[go: up one dir, main page]

CN201904207U - Fixture used for assembling electromagnet of transformer - Google Patents

Fixture used for assembling electromagnet of transformer Download PDF

Info

Publication number
CN201904207U
CN201904207U CN201020633782XU CN201020633782U CN201904207U CN 201904207 U CN201904207 U CN 201904207U CN 201020633782X U CN201020633782X U CN 201020633782XU CN 201020633782 U CN201020633782 U CN 201020633782U CN 201904207 U CN201904207 U CN 201904207U
Authority
CN
China
Prior art keywords
clamping
electromagnet
clamping blocks
vise
utility
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201020633782XU
Other languages
Chinese (zh)
Inventor
肖超超
边振杰
周仁领
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Pinggao Electric Co Ltd
Original Assignee
Pinggao Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pinggao Group Co Ltd filed Critical Pinggao Group Co Ltd
Priority to CN201020633782XU priority Critical patent/CN201904207U/en
Application granted granted Critical
Publication of CN201904207U publication Critical patent/CN201904207U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Clamps And Clips (AREA)

Abstract

本实用新型涉及一种用于变压器中电磁铁装配的夹具,包括第一夹块及第二夹块,所述第一、第二夹块的两端分别通过对应的销轴连接,第一、第二夹块分别沿销轴的轴向与销轴活动导向配合,两夹块在所述销轴轴向上互相靠近的一侧上均设置有对应的弧形的夹持口,相背对的一侧上分别设置有用于与台钳钳口的口沿卡配的台阶面;由于本实用新型的用于变压器中电磁铁装配的夹具在其第一、第二夹块上分别设置对应的弧形夹持口,减小了夹具与撞杆之间的局部接触应力,解决了撞杆夹伤的问题;另外,由于可与台钳配合使用,提高了工作效率;本实用新型的夹具既能防止夹伤撞杆且可单人操作,从总体上解决了电磁铁装配过程中电磁铁撞杆上的锁紧螺母安装困难的问题。

Figure 201020633782

The utility model relates to a fixture used for assembling electromagnets in transformers, comprising a first clamping block and a second clamping block, the two ends of the first and second clamping blocks are respectively connected by corresponding pin shafts, the first and second clamping blocks are respectively connected by corresponding pin shafts. The second clamping blocks are respectively guided and matched with the pin shaft along the axial direction of the pin shaft. The two clamping blocks are provided with corresponding arc-shaped clamping openings on the side close to each other in the axial direction of the pin shaft, opposite to each other. One side of the vise is respectively provided with a step surface for matching with the edge of the jaw of the vise; since the clamp used for the assembly of the electromagnet in the transformer of the utility model is respectively provided with corresponding clamps on the first and second clamps. The arc-shaped clamping opening reduces the local contact stress between the fixture and the lance, and solves the problem of the lance being pinched; in addition, because it can be used in conjunction with a vise, the work efficiency is improved; the fixture of the utility model is both The utility model can prevent the ram from being pinched and can be operated by a single person, and generally solves the problem of difficult installation of the locking nut on the electromagnet ram during the electromagnet assembly process.

Figure 201020633782

Description

一种用于变压器中电磁铁装配的夹具A jig for assembling electromagnets in transformers

技术领域technical field

本实用新型涉及变压器中的电磁铁装配辅助工具,尤其是一种用于变压器中电磁铁装配的夹具。The utility model relates to an auxiliary tool for assembling an electromagnet in a transformer, in particular to a clamp used for assembling an electromagnet in a transformer.

背景技术Background technique

电磁铁是目前变压器中不可缺少的部分之一,在电磁铁的装配过程中,需要在其电磁铁撞杆的一端设置锁紧螺母,而由于电磁铁撞杆的外轮廓为圆形,因此锁紧螺母的安装过较为困难;具体的说,即对电磁铁撞杆的夹紧比较困难,如果只用台钳直接夹紧,众所周知,台钳钳口处均为一平面夹紧口,若将电磁铁撞杆直接固定于钳口处,撞杆则极易被夹伤而失效;如通过钳子夹紧,则至少需要两个工作人员同时操作,且费时费力效率极低。The electromagnet is one of the indispensable parts of the current transformer. During the assembly process of the electromagnet, it is necessary to set a lock nut at one end of the electromagnet plunger. Since the outer contour of the electromagnet plunger is circular, the lock It is more difficult to install the tightening nut; specifically, it is more difficult to clamp the electromagnet striker. If you only use a vise to clamp it directly, as we all know, the jaws of the vise are all clamping on a plane. The electromagnet lance is directly fixed at the jaws, and the lance is easily pinched and becomes invalid; if it is clamped by pliers, at least two workers are required to operate at the same time, and the time-consuming and labor-intensive efficiency is extremely low.

发明内容Contents of the invention

本实用新型的目的在于提供一种用于变压器中电磁铁装配的夹具,以解决电磁铁装配过程中电磁铁撞杆上的锁紧螺母安装困难的问题。The purpose of the utility model is to provide a clamp used for assembling the electromagnet in the transformer, so as to solve the problem of difficulty in installing the lock nut on the electromagnet lance during the electromagnet assembly process.

为了解决上述问题,本实用新型的用于变压器中电磁铁装配的夹具采用以下技术方案:一种用于变压器中电磁铁装配的夹具,包括第一夹块及第二夹块,所述第一、第二夹块的两端分别通过对应的销轴连接,第一、第二夹块分别沿销轴的轴向与销轴活动导向配合,两夹块在所述销轴轴向上互相靠近的一侧上均设置有对应的用于夹持撞杆的弧形夹持口,两夹块互相背离的一侧上分别设置有用于与台钳钳口的口沿卡配的台阶面。In order to solve the above problems, the fixture for assembling electromagnets in transformers of the utility model adopts the following technical solutions: a fixture for assembling electromagnets in transformers, including a first clamping block and a second clamping block, the first 1. The two ends of the second clamping block are respectively connected by corresponding pin shafts, the first and second clamping blocks are respectively guided and matched with the pin shaft along the axial direction of the pin shaft, and the two clamping blocks are close to each other in the axial direction of the pin shaft Corresponding arc-shaped clamping openings for clamping the lance are provided on one side of the two clamping blocks, and stepped surfaces for engaging with the edge of the vise jaws are respectively provided on the sides of the two clamping blocks away from each other.

所述的夹持口为半圆形。The clamping opening is semicircular.

所述的两销轴上分别套设有复位弹簧,所述各复位弹簧均顶装于第一、第二夹块之间。The two pin shafts are respectively sleeved with return springs, and each of the return springs is top-mounted between the first and second clamping blocks.

由于本实用新型的用于变压器中电磁铁装配的夹具在其第一、第二夹块上分别设置对应的弧形夹持口,这样可以很好的与电磁铁的撞杆的外形相适配,增大了夹具与撞杆的接触面积,减小了夹具与撞杆之间的局部接触应力,解决了由于直接用台钳夹持撞杆而导致撞杆夹伤的问题;另外,由于两夹块上分别设置有用于与台钳卡配的台阶面,可与台钳配合使用,因此只需一人便可操作,降低了劳动成本的同时也提高了工作效率;本实用新型的夹具既能防止夹伤撞杆且可单人操作,从总体上解决了电磁铁装配过程中电磁铁撞杆上的锁紧螺母安装困难的问题。Since the fixture used for assembling the electromagnet in the transformer of the utility model has corresponding arc-shaped clamping openings respectively provided on its first and second clamping blocks, it can be well adapted to the shape of the lance of the electromagnet. , which increases the contact area between the fixture and the lance, reduces the local contact stress between the fixture and the lance, and solves the problem of pinching the lance caused by directly clamping the lance with vise; in addition, due to the two The clamping blocks are respectively provided with stepped surfaces for clamping with the vise, which can be used in conjunction with the vise, so only one person can operate, which reduces labor costs and improves work efficiency; the clamp of the utility model can not only The utility model can prevent the ram from being pinched and can be operated by a single person, and generally solves the problem of difficult installation of the locking nut on the ram of the electromagnet during the assembling process of the electromagnet.

更进一步的,在所述的两夹块之间顶装复位弹簧,可在每次使用后使两夹块自动弹开,一方面进一步降低的工作人员的劳动强度,另一方面也提高了上产效率。Furthermore, a return spring is installed on the top between the two clips, which can make the two clips bounce off automatically after each use. On the one hand, the labor intensity of the staff is further reduced, and on the other hand, the upper part is also improved. production efficiency.

附图说明Description of drawings

图1是本实用新型的用于变压器中电磁铁装配的夹具的实施例1的使用状态图(带局剖);Fig. 1 is the use state diagram (with partial cutaway) of Embodiment 1 of the clamp for electromagnet assembly in the transformer of the present utility model;

图2是图1除去撞杆后的俯视图。Fig. 2 is a top view of Fig. 1 after the lance is removed.

具体实施方式Detailed ways

本实用新型的用于变压器中电磁铁装配的夹具的实施例1,如图1-2所示,由第一夹块1、第二夹块2、用于连接两夹块的两销轴3及顶装于两夹块之间的复位弹簧4组成。第一、第二夹块的两端分别通过销轴3连接,两夹块均在销轴3的轴向上与销轴3活动导向配合,两销轴3上分别套设有复位弹簧4,复位弹簧4顶装于两夹块之间,复位弹簧4用于在对工件装配完毕后自动弹开两夹块,方便下一次的使用,同时也减轻了工作人员的劳动强度,第一、第二夹块在销轴3的轴向上互相靠近的一侧上分别对应设置有半圆形的夹持口5,夹持口5用于放入并夹紧电磁铁撞杆6,由于夹持口5为半圆形,因此与撞杆6的外轮廓相适配,可增大与撞杆6的接触面积,减小夹持口5夹紧撞杆6时的局部应力,避免撞杆6被夹伤;两夹块在销轴3轴向上相互背对的一侧上分别设置有用于与台钳的钳口口沿卡配的台阶面。本实用新型的用于变压器中电磁铁装配的夹具在使用时,首先将所述夹具放置于台钳的钳口处,两夹块分别通过其对应的台阶面与台钳的钳口口沿卡配,然后将撞杆6放置于两夹块的夹持口之间,通过旋动台钳来将顶杆夹紧后即可进行螺母装配;装配完毕后,旋动台钳将两夹块松开,两夹块在复位弹簧的作用下自动分离,即可取出撞杆6,然后放入下一个撞杆继续进行装配,如此循环。Embodiment 1 of the fixture used for the assembly of electromagnets in transformers of the present utility model, as shown in Figure 1-2, consists of a first clamping block 1, a second clamping block 2, and two pin shafts 3 for connecting the two clamping blocks And the back-moving spring 4 that the top is installed between the two clamping blocks is composed. The two ends of the first and second clamping blocks are respectively connected by the pin shaft 3, and the two clamping blocks are all in the axial direction of the pin shaft 3 to cooperate with the movable guide of the pin shaft 3, and the two pin shafts 3 are respectively sleeved with a return spring 4, The return spring 4 is installed between the two clamps on the top, and the return spring 4 is used to pop open the two clamps automatically after the workpiece is assembled, which is convenient for the next use, and also reduces the labor intensity of the staff. The two clamping blocks are respectively provided with semicircular clamping openings 5 on the side close to each other in the axial direction of the pin shaft 3. The clamping openings 5 are used to put in and clamp the electromagnet striker 6. Due to the clamping The mouth 5 is semicircular, so it is compatible with the outer contour of the lance 6, which can increase the contact area with the lance 6, reduce the local stress when the clamping mouth 5 clamps the lance 6, and avoid the impact of the lance 6. Being pinched; the two clamping blocks are respectively provided with stepped surfaces on the sides opposite to each other in the axial direction of the pin shaft 3 for engaging with the jaws of the vise. When the clamp used for assembling the electromagnet in the transformer of the utility model is used, firstly, the clamp is placed on the jaw of the vise, and the two clamps are respectively clamped by the corresponding step surface and the jaw of the vise. Then place the plunger 6 between the clamping openings of the two clamping blocks. After clamping the ejector rod by rotating the vise, the nut assembly can be carried out; after the assembly is completed, rotate the vise to loosen the two clamping blocks. Open, two clip blocks are separated automatically under the effect of back-moving spring, can take out lance 6, then put into next lance and continue to assemble, so cycle.

上述实施例中,所述的夹持口5的形状还可以为除半圆形以外的其它弧形,所述的复位弹簧4还可以省略。In the above-mentioned embodiment, the shape of the clamping opening 5 can also be arc-shaped other than semicircle, and the return spring 4 can also be omitted.

Claims (3)

1.一种用于变压器中电磁铁装配的夹具,其特征在于:包括第一夹块及第二夹块,所述第一、第二夹块的两端分别通过对应的销轴连接,第一、第二夹块分别沿销轴的轴向与销轴活动导向配合,两夹块在所述销轴轴向上互相靠近的一侧上均设置有对应的用于夹持撞杆的弧形夹持口,两夹块互相背离的一侧上分别设置有用于与台钳钳口的口沿卡配的台阶面。1. A fixture for assembling electromagnets in transformers, characterized in that: it comprises a first clamping block and a second clamping block, the two ends of the first and second clamping blocks are respectively connected by corresponding pin shafts, the first 1. The second clamping blocks are respectively guided and coordinated with the pin shaft along the axial direction of the pin shaft. The two clamping blocks are provided with corresponding arcs for clamping the lance on the side close to each other in the axial direction of the pin shaft. shaped clamping openings, the sides of the two clamping blocks facing away from each other are respectively provided with stepped surfaces for engaging with the jaws of the vise. 2.根据权利要求1所述的用于变压器中电磁铁装配的夹具,其特征在于:所述的夹持口为半圆形。2. The jig for assembling the electromagnet in the transformer according to claim 1, wherein the clamping opening is semicircular. 3.根据权利要求1或2所述的用于变压器中电磁铁装配的夹具,其特征在于:所述的两销轴上分别套设有复位弹簧,所述各复位弹簧均顶装于第一、第二夹块之间。3. The fixture for assembling electromagnets in transformers according to claim 1 or 2, characterized in that: the two pin shafts are respectively sleeved with return springs, and each of the return springs is top mounted on the first , Between the second clamping block.
CN201020633782XU 2010-11-30 2010-11-30 Fixture used for assembling electromagnet of transformer Expired - Lifetime CN201904207U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201020633782XU CN201904207U (en) 2010-11-30 2010-11-30 Fixture used for assembling electromagnet of transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201020633782XU CN201904207U (en) 2010-11-30 2010-11-30 Fixture used for assembling electromagnet of transformer

Publications (1)

Publication Number Publication Date
CN201904207U true CN201904207U (en) 2011-07-20

Family

ID=44274800

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201020633782XU Expired - Lifetime CN201904207U (en) 2010-11-30 2010-11-30 Fixture used for assembling electromagnet of transformer

Country Status (1)

Country Link
CN (1) CN201904207U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231347A (en) * 2013-05-14 2013-08-07 厦门力鼎光电技术有限公司 Assembling and disassembling tool for gland of surveillance lens
CN107597987A (en) * 2017-09-30 2018-01-19 万控智造浙江电气有限公司 A kind of conveying pressure riveting mechanism of positioning sleeve
CN107770988A (en) * 2017-10-11 2018-03-06 哈尔滨工程大学 A data protection device for shock-resistant offshore testing system
CN107900289A (en) * 2017-12-12 2018-04-13 重庆乐迪机车车辆配件有限公司 A kind of mould for being used to cast disk class multicolumn shaped cast part

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103231347A (en) * 2013-05-14 2013-08-07 厦门力鼎光电技术有限公司 Assembling and disassembling tool for gland of surveillance lens
CN107597987A (en) * 2017-09-30 2018-01-19 万控智造浙江电气有限公司 A kind of conveying pressure riveting mechanism of positioning sleeve
CN107770988A (en) * 2017-10-11 2018-03-06 哈尔滨工程大学 A data protection device for shock-resistant offshore testing system
CN107900289A (en) * 2017-12-12 2018-04-13 重庆乐迪机车车辆配件有限公司 A kind of mould for being used to cast disk class multicolumn shaped cast part

Similar Documents

Publication Publication Date Title
CN202607321U (en) Impact self-locking manual clamp
CN201904207U (en) Fixture used for assembling electromagnet of transformer
CN204365899U (en) A kind of transmission line tower stay wire tools
CN106002139A (en) Operating rod base feeding mechanical arm of limit switch head assembly machine
CN205765908U (en) A kind of ATF pump mentions device
CN201178254Y (en) Knife finger changer
CN205304187U (en) Damper tup riveting tools
CN204116132U (en) A kind of steel wire pulling force detects quick-speed jigs
CN204262393U (en) A kind of brush cover pulling claw hold down gag
CN204449732U (en) A kind of rivet welding equalizer bar fixture
CN102922455A (en) Automatic clamping device
CN204019472U (en) Rack buckle nut is installed, dismantling tong
CN203171466U (en) Automatic clamping device
CN108466075A (en) A Pneumatic Automatic Clamping Fixture
CN211306349U (en) Clamping jaw device
CN203197620U (en) Flat tongs capable of clamping long, narrow and thin walled workpieces
CN207014220U (en) Chucking clamp with double work jaw
CN201394795Y (en) Split mounting pliers for split pin
CN201235510Y (en) Tool pliers
CN211804979U (en) A collet that is easy to open and close
CN222269973U (en) Product clamp
CN202424012U (en) Special overhauling tool for stylus pressure clamp
CN205043397U (en) Scaffold slash pole welding jig
CN206632935U (en) A kind of rear pump packing ring dismounting pincers
CN205733562U (en) Positioning and tensioning device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: PINGGAO ELECTRIC CO., LTD., HENAN

Free format text: FORMER OWNER: PINGGAO GROUP CO., LTD.

Effective date: 20131216

C41 Transfer of patent application or patent right or utility model
TR01 Transfer of patent right

Effective date of registration: 20131216

Address after: South East of Pingdingshan city in Henan province 467001 No. 22

Patentee after: Pinggao Electric Co., Ltd., Henan

Address before: South East of Pingdingshan city in Henan province 467001 No. 22

Patentee before: Pinggao Group Co., Ltd.

CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20110720