CN201406865Y - 66kv架空输电线路双回水平穿越铁塔 - Google Patents
66kv架空输电线路双回水平穿越铁塔 Download PDFInfo
- Publication number
- CN201406865Y CN201406865Y CN2009200130851U CN200920013085U CN201406865Y CN 201406865 Y CN201406865 Y CN 201406865Y CN 2009200130851 U CN2009200130851 U CN 2009200130851U CN 200920013085 U CN200920013085 U CN 200920013085U CN 201406865 Y CN201406865 Y CN 201406865Y
- Authority
- CN
- China
- Prior art keywords
- tower
- lightning
- wire
- arm
- cross
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005540 biological transmission Effects 0.000 title claims abstract description 9
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 19
- 229910052742 iron Inorganic materials 0.000 claims description 10
- 239000004020 conductor Substances 0.000 claims description 4
- 102000001324 CD59 Antigens Human genes 0.000 abstract 1
- 108010055167 CD59 Antigens Proteins 0.000 abstract 1
- 230000006378 damage Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005065 mining Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000009977 dual effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 150000002505 iron Chemical class 0.000 description 1
- WABPQHHGFIMREM-UHFFFAOYSA-N lead(0) Chemical compound [Pb] WABPQHHGFIMREM-UHFFFAOYSA-N 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000012211 strain insulator Substances 0.000 description 1
Images
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本实用新型涉及一种66KV架空输电线路双回水平穿越铁塔,包括避雷系统、导线系统和塔身三部分,避雷系统和导线系统分别安装在塔身顶部和上部,塔身两侧的导线排列为双回水平排列。其中,避雷系统由避雷线、避雷线挂线点和避雷线横担组成,导线系统由导线横担、挂线点和导线组成。本实用新型设计合理,工作可靠,与现有门型电杆组相比,铁塔基础占地面积小,对线路路径选择没有特殊要求,塔身不易腐蚀或受人为破坏,电气安全性和通用性大大提高。
Description
技术领域:
本实用新型涉及一种用于工矿企业电力输送网络的架空线路杆塔装置。
背景技术:
目前,工矿企业采用的输电主干网络大多为66KV架空线路,此种架空线路又有单杆(塔)单回、单杆(塔)双回、单杆(塔)多回之分。在线路的设计施工中,根据电源、负荷位置、线路长短等设计要求,66KV架空线路与其它电压等级的线路交叉跨越是不可避免的。电力规程规定:低电压等级的架空线路禁止跨越高电压等级架空线路。当高电压等级线路(如220V架空线路)的下导线距地高度较低时(如12米),66KV架空线路(如220KV架空线路)既要保证对220KV架空线路的安全距离,又要保证对地安全距离,穿越就很困难。在具体项目中,有一条66KV单杆(塔)双回路与220KV架空线路交叉,设计难度更大。现有定型66KV双回电力铁塔的导线排列方式为鼓形排列,上导线最低高度为14m,不能满足穿越设计要求。对此,现场通常采用的解决办法是:将双回线路拆分为两条单回水平线路,再采用门型电杆来实现穿越。这种办法虽能实现穿越,但缺点也很明显:门型电杆采用两根同径混凝土电杆作为主柱,配以角钢横担、叉梁、8根导(线)地(线)拉线,不仅占地大,而且电杆易腐蚀,拉线易被人为损坏,安全性低,同时,采用4组门型电杆来实现穿越,增加了线路路由的宽度,对线路路径要求更加苛刻,通用性差。
实用新型内容:
本实用新型目的目的在于提供一种占地面积小、塔身不易腐蚀或人为损坏、安全性高且通用性强的66KV架空输电线路双回水平穿越铁塔。
本实用新型是这样实现的:此种架空输电线路双回水平穿越铁塔包括避雷系统、导线系统和塔身三部分,避雷系统和导线系统分别安装在塔身顶部和上部,塔身两侧的导线排列为双回水平排列。其中,避雷系统由避雷线、避雷线挂线点和避雷线横担组成,避雷线横担安装设置在塔身顶部,避雷线以塔身为中心线对称地与左右两个避雷线挂线点相连接。导线系统由导线横担、挂线点和导线组成,导线横担安装在塔身上部,横担左右两侧各设有3个挂线点,各挂线点以塔身为中心线相对称,各挂线点上分别设置走向与横担相垂直的导线,6根导线走向相互平行,呈双回路水平排列。塔身采用7719(9)型66KV双回路鼓形耐张转角架空线路铁塔。此种输电线路铁塔在实际使用时需要根据架空电力线路的实际交叉穿越要求进行施工设计,根据导线的最大工况荷载来设计导线横担桁架截面及结构,根据导线档距、弧垂来设计导线间距离,进而确定导线挂线点间水平间距和导线横担长度,并校核横担桁架截面尺寸及结构强度;根据防雷保护角度确定避雷线横担长度,根据实际最大工况荷载设计避雷线横担桁架截面及结构,根据线路档距校核避雷线与导线的净空距离,根据实际导地线最大工况荷载校核铁塔主材和基础受力。
本实用新型设计合理,工作可靠,与现有门型电杆组相比,铁塔基础占地面积小,对线路路径选择没有特殊要求,塔身不易腐蚀或受人为破坏,电气安全性和通用性大大提高。
附图说明:
图1为本实用新型的总体结构示意图。图中,标号“8”为设置在导线5上的耐张力绝缘子串,标号“9”为过引悬垂串,标号“10”为过引线。
图2为线路穿越示意图。图中,标号“11”为被穿越线路,标号“12”为穿越档线路。
具体实施方式:
本实用新型由以下实施例给出,下面结合附图予以说明:
如图所示,本实用新型包括避雷系统、导线系统和塔身三部分,由避雷线1、避雷线挂线点2和避雷线横担3、导线横担4、导线5、导线挂线点6和塔身7组成。其中,避雷线1、避雷线挂线点2为左右两组,双避雷线分别设置在避雷线横担3两侧。导线5、导线挂线点6为左右两组,分别为A、B、C和A′、B′、C′三点设置在导线横担4上。该铁塔的主要尺寸如下:塔身高度11500mm,宽度3095mm,避雷线横担长度6000mm,导线横担设置高度9000mm,长度8800mm,挂线点A、B、C(A′、B′、C′)间距为1200mm,两回线路间距为4000mm。
Claims (1)
1、一种66KV架空输电线路双回水平穿越铁塔,包括避雷系统、导线系统和塔身三部分,其特征在于:避雷系统和导线系统分别安装在塔身顶部和上部,塔身两侧的导线排列为双回水平排列;其中,避雷系统由避雷线(1)、避雷线挂线点(2)和避雷线横担(3)组成,避雷线横担(3)安装设置在塔身(7)顶部,避雷线(1)以塔身(2)为中心线对称地与左右两个避雷线挂线点(2)相连接,导线系统由导线横担(4)、挂线点(6)和导线(5)组成,导线横担(4)安装在塔身(7)上部,横担(4)左右两侧各设有3个挂线点(6),挂线点(6)以塔身(7)为中心线相对称,各挂线点(6)上分别设置走向与横担(4)相垂直的导线(5),6根导线(5)走向相互平行,呈双回路水平排列。
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200130851U CN201406865Y (zh) | 2009-04-20 | 2009-04-20 | 66kv架空输电线路双回水平穿越铁塔 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009200130851U CN201406865Y (zh) | 2009-04-20 | 2009-04-20 | 66kv架空输电线路双回水平穿越铁塔 |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201406865Y true CN201406865Y (zh) | 2010-02-17 |
Family
ID=41677797
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009200130851U Expired - Fee Related CN201406865Y (zh) | 2009-04-20 | 2009-04-20 | 66kv架空输电线路双回水平穿越铁塔 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201406865Y (zh) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102383639A (zh) * | 2011-08-19 | 2012-03-21 | 国网电力科学研究院 | 紧凑结构杆塔 |
| CN104198358A (zh) * | 2014-08-12 | 2014-12-10 | 国网电力科学研究院武汉南瑞有限责任公司 | 复合材料电杆多因子加速老化实验装置 |
| CN104901255A (zh) * | 2015-06-16 | 2015-09-09 | 国网山东省电力公司经济技术研究院 | 一种高压架空线路交叉钻越的方法及安全距离间隔装置 |
| CN109469394A (zh) * | 2018-10-19 | 2019-03-15 | 国网河南省电力公司濮阳供电公司 | 一种适用于220千伏线路的穿越塔 |
-
2009
- 2009-04-20 CN CN2009200130851U patent/CN201406865Y/zh not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102383639A (zh) * | 2011-08-19 | 2012-03-21 | 国网电力科学研究院 | 紧凑结构杆塔 |
| CN104198358A (zh) * | 2014-08-12 | 2014-12-10 | 国网电力科学研究院武汉南瑞有限责任公司 | 复合材料电杆多因子加速老化实验装置 |
| CN104901255A (zh) * | 2015-06-16 | 2015-09-09 | 国网山东省电力公司经济技术研究院 | 一种高压架空线路交叉钻越的方法及安全距离间隔装置 |
| CN109469394A (zh) * | 2018-10-19 | 2019-03-15 | 国网河南省电力公司濮阳供电公司 | 一种适用于220千伏线路的穿越塔 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN102306920B (zh) | 特高压紧凑型输电线路相间间隔棒防舞动安装配置方法 | |
| CN103362343B (zh) | 一种同塔六回路杆塔 | |
| CN202520040U (zh) | 一种实现双回路输电线双t接用的分歧杆塔 | |
| CN201406865Y (zh) | 66kv架空输电线路双回水平穿越铁塔 | |
| CN103422699A (zh) | 一种复合材料输电线路杆塔 | |
| CN103122723B (zh) | 一种酒杯复合材料塔 | |
| CN204552245U (zh) | 一种导线垂直排列的特高压直流直线塔 | |
| CN206016391U (zh) | 一种基于引流母线架空引下的双回路鼓形电缆终端塔 | |
| CN206128808U (zh) | 一种新型单回路电缆终端塔 | |
| CN204754412U (zh) | 一种单侧横担同时下两回电缆的终端杆 | |
| CN202672827U (zh) | 双回路viv串鼓形直线塔 | |
| CN201307742Y (zh) | 66kv架空线路水平穿越式铁塔 | |
| CN207813168U (zh) | 双回路单开断π型铁塔 | |
| CN207847235U (zh) | 无接地极直流输电线路杆塔 | |
| CN107237535A (zh) | 一种输电线路用单侧横担耐张塔 | |
| CN219477434U (zh) | 一种变电站出线紧凑型布置结构 | |
| CN201360131Y (zh) | 高压电力杆塔 | |
| CN107591684B (zh) | 一种330kV变电站GIS的垂直出线结构 | |
| CN104929410B (zh) | 一种架空输电线路 | |
| CN205688919U (zh) | 直流线路与接地极线同塔垂直排列的输电塔 | |
| CN204850643U (zh) | 一种三联钻越钢管杆 | |
| CN202012226U (zh) | 一种窄基铁塔 | |
| CN204899380U (zh) | 一种用于330kV交流输电线路的双回路直线高跨塔 | |
| CN211647529U (zh) | 双回路杆塔 | |
| CN210622425U (zh) | 一种单回路错层输电线路杆塔 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20100420 |