CN201843135U - 送电线路复合基础桩 - Google Patents
送电线路复合基础桩 Download PDFInfo
- Publication number
- CN201843135U CN201843135U CN2010205717906U CN201020571790U CN201843135U CN 201843135 U CN201843135 U CN 201843135U CN 2010205717906 U CN2010205717906 U CN 2010205717906U CN 201020571790 U CN201020571790 U CN 201020571790U CN 201843135 U CN201843135 U CN 201843135U
- Authority
- CN
- China
- Prior art keywords
- foundation
- pile
- anchor
- bars
- excavated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 9
- 239000002131 composite material Substances 0.000 title claims abstract description 8
- 239000004575 stone Substances 0.000 claims abstract description 7
- 230000003014 reinforcing effect Effects 0.000 claims description 9
- 238000004873 anchoring Methods 0.000 claims description 7
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 239000002689 soil Substances 0.000 abstract description 11
- 239000011435 rock Substances 0.000 abstract description 9
- 238000010276 construction Methods 0.000 abstract description 5
- 229910000831 Steel Inorganic materials 0.000 abstract description 4
- 239000000463 material Substances 0.000 abstract description 4
- 239000010959 steel Substances 0.000 abstract description 4
- 238000009412 basement excavation Methods 0.000 abstract description 2
- 238000005452 bending Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 2
- 238000005253 cladding Methods 0.000 description 1
- 150000001875 compounds Chemical class 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 238000009826 distribution Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000000605 extraction Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Landscapes
- Foundations (AREA)
Abstract
一种送电线路复合基础桩,包括由上部掏挖桩和下部锚桩组成的桩体,其特征是上部掏挖桩中部设置地脚螺栓,沿圆周均布设置主柱钢筋,并设置直达下部锚桩底部的基础锚筋,基础锚筋均匀间隔设置在主柱钢筋之间,在主柱钢筋和基础锚筋构成的圆周内外设置箍筋。本实用新型的优点是能抵御水平力产生的侧向弯矩和较强的抗拔性能,结构简单合理,节省工程材料量,使用安全可靠,从根本上解决基础施工劳动强度大,基面铲方量大,铲下的土石无法运走,对环境造成破坏的问题,解决了单一掏挖基础和单一岩石基础各自的局限性。
Description
技术领域
本实用新型涉及一种送电线路基础,特别是适用于我国广大的山区、丘陵地带送电线路复合基础桩。
背景技术
目前,约2/3送电线路途经山区、半山区、丘陵等,其基础的显著特点是基岩面积分布广泛,而基岩上覆盖厚度不同的土。按现有的设计理论及设计规程,土与岩石有不同的设计要求。若按土设计则材料浪费大,对环境的破坏也大;若按岩石设计则考虑其上的覆盖土时,目前无设计理论及设计规程,也不安全。
目前,我国东北等地区输电线路基础桩型式主要采用大开挖台阶式基础桩,主要缺点是施工土石方开挖量大,钢筋混凝土用量大,基础造价高、对环境影响较大。对在植被较好,土覆盖层较厚,岩与土结合地区应用原状土基础型式,国内尚未见相应的基础型式。
总之,国内电力行业对杆塔基础虽做了一些研究工作,但都是对单一土质的单一设计方法,没有对复合土质(土与岩石的组合)的设计方法,但实际工程经常出现这样地质状况,因此现在亟待提供一种新的基础桩满足实际工程的需要。
实用新型内容
本实用新型的目的是为了针对土岩结合的地质条件,提供一种送电线路复合基础桩,
结构简单合理,节省工程材料量,使用安全可靠,从根本上解决基础施工劳动强度大,基面铲方量大,铲下的土石无法运走,对环境造成破坏的问题,解决了单一掏挖基础和单一岩石基础各自的局限性。
本实用新型的技术方案是:包括由上部掏挖桩和下部锚桩组成的桩体,其特征是:上部掏挖桩中部设置地脚螺栓,沿圆周均布设置主柱钢筋,并设置直达下部锚桩底部的基础锚筋,基础锚筋均匀间隔设置在主柱钢筋之间,在主柱钢筋和基础锚筋构成的圆周内外设置箍筋。
本实用新型的积极效果是:能抵御水平力产生的侧向弯矩和较强的抗拔性能,结构简单合理,节省工程材料量,使用安全可靠,从根本上解决基础施工劳动强度大,基面铲方量大,铲下的土石无法运走,对环境造成破坏的问题,解决了单一掏挖基础和单一岩石基础各自的局限性。
附图说明
图1是本实用新型的结构示意图。
图2是图1的主柱配筋剖面图。
具体实施方式
见图1,具体结构如下:复合基础桩的桩体由混凝土的上部掏挖桩5-1和下部锚桩5-2组成,上部掏挖桩5-1中部设置地脚螺栓1;沿圆周均布设置主柱钢筋2-2,同时沿圆周均布设置基础锚筋2-1,基础锚筋2-1直达下部锚桩5-2底部,基础锚筋2-1均匀间隔设置在主柱钢筋2-2之间;在主柱钢筋2-2和基础锚筋2-1构成的圆周内外设置内、外箍筋3-2、3-1。
施工后,上部掏挖桩5-1位于土体内,下部锚桩5-2位于岩石层。通过地脚螺栓1安装电力铁塔。
Claims (1)
1. 一种送电线路复合基础桩,包括由上部掏挖桩和下部锚桩组成的桩体,其特征是:上部掏挖桩中部设置地脚螺栓,沿圆周均布设置主柱钢筋,并设置直达下部锚桩底部的基础锚筋,基础锚筋均匀间隔设置在主柱钢筋之间,在主柱钢筋和基础锚筋构成的圆周内外设置箍筋。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205717906U CN201843135U (zh) | 2010-10-22 | 2010-10-22 | 送电线路复合基础桩 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010205717906U CN201843135U (zh) | 2010-10-22 | 2010-10-22 | 送电线路复合基础桩 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201843135U true CN201843135U (zh) | 2011-05-25 |
Family
ID=44038029
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010205717906U Expired - Fee Related CN201843135U (zh) | 2010-10-22 | 2010-10-22 | 送电线路复合基础桩 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201843135U (zh) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102828525A (zh) * | 2012-08-16 | 2012-12-19 | 国核电力规划设计研究院 | 输电线路杆塔的基础结构 |
| CN104278690A (zh) * | 2014-10-11 | 2015-01-14 | 国家电网公司 | 一种新型高压输电线路铁塔桩基础 |
| CN104499501A (zh) * | 2014-12-08 | 2015-04-08 | 国家电网公司 | 一种输电线路窄基塔单桩墩式自稳基础 |
| CN110777836A (zh) * | 2019-10-31 | 2020-02-11 | 山东建筑大学 | 一种钢筋混凝土板式-锚杆复合基础及其使用方法 |
| CN111576469A (zh) * | 2020-04-02 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | 一种新型输电线路杆塔基础及施工方法 |
-
2010
- 2010-10-22 CN CN2010205717906U patent/CN201843135U/zh not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102828525A (zh) * | 2012-08-16 | 2012-12-19 | 国核电力规划设计研究院 | 输电线路杆塔的基础结构 |
| CN104278690A (zh) * | 2014-10-11 | 2015-01-14 | 国家电网公司 | 一种新型高压输电线路铁塔桩基础 |
| CN104278690B (zh) * | 2014-10-11 | 2016-03-30 | 国家电网公司 | 一种新型高压输电线路铁塔桩基础 |
| CN104499501A (zh) * | 2014-12-08 | 2015-04-08 | 国家电网公司 | 一种输电线路窄基塔单桩墩式自稳基础 |
| CN104499501B (zh) * | 2014-12-08 | 2017-02-22 | 国家电网公司 | 一种输电线路窄基塔单桩墩式自稳基础 |
| CN110777836A (zh) * | 2019-10-31 | 2020-02-11 | 山东建筑大学 | 一种钢筋混凝土板式-锚杆复合基础及其使用方法 |
| CN111576469A (zh) * | 2020-04-02 | 2020-08-25 | 国网浙江省电力有限公司湖州供电公司 | 一种新型输电线路杆塔基础及施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103711135B (zh) | 一种联拱结构抗滑桩 | |
| CN201843135U (zh) | 送电线路复合基础桩 | |
| CN102828525A (zh) | 输电线路杆塔的基础结构 | |
| CN205742175U (zh) | 一种钢结构挖孔桩护壁 | |
| CN101691760B (zh) | 一种锚杆联合掏挖复合基础及其施工方法 | |
| CN207092118U (zh) | 一种上部带有斜锚杆的挖孔桩复合基础 | |
| CN201485863U (zh) | 掏挖加岩石锚杆复合环保型基础 | |
| CN203361150U (zh) | 一种复合抗浮锚杆桩 | |
| CN201232194Y (zh) | 一种抗变形输电杆塔 | |
| CN102953392B (zh) | 一种光伏电站的桩基础结构与桩基础施工工艺 | |
| CN204151796U (zh) | 一种加筋生态混凝土护坡 | |
| CN201151920Y (zh) | 抗浮地坑结构 | |
| CN103046539B (zh) | 一种不等间距布设的外等腰梯形横截面抗滑桩的施工方法 | |
| CN202124863U (zh) | 螺旋锚掏挖复合基础 | |
| CN202644589U (zh) | 软土地质预应力管桩静压防挤土结构 | |
| CN108330963A (zh) | 一种用于土体内部既有桩基接桩的施工装置 | |
| CN101691759A (zh) | 掏挖加岩石锚杆复合环保型基础的施工方法 | |
| CN203498860U (zh) | 光伏组件支架带混凝土块的锚杆基础结构 | |
| CN103215965A (zh) | 层板式高桩承台塔吊基础结构及施工方法 | |
| CN201502065U (zh) | 一种锚杆联合开挖类复合基础 | |
| CN1952273A (zh) | 一种带挡板的掏挖基础及其施工方法 | |
| CN202830994U (zh) | 顺层边坡桥梁敦台防护结构 | |
| CN201588222U (zh) | 叠合式掏嵌基础 | |
| CN101349063B (zh) | 架空送电线路强风化岩层缠绕锚杆的铁塔基础 | |
| CN104420479A (zh) | 光伏组件支架带混凝土块的锚杆基础结构及设置方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20110525 Termination date: 20151022 |
|
| EXPY | Termination of patent right or utility model |