[go: up one dir, main page]

CN203223203U - Hanging packer for open hole completion pipe string - Google Patents

Hanging packer for open hole completion pipe string Download PDF

Info

Publication number
CN203223203U
CN203223203U CN 201320199426 CN201320199426U CN203223203U CN 203223203 U CN203223203 U CN 203223203U CN 201320199426 CN201320199426 CN 201320199426 CN 201320199426 U CN201320199426 U CN 201320199426U CN 203223203 U CN203223203 U CN 203223203U
Authority
CN
China
Prior art keywords
ring
sleeve
rubber
cone
piston
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320199426
Other languages
Chinese (zh)
Inventor
陈方利
谭莲香
邹刚
卢刚
高红平
周丰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SJS Ltd
Original Assignee
SJS Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SJS Ltd filed Critical SJS Ltd
Priority to CN 201320199426 priority Critical patent/CN203223203U/en
Application granted granted Critical
Publication of CN203223203U publication Critical patent/CN203223203U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

The utility model relates to the technical field of oil and gas field open hole horizontal well multi-section fracture, in particular to a hanging packer for an open hole completion pipe string. The hanging packer for the open hole completion pipe string is composed of a center pipe, an upper guiding ring, a glued dowel, an upper clamping tile, an upper cone, a cutting dowel, an outer back band, an inner back band, an upper rubber sleeved check ring, a rubber barrel bearing ring, a rubber barrel, an upper rubber sleeve check ring, a lower cone, a lower clamping tile, a locking ring, a locking ring sleeve, an upper piston, an O-shaped ring, a splitting ring sleeve, a splitting ring, a lower piston, an upper setting sleeve, a lower setting sleeve, a lower guiding ring and a lower connector. The hanging packer for the open hole completion pipe string is mainly applied to open hole horizontal well multi-section fracture, the anchoring performance is reliable, the packer can resist high temperature and high pressure and reliably seal a large-scale casing pipe, and the maximum inner drift diameter can ensure that 20 fracture balls can pass through the packer to achieve maximization of the number of fractured layers.

Description

一种裸眼完井管柱用悬挂封隔器A Suspension Packer for Open Hole Completion String

技术领域 technical field

本实用新型涉及油气田裸眼水平井多段压裂技术领域,特别涉及一种裸眼完井管柱用悬挂封隔器。 The utility model relates to the technical field of multi-stage fracturing of open-hole horizontal wells in oil and gas fields, in particular to a suspension packer for an open-hole completion pipe string.

背景技术 Background technique

裸眼水平井多层压裂技术是一项先进的完井技术,是低压、低渗透油气藏开发的重要增产措施之一,它具有封堵效果好、井下工具少、作业针对性强、施工成本低等优点。裸眼完井可以更好地实现全水平段的泄油气,该技术目前已在国外得到广泛应用。水平裸眼井多级压裂目前已经是北美页岩气压裂开采主要技术手段。 The open-hole horizontal well multi-layer fracturing technology is an advanced well completion technology and one of the important production stimulation measures for the development of low-pressure and low-permeability oil and gas reservoirs. low merit. Open hole completion can better realize oil and gas drainage in the entire horizontal section, and this technology has been widely used abroad. Horizontal open-hole multi-stage fracturing is currently the main technical method for shale gas fracturing in North America.

裸眼水平井多级压裂技术一般采用裸眼封隔器分段封隔。根据页岩气储层开发的需要,使用封隔器将水平井段分隔成若干段,水力压裂施工时水平段最尾端滑套为压力开启式滑套,其它滑套通过投球打开,从水平段尾端第二级开始逐级投球,进行有针对性的压裂施工。 Open-hole horizontal well multi-stage fracturing technology generally uses open-hole packers to isolate in stages. According to the needs of shale gas reservoir development, a packer is used to divide the horizontal well section into several sections. During hydraulic fracturing, the sliding sleeve at the end of the horizontal section is a pressure-opening sliding sleeve, and the other sliding sleeves are opened by throwing a ball. The second stage at the end of the horizontal section began to throw balls step by step for targeted fracturing construction.

在裸眼压裂完井管柱中,悬挂封隔器在悬挂整个尾管串的同时还要保证其在直井段套管内耐温耐压性能,达到悬挂尾管重量和密封的目的,同时悬挂封隔器需要保持最大内通径以便尽可能多的通过压裂球达到压裂的层数最大化。 In the open-hole fracturing completion string, the hanging packer must not only suspend the entire liner string, but also ensure its temperature and pressure resistance in the casing of the vertical well section, so as to achieve the purpose of hanging the liner weight and sealing. The spacer needs to maintain the largest internal diameter so that as many frac balls as possible can pass through the frac ball to maximize the number of fractured layers.

而普通的封隔器的产品性能不能满足悬挂尾管及密封大尺寸套管和保持最大内通径的要求。为此,研制了适用于裸眼水平井完井管柱直井段新型的悬挂封隔器,使其在裸眼水平井分段压裂改造中更具实用性。 However, the product performance of ordinary packers cannot meet the requirements of hanging the liner, sealing the large-size casing and maintaining the maximum internal diameter. For this reason, a new type of suspension packer suitable for the vertical section of the completion string in open-hole horizontal wells has been developed to make it more practical in the staged fracturing of open-hole horizontal wells.

发明内容 Contents of the invention

本实用新型的目的在于克服上述不足,提供一种裸眼完井管柱用悬挂封隔器,其锚定性能可靠,保证封隔器耐高温高压,能可靠地密封大尺寸套管,最大内通径能保证通过20个压裂球达到压裂层数最大化。 The purpose of the utility model is to overcome the above-mentioned shortcomings, and provide a suspension packer for open hole well completion strings, which has reliable anchoring performance, ensures that the packer can withstand high temperature and high pressure, can reliably seal large-size casing, and has the largest internal passage. The diameter can ensure that the number of fracturing layers is maximized through 20 fracturing balls.

为实现上述技术目的,本实用新型提供的方案是:一种裸眼完井管柱用悬挂封隔器,包括中心管和设置于中心管上的胶筒,其中,所述中心管的下端与下接头螺纹连接,并且用紧盯销钉固定;中心管和下接头连成的整体从上到下依次装有上导环、上卡瓦、上锥体、上外背圈、上内背圈、下内背圈、下外背圈、下锥体、下卡瓦、锁环套、上活塞、劈环套、劈环、下活塞、上坐封套、下坐封套和下导环;所述上导环与中心管螺纹连接且用紧盯销钉固定;所述上卡瓦和上锥体轴向套在中心管上,上卡瓦一端接触上导环和中心管台阶,另一端与上锥体接触,上锥体通过剪切销钉固定在中心管上;所述中心管和胶筒之间设有承留环,该承留环在胶筒中部且与中心管用“O”型圈密封,胶筒两端分别套入上内背圈、下内背圈、上外背圈、下外背圈构成胶筒总成,该胶筒总成套于中心管上,上外背圈与上锥体接触,下锥体和下卡瓦轴向套在中心管上,下锥体一端与下外背圈接触且通过剪切销钉固定在中心管上;所述锁环套通过锁环与中心管连接,并由剪切销钉与中心管固定,锁环套上端面与下卡瓦端面接触;所述上活塞与中心管之间通过“O”型圈滑动密封连接;所述劈环套与下活塞通过劈环固定在中心管上,下活塞通过“O”型圈密封中心管;所述上坐封套与上活塞螺纹连接,上坐封套、上活塞和下活塞均通过“O”型圈与中心管滑动密封连接;所述下坐封套与上坐封套螺纹连接,下坐封套与上坐封套、下接头之间均为滑动密封连接;所述下导环与中心管螺纹连接且用紧盯销钉固定。 In order to achieve the above technical purpose, the utility model provides a solution: a suspension packer for an open hole well completion string, including a central pipe and a rubber sleeve arranged on the central pipe, wherein the lower end of the central pipe is connected to the lower end of the central pipe. The joints are threaded and fixed with fastening pins; the whole connected by the center pipe and the lower joint is equipped with an upper guide ring, an upper slip, an upper cone, an upper outer back ring, an upper inner back ring, and a lower joint from top to bottom. Inner back ring, lower outer back ring, lower cone, lower slips, lock ring sleeve, upper piston, split ring sleeve, split ring, lower piston, upper set cover, lower set cover and lower guide ring; the upper guide The ring is threaded with the center pipe and fixed with pins; the upper slip and the upper cone are axially sleeved on the center pipe, one end of the upper slip contacts the upper guide ring and the step of the center pipe, and the other end contacts the upper cone , the upper cone is fixed on the central tube by shearing pins; there is a retaining ring between the central tube and the rubber tube, the retaining ring is in the middle of the rubber tube and is sealed with the central tube with an "O" ring, and the rubber tube The two ends are respectively inserted into the upper inner back ring, lower inner back ring, upper outer back ring, and lower outer back ring to form a rubber cartridge assembly. The rubber cartridge assembly is set on the central tube, and the upper outer back ring is in contact with the upper cone. The lower cone and the lower slips are axially sleeved on the center tube, one end of the lower cone is in contact with the lower outer backing ring and fixed on the center tube through shear pins; the lock ring sleeve is connected with the center tube through a lock ring, and The shear pin and the center tube are fixed, and the upper end surface of the lock ring sleeve is in contact with the end surface of the lower slip; the upper piston and the center tube are connected in a sliding and sealed manner through an "O" ring; the split ring sleeve and the lower piston are connected through a split The ring is fixed on the central tube, and the lower piston seals the central tube through the "O" ring; the upper setting sleeve is threadedly connected with the upper piston, and the upper setting sleeve, upper piston and lower piston all slide through the "O" ring and the central tube Sealed connection; the lower set cover is threadedly connected with the upper set cover, and the lower set cover, the upper set cover and the lower joint are all in sliding and sealed connection; the lower guide ring is threaded with the central pipe and fixed with pins.

而且,所述中心管上具有径向的第一传压孔和第二传压孔,第一传压孔位于上活塞和劈环套之间,第二传压孔位于上坐封套和下接头之间。 Moreover, the central pipe has a radial first pressure transmission hole and a second pressure transmission hole, the first pressure transmission hole is located between the upper piston and the split ring sleeve, and the second pressure transmission hole is located between the upper setting sleeve and the lower joint between.

而且,所述中心管上端为马牙扣内螺纹结构。 Moreover, the upper end of the central pipe is a horse-tooth button internal thread structure.

而且,所述上锥体和上卡瓦锥面配合,下锥体和下卡瓦锥面配合。 Moreover, the upper cone cooperates with the upper slip cone surface, and the lower cone cooperates with the lower slip cone surface.

而且,所述胶筒总成的上内背圈和下内背圈之间设有上橡胶套挡圈和下橡胶套挡圈;所述胶筒总成的上外背圈和上内背圈构成软金属环背圈,所述胶筒总成的下外背圈和下内背圈构成软金属环背圈。 Moreover, an upper rubber sleeve retaining ring and a lower rubber sleeve retaining ring are arranged between the upper inner back ring and the lower inner back ring of the rubber cartridge assembly; the upper outer back ring and the upper inner back ring of the rubber cartridge assembly A soft metal ring backing ring is formed, and the lower outer backing ring and the lower inner backing ring of the rubber cartridge assembly form a soft metal ring backing ring.

而且,所述胶筒的中间部位设置胶筒承留环,该胶筒承留环的内孔中间设有“O”型圈,其支撑胶筒心部利于胶筒膨胀。胶筒承留环是铸铁材质。 Moreover, a rubber cartridge retaining ring is arranged in the middle of the rubber cartridge, and an "O" ring is provided in the middle of the inner hole of the rubber cartridge retaining ring, which supports the center of the rubber cartridge to facilitate the expansion of the rubber cartridge. The cartridge retaining ring is cast iron.

而且,所述中心管上与锁环套接触的部分设有引导锁环套上行的锯齿状螺纹,且只能上行,不能下行。 Moreover, the part of the central tube that is in contact with the lock ring sleeve is provided with a serrated thread that guides the lock ring sleeve to go up, and can only go up, but not down.

而且,所述锁环采用单切口的内外齿结构,锁环套通过剪切销钉固定在锁环的切口槽内。锁环伴随锁环套传递压力,上行且将压力锁定在中心管上。 Moreover, the lock ring adopts a single-slit internal and external tooth structure, and the lock ring sleeve is fixed in the notch groove of the lock ring by shear pins. The lock ring transmits pressure with the lock ring sleeve, goes up and locks the pressure on the center tube.

而且,所述劈环为开口C环或2片C环组成。 Moreover, the split ring is composed of an open C ring or two pieces of C rings.

而且,所述上坐封套、上活塞和下活塞与中心管滑动密封连接的“O”型圈两端具有“O”型圈背圈,可达到良好滑动密封的性能。该“O”型圈背圈是聚四氟乙烯材质。 Moreover, the two ends of the "O" ring that are slidingly and sealingly connected with the center pipe by the upper setting sleeve, the upper piston and the lower piston have "O" ring back rings, which can achieve good sliding sealing performance. The "O" ring backing is made of PTFE.

本实用新型的裸眼完井管柱用悬挂封隔器设置了两个液压缸和两个活塞,当封隔器下入到设计层位后,通过管内打压,驱动两级活塞剪断锁环套上剪切销钉同时上行,挤压密封胶筒,撑破卡瓦咬合套管,锁环锁紧压力,实现可靠锚定和密封。该工具保证封隔器耐高温高压,可靠密封大尺寸套管,最大内通径能保证通过20个压裂球达到压裂层数最大化。 Two hydraulic cylinders and two pistons are installed in the suspension packer for the open hole completion pipe string of the utility model. When the packer is lowered to the design level, the two-stage piston is driven to cut off the lock ring sleeve by pressing inside the pipe. The shearing pin moves upward at the same time, squeezes the sealing rubber tube, breaks the slips and occludes the casing, and the lock ring locks the pressure to achieve reliable anchoring and sealing. This tool ensures that the packer is resistant to high temperature and high pressure, and can reliably seal large-size casings. The maximum internal diameter can ensure the maximum number of fracturing layers through 20 fracturing balls.

附图说明 Description of drawings

图1是本实用新型的结构示意图。 Fig. 1 is the structural representation of the utility model.

图2是图1中A部分放大图。 Fig. 2 is an enlarged view of part A in Fig. 1 .

图3是图1中B部分放大图。 Fig. 3 is an enlarged view of part B in Fig. 1 .

图4是图1中C部分放大图。 Fig. 4 is an enlarged view of part C in Fig. 1 .

其中,1、中心管,2、上导环,3、第一紧盯销钉,4、上卡瓦,5、上锥体,6、第一剪切销钉,7、上外背圈,8、上内背圈,9、上橡胶套挡圈,10、胶筒承留环,11、第一“O”型圈,12、胶筒,13、下橡胶套挡圈,14、下内背圈,15、下外背圈,16、下锥体,17、下卡瓦,18、锁环,19、第二紧盯销钉,20、锁环套,21、第二剪切销钉,22、上活塞,23、第二“O”型圈,24、第三“O”型圈,25、“O”型圈背圈,26、劈环套,27、劈环,28、下活塞,29、上坐封套,30、第三紧盯销钉,31、下坐封套,32、下导环,33、下接头,34、第一传压孔,35、第二传压孔。 Among them, 1. Center tube, 2. Upper guide ring, 3. First fastening pin, 4. Upper slip, 5. Upper cone, 6. First shear pin, 7. Upper outer back ring, 8. Upper inner back ring, 9. Upper rubber sleeve retaining ring, 10. Rubber sleeve retaining ring, 11. First "O" ring, 12. Rubber sleeve, 13. Lower rubber sleeve retaining ring, 14. Lower inner back ring , 15, the lower outer back ring, 16, the lower cone, 17, the lower slip, 18, the lock ring, 19, the second fastening pin, 20, the lock ring sleeve, 21, the second shear pin, 22, the upper Piston, 23, second "O" ring, 24, third "O" ring, 25, "O" ring back ring, 26, split ring sleeve, 27, split ring, 28, lower piston, 29, Last set cover, 30, the third staring at pin, 31, set cover under, 32, lower guide ring, 33, lower joint, 34, the first pressure transmission hole, 35, the second pressure transmission hole.

具体实施方式 Detailed ways

下面结合附图及实施例对本实用新型作进一步说明。 Below in conjunction with accompanying drawing and embodiment the utility model is further described.

本实施例提供一种裸眼完井管柱用悬挂封隔器,包括中心管1和设置于中心管1上的胶筒12,如图1所示,所述中心管1的下端与下接头33螺纹连接,并且用紧盯销钉固定防松;中心管1和下接头33连成的整体从上到下依次装有上导环2、上卡瓦4、上锥体5、上外背圈7、上内背圈8、下内背圈14、下外背圈15、下锥体16、下卡瓦17、锁环套20、上活塞22、劈环套26、劈环27、下活塞28、上坐封套29、下坐封套31和下导环32;所述上导环2与中心管1螺纹连接且用第一紧盯销钉3固定防松;所述上卡瓦4和上锥体5轴向套在中心管1上,上卡瓦4一端接触上导环2和中心管台阶,另一端与上锥体5接触,上锥体5通过第一剪切销钉6固定在中心管1上;所述中心管1和胶筒12之间设有承留环10,该承留环10在胶筒12中部且与中心管1用第一“O”型圈11密封,胶筒12两端分别套入上内背圈8、下内背圈14、上外背圈7、下外背圈15构成胶筒总成,该胶筒总成套于中心管1上,上外背圈7与上锥体5接触,下锥体16和下卡瓦17轴向套在中心管1上,下锥体16一端与下外背圈15接触且通过第一剪切销钉6固定在中心管1上;所述锁环套20通过锁环18与中心管1连接,并由第二剪切销钉21与中心管1固定防转,锁环套20上端面与下卡瓦17端面接触;所述上活塞22与中心管1之间通过第二“O”型圈23滑动密封连接;所述劈环套26与下活塞28通过劈环27固定在中心管1上,下活塞28通过第二“O”型圈23密封中心管1;所述上坐封套29与上活塞22螺纹连接,上坐封套29、上活塞22和下活塞28均与中心管1通过第二“O”型圈23滑动密封连接;所述下坐封套31与上坐封套29螺纹连接,下坐封套31与上坐封套29、下接头33之间均通过第三“O”型圈24与滑动密封连接;所述下导环32与中心管1螺纹连接且用第三紧盯销钉30固定防松。 This embodiment provides a suspension packer for an open-hole completion string, including a center pipe 1 and a rubber sleeve 12 arranged on the center pipe 1. As shown in FIG. 1 , the lower end of the center pipe 1 and the lower joint 33 Threaded connection, and fixed with pins to prevent loosening; the whole connected by the central tube 1 and the lower joint 33 is equipped with the upper guide ring 2, the upper slip 4, the upper cone 5, and the upper outer back ring 7 in sequence from top to bottom , Upper inner back ring 8, lower inner back ring 14, lower outer back ring 15, lower cone 16, lower slips 17, lock ring sleeve 20, upper piston 22, split ring sleeve 26, split ring 27, lower piston 28 , the upper set cover 29, the lower set cover 31 and the lower guide ring 32; the upper guide ring 2 is threadedly connected with the central pipe 1 and is fixed and anti-loose with the first fastening pin 3; the upper slip 4 and the upper cone 5 is axially sleeved on the center tube 1, one end of the upper slip 4 contacts the upper guide ring 2 and the step of the center tube, and the other end contacts the upper cone 5, and the upper cone 5 is fixed on the center tube 1 by the first shear pin 6 Above; there is a retaining ring 10 between the central tube 1 and the rubber tube 12, the retaining ring 10 is in the middle of the rubber tube 12 and is sealed with the central tube 1 with the first "O" ring 11, and the rubber tube 12 is two The upper inner back ring 8, the lower inner back ring 14, the upper outer back ring 7, and the lower outer back ring 15 are inserted into the upper inner back ring 8 and the lower outer back ring 15 respectively to form a rubber cartridge assembly. The upper cone 5 is in contact, the lower cone 16 and the lower slip 17 are axially sleeved on the central tube 1, and one end of the lower cone 16 is in contact with the lower outer back ring 15 and fixed on the central tube 1 by the first shear pin 6 The lock ring sleeve 20 is connected to the central tube 1 through the lock ring 18, and is fixed and anti-rotated by the second shear pin 21 and the central tube 1, and the upper end surface of the lock ring sleeve 20 is in contact with the end surface of the lower slip 17; The piston 22 is connected to the central tube 1 through a second "O" ring 23 for sliding sealing; the split ring sleeve 26 and the lower piston 28 are fixed on the central tube 1 through the split ring 27, and the lower piston 28 is passed through the second "O" "Ring 23 seals the center tube 1; the upper set cover 29 is threadedly connected with the upper piston 22, and the upper set cover 29, upper piston 22 and lower piston 28 are all slidably sealed with the center tube 1 through the second "O" ring 23 connection; the lower set cover 31 is threadedly connected with the upper set cover 29, and the lower set cover 31, the upper set cover 29, and the lower joint 33 are all connected to the sliding seal through the third "O" ring 24; the lower guide The ring 32 is threadedly connected with the central pipe 1 and fixed and anti-loosening with the third fastening pin 30 .

进一步的,上述中心管1上具有径向的第一传压孔34和第二传压孔35,第一传压孔34位于上活塞22和劈环套26之间,第二传压孔35位于上坐封套29和下接头33之间。 Further, the central pipe 1 has a radial first pressure transmission hole 34 and a second pressure transmission hole 35, the first pressure transmission hole 34 is located between the upper piston 22 and the split ring sleeve 26, the second pressure transmission hole 35 Located between the upper set cover 29 and the lower joint 33.

进一步的,上述中心管1上端为马牙扣内螺纹结构,便于悬挂封隔器的送入和转为生产管柱的回接。 Further, the upper end of the above-mentioned central pipe 1 has a horsetooth internal thread structure, which is convenient for the feeding of the suspension packer and the tie-back of the production string.

进一步的,上述上锥体5和上卡瓦4锥面配合,下锥体16和下卡瓦17锥面配合。 Further, the above-mentioned upper cone 5 is matched with the upper slip 4 with a tapered surface, and the lower cone 16 is matched with the lower slip 17 with a tapered surface.

进一步的,上述胶筒总成的上内背圈8和下内背圈14之间设有上橡胶套挡圈9和下橡胶套挡圈13。 Further, an upper rubber sleeve retaining ring 9 and a lower rubber sleeve retaining ring 13 are provided between the upper inner back ring 8 and the lower inner back ring 14 of the rubber cartridge assembly.

进一步的,上述胶筒总成的上外背圈7和上内背圈8构成软金属环背圈;所述胶筒总成的下外背圈15和下内背圈14构成软金属环背圈。 Further, the upper outer back ring 7 and the upper inner back ring 8 of the rubber cartridge assembly constitute a soft metal ring back; the lower outer back ring 15 and the lower inner back ring 14 of the rubber cartridge assembly constitute a soft metal ring back lock up.

进一步的,上述胶筒12中间部位设置由铸铁材质制作的胶筒承留环10,胶筒承留环10内孔中间设有第一“O”型圈11,其支撑胶筒心部利于胶筒膨胀。 Further, the middle part of the above-mentioned rubber cylinder 12 is provided with a rubber cylinder retaining ring 10 made of cast iron material, and a first "O" ring 11 is provided in the middle of the inner hole of the rubber cylinder retaining ring 10, which supports the core of the rubber cylinder to facilitate the glue The barrel expands.

进一步的,上述中心管1上与锁环套20接触的部分设有引导锁环套20上行的锯齿状螺纹,且只允许锁环套20上行。 Further, the part of the central tube 1 that is in contact with the lock ring sleeve 20 is provided with a serrated thread that guides the lock ring sleeve 20 to go upward, and only allows the lock ring sleeve 20 to go upward.

进一步的,上述锁环18采用单切口的内外齿结构,锁环套20通过第二紧盯销钉19固定在锁环18的切口槽内,防止锁环套20上行过程中,锁环18在锁环套20内转动。锁环18伴随锁环套20传递压力,上行且将压力锁定在中心管1上。 Further, the above-mentioned lock ring 18 adopts a single-cut internal and external tooth structure, and the lock ring sleeve 20 is fixed in the cutout groove of the lock ring 18 through the second pin 19, so as to prevent the lock ring sleeve 20 from going up. Rotate in the ring sleeve 20. The lock ring 18 transmits pressure along with the lock ring sleeve 20, goes up and locks the pressure on the central tube 1 .

进一步的,上述劈环27为开口C环或2片C环组成,用于固定下活塞28。 Further, the above-mentioned split ring 27 is composed of an open C-ring or two C-rings for fixing the lower piston 28 .

进一步的,上述第三“O”型圈24两端具有由聚四氟乙烯制作的“O”型圈背圈25。第三“O”型圈24两端配有“O”型圈背圈25能达到良好滑动密封的性能。 Further, both ends of the third "O" ring 24 have "O" ring backing rings 25 made of polytetrafluoroethylene. The two ends of the third "O" ring 24 are equipped with "O" ring back rings 25 to achieve good sliding sealing performance.

本实用新型的工作原理为:利用配套的插管或球座在封隔器内孔处形成密封,从油管内打压,液体通过悬挂封隔器的第一传压口和第二传压口在上活塞22和上坐封套29上产生轴向向上的推力,作用于锁环套20,达到启动压力剪断锁环套20上第二剪切销钉21带动锁环18一起上行,上行挤压下卡瓦17,下卡瓦17将力传递给下锥体16,到达一定力值剪断下锥体16上第一剪切销钉6,下锥体16上行挤压胶筒12和上锥体5,到达一定力值剪断上锥体5上的第一剪切销钉6,下锥体16上行挤压上卡瓦4,上卡瓦4破裂咬合套管,胶筒12继续膨胀,下卡瓦17继续上行,上行一定程度后,胶筒12膨胀密封套管,下卡瓦17咬合套管,完成坐封;同时封隔器内部的锁环18锁住坐封力,维持卡瓦和胶套的座封。 The working principle of the utility model is: use the matching intubation tube or ball seat to form a seal at the inner hole of the packer, pressurize from the oil pipe, and the liquid passes through the first pressure transmission port and the second pressure transmission port of the suspension packer in the The upper piston 22 and the upper set cover 29 produce an axial upward thrust, which acts on the lock ring sleeve 20, and when the starting pressure is reached, the second shear pin 21 on the lock ring sleeve 20 drives the lock ring 18 to move upward together, and the upward movement squeezes the lower card. The shoe 17, the lower slip 17 transmits the force to the lower cone 16, and when it reaches a certain force value, the first shear pin 6 on the lower cone 16 is cut off, and the lower cone 16 squeezes the rubber cylinder 12 and the upper cone 5 upwards, reaching Cut off the first shear pin 6 on the upper cone 5 with a certain force, the lower cone 16 presses the upper slip 4 upward, the upper slip 4 breaks and bites the casing, the rubber tube 12 continues to expand, and the lower slip 17 continues upward After going up to a certain extent, the rubber tube 12 expands to seal the casing, and the lower slip 17 bites the casing to complete the setting; at the same time, the locking ring 18 inside the packer locks the setting force to maintain the seat seal between the slips and the rubber sleeve .

以上所述仅是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型原理的前提下,还可以做出若干改进或变形,这些改进或变形也应视为本实用新型的保护范围。 The above is only a preferred embodiment of the utility model, it should be pointed out that for those of ordinary skill in the art, without departing from the principle of the utility model, some improvements or deformations can also be made, these improvements or Deformation should also be regarded as the protection scope of the present utility model.

Claims (10)

1.一种裸眼完井管柱用悬挂封隔器,包括中心管和设置于中心管上的胶筒,其特征在于:所述中心管的下端与下接头螺纹连接,并且用紧盯销钉固定;中心管和下接头连成的整体从上到下依次装有上导环、上卡瓦、上锥体、上外背圈、上内背圈、下内背圈、下外背圈、下锥体、下卡瓦、锁环套、上活塞、劈环套、劈环、下活塞、上坐封套、下坐封套和下导环;所述上导环与中心管螺纹连接且用紧盯销钉固定;所述上卡瓦和上锥体轴向套在中心管上,上卡瓦一端接触上导环和中心管台阶,另一端与上锥体接触,上锥体通过剪切销钉固定在中心管上;所述中心管和胶筒之间设有承留环,该承留环在胶筒中部且与中心管用“O”型圈密封,胶筒两端分别套入上内背圈、下内背圈、上外背圈、下外背圈构成胶筒总成,该胶筒总成套于中心管上,上外背圈与上锥体接触,下锥体和下卡瓦轴向套在中心管上,下锥体一端与下外背圈接触且通过剪切销钉固定在中心管上;所述锁环套通过锁环与中心管连接,并由剪切销钉与中心管固定,锁环套上端面与下卡瓦端面接触;所述上活塞与中心管之间通过“O”型圈滑动密封连接;所述劈环套与下活塞通过劈环固定在中心管上,下活塞通过“O”型圈密封中心管;所述上坐封套与上活塞螺纹连接,上坐封套、上活塞和下活塞均通过“O”型圈与中心管滑动密封连接;所述下坐封套与上坐封套螺纹连接,下坐封套与上坐封套、下接头之间均为滑动密封连接;所述下导环与中心管螺纹连接且用紧盯销钉固定。 1. A suspension packer for an open-hole well completion string, comprising a center pipe and a rubber sleeve arranged on the center pipe, characterized in that: the lower end of the center pipe is threadedly connected with the lower joint, and is fixed with fastening pins ; The whole connected by the center pipe and the lower joint is equipped with an upper guide ring, an upper slip, an upper cone, an upper outer back ring, an upper inner back ring, a lower inner back ring, a lower outer back ring, and a lower inner back ring from top to bottom. cone, lower slips, lock ring sleeve, upper piston, split ring sleeve, split ring, lower piston, upper set cover, lower set cover and lower guide ring; The pin is fixed; the upper slip and the upper cone are axially sleeved on the center tube, one end of the upper slip is in contact with the upper guide ring and the step of the center tube, and the other end is in contact with the upper cone, and the upper cone is fixed on the On the central tube; there is a retaining ring between the central tube and the rubber tube, the retaining ring is in the middle of the rubber tube and is sealed with the central tube with an "O" ring, and the two ends of the rubber tube are respectively inserted into the upper inner back ring, The lower inner back ring, upper outer back ring, and lower outer back ring constitute the rubber cartridge assembly, which is set on the central tube, the upper outer back ring is in contact with the upper cone, and the lower cone and the lower slip axially sleeve On the central tube, one end of the lower cone is in contact with the lower outer back ring and fixed on the central tube by a shear pin; The upper end surface of the ring sleeve is in contact with the end surface of the lower slip; the upper piston and the center pipe are connected in a sliding and sealed manner through an "O" ring; the split ring sleeve and the lower piston are fixed on the center pipe through the split ring, and the lower piston passes through the The "O" ring seals the central tube; the upper setting sleeve is threadedly connected with the upper piston, and the upper setting sleeve, upper piston and lower piston are all sliding and sealed with the central tube through the "O" ring; the lower setting sleeve is connected to the upper The setting sleeve is threadedly connected, and the lower setting sleeve, the upper setting sleeve, and the lower joint are all in sliding and sealed connection; the lower guide ring is threaded with the central pipe and fixed with fastening pins. 2.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述中心管上具有径向的第一传压孔和第二传压孔,第一传压孔位于上活塞和劈环套之间,第二传压孔位于上坐封套和下接头之间。 2. A hanging packer for open hole completion string according to claim 1, characterized in that: the central pipe has a first radial pressure transmission hole and a second pressure transmission hole, the first pressure transmission hole The pressure hole is located between the upper piston and the split ring sleeve, and the second pressure transmission hole is located between the upper setting sleeve and the lower joint. 3.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述中心管上端为马牙扣内螺纹结构。 3. A suspension packer for open hole completion string according to claim 1, characterized in that: the upper end of the central pipe is a horsetooth internal thread structure. 4.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述上锥体和上卡瓦锥面配合,下锥体和下卡瓦锥面配合。 4. A suspension packer for open hole completion string according to claim 1, characterized in that: the upper cone cooperates with the upper slip cone surface, and the lower cone cooperates with the lower slip cone surface. 5.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述胶筒总成的上内背圈和下内背圈之间设有上橡胶套挡圈和下橡胶套挡圈;所述胶筒总成的上外背圈和上内背圈构成软金属环背圈,所述胶筒总成的下外背圈和下内背圈构成软金属环背圈。 5. A suspension packer for open hole completion string according to claim 1, characterized in that: an upper rubber bushing is set between the upper inner back ring and the lower inner back ring of the rubber cartridge assembly Ring and lower rubber sleeve retaining ring; the upper outer back ring and upper inner back ring of the rubber cartridge assembly constitute a soft metal ring back ring, and the lower outer back ring and lower inner back ring of the rubber cartridge assembly form a soft metal ring Ring back ring. 6.根据权利要求1或5所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述胶筒的中间部位设置胶筒承留环,该胶筒承留环的内孔中间设有“O”型圈,胶筒承留环是铸铁材质。 6. A suspension packer for open hole completion string according to claim 1 or 5, characterized in that: a rubber sleeve retaining ring is arranged in the middle of the rubber sleeve, and the inner portion of the rubber sleeve retaining ring is There is an "O" ring in the middle of the hole, and the retaining ring of the rubber cylinder is made of cast iron. 7.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述中心管上与锁环套接触的部分设有引导锁环套上行的锯齿状螺纹。 7. The suspension packer for open hole completion string according to claim 1, characterized in that: the part of the center pipe in contact with the lock ring sleeve is provided with a serrated thread that guides the lock ring sleeve to go upward. 8.根据权利要求7所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述锁环采用单切口的内外齿结构,锁环套通过剪切销钉固定在锁环的切口槽内。 8. A hanging packer for open hole completion string according to claim 7, characterized in that: the lock ring adopts a single-cut inner and outer tooth structure, and the lock ring sleeve is fixed on the lock ring by shear pins. in the notch. 9.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述劈环为开口C环或2片C环组成。 9. A suspension packer for open hole completion string according to claim 1, characterized in that: the split ring is composed of an open C ring or two C rings. 10.根据权利要求1所述的一种裸眼完井管柱用悬挂封隔器,其特征在于:所述上坐封套、上活塞和下活塞与中心管滑动密封连接的“O”型圈两端具有“O”型圈背圈,该“O”型圈背圈是聚四氟乙烯材质。 10. A suspension packer for open hole completion string according to claim 1, characterized in that: the upper set sleeve, the upper piston and the lower piston are connected to the center pipe by two "O" rings which are slidingly and sealingly connected to each other. The end has an "O" ring backing which is made of PTFE.
CN 201320199426 2013-04-19 2013-04-19 Hanging packer for open hole completion pipe string Expired - Lifetime CN203223203U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320199426 CN203223203U (en) 2013-04-19 2013-04-19 Hanging packer for open hole completion pipe string

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320199426 CN203223203U (en) 2013-04-19 2013-04-19 Hanging packer for open hole completion pipe string

Publications (1)

Publication Number Publication Date
CN203223203U true CN203223203U (en) 2013-10-02

Family

ID=49250208

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320199426 Expired - Lifetime CN203223203U (en) 2013-04-19 2013-04-19 Hanging packer for open hole completion pipe string

Country Status (1)

Country Link
CN (1) CN203223203U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195389A (en) * 2013-04-19 2013-07-10 四机赛瓦石油钻采设备有限公司 Suspension packer for open hole well completion
CN103835675A (en) * 2014-03-18 2014-06-04 四机赛瓦石油钻采设备有限公司 Long-rubber-sleeve compression type open hole packer
CN104727776A (en) * 2015-02-12 2015-06-24 中国海洋石油总公司 Hanging packer for horizontal well multistage fracturing
CN111749639A (en) * 2019-03-28 2020-10-09 东营市汇诚石油工程技术有限责任公司 Naked eye plugging device
CN114809976A (en) * 2021-01-21 2022-07-29 中国石油天然气股份有限公司 Soluble packer and multistage sliding sleeve fracturing string
GB2638513A (en) * 2023-10-31 2025-08-27 Franks Int Llc Shearable lock mechanism for storm packer anchor

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103195389A (en) * 2013-04-19 2013-07-10 四机赛瓦石油钻采设备有限公司 Suspension packer for open hole well completion
CN103195389B (en) * 2013-04-19 2015-09-16 四机赛瓦石油钻采设备有限公司 A kind of suspension packer for open hole well completion
CN103835675A (en) * 2014-03-18 2014-06-04 四机赛瓦石油钻采设备有限公司 Long-rubber-sleeve compression type open hole packer
CN103835675B (en) * 2014-03-18 2017-01-25 四机赛瓦石油钻采设备有限公司 Long-rubber-sleeve compression type open hole packer
CN104727776A (en) * 2015-02-12 2015-06-24 中国海洋石油总公司 Hanging packer for horizontal well multistage fracturing
CN111749639A (en) * 2019-03-28 2020-10-09 东营市汇诚石油工程技术有限责任公司 Naked eye plugging device
CN111749639B (en) * 2019-03-28 2024-05-07 东营市汇诚石油工程技术有限责任公司 Naked eye plugging device
CN114809976A (en) * 2021-01-21 2022-07-29 中国石油天然气股份有限公司 Soluble packer and multistage sliding sleeve fracturing string
CN114809976B (en) * 2021-01-21 2023-12-22 中国石油天然气股份有限公司 Soluble packer and multi-stage sliding sleeve fracturing string
GB2638513A (en) * 2023-10-31 2025-08-27 Franks Int Llc Shearable lock mechanism for storm packer anchor
US12460494B2 (en) 2023-10-31 2025-11-04 Frank's International, Llc Shearable lock mechanism for storm packer anchor

Similar Documents

Publication Publication Date Title
CN203223203U (en) Hanging packer for open hole completion pipe string
CN202181876U (en) Drillable Composite Bridge Plug
CN104213864B (en) Protective device for packer rubber tube
CN103195389B (en) A kind of suspension packer for open hole well completion
CN205117285U (en) Time delay starts fracturing sliding sleeve
CN202125287U (en) Anchor fluke type sliding sleeve opening tool
CN103422846B (en) Open hole horizontal well completion and fracturing integrated string
CN204532243U (en) A kind of big orifice press-fracturing bridge plug
CN103410491B (en) Reducer sleeve
CN104500015B (en) Staged fracturing acidification controllable setting packer for oil-gas well
CN103266865B (en) A kind of big orifice packer for oil well
CN105672947B (en) A kind of novel sliding sleeve opens sliding sleeve tool and fracturing string
CN201818277U (en) Compression type open hole packer
CN103806864B (en) Hydraulic setting small diameter tubing bridge plug
CN103835675B (en) Long-rubber-sleeve compression type open hole packer
CN102071901A (en) Horizontal Well High Pressure Packer for Reservoir Stimulation
CN105134131B (en) A cementing casing or tubing sliding sleeve with unlimited segments and clusters
CN207296937U (en) Hydraulic tubing anchoring device for high-pressure oil and gas wells
CN201778750U (en) hanging frac packer
CN206617134U (en) Packer
CN104847301B (en) Open hole packer
CN107542418A (en) High-pressure oil-gas well hydraulic oil pipe anchoring device and its method of work
CN204677182U (en) Differential full-bore well cementation sliding sleeve
CN204252980U (en) A layered water injection string
CN203420698U (en) Open hole horizontal well completion and fracturing integrated string

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20131002

Effective date of abandoning: 20150916

RGAV Abandon patent right to avoid regrant