[go: up one dir, main page]

CN201873949U - 桥梁预应力张拉台车 - Google Patents

桥梁预应力张拉台车 Download PDF

Info

Publication number
CN201873949U
CN201873949U CN2010206008019U CN201020600801U CN201873949U CN 201873949 U CN201873949 U CN 201873949U CN 2010206008019 U CN2010206008019 U CN 2010206008019U CN 201020600801 U CN201020600801 U CN 201020600801U CN 201873949 U CN201873949 U CN 201873949U
Authority
CN
China
Prior art keywords
stretch
draw
trolley
draw trolley
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010206008019U
Other languages
English (en)
Inventor
刘军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Original Assignee
China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd filed Critical China Railway Construction Bridge Engineering Bureau Electrification Engineering Co Ltd
Priority to CN2010206008019U priority Critical patent/CN201873949U/zh
Application granted granted Critical
Publication of CN201873949U publication Critical patent/CN201873949U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

一种桥梁预应力张拉台车,属于桥梁建筑技术领域,其特征是:行走部分、接高部分和承载张拉部分的各对应立管通过插接配合固定,行走立管的底部安装有车轮,行走部分、接高部分和承载张拉部分的各立管之间固定有横梁和斜撑,在承载张拉部分的各立管中间安装有千斤顶。有益效果是:极大提高了施工效率。且张拉台车施工方便,相比传统的张拉方法可节省60%人工,并且可以节省30%~40%的施工时间,由于张拉台车可自己行走,大大减少了搬运时间和危险,并且由于自身有调节高度功能也大大的减少了张拉对正的时间。

Description

桥梁预应力张拉台车
技术领域
本实用新型属于桥梁建筑技术领域。
背景技术
目前在桥梁建筑施工过程中,箱梁内腔顶板张和底板拉时,一般为桥梁顶板预留孔,采用导链对张拉设备进行调整,但采用该种方法需要对桥梁顶板预留孔,张拉后需要封闭预留孔,而且张拉速度慢,费工费时。
发明内容
本实用新型的目的是:提供一种桥梁预应力张拉台车,它可高效、快捷地对箱梁内腔顶板张和底板拉。
本实用新型的技术方案是:它由行走部分、接高部分和承载张拉部分组成。
行走部分、接高部分和承载张拉部分的各对应立管通过插接配合固定,行走立管的底部安装有车轮,行走部分、接高部分和承载张拉部分的各立管之间固定有横梁和斜撑,在承载张拉部分的各立管中间安装有千斤顶。
本实用新型的有益效果是:经实际应用,张拉进度达到每天30束以上,极大提高了施工效率。且张拉台车施工方便,相比传统的张拉方法可节省60%人工,并且可以节省30%~40%的施工时间,减少了人工费的开支。由于张拉台车可自己行走,大大减少了搬运时间和危险,并且由于自身有调节高度功能也大大的减少了张拉对正的时间。实践证明张拉台车有很好的使用效果,在施工中没有发生任何安全事故,非常适合桥梁张拉工程施工,也可应用于其它相似工程。
附图说明
图1是本实用新型的主视图;
图2是本实用新型的侧视图。
具体实施方式
下面结合附图对本实用新型做进一步描述:
如图所示,1是车轮、2是立管、3是行走部分、4是接高部分、5是承载张拉部分、6是横梁、7是行走部分斜撑、8是接高部分斜撑、9是承载张拉部分斜撑、10是上下连接部分的套管、11是连接孔、12是千斤顶、13是千斤顶罩。
车轮1是张拉台车所用车轮需要采用可以旋转360度的,并在四个轮子构造中安装固定装置,该工程采用的是用轮子中设置多个圆孔,在轮子外侧设置防护罩,在防护罩上也设置相应的圆孔,用铁棍插到相应的圆孔中来固定台车;接高部分4可以根据需要接高;承载张拉部分5是根据张拉设备的不同进行吊装和加固,一般采用钢筋焊接相应的形状并与钢管连接承载;连接孔11是采用钢棍连接;千斤顶12是用来调节高度;千斤顶罩13是放置千斤顶及控制其移动方向。
本实用新型采用长宽根据张拉设备确定,高度根据张拉要求确定,整个台车完全用钢管,组装而成,若张拉高度比较高,要在台车四角设置支撑装置,防止倾斜。安装张拉设备时,由于台车内部空间大于张拉设备尺寸,所以在张拉台车内采用导链把张拉设备吊装到相应位置,并与台车相连。
采用张拉台车后,张拉用的千斤顶可以自由移动,节省搬运时间,并且再张拉时,可以采用台车四个支柱的千斤顶进行调节张拉千斤顶的高度和角度,再进行张拉。

Claims (1)

1.一种桥梁预应力张拉台车,其特征是:行走部分、接高部分和承载张拉部分的各对应立管通过插接配合固定,行走立管的底部安装有车轮,行走部分、接高部分和承载张拉部分的各立管之间固定有横梁和斜撑,在承载张拉部分的各立管中间安装有千斤顶。
CN2010206008019U 2010-11-11 2010-11-11 桥梁预应力张拉台车 Expired - Fee Related CN201873949U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010206008019U CN201873949U (zh) 2010-11-11 2010-11-11 桥梁预应力张拉台车

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010206008019U CN201873949U (zh) 2010-11-11 2010-11-11 桥梁预应力张拉台车

Publications (1)

Publication Number Publication Date
CN201873949U true CN201873949U (zh) 2011-06-22

Family

ID=44161874

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010206008019U Expired - Fee Related CN201873949U (zh) 2010-11-11 2010-11-11 桥梁预应力张拉台车

Country Status (1)

Country Link
CN (1) CN201873949U (zh)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661050A (zh) * 2012-05-29 2012-09-12 中国水利水电第十四工程局有限公司 一种预应力张拉辅助施工台架装置
CN105484165A (zh) * 2016-01-13 2016-04-13 浙江大学城市学院 一体化预应力张拉框架结构及其制作和使用方法
CN105839544A (zh) * 2016-05-10 2016-08-10 云南建工集团有限公司 可在狭窄空间高空作业的负弯矩张拉台车

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102661050A (zh) * 2012-05-29 2012-09-12 中国水利水电第十四工程局有限公司 一种预应力张拉辅助施工台架装置
CN105484165A (zh) * 2016-01-13 2016-04-13 浙江大学城市学院 一体化预应力张拉框架结构及其制作和使用方法
CN105484165B (zh) * 2016-01-13 2017-03-22 浙江大学城市学院 一体化预应力张拉框架结构及其制作和使用方法
CN105839544A (zh) * 2016-05-10 2016-08-10 云南建工集团有限公司 可在狭窄空间高空作业的负弯矩张拉台车

Similar Documents

Publication Publication Date Title
CN201143722Y (zh) 液压整体拆装式箱梁钢制外模
CN104695752B (zh) 快速抢修塔系统及其架设方法
CN203834373U (zh) 一种箱涵侧墙模板吊装移动运模台车
CN104005569A (zh) 一种托梁拔柱施工方法
CN204418784U (zh) 烟囱钢内筒液压提升施工装置
CN207903788U (zh) 一种钢柱筒架交替支撑式钢平台与塔吊同步提升装置
CN201873949U (zh) 桥梁预应力张拉台车
CN101177933A (zh) 桥梁拱肋吊运及支撑支架一体化施工方法及装置
CN101633483B (zh) 一种钢结构网架整体提升装置
CN201401005Y (zh) 滑升模板装置
CN204980946U (zh) 带行走机构的塔吊
CN102587643A (zh) 大吨位长行程油缸顶升模架
CN201250058Y (zh) 改进的起重行车
CN104563590A (zh) 烟囱钢内筒液压提升施工装置及其方法
CN202023353U (zh) 建筑施工整体提升脚手架
CN201598570U (zh) 斜拉桥缆索吊装设备
CN203867198U (zh) 高层钢结构转换层桁架的滑移设备
CN201128882Y (zh) 桥梁拱肋吊运及支撑支架一体化施工装置
CN204212069U (zh) 一种建筑施工用挂篮
CN102383613B (zh) 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置
CN206319628U (zh) 一种建筑装配式墙板安装机
CN204225503U (zh) 大跨度钢桁架高空散装转换梁胎架
CN203782573U (zh) 一种架设钢管拱桥用拖拉跑道结构
CN202039267U (zh) 荷载辅助承载装置
CN202379616U (zh) 移动式简易起吊装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY CONSTRUCTION BRIDGE ENGINEERING GROU

Free format text: FORMER NAME: CHINA RAILWAY 13TH BUREAU GROUP ELECTRICAL SERVICE ENGINEERING CO., LTD.

CP01 Change in the name or title of a patent holder

Address after: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee after: CR13G ELECTRIC ENGINEERING CO., LTD.

Address before: Hedong District of Tianjin City, 300011 open 46 new Guanfu building room 1201

Patentee before: CR13G Electric Engineering Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110622

Termination date: 20161111