CN201367466Y - Divisional configuration structure of electrolysis bath complete overhaul shop - Google Patents

Divisional configuration structure of electrolysis bath complete overhaul shop Download PDF

Info

Publication number
CN201367466Y
CN201367466Y CNU2009203001087U CN200920300108U CN201367466Y CN 201367466 Y CN201367466 Y CN 201367466Y CN U2009203001087 U CNU2009203001087 U CN U2009203001087U CN 200920300108 U CN200920300108 U CN 200920300108U CN 201367466 Y CN201367466 Y CN 201367466Y
Authority
CN
China
Prior art keywords
district
lining
region
electrolysis bath
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2009203001087U
Other languages
Chinese (zh)
Inventor
李琏
刘星桂
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Original Assignee
Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guiyang Aluminum Magnesium Design and Research Institute Co Ltd filed Critical Guiyang Aluminum Magnesium Design and Research Institute Co Ltd
Priority to CNU2009203001087U priority Critical patent/CN201367466Y/en
Application granted granted Critical
Publication of CN201367466Y publication Critical patent/CN201367466Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Electrolytic Production Of Metals (AREA)

Abstract

The utility model discloses a divisional configuration structure of electrolysis bath complete overhaul shop, wherein an electrolysis shop is connected with a complete overhaul shop through a middle channel, the complete overhaul shop is divided into a multifunctional crown block maintenance region, a bath upper structure maintenance region, an electrolysis bath lining dismantlement region, an electrolysis bath shell repair and lining building region and an electrolysis bath cathode carbon block assembly region, and the middle channel is respectively connected with the multifunctional crown block maintenance region, the bath upper portion structure maintenance region, the electrolysis bath lining dismantlement region through a gantry crane, a cathode crane block, a flat automobile trailer or a flat rail trailer, the electrolysis bath lining dismantlement region is connected with the electrolysis bath shell repair and lining building region through a 25+25 ton crane block, the electrolysis bath cathode carbon block assembly region is connected with the electrolysis bath lining building region through a straddle truck. The divisional configuration structure can reasonably configure the complete overhaul shop of the electrolysis bath, guarantees the complete overhaul of the electrolysis bath in different regions and the electrolysis multifunction crane block in the repair shop to orderly and divisionally operate according to flows and functions with mutual connection without interferences.

Description

The zone configuration structure in a kind of electrolytic cell overhaul workshop
Technical field
The utility model relates to the zone configuration structure in a kind of electrolytic cell overhaul workshop, belongs to workshop structure and equipment configurations technical field.
Background technology
Progress along with modern aluminum electrolysis technology, the strength of current of aluminium cell constantly increases, the electrolytic series production capacity is increasing, increase economic benefit in order to improve potroom fluting rate, that improves electrolyzer repaiies the stove quality, in recent years, adopting whole transhipment electrolyzer to carry out the strange land groove overhaul at potroom more and more is applied in the design of large-scale aluminium manufacturer with the scheduled maintenance that the transhipment electrolysis multi-function crane carries out overhead traveling crane.But the configuration of existing traditional slot heavy repair department can not be satisfied the requirement of strange land groove overhaul and the maintenance of strange land electrolysis multi-function crane.At first, be requirement to factory building, require the factory building in groove overhaul workshop can satisfy the span of negative electrode overhead traveling crane, 25+25 ton overhead travelling crane and gantry car and the requirement of load, so that the negative electrode overhead traveling crane of electrolyzer pot shell or multifunction crane, load can reach heavy repair department.Be the requirement of the configuration feature in groove overhaul workshop then, require the groove overhaul workshop except the cathode carbon block of electrolytic bath assembling with traditional slot heavy repair department is and also must have functions such as maintenance, upper part of the electrolytic cell repairing the dismounting of cell lining and the reparation of building by laying bricks or stones, electrolyzer is out of shape pot shell, multifunctional electrolytic machine group.Therefore, the distributing style and the structure in existing electrolytic cell overhaul workshop can not meet the needs of production.
The utility model content
The purpose of this utility model is, the zone configuration structure in a kind of electrolytic cell overhaul workshop is provided, guaranteeing that electrolyzer strange land overhaul and electrolysis multi-function crane can connect each other by function and orderly subregion that can mutually noninterfere carries out by flow process in the service shop, thereby overcome the deficiencies in the prior art.
The utility model is to constitute like this: comprise potroom and heavy repair department; Potroom is connected with heavy repair department through center-aisle; Heavy repair department is divided into multifunction crane maintenance area, groove superstructure maintenance area, cell lining removes district, electrolytic bath shell reparation and inside lining building district and the cathode carbon block of electrolytic bath assembling is distinguished; Gantry car that is provided with in the center-aisle is connected with the multifunction crane maintenance area; The top of center-aisle is connected with groove superstructure maintenance area with the negative electrode overhead traveling crane by gantry car, is connected by the flat truck trailer on the ground between center-aisle and the groove superstructure maintenance area; Center-aisle and cell lining are removed on the ground between the district and are connected by the slab track trailer; Cell lining is removed district and electrolytic bath shell reparation and is connected by the 25+25 ton overhead travelling crane with top between the inside lining building district; Cathode carbon block of electrolytic bath assembling district builds by laying bricks or stones between the district with cell lining and is connected by straddle carrier.
In the zone configuration structure in above-mentioned electrolytic cell overhaul workshop, be provided with between the storeroom of spare product and part, overhead traveling crane maintenance tool in the described multifunction crane maintenance area and machinery room.
In the zone configuration structure in aforesaid electrolytic cell overhaul workshop, described cell lining is removed the sealing area of district for the band dust arrester installation; Cell lining is removed the district and is provided with the multifunction remote-control incrustation-removing machine.
Owing to adopted technique scheme, compared with prior art, the utility model has carried out reasonable disposition to the heavy repair department and the existing equipment of existing electrolyzer, has guaranteed that overhaul of electrolyzer strange land and electrolysis multi-function crane can connect each other by function and orderly subregion that can mutually noninterfere carries out by flow process in the service shop.Adopt the utility model, can not only save the workshop floor space greatly, and can also increase work efficiency effectively and guarantee work quality.
Description of drawings
Fig. 1 is a structural representation of the present utility model.
Being labeled as in the accompanying drawing: 1-potroom, the 2-heavy repair department, the 3-center-aisle, 4-multifunction crane maintenance area, 5-groove superstructure maintenance area, the 6-cell lining is removed the district, the 7-electrolytic bath shell is repaired and the inside lining building district, 8-cathode carbon block of electrolytic bath assembling district, 9-negative electrode overhead traveling crane, 10-gantry car, 11-flat truck trailer, 12-25+25 ton overhead travelling crane, 13-straddle carrier, the 14-storeroom of spare product and part, between 15-overhead traveling crane maintenance tool, 16-machinery room, 17-dust arrester installation, 18-multifunction remote-control incrustation-removing machine, 19-slab track trailer.
Embodiment
The utility model is described in further detail below in conjunction with drawings and Examples, but not as the foundation of the utility model being done any restriction.
Embodiment of the present utility model: the zone configuration structure in electrolytic cell overhaul of the present utility model workshop as shown in Figure 1.The zonal structure in a kind of electrolytic cell overhaul workshop of implementing comprises potroom 1 and heavy repair department 2; Potroom 1 is connected with heavy repair department 2 through center-aisle 3; Heavy repair department 2 is divided into multifunction crane maintenance area 4, groove superstructure maintenance area 5, cell lining removes district 6, electrolytic bath shell reparation and inside lining building district 7 and the cathode carbon block of electrolytic bath assembling distinguishes 8; Being provided with gantry car in the center-aisle 3 is connected with multifunction crane maintenance area 4; The top of center-aisle 3 is connected with groove superstructure maintenance area with the negative electrode overhead traveling crane by gantry car 10, is connected by flat truck trailer 11 on the ground between center-aisle 3 and the groove superstructure maintenance area 5; Center-aisle 3 is removed on the ground of distinguishing between 6 with cell lining and is connected by slab track trailer 19; Cell lining is removed district 6 and electrolytic bath shell reparation and is connected by 25+25 ton overhead travelling crane 12 with top between the inside lining building district 7; Cathode carbon block of electrolytic bath assembling district 8 builds by laying bricks or stones between the district 7 with cell lining and is connected by straddle carrier 13.Be provided with between the storeroom of spare product and part 14, overhead traveling crane maintenance tool 15 and machinery room 16 in the multifunction crane maintenance area 4.Cell lining is removed the sealing area of district 6 for band dust arrester installation 17; Cell lining is removed district 6 and is provided with multifunction remote-control incrustation-removing machine 18.
Employed all equipments all adopt existing weaponry and equipment of the prior art to install in the utility model.
The partitioned allocation method in electrolytic cell overhaul of the present utility model workshop is that the electrolytic cell overhaul workshop is divided into different zones according to technical process, job specification and the operating environment of electrolytic cell overhaul, and different zones is connected by negative electrode overhead traveling crane, gantry car, flat truck trailer, slab track trailer, straddle carrier and 25+25 ton overhead travelling crane, the electrolyzer and the multifunction crane that need repairing are sent to the designated area according to maintenance flow, avoid the interference each other of each operation.Described different zone comprises the central channel section that connects potroom and heavy repair department; The multifunction crane maintenance area that multifunction crane is overhauled and safeguards; To the lifting mechanism on groove top, pneumatic and blanking system, electric control system are overhauled, debugging and the big bus of antianode balance carry out Welding Repair groove superstructure maintenance area; The cell lining that the electrolysis liner is removed is removed the district; To the reparation of electrolyzer pot shell, cathode block laying, inside lining building, thickener is made firm by ramming and park the electrolyzer pot shell of fixing stand-by electric tank cathode and repair and the inside lining building district; The cathode carbon block of electrolytic bath assembling district of the assembling of anticathode carbon piece and cathode steel bar.The negative electrode overhead traveling crane is used for and will needs the electrolyzer or the multifunction crane of overhaul to be transported to heavy repair department from potroom; Gantry car is used for the superstructure of electrolyzer is transported to groove superstructure maintenance area with negative electrode overhead traveling crane or flat truck trailer; The slab track trailer is used for that electric tank cathode is transported to cell lining and removes the district; The old pot shell that the 25+25 ton overhead travelling crane is used for removing liner is transported to reparation of electrolyzer pot shell and inside lining building district; The cathode block group that straddle carrier is used for assembling is transported to cell lining and builds the district by laying bricks or stones.Described multifunction crane maintenance area is equipped with between the storeroom of spare product and part, overhead traveling crane maintenance tool, machinery room.It has been the closed region that cell lining is removed the district, is equipped with the multifunction remote-control incrustation-removing machine that the waste liner in the old pot shell is removed by remote control under hot state; And be provided with dust arrester installation and denoising device, with isolated dust, noise and thermal source.
When the utility model is disposed at the electrolytic aluminum engineering of producing 500000 tons per year, the workshop is that power house is striden by two companies, factory building span, tread absolute altitude are all consistent with cell room with the overhead traveling crane wheel load, the workshop length overall is 259.2 meters, comprises wherein 16 meters the connection heavy repair department 2 and the center-aisle 3 of potroom 1.In the time of need carrying out the maintenance of multifunction crane or electrolyzer, by 9 loads of negative electrode overhead traveling crane multifunction crane or electrolyzer from potroom 1 by center-aisle 3, multifunction crane is transported to the multifunction crane maintenance area 4 of heavy repair department 2, in multifunction crane maintenance area 4, multifunction crane is overhauled and safeguard, be provided with between the storeroom of spare product and part 14, overhead traveling crane maintenance tool 15 in the multifunction crane maintenance area 4, machinery room 16 to be to satisfy the needs of maintenance.As carry out electrolytic cell overhaul and then need pass through following operation: negative electrode overhead traveling crane 9 partly is placed on electric tank cathode on the slab track trailer 19, the cell lining that is transported to independent sealed band dust arrester installation is removed district 6, by the multifunction remote-control incrustation-removing machine 18 that has instruments such as hydraulic hammer, shovel, grab bucket the waste liner in the old pot shell is removed.Cell lining remove district 6 for independent airtight relatively room and special configuration dust arrester installation 17 (dust-precipitator is configured in top, liner dismounting room, not shown), dust, noise and thermal source have been completely cut off, need not cool off waste liner, under hot state, remove by the waste liner in 18 pairs of old pot shells of multifunction remote-control incrustation-removing machine.The old pot shell of having removed liner is transported to the reparation of electrolyzer pot shell by 25+25 ton overhead travelling crane 12 and cell lining is built district 7 by laying bricks or stones, be provided with 16 in this zone and repair groove position (pit type), pot shell straightener and electric tank tamping tool mainly be equipped with in electrolytic bath shell reparation and inside lining building district 7, work such as electric tank cathode to be used such as can finish the reparation of electrolyzer pot shell, cathode block laying, inside lining building, thickener is made firm by ramming and park.Also be provided with cathode carbon block of electrolytic bath assembling district 8 at heavy repair department, finish the assembling of anticathode carbon piece and cathode steel bar, provide qualified cathode block group for building new groove liner by laying bricks or stones, and the cathode block group that assembles is transported to electrolytic bath shell reparation and inside lining building district 7 by straddle carrier 13.The superstructure of overhaul groove is sling on gantry car 10 that moves to center-aisle 3 by the 25+25 ton overhead travelling crane or is put the groove superstructure maintenance area 5 of transporting to groove overhaul workshop 2 on the flat truck trailer of waiting in the passage 11 to resting in, in this work area to operations such as the maintenance of superstructure lifting mechanism, pneumatic and blanking system, electric control system, the big bus repair welding of anode balance operation, positive bar reparation, Installation and Debugging.

Claims (3)

1. the zone configuration structure in an electrolytic cell overhaul workshop comprises potroom (1) and heavy repair department (2); It is characterized in that: potroom (1) is connected with heavy repair department (2) through center-aisle (3); Heavy repair department (2) is divided into multifunction crane maintenance area (4), groove superstructure maintenance area (5), cell lining dismounting district (6), electrolytic bath shell reparation and inside lining building district (7) and cathode carbon block of electrolytic bath assembling district (8); Gantry car (10) that is provided with in the center-aisle (3) is connected with multifunction crane maintenance area (4); The top of center-aisle (3) is connected with groove superstructure maintenance area (5) with negative electrode overhead traveling crane (9) by gantry car (10), is connected by flat truck trailer (11) on the ground between center-aisle (3) and the groove superstructure maintenance area (5); Center-aisle (3) is removed on the ground of distinguishing between (6) with cell lining and is connected by slab track trailer (19); Cell lining is removed district (6) and electrolytic bath shell reparation and is connected by 25+25 ton overhead travelling crane (12) with top between inside lining building district (7); Cathode carbon block of electrolytic bath assembling district (8) builds by laying bricks or stones between the district (7) with cell lining and is connected by straddle carrier (13).
2. the zone configuration structure in electrolytic cell overhaul according to claim 1 workshop is characterized in that: be provided with (15) and machinery room (16) between the storeroom of spare product and part (14), overhead traveling crane maintenance tool in the described multifunction crane maintenance area (4).
3. the zone configuration structure in electrolytic cell overhaul according to claim 1 workshop is characterized in that: described cell lining is removed the sealing area of district (6) for band dust arrester installation (17); Cell lining is removed district (6) and is provided with multifunction remote-control incrustation-removing machine (18).
CNU2009203001087U 2009-01-08 2009-01-08 Divisional configuration structure of electrolysis bath complete overhaul shop Expired - Lifetime CN201367466Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009203001087U CN201367466Y (en) 2009-01-08 2009-01-08 Divisional configuration structure of electrolysis bath complete overhaul shop

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009203001087U CN201367466Y (en) 2009-01-08 2009-01-08 Divisional configuration structure of electrolysis bath complete overhaul shop

Publications (1)

Publication Number Publication Date
CN201367466Y true CN201367466Y (en) 2009-12-23

Family

ID=41486359

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009203001087U Expired - Lifetime CN201367466Y (en) 2009-01-08 2009-01-08 Divisional configuration structure of electrolysis bath complete overhaul shop

Country Status (1)

Country Link
CN (1) CN201367466Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775620A (en) * 2009-01-08 2010-07-14 贵阳铝镁设计研究院 Partitioned allocation method of electrolytic cell overhaul workshop and structure
CN105874292A (en) * 2013-12-17 2016-08-17 法孚斯Ecl公司 Carriages and machines for operating furnaces in anode baking facilities
CN114164461A (en) * 2020-09-10 2022-03-11 中国瑞林工程技术股份有限公司 Lead electrolysis workshop and lead electrolysis method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101775620A (en) * 2009-01-08 2010-07-14 贵阳铝镁设计研究院 Partitioned allocation method of electrolytic cell overhaul workshop and structure
CN101775620B (en) * 2009-01-08 2014-05-07 贵阳铝镁设计研究院有限公司 Partitioned allocation method of electrolytic cell overhaul workshop and structure
CN105874292A (en) * 2013-12-17 2016-08-17 法孚斯Ecl公司 Carriages and machines for operating furnaces in anode baking facilities
CN105874292B (en) * 2013-12-17 2019-04-26 法孚斯Ecl公司 Skids and machines for operating furnaces in anode baking facilities
CN114164461A (en) * 2020-09-10 2022-03-11 中国瑞林工程技术股份有限公司 Lead electrolysis workshop and lead electrolysis method

Similar Documents

Publication Publication Date Title
CN201367466Y (en) Divisional configuration structure of electrolysis bath complete overhaul shop
CN103358115A (en) Device for automatically lengthening graphite electrode
CN102849627A (en) Cathode transporting crown block of transfer system for centralized overhaul of electrolytic bath
CN206306021U (en) Accumulator box assembly tool
CN105197833A (en) Locomotive transformer lifting platform
CN109055637B (en) Hydraulic lifting process for mounting furnace shell in blast furnace overhaul
CN101775620A (en) Partitioned allocation method of electrolytic cell overhaul workshop and structure
CN207738316U (en) Large scale single wall bottom board steel lifting box integral hoisting suspender
CN102101159A (en) Mounting method for exchanging guide rail at fan-shaped section of continuous casting machine
CN101591789B (en) Collocation method for dismantling furnace room in electrolytic cell overhaul workshop
CN203143964U (en) Device for quickly changing blast furnace air-tight box
CN201367311Y (en) Electrolytic multifunctional unit crown block
CN101215616A (en) Upper repairing method for mammoth converter lining
CN214868222U (en) Tunnel segment steel girth welding robot workstation
CN201485510U (en) A structure for removing the cathode liner of an electrolytic cell
CN204873680U (en) Portable portable building lifting machine device
CN101117721A (en) Allocation mode of anode composing room
CN101713613A (en) Process for constructing oversize main air draft pipeline of sintering project
CN203356982U (en) Automatic lengthening device for graphite electrode
CN103359602B (en) Insulating hook pulley assembly device
CN217462251U (en) Train set for railway tunnel maintenance
CN204435911U (en) The former material protection canopy of a kind of mobile superposed type reinforcing bar
CN101649467B (en) Configuration structure for concentrating overhaul workshops in electrolytic aluminum plant
CN101824629A (en) Structure for removing cathode lining of electrolytic bath
CN217832565U (en) Device is changed to locomotive diesel engine cylinder cap

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
ASS Succession or assignment of patent right

Owner name: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INSTITUTE C

Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST.

Effective date: 20110531

C41 Transfer of patent application or patent right or utility model
COR Change of bibliographic data

Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE

TR01 Transfer of patent right

Effective date of registration: 20110531

Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2

Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd.

Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou

Patentee before: Guiyang Aluminium and Magnesium Design Inst.

AV01 Patent right actively abandoned

Granted publication date: 20091223

Effective date of abandoning: 20090108

RGAV Abandon patent right to avoid regrant