CN201620915U - 岩溶隧道反坡排水定压受控排水装置 - Google Patents
岩溶隧道反坡排水定压受控排水装置 Download PDFInfo
- Publication number
- CN201620915U CN201620915U CN2010201441460U CN201020144146U CN201620915U CN 201620915 U CN201620915 U CN 201620915U CN 2010201441460 U CN2010201441460 U CN 2010201441460U CN 201020144146 U CN201020144146 U CN 201020144146U CN 201620915 U CN201620915 U CN 201620915U
- Authority
- CN
- China
- Prior art keywords
- drainage
- tunnel
- karst
- reverse slope
- discharge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 19
- 238000005086 pumping Methods 0.000 claims abstract description 11
- 238000011144 upstream manufacturing Methods 0.000 claims abstract description 11
- 230000035807 sensation Effects 0.000 claims 1
- 238000010276 construction Methods 0.000 abstract description 7
- 238000000034 method Methods 0.000 description 6
- 238000005553 drilling Methods 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000012544 monitoring process Methods 0.000 description 1
- 239000011435 rock Substances 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
本实用新型涉及一种地下排水装置,具体为一种岩溶隧道反坡排水定压受控排水装置,解决原有排水系统易受雨季降雨量影响,无法做到受控排放以及排放费时费力等问题,包括经横通道与正洞、平导贯通的上游泄水洞以及安装在平导下游的抽水泵站,还包含与横通道和岩溶溶腔连通的泄水支洞,泄水支洞内埋设有与岩溶溶腔相通的六根排水管路,排水管路上装有闸阀,其中四根排水管路与抽水泵站连接,其余两根排水管路与上游泄水洞连接。实现受控排放,保证岩溶安全;最大限度减少了对溶腔水系的破坏,尽可能维持原有排水系统,减少隧道反坡排水压力;同时减少反坡排水工作量,保障作业安全,加快隧道施工进度,最终达到受控排放自动化、智能化的目的。
Description
技术领域
本实用新型涉及一种地下排水装置,具体为一种岩溶隧道反坡排水定压受控排水装置。
背景技术
岩溶地区隧道反坡排水通常采用泄水洞排水法、施作止浆墙钻孔排水法,但在实际应用中均存在各自不同的问题,具体如下:
1、泄水洞排水法存在的问题:地形条件受限,尤其反坡施工泄水洞选线困难;长大隧道泄水洞长,投资大,对工程影响时间长;改变原有水系循环,易引起隧道顶部地表水文环境恶化,造成较大环境影响事件;雨季泄水洞水量大,对下游原有排水系统造成威胁;
2、施作止浆墙钻孔排水法存在的问题:断面大、水压高时,止浆墙施作工程量大;要做到受控排放,需人工实时监测控制水压和水量,费时费力。
发明内容
本实用新型为了解决现有岩溶地区隧道反坡排水时原有排水系统易受雨季降雨量影响,无法做到受控排放以及排放费时费力等诸多问题,提供一种岩溶隧道反坡排水定压受控排水装置。
本实用新型是采用如下技术方案实现的:岩溶隧道反坡排水定压受控排水装置,包括经横通道与正洞、平导相互贯通的上游泄水洞以及安装在平导下游的抽水泵站,本实用新型的创新点在于还包含分别与横通道和岩溶溶腔连通的泄水支洞,泄水支洞内埋设有与岩溶溶腔相通的六根排水管路,排水管路上均装有闸阀,其中四根排水管路与抽水泵站连接,其余两根排水管路与上游泄水洞连接。
采用本实用新型的结构设计,实现受控排放,保证岩溶安全;最大限度的减少了对溶腔水系的破坏,尽可能维持原有排水系统,减少隧道反坡排水压力;同时减少了反坡排水工作量,保障了作业安全,加快了隧道施工进度,最终达到受控排放自动化、智能化的目的。
附图说明
图1为本实用新型的结构示意图;
图中:1-横通道;2-正洞;3-平导;4-上游泄水洞;5-抽水泵站;6-岩溶溶腔;7-泄水支洞;8-四根排水管路;9-两根排水管路。
具体实施方式
岩溶隧道反坡排水定压受控排水装置,如图1所示,包括经横通道1与正洞2、平导3相互贯通的上游泄水洞4以及安装在平导下游的抽水泵站5,还包含分别与横通道1和岩溶溶腔6连通的泄水支洞7,泄水支洞7内埋设有与岩溶溶腔相通的六根排水管路,排水管路上均装有闸阀,其中四根排水管路8与抽水泵站5连接,其余两根排水管路9与上游泄水洞4连接。
在溶腔反坡排水施工中,采用本实用新型所述装置,同时结合洞外雨量监测,排水过程为:正常情况不降雨水压小于0.15Mpa时,溶腔水自流,利用四根排水管路及抽水泵站自排,通过平导排至上游泄水洞;当降雨且降雨量较大,抽水泵站无法满足抽排洞内涌水时,关闭四根排水管路上的闸阀,利用隧道稳定岩壁和1.5%反坡,使涌水通过两根排水管路直接排至上游泄水洞;雨季降雨后水压超过0.15Mpa利用水压自动反坡排水,其余溶腔水自循环,保证水压低于0.5Mpa,保证施工安全,最大限度的减少了对溶腔水系的破坏,减少了反坡排水工作量,保障了作业安全,加快了隧道施工进度。
Claims (1)
1.一种岩溶隧道反坡排水定压受控排水装置,包括经横通道(1)与正洞(2)、平导(3)相互贯通的上游泄水洞(4)以及安装在平导下游的抽水泵站(5),其特征是还包含分别与横通道(1)和岩溶溶腔(6)连通的泄水支洞(7),泄水支洞(7)内埋设有与岩溶溶腔相通的六根排水管路,排水管路上均装有闸阀,其中四根排水管路(8)与抽水泵站(5)连接,其余两根排水管路(9)与上游泄水洞(4)连接。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010201441460U CN201620915U (zh) | 2010-03-26 | 2010-03-26 | 岩溶隧道反坡排水定压受控排水装置 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2010201441460U CN201620915U (zh) | 2010-03-26 | 2010-03-26 | 岩溶隧道反坡排水定压受控排水装置 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201620915U true CN201620915U (zh) | 2010-11-03 |
Family
ID=43024371
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2010201441460U Expired - Fee Related CN201620915U (zh) | 2010-03-26 | 2010-03-26 | 岩溶隧道反坡排水定压受控排水装置 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201620915U (zh) |
Cited By (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102251777A (zh) * | 2011-05-31 | 2011-11-23 | 中铁二十局集团第一工程有限公司 | 一种岩溶隧道大规模溶腔处理方法 |
| CN102383858A (zh) * | 2011-10-06 | 2012-03-21 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
| CN102619560A (zh) * | 2012-04-17 | 2012-08-01 | 中铁十六局集团有限公司 | 一种长距离反坡隧道的排水装置以及排水方法 |
| CN102720511A (zh) * | 2012-06-15 | 2012-10-10 | 中铁十二局集团第二工程有限公司 | 隧道泄水沉沙施工结构 |
| CN102808652A (zh) * | 2012-08-20 | 2012-12-05 | 刘元雪 | 一种既有岩溶隧道泄水防突与水文地质环境保护方法 |
| CN104912091A (zh) * | 2015-06-19 | 2015-09-16 | 济南轨道交通集团有限公司 | 一种岩溶水导水装置及导水方法 |
| CN105909309A (zh) * | 2016-06-14 | 2016-08-31 | 中铁十四局集团有限公司 | 长大隧道反坡自动排水系统 |
| CN112145186A (zh) * | 2020-09-25 | 2020-12-29 | 中铁二十局集团有限公司 | 隧道泄水降压结构及施工方法 |
| CN116557061A (zh) * | 2023-06-16 | 2023-08-08 | 四川公路桥梁建设集团有限公司 | 一种应用于公路双隧道反坡排水系统 |
-
2010
- 2010-03-26 CN CN2010201441460U patent/CN201620915U/zh not_active Expired - Fee Related
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102251777B (zh) * | 2011-05-31 | 2014-01-15 | 中铁二十局集团第一工程有限公司 | 一种岩溶隧道大规模溶腔处理方法 |
| CN102251777A (zh) * | 2011-05-31 | 2011-11-23 | 中铁二十局集团第一工程有限公司 | 一种岩溶隧道大规模溶腔处理方法 |
| CN102383858A (zh) * | 2011-10-06 | 2012-03-21 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
| CN102383858B (zh) * | 2011-10-06 | 2014-02-26 | 山西晋城无烟煤矿业集团有限责任公司 | 改进型千米钻场水坝系统 |
| CN102619560A (zh) * | 2012-04-17 | 2012-08-01 | 中铁十六局集团有限公司 | 一种长距离反坡隧道的排水装置以及排水方法 |
| CN102619560B (zh) * | 2012-04-17 | 2014-01-08 | 中铁十六局集团有限公司 | 一种长距离反坡隧道的排水装置以及排水方法 |
| CN102720511A (zh) * | 2012-06-15 | 2012-10-10 | 中铁十二局集团第二工程有限公司 | 隧道泄水沉沙施工结构 |
| CN102808652A (zh) * | 2012-08-20 | 2012-12-05 | 刘元雪 | 一种既有岩溶隧道泄水防突与水文地质环境保护方法 |
| CN104912091A (zh) * | 2015-06-19 | 2015-09-16 | 济南轨道交通集团有限公司 | 一种岩溶水导水装置及导水方法 |
| CN105909309A (zh) * | 2016-06-14 | 2016-08-31 | 中铁十四局集团有限公司 | 长大隧道反坡自动排水系统 |
| CN105909309B (zh) * | 2016-06-14 | 2018-07-03 | 中铁十四局集团有限公司 | 长大隧道反坡自动排水系统 |
| CN112145186A (zh) * | 2020-09-25 | 2020-12-29 | 中铁二十局集团有限公司 | 隧道泄水降压结构及施工方法 |
| CN116557061A (zh) * | 2023-06-16 | 2023-08-08 | 四川公路桥梁建设集团有限公司 | 一种应用于公路双隧道反坡排水系统 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201620915U (zh) | 岩溶隧道反坡排水定压受控排水装置 | |
| CN103821544B (zh) | 隧道与地下工程高压大流量突涌水治理方法 | |
| CN102635402A (zh) | 隧道洞壁渗水处置的下倾钻孔虹吸排水法 | |
| CN205035779U (zh) | 一种适用于输水隧洞调压及检修交通的施工支洞 | |
| CN109538293B (zh) | 一种地下洞室涌水通道的置换处理结构及方法 | |
| CN205259201U (zh) | 一种隧洞地下水控排装置 | |
| CN103374904B (zh) | 农田排灌模式转换节地节水方法 | |
| CN106761919A (zh) | 一种高压富水区隧道自动调压泄水控制装置 | |
| CN107152294A (zh) | 高水压大流量岩溶隧道地下水封堵方法 | |
| CN103114553B (zh) | 一种土石坝管涌溃决现场试验方法 | |
| CN204217594U (zh) | 一种梯田雨水灌溉系统 | |
| CN104652383B (zh) | 尾矿库坝体自流排水装置 | |
| CN103556989B (zh) | 一种冻结法施工井筒围岩水压测量及限量排水装置及其施工方法 | |
| CN203175568U (zh) | 电缆隧道用顶管掘进机内部进排泥控制机构 | |
| CN103758099B (zh) | 一种高水头船闸输水阀门底缘掺气系统 | |
| CN207080232U (zh) | 土压盾构膨润土保压设备 | |
| CN204676504U (zh) | 一种无自流引排条件的长尾水隧洞群的放空检修结构 | |
| CN203383853U (zh) | 用于解决隧道中心沟排水能力不足的缓冲系统 | |
| CN203768881U (zh) | 一种山体、坝体廊道渗水排水装置 | |
| CN105887778A (zh) | 一种高压隧洞附近临空面的可控排水系统 | |
| CN103216263B (zh) | 一种采用截流阀来排空井下充填立管内空气的控制方法 | |
| CN203105243U (zh) | 新型滴灌管 | |
| CN103098661A (zh) | 一种基于农田水位的自动输氧减轻作物渍害的装置 | |
| CN102193515A (zh) | 盾构隧道联络通道冻结效果控制法 | |
| CN206205109U (zh) | 一种水电站地下厂房渗漏排水总管布置结构 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20101103 Termination date: 20180326 |