CN201695339U - 盖梁施工钢支撑 - Google Patents
盖梁施工钢支撑 Download PDFInfo
- Publication number
- CN201695339U CN201695339U CN2010202362485U CN201020236248U CN201695339U CN 201695339 U CN201695339 U CN 201695339U CN 2010202362485 U CN2010202362485 U CN 2010202362485U CN 201020236248 U CN201020236248 U CN 201020236248U CN 201695339 U CN201695339 U CN 201695339U
- Authority
- CN
- China
- Prior art keywords
- bent cap
- construction steel
- steel support
- built
- fitting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 16
- 239000010959 steel Substances 0.000 title claims abstract description 16
- 230000000295 complement effect Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 abstract description 4
- 238000000034 method Methods 0.000 description 7
- 238000003466 welding Methods 0.000 description 5
- 239000011230 binding agent Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202362485U CN201695339U (zh) | 2010-06-24 | 2010-06-24 | 盖梁施工钢支撑 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010202362485U CN201695339U (zh) | 2010-06-24 | 2010-06-24 | 盖梁施工钢支撑 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201695339U true CN201695339U (zh) | 2011-01-05 |
Family
ID=43396579
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010202362485U Expired - Lifetime CN201695339U (zh) | 2010-06-24 | 2010-06-24 | 盖梁施工钢支撑 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201695339U (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102277834A (zh) * | 2011-05-10 | 2011-12-14 | 吴江市明港道桥工程有限公司 | 一种桥梁盖梁的施工托架 |
| CN108867845A (zh) * | 2018-06-29 | 2018-11-23 | 中国二十冶集团有限公司 | I梁挑台支架的安装方法 |
| CN111827116A (zh) * | 2019-04-15 | 2020-10-27 | 中交路桥建设有限公司 | 一种组合式高墩盖梁施工支架 |
| CN113668370A (zh) * | 2021-09-15 | 2021-11-19 | 中建三局第一建设工程有限责任公司 | 一种预制装配式桥墩及其施工方法 |
-
2010
- 2010-06-24 CN CN2010202362485U patent/CN201695339U/zh not_active Expired - Lifetime
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102277834A (zh) * | 2011-05-10 | 2011-12-14 | 吴江市明港道桥工程有限公司 | 一种桥梁盖梁的施工托架 |
| CN108867845A (zh) * | 2018-06-29 | 2018-11-23 | 中国二十冶集团有限公司 | I梁挑台支架的安装方法 |
| CN111827116A (zh) * | 2019-04-15 | 2020-10-27 | 中交路桥建设有限公司 | 一种组合式高墩盖梁施工支架 |
| CN113668370A (zh) * | 2021-09-15 | 2021-11-19 | 中建三局第一建设工程有限责任公司 | 一种预制装配式桥墩及其施工方法 |
| CN113668370B (zh) * | 2021-09-15 | 2024-04-26 | 中建三局第一建设工程有限责任公司 | 一种预制装配式桥墩及其施工方法 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN104005338B (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
| CN102704491B (zh) | 一种型钢与钢筋混凝土梁组合基坑支护围檩及其施工方法 | |
| CN201567532U (zh) | 一种桥梁盖梁的新型支撑结构 | |
| CN202125105U (zh) | 地埋式单立柱小型光伏支架 | |
| CN210134353U (zh) | 一种用于盖梁施工的牛腿式抱箍托架 | |
| CN201695339U (zh) | 盖梁施工钢支撑 | |
| CN103114604A (zh) | 预应力混凝土圆筒型风力发电机组基础 | |
| CN202913420U (zh) | 可重复使用的安装地脚螺栓的定位装置 | |
| CN202090290U (zh) | 预应力钢筋张拉工具 | |
| CN202138969U (zh) | 用于现浇混凝土结构中的塔吊附墙装置 | |
| CN105297766A (zh) | 可更换式预应力锚栓风机基础 | |
| CN204418022U (zh) | 全螺栓连接拼装的工具式钢管柱塔架 | |
| CN203866703U (zh) | 一种护栏 | |
| CN203247601U (zh) | 塔式起重机装配式基座 | |
| CN203866711U (zh) | 一种大跨斜拉桥塔梁三向临时固结结构 | |
| CN202090291U (zh) | 张拉支座 | |
| CN102953344A (zh) | 爬锥式三角悬臂支架 | |
| CN203160142U (zh) | 顶升桥梁钢抱箍支架系统 | |
| CN201347616Y (zh) | 拼装式焊接操作钢平台 | |
| CN112962427A (zh) | 一种跨沟谷非标跨度现浇梁支架及施工方法 | |
| CN204960456U (zh) | 一种屋面配重通信杆塔结构 | |
| CN203924352U (zh) | 一种型钢混凝土钢柱柱脚 | |
| CN203145040U (zh) | 一种便于拆卸运输的预制板铁塔基础 | |
| CN201513443U (zh) | 预埋螺栓 | |
| CN102444202A (zh) | 一种能减小基底作用的h型钢结构体系 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: CHINA 19TH METALLURGICAL CORPORATION Free format text: FORMER OWNER: MCC SHIJIU CONSTRUCTION CO., LTD. Effective date: 20110317 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 617023 NO. 350, RENMIN STREET, PANZHIHUA CITY, SICHUAN PROVINCE TO: 617000 NO. 350, RENMIN STREET, EAST DISTRICT, PANZHIHUA CITY, SICHUAN PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20110317 Address after: 617000 Panzhihua, Sichuan, East Street, No. 350 Patentee after: CHINA 19TH METALLURGICAL GROUP Co.,Ltd. Address before: 617023 No. 350 Renmin Street, Sichuan, Panzhihua Patentee before: MCC SHIJIU CONSTRUCTION Co.,Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20110105 |