CN201818097U - Prestressed steel rod - Google Patents

Prestressed steel rod Download PDF

Info

Publication number
CN201818097U
CN201818097U CN2010202062372U CN201020206237U CN201818097U CN 201818097 U CN201818097 U CN 201818097U CN 2010202062372 U CN2010202062372 U CN 2010202062372U CN 201020206237 U CN201020206237 U CN 201020206237U CN 201818097 U CN201818097 U CN 201818097U
Authority
CN
China
Prior art keywords
gripper shoe
steel pipe
rod
pipe bar
prestressed cable
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2010202062372U
Other languages
Chinese (zh)
Inventor
曾友明
蔡建林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HUBEI MICROWORLD TECHNOLOGY Co Ltd
Original Assignee
HUBEI MICROWORLD TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by HUBEI MICROWORLD TECHNOLOGY Co Ltd filed Critical HUBEI MICROWORLD TECHNOLOGY Co Ltd
Priority to CN2010202062372U priority Critical patent/CN201818097U/en
Application granted granted Critical
Publication of CN201818097U publication Critical patent/CN201818097U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses a prestrssed steel rod and the two ends of the steel rod are welded with support boards. The support boards are then connected with prestressed material to reinforce the structure of large flexibility rods. The prestressed steel rod is lighter than the cement rod or other steel rod of the same size. According to the utility model, the stress distribution and the lateral rigidity of the rod body are improved. The prestressed steel rod has the advantages of light weight, low cost, easy recovery and the like, which effectively replaces the existing transmission steel towers and cement rods and is simultaneously used in traffic signal lamp bars, traffic signs, monitoring rods, lighting rods and flagpoles.

Description

A kind of pre-stressed steel pipe bar
Technical field
The utility model patent relates to the steel pipe pole field, relates in particular to a kind of pre-stressed steel pipe bar.
Background technology
All be transmission of electricity shaped steel tower and cement pole now at present in our the power transmission lines system, this type of steel pipe pole class formation is big flexibility structure, in structure design often intensity have more than needed, and insufficient rigidity.The structure of roadway sign bar and monitoring bar and so on also is like this.Cement pole is to use cement to make, and has produced a large amount of not tractable rubbish after scrapping, and environment contaminates society.And the big open-air transportation of bar weight that cement is made is extremely inconvenient.
The utility model content
Technical problem to be solved in the utility model is exactly at above-mentioned deficiency, and provide a kind of in light weight, save the energy, safe and reliable a kind of pre-stressed steel pipe bar.The both sides of central axis are equipped with some prestressed cables in the body of rod.
The purpose of this utility model can be achieved through the following technical solutions, and the pre-stressed steel pipe bar comprises the body of rod and prestressing apparatus.
The pre-stressed steel pipe bar is characterized in that: inboard, body of rod two ends all is welded with gripper shoe;
The pre-stressed steel pipe bar is characterized in that: two gripper shoes are connected by the prestressed cable material;
The pre-stressed steel pipe bar is characterized in that: there is ground tackle at prestressed cable material two;
Compared with prior art, what the utility model adopted is that steel pole two is welded with gripper shoe, connects gripper shoe to add the structure of powerful flexibility bar class rigidity with the prestressed cable material again.The pre-stressed steel pipe bar is lighter than cement pole and other steel pole weight under identical specification.The pre-stressed steel pipe bar has improved the stress distribution of the body of rod, improved body of rod lateral rigidity, have characteristics such as in light weight, that cost is low, material recovery is easy, existing transmission of electricity shaped steel tower and cement pole be can effectively substitute, traffic signals lamp stand, traffic sign bar, monitoring bar, illumination lamp stand and flagpole etc. can be applicable to simultaneously.
Description of drawings
Fig. 1 is the cross-sectional view of pre-stressed steel pipe bar in the utility model.
Fig. 2 is the top cross-sectional view of pre-stressed steel pipe bar in the utility model.
Fig. 3 is the bottom cross-sectional view of pre-stressed steel pipe bar in the utility model.
Fig. 4 is a flange connection diagram in the utility model.
Fig. 5 is a connected structure schematic diagram in the utility model.
Fig. 6 be in the utility model end flange as the scheme of installation of gripper shoe.
Fig. 7 is the structural representation of gripper shoe in the utility model.
Fig. 8 is the another kind of structural representation of gripper shoe in the utility model.
Among the figure, joint 7 steel poles save 8 blocks, 9 rope material holes 10 down on the body of rod 1 upper backup pad 2 ground tackles 3 prestressed cable materials 4 stream zinc hole 5 lower supporting plates, 6 steel poles.
The specific embodiment
Embodiment describes in further detail the utility model below in conjunction with accompanying drawing:
Structure of the present utility model is seen Fig. 1-shown in Figure 8, and a kind of pre-stressed steel pipe bar includes the body of rod, gripper shoe and ground tackle.
The body of rod 1 is polygon taper of metal system or taper shape.Rope material hole on upper backup pad and the lower supporting plate and ground tackle are circle distribution.All be welded with gripper shoe at the body of rod 1 upper and lower side, the inside respectively indentation of gripper shoe has certain distance, gripper shoe is simultaneously also as conventional stiffening plate, the rope material hole 10 that some circumference are arranged on the gripper shoe, prestressed cable material 4 is passed the rope material hole 10 of upper backup pad 2 and band reinforcement gusset lower supporting plate 6, one end will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe, after the other end arrives suitable length to 4 stretch-draw of prestressed cable material with prestress tensioning equipment, also will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe.End flange also can be used as lower supporting plate 6 usefulness.
Gripper shoe has two kinds of structures: 1, be cirque structure, on have the rope material hole 10 of some circumference, the outside that stream zinc hole 5 is arranged.2, be single chip architecture, every gripper shoe is welded in the inwall of the body of rod 1, also is circumference, and every gripper shoe all has a rope material hole 10.
For the facility of processing and transporting, when a cover steel pole can be made up of more piece, then adopt flange to connect or socket connection.
When flange connects, steel pole two ends welded flange, joint 7 flange in the bottom are connected by bolton with the following joint of steel pole 8 top flange on the steel pole.Again prestressed cable material 4 is passed the rope material hole 10 of the gripper shoe of two ends correspondence, one end will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe, after the other end arrives suitable length to 4 stretch-draw of prestressed cable material with prestress tensioning equipment, also will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe.
During socket connection, joint 7 bottoms are bigger slightly than the following joint of steel pole 8 top diameters on the steel pole, the top that joint 7 bottoms cover is received joint 8 under the steel pole on the steel pole, and again by the equipment tension, for guaranteeing the prestressing force effect, the suitable position of joint 7 bottom interior wall is welded with block 9 on steel pole.After each pole body 1 grafting finishes, prestressed cable material 4 is passed the rope material hole 10 of the gripper shoe of two ends correspondence, one end will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe, after the other end arrives suitable length to 4 stretch-draw of prestressed cable material with prestress tensioning equipment, also will pass prestressed cable material 4 usefulness ground tackles 3 anchorings of gripper shoe.
If the body of rod 1 each side force-bearing situation difference, then ground tackle 3 distributing positions on the upper backup pad 2 and prestressed cable material 4 stretch-draw length are made corresponding adjustment according to actual state, ground tackle 3 can be an asymmetric arrangement, and the stretch-draw length of every prestressed cable material 4 is also not necessarily identical.
The rope material hole 10 of lower supporting plate 6 also can be directly on end flange in the utility model, anchor slab 3 and intermediate plate 5 are positioned at the bottom surface of lower supporting plate 6 (end flange), central authorities left a sinking space when steel pipe pole basis was pre-buried, after steel pipe pole was installed on the stone bolt, the tail end of ground tackle 3 and prestressed cable material 4 just in time was positioned at this space.
[0027] though the utility model only illustrate and describe by embodiment; but those skilled in the art should understand; in the scope of claims; different profiles and quantity to gripper shoe; the position of the different size of prestressed cable material 4 and quantity and gripper shoe all belongs to protection domain of the present utility model.

Claims (6)

1. pre-stressed steel pipe bar, it is characterized in that, comprise the body of rod, gripper shoe and ground tackle, all be welded with gripper shoe at the body of rod (1) upper and lower side, the inside respectively indentation of gripper shoe has certain distance, the rope material hole (10) that some circumference are arranged on the gripper shoe, prestressed cable material (4) is passed the rope material hole (10) of upper backup pad (2) and band reinforcement gusset lower supporting plate (6), one end will pass prestressed cable material (4) ground tackle (3) anchoring of gripper shoe, after the other end uses prestress tensioning equipment prestressed cable material (4) stretch-draw, also will pass prestressed cable material (4) ground tackle (3) anchoring of gripper shoe.
2. a kind of pre-stressed steel pipe bar according to claim 1 is characterized in that: rope material hole (10) on upper backup pad (2) and the lower supporting plate (6) and ground tackle (3) are circle distribution.
3. a kind of pre-stressed steel pipe bar according to claim 1 is characterized in that: joint (7) adopts flange to be connected or the socket connection mode with the following joint of steel pole (8) on the steel pole.
4. a kind of pre-stressed steel pipe bar according to claim 1 is characterized in that: joint (7) bottom interior wall is welded with block (9) on the steel pole.
5. a kind of pre-stressed steel pipe bar according to claim 1 is characterized in that: the hole of lower supporting plate (6) can be directly on end flange.
6. a kind of pre-stressed steel pipe bar according to claim 1 is characterized in that: ground tackle (3) can be an asymmetric arrangement.
CN2010202062372U 2010-05-28 2010-05-28 Prestressed steel rod Expired - Fee Related CN201818097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN2010202062372U CN201818097U (en) 2010-05-28 2010-05-28 Prestressed steel rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN2010202062372U CN201818097U (en) 2010-05-28 2010-05-28 Prestressed steel rod

Publications (1)

Publication Number Publication Date
CN201818097U true CN201818097U (en) 2011-05-04

Family

ID=43916061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2010202062372U Expired - Fee Related CN201818097U (en) 2010-05-28 2010-05-28 Prestressed steel rod

Country Status (1)

Country Link
CN (1) CN201818097U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291110A (en) * 2013-05-20 2013-09-11 同济大学 Electricity transmitting pole with functions of swinging and self-resetting
WO2015090861A1 (en) * 2013-12-18 2015-06-25 Wobben Properties Gmbh Arrangement with a concrete foundation and a tower and method for erecting a tower
CN105114412A (en) * 2015-07-30 2015-12-02 中国人民解放军理工大学 Connector employing prestressed cable for composite pipe and application method of connector
CN105298203A (en) * 2015-10-16 2016-02-03 青岛中天斯壮科技有限公司 Anti-fatigue pre-stress steel pipe column structure
CN106400677A (en) * 2016-11-03 2017-02-15 华侨大学 Box type steel bridge pier with earthquake damage capable of being fast restored in situ
CN107965194A (en) * 2017-11-03 2018-04-27 华信咨询设计研究院有限公司 Prestressing force single-pipe tower
CN110159054A (en) * 2019-03-19 2019-08-23 中国电力科学研究院有限公司 A kind of steel pipe flange structure and production method containing compressor wire
CN110306862A (en) * 2019-06-10 2019-10-08 山东科技大学 Steel pipe pole with stabilizing cable and construction method
CN110374818A (en) * 2019-08-16 2019-10-25 太原重工股份有限公司 Wind power generating set

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103291110B (en) * 2013-05-20 2015-12-23 同济大学 A kind of have the power transmission rod waved with Self-resetting function
CN103291110A (en) * 2013-05-20 2013-09-11 同济大学 Electricity transmitting pole with functions of swinging and self-resetting
US10704220B2 (en) 2013-12-18 2020-07-07 Wobben Properties Gmbh Arrangement with a concrete foundation and a tower and a method for erecting a tower
WO2015090861A1 (en) * 2013-12-18 2015-06-25 Wobben Properties Gmbh Arrangement with a concrete foundation and a tower and method for erecting a tower
CN105829624A (en) * 2013-12-18 2016-08-03 乌本产权有限公司 Arrangement With A Concrete Foundation And A Tower And Method For Erecting A Tower
CN105114412A (en) * 2015-07-30 2015-12-02 中国人民解放军理工大学 Connector employing prestressed cable for composite pipe and application method of connector
CN105114412B (en) * 2015-07-30 2017-09-22 中国人民解放军理工大学 Using the composite material tube jointing and its application method of prestressed cable
CN105298203A (en) * 2015-10-16 2016-02-03 青岛中天斯壮科技有限公司 Anti-fatigue pre-stress steel pipe column structure
CN106400677A (en) * 2016-11-03 2017-02-15 华侨大学 Box type steel bridge pier with earthquake damage capable of being fast restored in situ
CN107965194A (en) * 2017-11-03 2018-04-27 华信咨询设计研究院有限公司 Prestressing force single-pipe tower
CN110159054A (en) * 2019-03-19 2019-08-23 中国电力科学研究院有限公司 A kind of steel pipe flange structure and production method containing compressor wire
CN110306862A (en) * 2019-06-10 2019-10-08 山东科技大学 Steel pipe pole with stabilizing cable and construction method
CN110306862B (en) * 2019-06-10 2021-02-19 山东科技大学 Steel pipe pole with stabilizing cable and construction method
CN110374818A (en) * 2019-08-16 2019-10-25 太原重工股份有限公司 Wind power generating set

Similar Documents

Publication Publication Date Title
CN201818097U (en) Prestressed steel rod
CN102713071A (en) Method for constructing a suspension bridge using temporary cables under tensionless stay cable conditions, and temporary cable for same
CN103993735A (en) Support system of roof inclined beam and slab cantilever structure and construction method of support system
CN203867181U (en) Supporting system for roof inclined beam and slab cantilever structure
CN204023319U (en) For the triangular tower of cableway of constructing
CN211395402U (en) Municipal works road and bridge crack restoration fixed knot constructs
CN201730776U (en) Wind driven generator tower capable of lifting
CN202530823U (en) Prestressing force truss type tube tower
CN201771246U (en) Reactive powder concrete contact line supporting column
CN205348963U (en) A security fence for building site
CN205046927U (en) Improved generation is joined in marriage net overhead line and is prevent wind draw off mechanism
CN204876759U (en) Prestressing force steel pipe component
CN203113868U (en) Gantry tower for construction cableway
CN218713128U (en) Cable net photovoltaic system for slope protection
CN201785764U (en) Steel pipe concrete structured tower mast foundation
CN106533334A (en) Novel single-layer parallel suspension cable photovoltaic support system
CN216512520U (en) Lifting system suitable for small space
CN205979564U (en) Electric power steel pipe pole is used in city
CN202164622U (en) Tandem tower crane foundation
CN209960150U (en) Reinforced monitoring rod
CN202227482U (en) Connection structure for roof truss and concrete column
CN102535337A (en) Overwater bridge lifting equipment and method
CN104532873A (en) Rock anchor rod foundation structure
CN114084814A (en) Lifting system suitable for small space
CN108442230B (en) Arch bridge suspender structure

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20110504