CN201506979U - A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns - Google Patents
A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns Download PDFInfo
- Publication number
- CN201506979U CN201506979U CN2009201794578U CN200920179457U CN201506979U CN 201506979 U CN201506979 U CN 201506979U CN 2009201794578 U CN2009201794578 U CN 2009201794578U CN 200920179457 U CN200920179457 U CN 200920179457U CN 201506979 U CN201506979 U CN 201506979U
- Authority
- CN
- China
- Prior art keywords
- grouting
- jacket leg
- annular space
- leg column
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 45
- 239000010959 steel Substances 0.000 claims abstract description 45
- 239000000463 material Substances 0.000 claims abstract description 9
- 239000004568 cement Substances 0.000 claims abstract description 6
- 239000011324 bead Substances 0.000 claims description 5
- 239000002002 slurry Substances 0.000 claims description 3
- 238000003466 welding Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 abstract description 13
- 230000000694 effects Effects 0.000 abstract description 7
- 239000004575 stone Substances 0.000 abstract description 7
- 238000012546 transfer Methods 0.000 abstract description 4
- 239000011440 grout Substances 0.000 abstract description 3
- 238000009434 installation Methods 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 abstract description 3
- 238000003780 insertion Methods 0.000 abstract description 2
- 230000037431 insertion Effects 0.000 abstract description 2
- 238000010248 power generation Methods 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 6
- 238000011161 development Methods 0.000 description 4
- 238000013461 design Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 239000011148 porous material Substances 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 230000003746 surface roughness Effects 0.000 description 1
Images
Landscapes
- Foundations (AREA)
- Wind Motors (AREA)
Abstract
本实用新型涉及一种海上风机钢管桩基础与导管架腿柱的灌浆连接结构,属于海洋工程和风力发电领域。主要技术方案为:通过对钢管桩与导管架腿柱组成的环形空间进行灌浆连接,可以把上部荷载经由灌浆结石体传递给钢管桩;在环形空间内设置剪切键,以增大灌浆连接段传递荷载的能力;在环形空间上部及下部设置导向体,可方便打桩施工中钢管桩能够顺利插入导管架腿柱;在环形空间顶部和底部设置封堵器以保证顺利灌浆。选用水泥基高强无收缩灌浆料作为灌浆材料,结石体强度高,连接效果可靠;自环形空间底部注浆阀注入浆液,通过环形空间上部浆液回流阀控制灌浆结束标准。本实用新型可以全断面有效连接,对钢结构不施加外力和热量,易于吸收构件制造误差和安装偏差;对设备无特殊要求,操作简单,并在江苏响水海上测风塔中得到了成功应用,可进一步推广使用。
The utility model relates to a grouting connection structure for a steel pipe pile foundation of an offshore fan and a jacket leg column, and belongs to the fields of marine engineering and wind power generation. The main technical scheme is: by grouting the annular space formed by the steel pipe pile and the jacket leg column, the upper load can be transmitted to the steel pipe pile through the grouting stone body; setting shear keys in the annular space to increase the grouting The ability of the connecting section to transfer load; guide bodies are set at the upper and lower parts of the annular space to facilitate the smooth insertion of steel pipe piles into the jacket leg columns during piling construction; blockers are installed at the top and bottom of the annular space to ensure smooth grouting. Cement-based high-strength non-shrinkage grouting material is selected as the grouting material. The stone body has high strength and reliable connection effect. The grout is injected from the grouting valve at the bottom of the annular space, and the grouting end standard is controlled through the grouting return valve at the upper part of the annular space. The utility model can effectively connect the whole section, does not apply external force and heat to the steel structure, and is easy to absorb component manufacturing errors and installation deviations; there is no special requirement for equipment, and the operation is simple, and it has been successfully applied in Jiangsu Xiangshui offshore wind measuring tower , which can be further promoted.
Description
所属技术领域Technical field
本实用新型涉及海上风机基础用的一种钢管桩基础与导管架腿柱的灌浆连接结构。The utility model relates to a grouting connection structure for a steel pipe pile foundation and a jacket leg column for an offshore fan foundation.
背景技术Background technique
风能是一种清洁的可再生能源,风力发电是风能利用的主要形式。海上风况优于陆地,海面粗糙度小,风湍流强度小,风切变小,具有稳定的主导风向,且不占用陆地资源,海上风电开发将是今后风电发展的重要方向。但是,海上风电的开发利用受海上环境条件影响,在风电场建设和运行维护上难度要较陆地风电场大很多。Wind energy is a clean and renewable energy, and wind power generation is the main form of wind energy utilization. Offshore wind conditions are better than those on land, with less sea surface roughness, less wind turbulence intensity, less wind shear, stable dominant wind direction, and no occupation of land resources. Offshore wind power development will be an important direction for future wind power development. However, the development and utilization of offshore wind power is affected by offshore environmental conditions, and the construction and operation and maintenance of wind farms are much more difficult than land wind farms.
海上风机基础一般多采用钢管桩基础,桩基础与风机塔筒的连接可通过导管架结构进行连接。导管架结构是由腿柱和连接腿柱的拉管所构成的空间构架,钢管桩通过腿柱打入海床以固定导管架。导管架结构不受风机型号与海水深度的影响,在施工之前不需要进行专门的河床清理,施工工艺简单。Offshore wind turbine foundations generally use steel pipe pile foundations, and the connection between the pile foundation and the wind turbine tower can be connected through a jacket structure. The jacket structure is a space frame composed of leg columns and tension pipes connected to the leg columns. Steel pipe piles are driven into the seabed through the leg columns to fix the jacket. The jacket structure is not affected by the model of the fan and the depth of seawater, and no special river bed cleaning is required before construction, and the construction process is simple.
欧洲一些海上风电技术较发达的国家,已经对海上风机钢管桩基础与导管架腿柱的灌浆连接的应用中展开了一定的研究,并在一些海上风电场工程中进行了实际应用。在我国,海上风电开发利用还处于起步阶段,桩基础与导管架腿柱的灌浆连接在海洋平台的建设中应用较多,积累了一定的设计与施工经验,但是将桩基础与导管架腿柱的灌浆连接应用在海上风机基础的建设当中,需要充分考虑海上风机的结构特点:风机基础规模相对海洋平台的基础规模要小;风机为高耸结构,受到较大的风荷载、波浪荷载等多种荷载的综合作用。因此,为了保证海上风机的正常运行和结构安全,需对桩基础与导管架腿柱间的灌浆连接质量提出更高的要求。Some European countries with relatively developed offshore wind power technology have carried out some research on the application of grouting connections between offshore wind turbine steel pipe pile foundations and jacket leg columns, and have carried out practical applications in some offshore wind farm projects. In my country, the development and utilization of offshore wind power is still in its infancy. The grouting connection between the pile foundation and the jacket leg columns is widely used in the construction of offshore platforms, and a certain amount of design and construction experience has been accumulated. The application of grouting connection in the foundation construction of offshore wind turbines requires full consideration of the structural characteristics of offshore wind turbines: the scale of the foundation of the wind turbine is smaller than that of the offshore platform; Combination of loads. Therefore, in order to ensure the normal operation and structural safety of offshore wind turbines, it is necessary to put forward higher requirements for the quality of the grouting connection between the pile foundation and the jacket leg column.
钢管桩桩基础与导管架腿柱的灌浆连接具有其独特的施工技术优势,对设备无特殊要求,操作简单,并在海洋平台工程应用中积累了一定的施工经验。通过对连接段灌浆材料、灌浆施工工艺及环形空间结构进行优化,以增大连接段灌浆连接的作用效果,实现海上风机钢管桩基础与导管架腿柱灌浆连接在中国海上风电场建设中的应用,具有重要的现实意义和较大的社会经济效益。The grouting connection between the steel pipe pile foundation and the jacket leg column has its unique construction technology advantages, no special requirements for equipment, simple operation, and has accumulated certain construction experience in offshore platform engineering applications. By optimizing the grouting material, grouting construction process and annular space structure of the connecting section, the effect of the grouting connection of the connecting section is increased, and the grouting connection between the steel pipe pile foundation of the offshore fan and the jacket leg column is realized in the construction of offshore wind farms in China. It has important practical significance and great social and economic benefits.
发明内容Contents of the invention
本发明的目的是提供一种海上风机基础与塔筒连接的过渡装置钢管桩基础与导管架腿柱的灌浆连接结构。The purpose of the present invention is to provide a transitional device for connecting the foundation of an offshore wind turbine to a tower, and a grouting connection structure between a steel pipe pile foundation and a jacket leg column.
本发明的技术方案是:Technical scheme of the present invention is:
一种海上风机桩基础与导管架腿柱的灌浆连接结构,由导管架腿柱内壁及桩基础钢管桩外壁形成环形空间,环形空间内部设置剪切键、导向体及上、下封堵器,剪切键在导管架腿柱内壁及钢管桩外壁间环向设置,导向体位于导管架腿柱内壁,上、下封堵器分别位于导管架顶部和底部,环形空间内灌注有水泥基高强无收缩灌浆料。A grouting connection structure between the pile foundation of an offshore wind turbine and the jacket leg column. An annular space is formed by the inner wall of the jacket leg column and the outer wall of the steel pipe pile of the pile foundation. Shear keys, guide bodies, and upper and lower blockers are arranged inside the annular space , the shear key is arranged circumferentially between the inner wall of the jacket leg column and the outer wall of the steel pipe pile, the guide body is located on the inner wall of the jacket leg column, the upper and lower blockers are respectively located at the top and bottom of the jacket, and the annular space is filled with cement-based High-strength non-shrink grouting material.
剪切键沿钢管桩外壁均匀焊制,剪切键可为焊珠、贴角焊扁钢或贴角焊圆钢。The shear key is uniformly welded along the outer wall of the steel pipe pile, and the shear key can be welded beads, fillet welded flat steel or fillet welded round steel.
剪切键沿钢管桩外壁和导管架腿柱内壁双面均匀焊制,剪切键可为焊珠、贴角焊扁钢或贴角焊圆钢。The shear key is uniformly welded on both sides along the outer wall of the steel pipe pile and the inner wall of the jacket leg column. The shear key can be welded beads, fillet welded flat steel or fillet welded round steel.
钢管桩外壁与导管架腿柱内壁的剪切键为交错布置。The shear keys of the outer wall of the steel pipe pile and the inner wall of the jacket leg column are arranged in a staggered manner.
在环形空间底部设置有注浆阀,上部设置浆液回流阀。A grouting valve is arranged at the bottom of the annular space, and a slurry return valve is arranged at the upper part.
环形空间的宽度为40~50mm,剪切键高度为6~8mm,剪切键宽度为10~15mm。The width of the annular space is 40-50 mm, the height of the shear key is 6-8 mm, and the width of the shear key is 10-15 mm.
灌浆工艺采用底部灌浆,即由环形空间底部注浆阀对环形空间进行灌浆,通过检测回流阀处回流浆液的比重判断灌浆结束标准。The grouting process adopts bottom grouting, that is, the annular space is grouted by the grouting valve at the bottom of the annular space, and the grouting end standard is judged by detecting the specific gravity of the backflow grout at the backflow valve.
工程中优先选用双面设置剪切键,当由于导管架腿柱内径的影响而不能在其内部设置剪切键时可采用在桩基础钢管桩外壁单面设置剪切键。In the project, it is preferred to set shear keys on both sides. When the shear keys cannot be set inside the jacket leg column due to the influence of the inner diameter, the shear keys can be set on one side on the outer wall of the steel pipe pile of the pile foundation.
该发明的有益效果是:The beneficial effects of the invention are:
1、海上风机桩基础与导管架腿柱采用灌浆进行连接,可以把上部荷载经由灌浆结石体传递给钢管桩,质量可靠,操作简单。1. The offshore wind turbine pile foundation and the jacket leg column are connected by grouting, which can transfer the upper load to the steel pipe pile through the grouting stone body, with reliable quality and simple operation.
2、灌浆连接具有结合部平整严密、全断面有效连接,对钢结构不施加外力和热量,适合于不同表面形状、不同口径的连接。2. The grouting connection has a flat and tight joint and an effective connection across the entire section. It does not apply external force and heat to the steel structure, and is suitable for connections with different surface shapes and different calibers.
3、钢管桩基础和腿柱之间有一定的间隙,采用灌浆连接易于吸收构件制造误差和安装偏差。3. There is a certain gap between the steel pipe pile foundation and the leg column, and the grouting connection is easy to absorb component manufacturing errors and installation deviations.
4、灌浆连接材料采用水泥基高强无收缩灌浆料,结石体无收缩、强度高,连接效果可靠,可以满足极端工况条件下风机基础的结构安全。4. The grouting connection material adopts cement-based high-strength non-shrinkage grouting material, the stone body does not shrink, the strength is high, and the connection effect is reliable, which can meet the structural safety of the fan foundation under extreme working conditions.
5、灌浆工艺采用底部灌浆,灌浆结石体较密实,与钢管壁的粘结效果好,不存在较大的孔隙。5. The grouting process adopts bottom grouting, and the grouting stones are relatively dense, and the bonding effect with the steel pipe wall is good, and there are no large pores.
6、环形空间的最佳设计范围为40~50mm,剪切键高为6~8mm,剪切键宽为10~15mm。6. The optimal design range of the annular space is 40-50 mm, the height of the shear key is 6-8 mm, and the width of the shear key is 10-15 mm.
7、在环形空间设置剪切键可以大大提高灌浆连接段传递荷载的能力,且双面设置的灌浆连接效果优于单面设置剪切键。7. Setting the shear key in the annular space can greatly improve the load transfer capacity of the grouting connection section, and the grouting connection effect of the double-sided setting is better than that of the single-sided setting of the shear key.
8、在环形空间内设导向体,可方便打桩施工中钢管桩能够顺利插入导管架腿柱。8. A guide body is provided in the annular space to facilitate the smooth insertion of the steel pipe pile into the jacket leg column during piling construction.
附图说明Description of drawings
图1:是海上风机桩基础与导管架腿柱灌浆连接结构示意图;Figure 1: It is a schematic diagram of the grouting connection structure between the offshore wind turbine pile foundation and the jacket leg column;
图2:是图1中A部的放大示意图。Fig. 2: It is an enlarged schematic diagram of part A in Fig. 1 .
其中:1-导管架腿柱,2-桩基础钢管桩,3-导管架,4-作业平台,5-风机塔筒,6-环形空间;7-剪切键;8-导向体;9-上部封堵器,10-下部封堵器,11-注浆阀;12-浆液回流阀。Among them: 1-jacket leg column, 2-pile foundation steel pipe pile, 3-jacket, 4-operating platform, 5-wind tower, 6-annular space; 7-shear key; 8-guide body; 9 -upper occluder, 10-lower occluder, 11-grouting valve; 12-slurry return valve.
具体实施方式Detailed ways
结合附图1、2所示,一种海上风机桩基础与导管架腿柱的灌浆连接结构,导管架腿柱(1)内壁及桩基础钢管桩(2)外壁形成环形空间(6),环形空间(6)内部设置剪切键(7)、导向体(8)及上、下封堵器(9、10),剪切键(7)在导管架腿柱内壁及钢管桩外壁间环向设置,导向体(8)位于导管架腿柱内壁,上、下封堵器(9、10)分别位于导管架顶部和底部,环形空间内灌注有水泥基高强无收缩灌浆料;剪切键(7)沿钢管桩外壁和导管架腿柱双面均匀焊制,剪切键(7)可为焊珠、贴角焊扁钢或贴角焊圆钢;钢管桩(2)外壁与导管架腿柱(1)内壁的剪切键为交错布置;环形空间(6)底部设置有注浆阀(11),上部设置浆液回流阀;环形空间(6)的宽度为40~50mm,剪切键(7)高度为6~8mm,剪切键(7)宽度为10~15mm。As shown in the accompanying
该灌浆连接型式的合理设计为:采用导管架结构作为海上风机基础结构型式,通过灌浆连接型式实现导管架腿柱与钢管桩的连接,这种连接型式具有:①结合部平整严密、全断面有效连接;②对钢结构不施加外力和热量;③适合于不同表面形状、不同口径的连接;④由于钢管桩和腿柱之间有一定的间隙,易于吸收构件制造误差和安装偏差。The reasonable design of the grouting connection type is: adopt the jacket structure as the foundation structure type of the offshore wind turbine, and realize the connection between the jacket leg column and the steel pipe pile through the grouting connection type. Effective connection; ②No external force and heat are applied to the steel structure; ③Suitable for connections with different surface shapes and different calibers; ④Because there is a certain gap between the steel pipe pile and the leg column, it is easy to absorb component manufacturing errors and installation deviations.
采用水泥基高强无收缩灌浆材料,结石体强度高,灌浆连接效果可靠,可以满足极端工况条件下风机基础的结构安全;采用环形空间底部灌浆工艺灌浆,施工操作简单,灌浆结石体密实,与钢管壁的粘结效果好,不存在较大的孔隙;在环形空间设置剪切键可以大大提高灌浆连接段传递荷载的能力。The cement-based high-strength non-shrinkage grouting material is adopted, the stone body has high strength, and the grouting connection effect is reliable, which can meet the structural safety of the fan foundation under extreme working conditions; the bottom grouting process of the annular space is used for grouting, the construction operation is simple, the grouting stone body is dense, and is compatible with The bonding effect of the steel pipe wall is good, and there are no large pores; setting shear keys in the annular space can greatly improve the load transfer capacity of the grouting joint.
该连接结构采用灌浆连接,对设备无特殊要求,操作简单,并在江苏响水海上测风塔连接段中得到了成功应用,可进一步推广使用。The connection structure adopts grouting connection, has no special requirements for equipment, and is easy to operate. It has been successfully applied in the connection section of Jiangsu Xiangshui Offshore Anemometer Tower and can be further popularized and used.
Claims (6)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201794578U CN201506979U (en) | 2009-09-14 | 2009-09-14 | A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201794578U CN201506979U (en) | 2009-09-14 | 2009-09-14 | A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201506979U true CN201506979U (en) | 2010-06-16 |
Family
ID=42468108
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201794578U Expired - Fee Related CN201506979U (en) | 2009-09-14 | 2009-09-14 | A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201506979U (en) |
Cited By (27)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102535534A (en) * | 2012-01-05 | 2012-07-04 | 江苏海上龙源风力发电有限公司 | Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation |
| CN102561354A (en) * | 2012-01-19 | 2012-07-11 | 中国水电顾问集团华东勘测设计研究院 | Grouting and ballast structure for offshore wind power foundation grouting connection |
| CN102587405A (en) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | Offshore wind turbine jacket foundation installation method and separate jacket device |
| CN102619227A (en) * | 2011-01-31 | 2012-08-01 | 华锐风电科技(江苏)有限公司 | Grouting device, assembly and grouting method for single pipe pile foundation of offshore wind turbine generating set |
| CN102644325A (en) * | 2012-03-31 | 2012-08-22 | 中国海洋石油总公司 | Grouting connection node for deepwater floating type platform steel structures |
| CN102733410A (en) * | 2012-07-18 | 2012-10-17 | 中国水电顾问集团中南勘测设计研究院 | Jacket wind turbine foundation connecting piece |
| CN102767189A (en) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
| CN103174159A (en) * | 2011-12-23 | 2013-06-26 | 华锐风电科技(集团)股份有限公司 | Single tubular pile base equipment of offshore wind power generating set |
| CN103233481A (en) * | 2013-04-17 | 2013-08-07 | 广东明阳风电产业集团有限公司 | A jacket support structure that can be connected by grouting |
| CN103437372A (en) * | 2013-08-13 | 2013-12-11 | 广东明阳风电产业集团有限公司 | Connecting structure for jacket foundation and underwater pile foundation of offshore wind turbine and grouting method |
| CN103967036A (en) * | 2014-05-07 | 2014-08-06 | 中国水电顾问集团华东勘测设计研究院有限公司 | Pile and sleeve grouting connecting structure for offshore wind power generation and construction method thereof |
| CN104044706A (en) * | 2014-05-06 | 2014-09-17 | 中国海洋石油总公司 | Grouting and Welding Combined Connection Joint Applied to a Deepwater Floating Type Platform and an Offshore Installation Method Thereof |
| CN104153384A (en) * | 2014-08-22 | 2014-11-19 | 熊翱 | On-sea sandwich steel pipe pile foundation and construction method |
| CN104302842A (en) * | 2012-05-09 | 2015-01-21 | 西班牙阿尔斯通可再生能源有限公司 | wind turbine base |
| CN105604084A (en) * | 2016-03-02 | 2016-05-25 | 福建省水利水电勘测设计研究院 | Underwater high-pressure grouting connecting structure for offshore wind turbine foundation steel pipe pile and transition section and installation process of underwater high-pressure grouting connecting structure |
| CN105862907A (en) * | 2016-06-04 | 2016-08-17 | 福建省新能海上风电研发中心有限公司 | Annular combination type super-large diameter offshore wind power single pile foundation and construction technology thereof |
| CN107034911A (en) * | 2017-05-25 | 2017-08-11 | 中国能源建设集团广东省电力设计研究院有限公司 | Marine wind electric field many blower foundations waterborne and Wind turbines |
| CN107386313A (en) * | 2017-08-16 | 2017-11-24 | 中交第航务工程局有限公司 | Offshore wind farm jacket construction exempts from leveling cylinder foundation and installation method |
| CN109653207A (en) * | 2018-11-07 | 2019-04-19 | 南通市海洋水建工程有限公司 | A kind of gap grouting process between offshore boosting station jacket structure and pile foundation |
| CN111101535A (en) * | 2020-01-08 | 2020-05-05 | 中国电建集团华东勘测设计研究院有限公司 | Offshore wind power multi-pile-suction bucket-jacket foundation structure and its construction method |
| CN112252359A (en) * | 2020-11-25 | 2021-01-22 | 福建省水利水电勘测设计研究院 | A new type of pile foundation jacket foundation grouting connection section structure and construction method |
| CN113073653A (en) * | 2021-04-06 | 2021-07-06 | 中交第三航务工程局有限公司 | Grouting plugging system for rock-socketed section of inclined pile rock-socketed jacket by' post-pile method |
| CN113653092A (en) * | 2021-07-28 | 2021-11-16 | 中国能源建设集团广东省电力设计研究院有限公司 | Double-pile sleeve type foundation and installation method thereof |
| CN114855867A (en) * | 2022-05-19 | 2022-08-05 | 中国电建集团华东勘测设计研究院有限公司 | Raft gravity type jacket offshore wind turbine foundation and construction method thereof |
| CN116927236A (en) * | 2023-07-21 | 2023-10-24 | 武汉理工大学 | Integrated sleeve cage structure of single pile foundation of fan |
| CN117166522A (en) * | 2023-08-23 | 2023-12-05 | 中国华能集团清洁能源技术研究院有限公司 | A photovoltaic system based on decommissioned offshore wind power pile foundations |
| CN119195204A (en) * | 2024-09-27 | 2024-12-27 | 中国电建集团华东勘测设计研究院有限公司 | Jacket foundation grouting reinforcement connection structure and construction method thereof |
-
2009
- 2009-09-14 CN CN2009201794578U patent/CN201506979U/en not_active Expired - Fee Related
Cited By (36)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102619227A (en) * | 2011-01-31 | 2012-08-01 | 华锐风电科技(江苏)有限公司 | Grouting device, assembly and grouting method for single pipe pile foundation of offshore wind turbine generating set |
| CN102619227B (en) * | 2011-01-31 | 2014-05-14 | 华锐风电科技(江苏)有限公司 | Grouting device, assembly and grouting method for single pipe pile foundation of offshore wind turbine generating set |
| CN103174159B (en) * | 2011-12-23 | 2015-11-25 | 华锐风电科技(集团)股份有限公司 | Offshore wind turbine single pipe pile foundation device |
| CN103174159A (en) * | 2011-12-23 | 2013-06-26 | 华锐风电科技(集团)股份有限公司 | Single tubular pile base equipment of offshore wind power generating set |
| CN102535534A (en) * | 2012-01-05 | 2012-07-04 | 江苏海上龙源风力发电有限公司 | Construction process for leveling and grouting intertidal zone polygonal bracket fan foundation |
| CN102535534B (en) * | 2012-01-05 | 2016-01-20 | 江苏海上龙源风力发电有限公司 | A kind of intertidal zone multi-angular bracket blower foundation leveling grouting construction process |
| CN102561354A (en) * | 2012-01-19 | 2012-07-11 | 中国水电顾问集团华东勘测设计研究院 | Grouting and ballast structure for offshore wind power foundation grouting connection |
| CN102561354B (en) * | 2012-01-19 | 2014-10-08 | 中国水电顾问集团华东勘测设计研究院 | Grouting and ballast structure for offshore wind power foundation grouting connection |
| CN102587405A (en) * | 2012-02-27 | 2012-07-18 | 广东明阳风电产业集团有限公司 | Offshore wind turbine jacket foundation installation method and separate jacket device |
| CN102644325B (en) * | 2012-03-31 | 2014-07-30 | 中国海洋石油总公司 | Grouting connection node for deepwater floating type platform steel structures |
| CN102644325A (en) * | 2012-03-31 | 2012-08-22 | 中国海洋石油总公司 | Grouting connection node for deepwater floating type platform steel structures |
| CN104302842A (en) * | 2012-05-09 | 2015-01-21 | 西班牙阿尔斯通可再生能源有限公司 | wind turbine base |
| CN102733410A (en) * | 2012-07-18 | 2012-10-17 | 中国水电顾问集团中南勘测设计研究院 | Jacket wind turbine foundation connecting piece |
| CN102767189B (en) * | 2012-07-31 | 2014-06-25 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
| CN102767189A (en) * | 2012-07-31 | 2012-11-07 | 中铁第五勘察设计院集团有限公司 | Set bearing platform foundations and construction method thereof |
| CN103233481A (en) * | 2013-04-17 | 2013-08-07 | 广东明阳风电产业集团有限公司 | A jacket support structure that can be connected by grouting |
| CN103233481B (en) * | 2013-04-17 | 2015-08-12 | 广东明阳风电产业集团有限公司 | Jacket supporting structure capable of being connected in grouting mode |
| CN103437372A (en) * | 2013-08-13 | 2013-12-11 | 广东明阳风电产业集团有限公司 | Connecting structure for jacket foundation and underwater pile foundation of offshore wind turbine and grouting method |
| CN104044706A (en) * | 2014-05-06 | 2014-09-17 | 中国海洋石油总公司 | Grouting and Welding Combined Connection Joint Applied to a Deepwater Floating Type Platform and an Offshore Installation Method Thereof |
| CN103967036A (en) * | 2014-05-07 | 2014-08-06 | 中国水电顾问集团华东勘测设计研究院有限公司 | Pile and sleeve grouting connecting structure for offshore wind power generation and construction method thereof |
| CN104153384A (en) * | 2014-08-22 | 2014-11-19 | 熊翱 | On-sea sandwich steel pipe pile foundation and construction method |
| CN105604084A (en) * | 2016-03-02 | 2016-05-25 | 福建省水利水电勘测设计研究院 | Underwater high-pressure grouting connecting structure for offshore wind turbine foundation steel pipe pile and transition section and installation process of underwater high-pressure grouting connecting structure |
| CN105862907A (en) * | 2016-06-04 | 2016-08-17 | 福建省新能海上风电研发中心有限公司 | Annular combination type super-large diameter offshore wind power single pile foundation and construction technology thereof |
| CN107034911A (en) * | 2017-05-25 | 2017-08-11 | 中国能源建设集团广东省电力设计研究院有限公司 | Marine wind electric field many blower foundations waterborne and Wind turbines |
| CN107386313B (en) * | 2017-08-16 | 2020-02-11 | 中交第一航务工程局有限公司 | Leveling-free cylinder foundation for offshore wind power jacket construction and installation method |
| CN107386313A (en) * | 2017-08-16 | 2017-11-24 | 中交第航务工程局有限公司 | Offshore wind farm jacket construction exempts from leveling cylinder foundation and installation method |
| CN109653207A (en) * | 2018-11-07 | 2019-04-19 | 南通市海洋水建工程有限公司 | A kind of gap grouting process between offshore boosting station jacket structure and pile foundation |
| CN111101535A (en) * | 2020-01-08 | 2020-05-05 | 中国电建集团华东勘测设计研究院有限公司 | Offshore wind power multi-pile-suction bucket-jacket foundation structure and its construction method |
| CN112252359A (en) * | 2020-11-25 | 2021-01-22 | 福建省水利水电勘测设计研究院 | A new type of pile foundation jacket foundation grouting connection section structure and construction method |
| CN113073653A (en) * | 2021-04-06 | 2021-07-06 | 中交第三航务工程局有限公司 | Grouting plugging system for rock-socketed section of inclined pile rock-socketed jacket by' post-pile method |
| CN113653092A (en) * | 2021-07-28 | 2021-11-16 | 中国能源建设集团广东省电力设计研究院有限公司 | Double-pile sleeve type foundation and installation method thereof |
| CN114855867A (en) * | 2022-05-19 | 2022-08-05 | 中国电建集团华东勘测设计研究院有限公司 | Raft gravity type jacket offshore wind turbine foundation and construction method thereof |
| CN116927236A (en) * | 2023-07-21 | 2023-10-24 | 武汉理工大学 | Integrated sleeve cage structure of single pile foundation of fan |
| CN117166522A (en) * | 2023-08-23 | 2023-12-05 | 中国华能集团清洁能源技术研究院有限公司 | A photovoltaic system based on decommissioned offshore wind power pile foundations |
| CN119195204A (en) * | 2024-09-27 | 2024-12-27 | 中国电建集团华东勘测设计研究院有限公司 | Jacket foundation grouting reinforcement connection structure and construction method thereof |
| CN119195204B (en) * | 2024-09-27 | 2026-01-06 | 中国电建集团华东勘测设计研究院有限公司 | Grouting Reinforcement Connection Structure and Construction Method of Jacket Foundation |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201506979U (en) | A grouting connection structure between offshore wind turbine pile foundation and jacket leg columns | |
| CN110984214B (en) | Offshore wind power monopile-wing plate-rockfill composite foundation and construction method thereof | |
| CN211646450U (en) | Offshore wind power single pile-wing plate-rockfill composite foundation | |
| CN101545462B (en) | A steel-concrete combined weight type offshore wind fan foundation structure | |
| CN108867688A (en) | A kind of offshore wind turbine gravity type foundation and its installation method | |
| CN109853609A (en) | A kind of offshore wind farm combination foundation | |
| CN103469808B (en) | Offshore wind turbine foundation combining concrete caisson and jacket | |
| CN103243735A (en) | Prestressed concrete cylindrical foundation with oblique supports | |
| CN105862907B (en) | Circular combined super-large diameter offshore wind farm single-pile foundation and its construction technology | |
| CN209603168U (en) | A kind of offshore wind farm combination foundation | |
| CN106245671B (en) | A kind of combined type offshore wind power foundation and its construction method | |
| CN106381881B (en) | A kind of gravity type single-pile foundation | |
| CN202323978U (en) | Base components for offshore wind power set installation | |
| WO2022127466A1 (en) | Novel offshore wind turbine foundation suitable for shallow covering layer and construction method therefor | |
| CN201746849U (en) | Basic structure of offshore wind-power-station fan | |
| CN204645074U (en) | A kind of single pile-gravity associating offshore wind power foundation | |
| CN202247928U (en) | Multi-pile portal frame type offshore wind generating set foundation structure | |
| CN201713827U (en) | Fan base structure of offshore wind power station | |
| CN204676584U (en) | A kind of high stake truss-like offshore wind turbine foundation structure | |
| CN201502064U (en) | Offshore wind turbine steel structure foundation | |
| CN201599157U (en) | Offshore wind turbine infrastructure with multi-pile steel framework and without peripheral connecting pipes | |
| CN203238655U (en) | Offshore wind power single pile foundation-based tidal current energy power generation foundation structure | |
| CN209538210U (en) | A kind of interpolation type offshore wind farm jacket basis carrying steady pipe casing | |
| CN204212174U (en) | Single pile adds taper pile brace type offshore wind turbine foundation structure | |
| CN203256765U (en) | Pre-stressed concrete cylindrical foundation with inclined supports |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100616 Termination date: 20150914 |
|