CN201406627Y - Portable rack-type cable bridge - Google Patents
Portable rack-type cable bridge Download PDFInfo
- Publication number
- CN201406627Y CN201406627Y CN2009201548681U CN200920154868U CN201406627Y CN 201406627 Y CN201406627 Y CN 201406627Y CN 2009201548681 U CN2009201548681 U CN 2009201548681U CN 200920154868 U CN200920154868 U CN 200920154868U CN 201406627 Y CN201406627 Y CN 201406627Y
- Authority
- CN
- China
- Prior art keywords
- bridge
- cable
- cables
- rope
- stay cords
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004677 Nylon Substances 0.000 claims abstract description 4
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 4
- 239000000463 material Substances 0.000 claims abstract description 4
- 229920001778 nylon Polymers 0.000 claims abstract description 4
- 239000010959 steel Substances 0.000 claims abstract description 4
- 230000000087 stabilizing effect Effects 0.000 abstract 2
- 230000015572 biosynthetic process Effects 0.000 description 2
- 241000272525 Anas platyrhynchos Species 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000009429 distress Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000007665 sagging Methods 0.000 description 1
- 235000014347 soups Nutrition 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model provides a portable rack-type cable bridge which comprises a bridge body, bridge cables, stabilizing cables and laying stay cords, wherein the bridge body is made of a flexible material with higher bearing strength such as nylon, steel hanging rings are fixedly spaced at the two edges of the bridge body, the two bridge cables with extremely-strong bearing capacity pass through the hanging rings so that the bridge body and the bridge cables are connected in a movable manner, the hanging rings can slide smoothly on the bridge cables so as to drive the bridge body to expand andcontract freely, the two ends of each bridge cable are connected with fixing cables, a concave wheel is mounted at the middle of one end of each bridge cable, the laying stay cords are connected on the bridge body in the same direction as the concave wheels, and the stay cords pass through the concave wheels and then return to the other end of the cable bridge. When the stay cords are pulled, thebridge body is laid from the reeled end to the other end under the traction of the stay cords, thereby forming the bridge floor; and the stabilizing cables that are fixedly connected at the middle part of the bridge body can prevent the cable bridge turning over when people cross the cable bridge.
Description
Technical field
The utility model relates to the simple and easy cable bridge that a kind of portable band just sets up.
Background technology
The out on tours of going with has become one of life content of many people with exploring, and often has the gully, river to intercept the outlet in the way, and in some rescues in danger, the rescue personnel also usually leans on a cable wire to help distress personnel to escape danger.Because will be and not really wide gully, river on set up together can the pedestrian bridge come not a duck soup, portable posture cable bridge can more conveniently help effectively for this situation provide safer.
Summary of the invention
Portable posture cable bridge, be by the body of a bridge, the bridge rope, antilift wire, steadying line, the laying stay cord constitutes, the body of a bridge that has the flexible material of strong load bearing stength to make with nylon etc., its both sides are embroidered with the steel link at interval, two extremely strong bridge ropes of bearing capacity pass in the middle of link, making the body of a bridge become movable with the bridge rope is connected, link can slide on the bridge rope freely, it is flexible freely to drive the body of a bridge, the two ends of bridge rope are connected and fixed rope, adorn recessed a wheel in the centre of bridge rope one end, lay stay cord and connect and recessed the wheel on the unidirectional body of a bridge, stay cord passes recessed the wheel, go back to the other end of cable bridge, pulling stay cord, the body of a bridge affect on stay cord ground down from draw in one to other end laying formation in the past bridge floor, be fixedly connected on the steadying line of body of a bridge middle part, unlikely upset when making cable bridge remarkable.
Description of drawings
Below in conjunction with accompanying drawing the present invention is described in detail.
Fig. 1 is a body of a bridge structure chart.
Fig. 2 is a bridge hitch composition.
Fig. 3 is the cable bridge schematic diagram that draws in.
Fig. 4 is cable bridge overall structure figure.
The specific embodiment
As shown in the figure, with nylon and variously have the flexible material of strong load bearing stength to make the body of a bridge 1, its both sides are embroidered with steel link 2 at interval, the spacing of link 2 is determined as required, two extremely strong bridge ropes 3 of bearing capacity pass in the middle of link 2, make 3 one-tenth movable connections of the body of a bridge 1 and bridge rope, link 2 can the slip drive body of a bridge be flexible freely freely on bridge rope 3, the two ends of bridge rope 3 are connected and fixed rope 4, adorn one in an end middle part of bridge rope 3 and recessedly take turns 5, an end of laying stay cord 6 connects and recessed the wheel on the 5 unidirectional body of a bridgies 1, stay cord passes recessedly takes turns 5, goes back to the other end 9 of cable bridge, pulling stay cord 6, the body of a bridge 1 affects on stay cord 6 ground down, lays to the opposite from gathering 10 along bridge rope 3 and forms bridge floor in the past.The support bar 7 that is provided with at interval on the body of a bridge 1 supports the body of a bridge can be together not superimposed, and support bar 7 can be provided with as required.Strut 7 is narrower slightly than the body of a bridge 1, makes the sagging formation U-shaped of body of a bridge bridge floor.Steadying line 8 is connected the middle part of the body of a bridge 1, unlikely upset when the back cable bridge that is strained and fixed is remarkable.Meet the gully, river or recover, earlier bridge rope, antilift wire are thrown the opposite bank and fixed, stay cord is laid in pulling, and pedestrian's cable bridge of safety just is set as merit at extremely short time internal frame together.
Claims (1)
1, a kind of portable posture cable bridge, be by the body of a bridge, the bridge rope, antilift wire, steadying line, the laying stay cord constitutes, its technical characterictic is: the body of a bridge made from the flexible material of strong load bearing stength such as nylon, its both sides are embroidered with the steel link, two bridge ropes pass in the middle of link, making the body of a bridge become movable with the bridge rope is connected, link can the slip drive body of a bridge be flexible freely freely on the bridge rope, the two ends of bridge rope are connected and fixed rope, adorn recessed a wheel in the centre of bridge rope one end, lay stay cord and connect and recessed the wheel on the unidirectional body of a bridge, stay cord passes the recessed other end of going back to cable bridge of taking turns; At interval the support bar narrower slightly than the body of a bridge is set on the body of a bridge, makes the body of a bridge unlikely superimposed and sag into the U-shaped bridge floor.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201548681U CN201406627Y (en) | 2009-05-09 | 2009-05-09 | Portable rack-type cable bridge |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2009201548681U CN201406627Y (en) | 2009-05-09 | 2009-05-09 | Portable rack-type cable bridge |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201406627Y true CN201406627Y (en) | 2010-02-17 |
Family
ID=41677558
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2009201548681U Expired - Fee Related CN201406627Y (en) | 2009-05-09 | 2009-05-09 | Portable rack-type cable bridge |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201406627Y (en) |
Cited By (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102051853A (en) * | 2010-12-16 | 2011-05-11 | 陈洪凯 | Combined emergency bridge and erection method thereof |
| CN107227683A (en) * | 2017-07-27 | 2017-10-03 | 燕山大学 | It is a kind of to be used for the collapsible suspension bridge that personnel are crossed a river or goods is conveyed |
| CN111379216A (en) * | 2020-03-16 | 2020-07-07 | 陆峰 | Portable folding soft bridge |
-
2009
- 2009-05-09 CN CN2009201548681U patent/CN201406627Y/en not_active Expired - Fee Related
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102051853A (en) * | 2010-12-16 | 2011-05-11 | 陈洪凯 | Combined emergency bridge and erection method thereof |
| CN102051853B (en) * | 2010-12-16 | 2012-12-12 | 陈洪凯 | Combined emergency bridge and erection method thereof |
| CN107227683A (en) * | 2017-07-27 | 2017-10-03 | 燕山大学 | It is a kind of to be used for the collapsible suspension bridge that personnel are crossed a river or goods is conveyed |
| CN111379216A (en) * | 2020-03-16 | 2020-07-07 | 陆峰 | Portable folding soft bridge |
| CN111379216B (en) * | 2020-03-16 | 2022-04-15 | 江苏高峰特种纺织科技有限公司 | Portable folding soft bridge |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| SG11201807332TA (en) | Device for conversion of wave energy into electrical energy and the process for its deployment at the exploitation location | |
| CN201406627Y (en) | Portable rack-type cable bridge | |
| CN102316939A (en) | Pole safety assembly | |
| CN104577870B (en) | A kind of active obstacle type overhauls property-line driving | |
| CN201581790U (en) | Anti-breaking device of large-scale flexible lifting door | |
| CN101874922A (en) | A portable utility pole climbing mechanism | |
| CN208344047U (en) | Towing device for obstacles removing car | |
| CN202743903U (en) | Hoisting and tensioning device at tail part of long-distance belt conveyor | |
| CN204956861U (en) | Strengthening mechanism is violently tied up with pilot boat to dink | |
| CN208436391U (en) | Single backpack lowering rope device | |
| CN205044592U (en) | Telescopic bus handle | |
| CN204211391U (en) | A kind of cable type mast crane | |
| CN204967120U (en) | Wire exhibition of pulling is put special steel pipe and is strideed across frame | |
| CN103321565A (en) | Folding soft ladder for climbing pole tower | |
| CN203846386U (en) | Portable and convenient-to-set-up rope bridge | |
| CN204245777U (en) | Hammock sleeping bag | |
| CN201981998U (en) | Anti-skid ladder for electricians | |
| CN201609185U (en) | Backpack | |
| CN207868714U (en) | One kind sending power transformation line construction driving | |
| CN207728300U (en) | A kind of fire-fighting lightweight tightrope ladder | |
| CN205360308U (en) | Modular deep well rescue ware | |
| CN202439688U (en) | Bidirectional safety catching hook | |
| CN211188852U (en) | Power maintenance high altitude construction protector | |
| CN203867212U (en) | Aerial operation safety belt | |
| CN201650346U (en) | Underground lifesaving device |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100217 Termination date: 20100509 |