension packer for an open hole well completion string, including a central pipe and a rubber sleeve arranged on the central pipe, wherein the lower end of the central pipe is connected to the lower end of the central pipe. The joints are threaded and fixed with fastening pins; the whole connected by the center pipe and the lower joint is equipped with an upper guide ring, an upper slip, an upper cone, an upper outer back ring, an upper inner back ring, and a lower joint from top to bottom. Inner back ring, lower outer back ring, lower cone, lower slips, lock ring sleeve, upper piston, split ring sleeve, split ring, lower piston, upper set cover, lower set cover and lower guide ring; the upper guide The ring is threaded with the center pipe and fixed with pins; the upper slip and the upper cone are axially sleeved on the center pipe, one end of the upper slip contacts the upper guide ring and the step of the center pipe, and the other end contacts the upper cone , the upper cone is fixed on the central tube by shearing pins; there is a retaining ring between the central tube and the rubber tube, the retaining ring is in the middle of the rubber tube and is sealed with the central tube with an "O" ring, and the rubber tube The two ends are respectively inserted into the upper inner back ring, lower inner back ring, upper outer back ring, and lower outer back ring to form a rubber cartridge assembly. The rubber cartridge assembly is set on the central tube, and the upper outer back ring is in contact with the upper cone. The lower cone and the lower slips are axially sleeved on the center tube, one end of the lower cone is in contact with the lower outer backing ring and fixed on the center tube through shear pins; the lock ring sleeve is connected with the center tube through a lock ring, and The shear pin and the center tube are fixed, and the upper end surface of the lock ring sleeve is in contact with the end surface of the lower slip; the upper piston and the center tube are connected in a sliding and sealed manner through an "O" ring; the split ring sleeve and the lower piston are connected through a split The ring is fixed on the central tube, and the lower piston seals the central tube through the "O" ring; the upper setting sleeve is threadedly connected with the upper piston, and the upper setting sleeve, upper piston and lower piston all slide through the "O" ring and the central tube Sealed connection; the lower set cover is threadedly connected with the upper set cover, and the lower set cover, the upper set cover and the lower joint are all in sliding and sealed connection; the lower guide ring is threaded with the central pipe and fixed with pins.
而且,所述中心管上具有径向的第一传压孔和第二传压孔,第一传压孔位于上活塞和劈环套之间,第二传压孔位于上坐封套和下接头之间。 Moreover, the central pipe has a radial first pressure transmission hole and a second pressure transmission hole, the first pressure transmission hole is located between the upper piston and the split ring sleeve, and the second pressure transmission hole is located between the upper setting sleeve and the lower joint between.
而且,所述中心管上端为马牙扣内螺纹结构。 Moreover, the upper end of the central pipe is a horse-tooth button internal thread structure.
而且,所述上锥体和上卡瓦锥面配合,下锥体和下卡瓦锥面配合。 Moreover, the upper cone cooperates with the upper slip cone surface, and the lower cone cooperates with the lower slip cone surface.
而且,所述胶筒总成的上内背圈和下内背圈之间设有上橡胶套挡圈和下橡胶套挡圈;所述胶筒总成的上外背圈和上内背圈构成软金属环背圈,所述胶筒总成的下外背圈和下内背圈构成软金属环背圈。 Moreover, an upper rubber sleeve retaining ring and a lower rubber sleeve retaining ring are arranged between the upper inner back ring and the lower inner back ring of the rubber cartridge assembly; the upper outer back ring and the upper inner back ring of the rubber cartridge assembly A soft metal ring backing ring is formed, and the lower outer backing ring and the lower inner backing ring of the rubber cartridge assembly form a soft metal ring backing ring.
而且,所述胶筒的中间部位设置胶筒承留环,该胶筒承留环的内孔中间设有“O”型圈,其支撑胶筒心部利于胶筒膨胀。胶筒承留环是铸铁材质。 Moreover, a rubber cartridge retaining ring is arranged in the middle of the rubber cartridge, and an "O" ring is provided in the middle of the inner hole of the rubber cartridge retaining ring, which supports the center of the rubber cartridge to facilitate the expansion of the rubber cartridge. The cartridge retaining ring is cast iron.
而且,所述中心管上与锁环套接触的部分设有引导锁环套上行的锯齿状螺纹,且只能上行,不能下行。 Moreover, the part of the central tube that is in contact with the lock ring sleeve is provided with a serrated thread that guides the lock ring sleeve to go up, and can only go up, but not down.
而且,所述锁环采用单切口的内外齿结构,锁环套通过剪切销钉固定在锁环的切口槽内。锁环伴随锁环套传递压力,上行且将压力锁定在中心管上。 Moreover, the lock ring adopts a single-slit internal and external tooth structure, and the lock ring sleeve is fixed in the notch groove of the lock ring by shear pins. The lock ring transmits pressure with the lock ring sleeve, goes up and locks the pressure on the center tube.
而且,所述劈环为开口C环或2片C环组成。 Moreover, the split ring is composed of an open C ring or two pieces of C rings.
而且,所述上坐封套、上活塞和下活塞与中心管滑动密封连接的“O”型圈两端具有“O”型圈背圈,可达到良好滑动密封的性能。该“O”型圈背圈是聚四氟乙烯材质。 Moreover, the two ends of the "O" ring that are slidingly and sealingly connected with the center pipe by the upper setting sleeve, the upper piston and the lower piston have "O" ring back rings, which can achieve good sliding sealing performance. The "O" ring backing is made of PTFE.
本实用新型的裸眼完井管柱用悬挂封隔器设置了两个液压缸和两个活塞,当封隔器下入到设计层位后,通过管内打压,驱动两级活塞剪断锁环套上剪切销钉同时上行,挤压密封胶筒,撑破卡瓦咬合套管,锁环锁紧压力,实现可靠锚定和密封。该工具保证封隔器耐高温高压,可靠密封大尺寸套管,最大内通径能保证通过20个压裂球达到压裂层数最大化。 Two hydraulic cylinders and two pistons are installed in the suspension packer for the open hole completion pipe string of the utility model. When the packer is lowered to the design level, the two-stage piston is driven to cut off the lock ring sleeve by pressing inside the pipe. The shearing pin moves upward at the same time, squeezes the sealing rubber tube, breaks the slips and occludes the casing, and the lock ring locks the pressure to achieve reliable anchoring and sealing. This tool ensures that the packer is resistant to high temperature and high pressure, and can reliably seal large-size casings. The maximum internal diameter can ensure the maximum number of fracturing layers through 20 fracturing balls.
附图说明 Description of drawings
图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.
图2是图1中A部分放大图。 Fig. 2 is an enlarged view of part A in Fig. 1 .
图3是图1中B部分放大图。 Fig. 3 is an enlarged view of part B in Fig. 1 .
图4是图1中C部分放大图。 Fig. 4 is an enlarged view of part C in Fig. 1 .
其中,1、中心管,2、上导环,3、第一紧盯销钉,4、上卡瓦,5、上锥体,6、第一剪切销钉,7、上外背圈,8、上内背圈,9、上橡胶套挡圈,10、胶筒承留环,11、第一“O”型圈,12、胶筒,13、下橡胶套挡圈,14、下内背圈,15、下外背圈,16、下锥体,17、下卡瓦,18、锁环,19、第二紧盯销钉,20、锁环套,21、第二剪切销钉,22、上活塞,23、第二“O”型圈,24、第三“O”型圈,25、“O”型圈背圈,26、劈环套,27、劈环,28、下活塞,29、上坐封套,30、第三紧盯销钉,31、下坐封套,32、下导环,33、下接头,34、第一传压孔,35、第二传压孔。 Among them, 1. Center tube, 2. Upper guide ring, 3. First fastening pin, 4. Upper slip, 5. Upper cone, 6. First shear pin, 7. Upper outer back ring, 8. Upper inner back ring, 9. Upper rubber sleeve retaining ring, 10. Rubber sleeve retaining ring, 11. First "O" ring, 12. Rubber sleeve, 13. Lower rubber sleeve retaining ring, 14. Lower inner back ring , 15, the lower outer back ring, 16, the lower cone, 17, the lower slip, 18, the lock ring, 19, the second fastening pin, 20, the lock ring sleeve, 21, the second shear pin, 22, the upper Piston, 23, second "O" ring, 24, third "O" ring, 25, "O" ring back ring, 26, split ring sleeve, 27, split ring, 28, lower piston, 29, Last set cover, 30, the third staring at pin, 31, set cover under, 32, lower guide ring, 33, lower joint, 34, the first pressure transmission hole, 35, the second pressure transmission hole.
具体实施方式 Detailed ways
下面结合附图及实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.
本实施例提供一种裸眼完井管柱用悬挂封隔器,包括中心管1和设置于中心管1上的胶筒12,如图1所示,所述中心管1的下端与下接头33螺纹连接,并且用紧盯销钉固定防松;中心管1和下接头33连成的整体从上到下依次装有上导环2、上卡瓦4、上锥体5、上外背圈7、上内背圈8、下内背圈14、下外背圈15、下锥体16、下卡瓦17、锁环套20、上活塞22、劈环套26、劈环27、下活塞28、上坐封套29、下坐封套31和下导环32;所述上导环2与中心管1螺纹连接且用第一紧盯销钉3固定防松;所述上卡瓦4和上锥体5轴向套在中心管1上,上卡瓦4一端接触上导环2和中心管台阶,另一端与上锥体5接触,上锥体5通过第一剪切销钉6固定在中心管1上;所述中心管1和胶筒12之间设有承留环10,该承留环10在胶筒12中部且与中心管1用第一“O”型圈11密封,胶筒12两端分别套入上内背圈8、下内背圈14、上外背圈7、下外背圈15构成胶筒总成,该胶筒总成套于中心管1上,上外背圈7与上锥体5接触,下锥体16和下卡瓦17轴向套在中心管1上,下锥体16一端与下外背圈15接触且通过第一剪切销钉6固定在中心管1上;所述锁环套20通过锁环18与中心管1连接,并由第二剪切销钉21与中心管1固定防转,锁环套20上端面与下卡瓦17端面接触;所述上活塞22与中心管1之间通过第二“O”型圈23滑动密封连接;所述劈环套26与下活塞28通过劈环27固定在中心管1上,下活塞28通过第二“O”型圈23密封中心管1;所述上坐封套29与上活塞22螺纹连接,上坐封套29、上活塞22和下活塞28均与中心管1通过第二“O”型圈23滑动密封连接;所述下坐封套31与上坐封套29螺纹连接,下坐封套31与上坐封套29、下接头33之间均通过第三“O”型圈24与滑动密封连接;所述下导环32与中心管1螺纹连接且用第三紧盯销钉30固定防松。
This embodiment provides a suspension packer for an open-hole completion string, including a center pipe 1 and a
进一步的,上述中心管1上具有径向的第一传压孔34和第二传压孔35,第一传压孔34位于上活塞22和劈环套26之间,第二传压孔35位于上坐封套29和下接头33之间。
Further, the central pipe 1 has a radial first
进一步的,上述中心管1上端为马牙扣内螺纹结构,便于悬挂封隔器的送入和转为生产管柱的回接。 Further, the upper end of the above-mentioned central pipe 1 has a horsetooth internal thread structure, which is convenient for the feeding of the suspension packer and the tie-back of the production string.
进一步的,上述上锥体5和上卡瓦4锥面配合,下锥体16和下卡瓦17锥面配合。
Further, the above-mentioned
进一步的,上述胶筒总成的上内背圈8和下内背圈14之间设有上橡胶套挡圈9和下橡胶套挡圈13。
Further, an upper rubber
进一步的,上述胶筒总成的上外背圈7和上内背圈8构成软金属环背圈;所述胶筒总成的下外背圈15和下内背圈14构成软金属环背圈。
Further, the upper
进一步的,上述胶筒12中间部位设置由铸铁材质制作的胶筒承留环10,胶筒承留环10内孔中间设有第一“O”型圈11,其支撑胶筒心部利于胶筒膨胀。
Further, the middle part of the above-mentioned
进一步的,上述中心管1上与锁环套20接触的部分设有引导锁环套20上行的锯齿状螺纹,且只允许锁环套20上行。
Further, the part of the central tube 1 that is in contact with the
进一步的,上述锁环18采用单切口的内外齿结构,锁环套20通过第二紧盯销钉19固定在锁环18的切口槽内,防止锁环套20上行过程中,锁环18在锁环套20内转动。锁环18伴随锁环套20传递压力,上行且将压力锁定在中心管1上。
Further, the above-mentioned
进一步的,上述劈环27为开口C环或2片C环组成,用于固定下活塞28。
Further, the above-mentioned
进一步的,上述第三“O”型圈24两端具有由聚四氟乙烯制作的“O”型圈背圈25。第三“O”型圈24两端配有“O”型圈背圈25能达到良好滑动密封的性能。
Further, both ends of the third "O"
本实用新型的工作原理为:利用配套的插管或球座在封隔器内孔处形成密封,从油管内打压,液体通过悬挂封隔器的第一传压口和第二传压口在上活塞22和上坐封套29上产生轴向向上的推力,作用于锁环套20,达到启动压力剪断锁环套20上第二剪切销钉21带动锁环18一起上行,上行挤压下卡瓦17,下卡瓦17将力传递给下锥体16,到达一定力值剪断下锥体16上第一剪切销钉6,下锥体16上行挤压胶筒12和上锥体5,到达一定力值剪断上锥体5上的第一剪切销钉6,下锥体16上行挤压上卡瓦4,上卡瓦4破裂咬合套管,胶筒12继续膨胀,下卡瓦17继续上行,上行一定程度后,胶筒12膨胀密封套管,下卡瓦17咬合套管,完成坐封;同时封隔器内部的锁环18锁住坐封力,维持卡瓦和胶套的座封。
The working principle of the utility model is: use the matching intubation tube or ball seat to form a seal at the inner hole of the packer, pressurize from the oil pipe, and the liquid passes through the first pressure transmission port and the second pressure transmission port of the suspension packer in the The
以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进或变形,这些改进或变形也应视为本实用新型的保护范围。 The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements or deformations can also be made, these improvements or Deformation should also be regarded as the protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320199426 CN203223203U (en) | 2013-04-19 | 2013-04-19 | Hanging packer for open hole completion pipe string |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 201320199426 CN203223203U (en) | 2013-04-19 | 2013-04-19 | Hanging packer for open hole completion pipe string |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN203223203U true CN203223203U (en) | 2013-10-02 |
Family
ID=49250208
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 201320199426 Expired - Lifetime CN203223203U (en) | 2013-04-19 | 2013-04-19 | Hanging packer for open hole completion pipe string |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN203223203U (en) |
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103195389A (en) * | 2013-04-19 | 2013-07-10 | 四机赛瓦石油钻采设备有限公司 | Suspension packer for open hole well completion |
| CN103835675A (en) * | 2014-03-18 | 2014-06-04 | 四机赛瓦石油钻采设备有限公司 | Long-rubber-sleeve compression type open hole packer |
| CN104727776A (en) * | 2015-02-12 | 2015-06-24 | 中国海洋石油总公司 | Hanging packer for horizontal well multistage fracturing |
| CN111749639A (en) * | 2019-03-28 | 2020-10-09 | 东营市汇诚石油工程技术有限责任公司 | Naked eye plugging device |
| CN114809976A (en) * | 2021-01-21 | 2022-07-29 | 中国石油天然气股份有限公司 | Soluble packer and multistage sliding sleeve fracturing string |
| GB2638513A (en) * | 2023-10-31 | 2025-08-27 | Franks Int Llc | Shearable lock mechanism for storm packer anchor |
-
2013
- 2013-04-19 CN CN 201320199426 patent/CN203223203U/en not_active Expired - Lifetime
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103195389A (en) * | 2013-04-19 | 2013-07-10 | 四机赛瓦石油钻采设备有限公司 | Suspension packer for open hole well completion |
| CN103195389B (en) * | 2013-04-19 | 2015-09-16 | 四机赛瓦石油钻采设备有限公司 | A kind of suspension packer for open hole well completion |
| CN103835675A (en) * | 2014-03-18 | 2014-06-04 | 四机赛瓦石油钻采设备有限公司 | Long-rubber-sleeve compression type open hole packer |
| CN103835675B (en) * | 2014-03-18 | 2017-01-25 | 四机赛瓦石油钻采设备有限公司 | Long-rubber-sleeve compression type open hole packer |
| CN104727776A (en) * | 2015-02-12 | 2015-06-24 | 中国海洋石油总公司 | Hanging packer for horizontal well multistage fracturing |
| CN111749639A (en) * | 2019-03-28 | 2020-10-09 | 东营市汇诚石油工程技术有限责任公司 | Naked eye plugging device |
| CN111749639B (en) * | 2019-03-28 | 2024-05-07 | 东营市汇诚石油工程技术有限责任公司 | Naked eye plugging device |
| CN114809976A (en) * | 2021-01-21 | 2022-07-29 | 中国石油天然气股份有限公司 | Soluble packer and multistage sliding sleeve fracturing string |
| CN114809976B (en) * | 2021-01-21 | 2023-12-22 | 中国石油天然气股份有限公司 | Soluble packer and multi-stage sliding sleeve fracturing string |
| GB2638513A (en) * | 2023-10-31 | 2025-08-27 | Franks Int Llc | Shearable lock mechanism for storm packer anchor |
| US12460494B2 (en) | 2023-10-31 | 2025-11-04 | Frank's International, Llc | Shearable lock mechanism for storm packer anchor |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN203223203U (en) | Hanging packer for open hole completion pipe string | |
| CN202181876U (en) | Drillable Composite Bridge Plug | |
| CN104213864B (en) | Protective device for packer rubber tube | |
| CN103195389B (en) | A kind of suspension packer for open hole well completion | |
| CN205117285U (en) | Time delay starts fracturing sliding sleeve | |
| CN202125287U (en) | Anchor fluke type sliding sleeve opening tool | |
| CN103422846B (en) | Open hole horizontal well completion and fracturing integrated string | |
| CN204532243U (en) | A kind of big orifice press-fracturing bridge plug | |
| CN103410491B (en) | Reducer sleeve | |
| CN104500015B (en) | Staged fracturing acidification controllable setting packer for oil-gas well | |
| CN103266865B (en) | A kind of big orifice packer for oil well | |
| CN105672947B (en) | A kind of novel sliding sleeve opens sliding sleeve tool and fracturing string | |
| CN201818277U (en) | Compression type open hole packer | |
| CN103806864B (en) | Hydraulic setting small diameter tubing bridge plug | |
| CN103835675B (en) | Long-rubber-sleeve compression type open hole packer | |
| CN102071901A (en) | Horizontal Well High Pressure Packer for Reservoir Stimulation | |
| CN105134131B (en) | A cementing casing or tubing sliding sleeve with unlimited segments and clusters | |
| CN207296937U (en) | Hydraulic tubing anchoring device for high-pressure oil and gas wells | |
| CN201778750U (en) | hanging frac packer | |
| CN206617134U (en) | Packer | |
| CN104847301B (en) | Open hole packer | |
| CN107542418A (en) | High-pressure oil-gas well hydraulic oil pipe anchoring device and its method of work | |
| CN204677182U (en) | Differential full-bore well cementation sliding sleeve | |
| CN204252980U (en) | A layered water injection string | |
| CN203420698U (en) | Open hole horizontal well completion and fracturing integrated string |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| AV01 | Patent right actively abandoned |
Granted publication date: 20131002 Effective date of abandoning: 20150916 |
|
| RGAV | Abandon patent right to avoid regrant |