CN201359437Y - Pre-assembly steel-tapping hole sleeve brick for electric furnace - Google Patents
Pre-assembly steel-tapping hole sleeve brick for electric furnace Download PDFInfo
- Publication number
- CN201359437Y CN201359437Y CNU2009200110167U CN200920011016U CN201359437Y CN 201359437 Y CN201359437 Y CN 201359437Y CN U2009200110167 U CNU2009200110167 U CN U2009200110167U CN 200920011016 U CN200920011016 U CN 200920011016U CN 201359437 Y CN201359437 Y CN 201359437Y
- Authority
- CN
- China
- Prior art keywords
- brick
- bricks
- tapping hole
- electric furnace
- peripheral seat
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000011449 brick Substances 0.000 title claims abstract description 88
- 238000010079 rubber tapping Methods 0.000 title claims abstract description 21
- 230000002093 peripheral effect Effects 0.000 claims abstract description 24
- CPLXHLVBOLITMK-UHFFFAOYSA-N Magnesium oxide Chemical compound [Mg]=O CPLXHLVBOLITMK-UHFFFAOYSA-N 0.000 claims description 12
- 239000000395 magnesium oxide Substances 0.000 claims description 6
- 229910000831 Steel Inorganic materials 0.000 abstract description 5
- 239000010959 steel Substances 0.000 abstract description 5
- 239000011819 refractory material Substances 0.000 abstract description 3
- FYYHWMGAXLPEAU-UHFFFAOYSA-N Magnesium Chemical compound [Mg] FYYHWMGAXLPEAU-UHFFFAOYSA-N 0.000 abstract description 2
- 238000010304 firing Methods 0.000 abstract description 2
- 238000009434 installation Methods 0.000 abstract description 2
- 229910052749 magnesium Inorganic materials 0.000 abstract description 2
- 239000011777 magnesium Substances 0.000 abstract description 2
- 238000003825 pressing Methods 0.000 abstract description 2
- 238000005245 sintering Methods 0.000 abstract description 2
- 238000005516 engineering process Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 238000010586 diagram Methods 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000003723 Smelting Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 229910052799 carbon Inorganic materials 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 230000003628 erosive effect Effects 0.000 description 1
- 239000003292 glue Substances 0.000 description 1
- 230000001788 irregular Effects 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 238000009628 steelmaking Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P10/00—Technologies related to metal processing
- Y02P10/20—Recycling
Landscapes
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
- Vertical, Hearth, Or Arc Furnaces (AREA)
Abstract
电炉用预组合出钢口套砖,外围是组合式座砖,中间通过浇注料浇注,将整体砖与座砖粘结组合在一起,并在整体式组合砖的尾端配一端砖,形成了预组合的电炉出钢口套砖,整体工作砖可整体更换,提高电炉出钢口用耐火材料的使用寿命,提高更换效率,减少吨钢耐材消耗成本。端砖与外围座砖的紧密贴合,能够有效的提高整体套砖的结构强度,提高了套砖安装的安全性;整体工作砖采用冷等静压成型方式,坯体密度均匀,烧成时收缩无方向性,消除了机械压制时因密度差产生压力而出现烧成裂纹现象,并且拆装方便。镁质浇注料能够提供适宜的烧结强度,有效的提高更换频率,延长了使用寿命,降低了成本。
The pre-assembled tapping hole bricks for electric furnaces are surrounded by combined seat bricks, and the middle is poured with castables. The whole brick and seat brick are bonded together, and one end brick is placed at the end of the integral combined brick to form a The pre-assembled electric furnace tapping hole bricks and the whole working brick can be replaced as a whole, which improves the service life of the refractory materials for the electric furnace tapping hole, improves the replacement efficiency, and reduces the cost of refractory consumption per ton of steel. The close fit of the end bricks and the peripheral seat bricks can effectively improve the structural strength of the overall set of bricks and improve the safety of the installation of the set of bricks; The shrinkage is non-directional, which eliminates the phenomenon of firing cracks caused by pressure caused by density differences during mechanical pressing, and is easy to disassemble. Magnesium castables can provide suitable sintering strength, effectively increase the replacement frequency, prolong the service life and reduce the cost.
Description
技术领域 technical field
本实用新型涉及一种用于电炉出钢口部位的预组合出钢口套砖。The utility model relates to a pre-assembled tapping hole brick used for the tapping hole of an electric furnace.
背景技术 Background technique
近年来随着电炉技术的发展,对出钢口部位用耐火材料的要求愈加苛刻,其中电炉出钢口部位更换技术主要经历了两个发展阶段:“下眼式”和“镗孔式”。采用“下眼式”更换出钢口时,由于人工对原出钢口清理具有局限性,如出钢口内壁不规则,凹坑不容易填实,加之出钢口长期受钢水钢渣的冲刷和侵蚀,出钢口倾角中心偏移,定位不准,出钢散流,导致下渣量偏大。采用“镗孔式”更换出钢口后,与“下眼式”进行对比表明:出钢口更换作业时间在一定程度上有所减少,出钢口使用寿命有所提高,出钢时间分布趋于合理。随着冶炼技术的提高,上述两种更换方式已不能适应现代炼钢要求,如何改进出钢口更换效率,减少吨钢耐材消耗成本已成为目前迫切需要解决的问题。In recent years, with the development of electric furnace technology, the requirements for refractory materials for taphole parts have become more and more stringent. Among them, the replacement technology for taphole parts of electric furnaces has mainly experienced two development stages: "lower eye type" and "boring type". When the tap hole is replaced by the "lower eye type", due to the limitations of manual cleaning of the original tap hole, such as the irregular inner wall of the tap hole, the pits are not easy to fill, and the tap hole has been washed away by molten steel and slag for a long time. Erosion, deviation of the center of the inclination angle of the tap hole, inaccurate positioning, and scattered flow of the steel, resulting in a large amount of slag. After using the "boring hole type" to replace the tapping hole, the comparison with the "bottom hole type" shows that the replacement operation time of the tapping hole is reduced to a certain extent, the service life of the tapping hole is improved, and the distribution of tapping time tends to be more reasonable. With the improvement of smelting technology, the above two replacement methods can no longer meet the requirements of modern steelmaking. How to improve the replacement efficiency of tapholes and reduce the cost of refractory consumption per ton of steel has become an urgent problem to be solved.
发明内容 Contents of the invention
为了解决上述存在的问题,本实用新型提供一种使用寿命长、提高出钢口更换效率的电炉用预组合出钢口套砖;本实用新型的目的是通过下述技术方案实现的:一种电炉用预组合出钢口套砖,包括外围座砖、端砖、镁质浇注料和整体工作砖,外围座砖的砖体上端面有一凹面,下端面有一凸面,在外围座砖内设有整体工作砖,在外围座砖与整体工作砖之间填充镁质浇注料,在外围座砖的一端安装有端砖,端砖的砖体上制有与外围座砖匹配的凹面,装配时端砖与外围座砖的砖体凹凸面紧密胶粘。In order to solve the above existing problems, the utility model provides a pre-assembled tapping hole brick for electric furnaces with long service life and improved tapping hole replacement efficiency; the purpose of the utility model is achieved through the following technical solutions: a The pre-assembled tapping hole bricks for electric furnaces include peripheral seat bricks, end bricks, magnesia castables and integral working bricks. The upper end of the peripheral seat brick has a concave surface and the lower end surface has a convex surface. Integral working brick, magnesia castable is filled between the peripheral seat brick and the integral working brick, an end brick is installed at one end of the peripheral seat brick, and the brick body of the end brick is made with a concave surface matching the peripheral seat brick. The brick is closely glued to the concave and convex surface of the brick body of the peripheral seat brick.
本实用新型的有益效果:本实用新型采用整体式与组合式相结合的方式,外围是组合式座砖,中间通过浇注料浇注,将整体砖与座砖粘结组合在一起,并在整体式组合砖的尾端配一端砖,形成了预组合的电炉出钢口套砖,其中整体工作砖可整体更换,该方式对提高电炉出钢口用耐火材料的使用寿命,提高更换效率,减少吨钢耐材消耗成本起到了积极的推动作用。端砖与外围座砖的紧密贴合,能够有效的提高整体套砖的结构强度,提高了套砖安装的安全性;整体工作砖采用冷等静压成型方式,坯体密度均匀,烧成时收缩无方向性,消除了机械压制时因密度差产生压力而出现烧成裂纹现象,并且拆装方便。镁质浇注料能够提供适宜的烧结强度,有效的提高更换频率,延长了使用寿命,降低了成本。Beneficial effects of the utility model: the utility model adopts the combination of the integral type and the combined type, the periphery is the combined seat brick, and the middle is poured with the castable, and the integral brick and the seat brick are bonded together, and the integral brick The end of the combination brick is matched with one end brick to form a pre-assembled electric furnace tapping hole brick, in which the whole working brick can be replaced as a whole. This method can improve the service life of the refractory material used in the electric furnace tapping hole, improve the replacement efficiency, and reduce the ton The cost of steel refractory consumption has played a positive role in promoting. The close fit of the end bricks and the peripheral seat bricks can effectively improve the structural strength of the overall set of bricks and improve the safety of the installation of the set of bricks; The shrinkage is non-directional, which eliminates the phenomenon of firing cracks caused by pressure caused by density differences during mechanical pressing, and is easy to disassemble. Magnesium castables can provide suitable sintering strength, effectively increase the replacement frequency, prolong the service life and reduce the cost.
附图说明 Description of drawings
图1是电炉用预组合出钢口套砖的结构示意图;Fig. 1 is the structural representation of the pre-assembled tapping hole brick of electric furnace;
图2是电炉用预组合出钢口套砖外围座砖示意图;Fig. 2 is a schematic diagram of the peripheral seat brick of a pre-assembled tapping hole brick for an electric furnace;
图3是图2的俯视图;Fig. 3 is the top view of Fig. 2;
图4是图2中凹面的放大图;Figure 4 is an enlarged view of the concave surface in Figure 2;
图5时图2中凸面的放大图;Figure 5 is an enlarged view of the convex surface in Figure 2;
图6是电炉用预组合出钢口套砖端砖的结构示意图;Fig. 6 is a structural schematic diagram of a pre-assembled tapping hole brick end brick for an electric furnace;
图7是图6的俯视图;Figure 7 is a top view of Figure 6;
图8是电炉用预组合出钢口套砖整体工作砖的结构示意图;Fig. 8 is a schematic structural view of the integral working brick of the pre-assembled tapping hole brick for electric furnace;
图9是图8的侧视图。FIG. 9 is a side view of FIG. 8 .
具体实施方式 Detailed ways
一种电炉用预组合出钢口套砖,包括外围座砖2、端砖1、镁质浇注料3和整体工作砖4,其中外围座砖2采用特殊形状的镁碳砖,外围座砖2的砖体上端面有一凹面5,下端面有一凸面6,若干块外围座砖通过凹凸面匹配连接,并用填缝胶粘接成具有一定的结构强度的组合砖体,在外围座砖2内设有整体工作砖4,在外围座砖2与整体工作砖4之间填充镁质浇注料3,在外围座砖2的一端安装有端砖1,端砖1的砖体上制有与外围座砖匹配的凹面7,装配时端砖1与外围座砖2的砖体凹凸面紧密胶粘。A pre-assembled tapping hole brick for an electric furnace, including a
Claims (1)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2009200110167U CN201359437Y (en) | 2009-02-27 | 2009-02-27 | Pre-assembly steel-tapping hole sleeve brick for electric furnace |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2009200110167U CN201359437Y (en) | 2009-02-27 | 2009-02-27 | Pre-assembly steel-tapping hole sleeve brick for electric furnace |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201359437Y true CN201359437Y (en) | 2009-12-09 |
Family
ID=41425202
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2009200110167U Expired - Fee Related CN201359437Y (en) | 2009-02-27 | 2009-02-27 | Pre-assembly steel-tapping hole sleeve brick for electric furnace |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201359437Y (en) |
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102310192A (en) * | 2011-10-08 | 2012-01-11 | 维苏威高级陶瓷(苏州)有限公司 | Novel combined type brick cup |
| CN103602780A (en) * | 2013-10-21 | 2014-02-26 | 张家港联峰钢铁研究所有限公司 | Replacing method of converter tap hole |
| CN107841591A (en) * | 2017-12-20 | 2018-03-27 | 马鞍山钢铁股份有限公司 | A kind of novel converter tapping hole brick cup |
| CN113088597A (en) * | 2021-04-28 | 2021-07-09 | 北京联合荣大工程材料股份有限公司 | Blast furnace taphole structure |
-
2009
- 2009-02-27 CN CNU2009200110167U patent/CN201359437Y/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102310192A (en) * | 2011-10-08 | 2012-01-11 | 维苏威高级陶瓷(苏州)有限公司 | Novel combined type brick cup |
| CN103602780A (en) * | 2013-10-21 | 2014-02-26 | 张家港联峰钢铁研究所有限公司 | Replacing method of converter tap hole |
| CN107841591A (en) * | 2017-12-20 | 2018-03-27 | 马鞍山钢铁股份有限公司 | A kind of novel converter tapping hole brick cup |
| CN113088597A (en) * | 2021-04-28 | 2021-07-09 | 北京联合荣大工程材料股份有限公司 | Blast furnace taphole structure |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103736985B (en) | A kind of ladle working lining and slag lining thereof build by laying method | |
| CN201359437Y (en) | Pre-assembly steel-tapping hole sleeve brick for electric furnace | |
| CN202126183U (en) | Arc furnace lining with composite structure | |
| CN201801532U (en) | Main runner of iron-storing iron runner of single-taphole blast furnace | |
| CN201702360U (en) | Steel ladle with slope-shaped ladle bottom | |
| CN202519276U (en) | Iron tap channel combination | |
| CN208083449U (en) | A kind of replaceable ladle prefabricated component | |
| CN201289301Y (en) | Copple for medium-frequency induction furnace and mold for manufacturing the same | |
| CN209443031U (en) | Combined type slide board brick is used in a kind of tapping of blocking dregs of converter furnace sliding plate | |
| CN201876117U (en) | Aluminum scrap recycling and smelting furnace | |
| CN213388767U (en) | RH dip pipe structure | |
| CN212320413U (en) | Refractory material lining structure for sintering machine air box | |
| CN202329196U (en) | Groove carbon block for molten iron flow groove of ore-smelting electric furnace | |
| CN202139244U (en) | Iron-smelting blast furnace body structure | |
| CN203265612U (en) | Novel steel ladle | |
| CN202450115U (en) | Tapping channel device at furnace mouth of argon oxygen refining furnace | |
| CN203269958U (en) | Blast-furnace tapping channel | |
| CN201828148U (en) | Integrated nose brick | |
| CN201669421U (en) | Quick change upper nozzle for stopper rod flow control | |
| CN111560486A (en) | Blast furnace bottom building method for guiding furnace bottom to be in shape of boiler bottom | |
| CN223422708U (en) | An induction furnace steel trough prefabricated part | |
| CN202039086U (en) | Arc furnace capable of realizing slag steel tapping and slag free tapping | |
| CN204975304U (en) | KR stirs hot metal bottle | |
| CN201670846U (en) | Embedded swing nozzle prefabricated part | |
| CN201381344Y (en) | Improved RH stove hot-bending pipe |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091209 Termination date: 20130227 |