[go: up one dir, main page]

CN201359437Y - Pre-assembly steel-tapping hole sleeve brick for electric furnace - Google Patents

Pre-assembly steel-tapping hole sleeve brick for electric furnace Download PDF

Info

Publication number
CN201359437Y
CN201359437Y CNU2009200110167U CN200920011016U CN201359437Y CN 201359437 Y CN201359437 Y CN 201359437Y CN U2009200110167 U CNU2009200110167 U CN U2009200110167U CN 200920011016 U CN200920011016 U CN 200920011016U CN 201359437 Y CN201359437 Y CN 201359437Y
Authority
CN
China
Prior art keywords
brick
bricks
tapping hole
electric furnace
peripheral seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200110167U
Other languages
Chinese (zh)
Inventor
周清德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YINGKOU BAYUQUAN REFRACTORY MATERIAL CO Ltd
Original Assignee
YINGKOU BAYUQUAN REFRACTORY MATERIAL CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YINGKOU BAYUQUAN REFRACTORY MATERIAL CO Ltd filed Critical YINGKOU BAYUQUAN REFRACTORY MATERIAL CO Ltd
Priority to CNU2009200110167U priority Critical patent/CN201359437Y/en
Application granted granted Critical
Publication of CN201359437Y publication Critical patent/CN201359437Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P10/00Technologies related to metal processing
    • Y02P10/20Recycling

Landscapes

  • Furnace Housings, Linings, Walls, And Ceilings (AREA)
  • Vertical, Hearth, Or Arc Furnaces (AREA)

Abstract

电炉用预组合出钢口套砖,外围是组合式座砖,中间通过浇注料浇注,将整体砖与座砖粘结组合在一起,并在整体式组合砖的尾端配一端砖,形成了预组合的电炉出钢口套砖,整体工作砖可整体更换,提高电炉出钢口用耐火材料的使用寿命,提高更换效率,减少吨钢耐材消耗成本。端砖与外围座砖的紧密贴合,能够有效的提高整体套砖的结构强度,提高了套砖安装的安全性;整体工作砖采用冷等静压成型方式,坯体密度均匀,烧成时收缩无方向性,消除了机械压制时因密度差产生压力而出现烧成裂纹现象,并且拆装方便。镁质浇注料能够提供适宜的烧结强度,有效的提高更换频率,延长了使用寿命,降低了成本。

The pre-assembled tapping hole bricks for electric furnaces are surrounded by combined seat bricks, and the middle is poured with castables. The whole brick and seat brick are bonded together, and one end brick is placed at the end of the integral combined brick to form a The pre-assembled electric furnace tapping hole bricks and the whole working brick can be replaced as a whole, which improves the service life of the refractory materials for the electric furnace tapping hole, improves the replacement efficiency, and reduces the cost of refractory consumption per ton of steel. The close fit of the end bricks and the peripheral seat bricks can effectively improve the structural strength of the overall set of bricks and improve the safety of the installation of the set of bricks; The shrinkage is non-directional, which eliminates the phenomenon of firing cracks caused by pressure caused by density differences during mechanical pressing, and is easy to disassemble. Magnesium castables can provide suitable sintering strength, effectively increase the replacement frequency, prolong the service life and reduce the cost.

Description

电炉用预组合出钢口套砖 Pre-assembled tapping hole bricks for electric furnace

技术领域 technical field

本实用新型涉及一种用于电炉出钢口部位的预组合出钢口套砖。The utility model relates to a pre-assembled tapping hole brick used for the tapping hole of an electric furnace.

背景技术 Background technique

近年来随着电炉技术的发展,对出钢口部位用耐火材料的要求愈加苛刻,其中电炉出钢口部位更换技术主要经历了两个发展阶段:“下眼式”和“镗孔式”。采用“下眼式”更换出钢口时,由于人工对原出钢口清理具有局限性,如出钢口内壁不规则,凹坑不容易填实,加之出钢口长期受钢水钢渣的冲刷和侵蚀,出钢口倾角中心偏移,定位不准,出钢散流,导致下渣量偏大。采用“镗孔式”更换出钢口后,与“下眼式”进行对比表明:出钢口更换作业时间在一定程度上有所减少,出钢口使用寿命有所提高,出钢时间分布趋于合理。随着冶炼技术的提高,上述两种更换方式已不能适应现代炼钢要求,如何改进出钢口更换效率,减少吨钢耐材消耗成本已成为目前迫切需要解决的问题。In recent years, with the development of electric furnace technology, the requirements for refractory materials for taphole parts have become more and more stringent. Among them, the replacement technology for taphole parts of electric furnaces has mainly experienced two development stages: "lower eye type" and "boring type". When the tap hole is replaced by the "lower eye type", due to the limitations of manual cleaning of the original tap hole, such as the irregular inner wall of the tap hole, the pits are not easy to fill, and the tap hole has been washed away by molten steel and slag for a long time. Erosion, deviation of the center of the inclination angle of the tap hole, inaccurate positioning, and scattered flow of the steel, resulting in a large amount of slag. After using the "boring hole type" to replace the tapping hole, the comparison with the "bottom hole type" shows that the replacement operation time of the tapping hole is reduced to a certain extent, the service life of the tapping hole is improved, and the distribution of tapping time tends to be more reasonable. With the improvement of smelting technology, the above two replacement methods can no longer meet the requirements of modern steelmaking. How to improve the replacement efficiency of tapholes and reduce the cost of refractory consumption per ton of steel has become an urgent problem to be solved.

发明内容 Contents of the invention

为了解决上述存在的问题,本实用新型提供一种使用寿命长、提高出钢口更换效率的电炉用预组合出钢口套砖;本实用新型的目的是通过下述技术方案实现的:一种电炉用预组合出钢口套砖,包括外围座砖、端砖、镁质浇注料和整体工作砖,外围座砖的砖体上端面有一凹面,下端面有一凸面,在外围座砖内设有整体工作砖,在外围座砖与整体工作砖之间填充镁质浇注料,在外围座砖的一端安装有端砖,端砖的砖体上制有与外围座砖匹配的凹面,装配时端砖与外围座砖的砖体凹凸面紧密胶粘。In order to solve the above existing problems, the utility model provides a pre-assembled tapping hole brick for electric furnaces with long service life and improved tapping hole replacement efficiency; the purpose of the utility model is achieved through the following technical solutions: a The pre-assembled tapping hole bricks for electric furnaces include peripheral seat bricks, end bricks, magnesia castables and integral working bricks. The upper end of the peripheral seat brick has a concave surface and the lower end surface has a convex surface. Integral working brick, magnesia castable is filled between the peripheral seat brick and the integral working brick, an end brick is installed at one end of the peripheral seat brick, and the brick body of the end brick is made with a concave surface matching the peripheral seat brick. The brick is closely glued to the concave and convex surface of the brick body of the peripheral seat brick.

本实用新型的有益效果:本实用新型采用整体式与组合式相结合的方式,外围是组合式座砖,中间通过浇注料浇注,将整体砖与座砖粘结组合在一起,并在整体式组合砖的尾端配一端砖,形成了预组合的电炉出钢口套砖,其中整体工作砖可整体更换,该方式对提高电炉出钢口用耐火材料的使用寿命,提高更换效率,减少吨钢耐材消耗成本起到了积极的推动作用。端砖与外围座砖的紧密贴合,能够有效的提高整体套砖的结构强度,提高了套砖安装的安全性;整体工作砖采用冷等静压成型方式,坯体密度均匀,烧成时收缩无方向性,消除了机械压制时因密度差产生压力而出现烧成裂纹现象,并且拆装方便。镁质浇注料能够提供适宜的烧结强度,有效的提高更换频率,延长了使用寿命,降低了成本。Beneficial effects of the utility model: the utility model adopts the combination of the integral type and the combined type, the periphery is the combined seat brick, and the middle is poured with the castable, and the integral brick and the seat brick are bonded together, and the integral brick The end of the combination brick is matched with one end brick to form a pre-assembled electric furnace tapping hole brick, in which the whole working brick can be replaced as a whole. This method can improve the service life of the refractory material used in the electric furnace tapping hole, improve the replacement efficiency, and reduce the ton The cost of steel refractory consumption has played a positive role in promoting. The close fit of the end bricks and the peripheral seat bricks can effectively improve the structural strength of the overall set of bricks and improve the safety of the installation of the set of bricks; The shrinkage is non-directional, which eliminates the phenomenon of firing cracks caused by pressure caused by density differences during mechanical pressing, and is easy to disassemble. Magnesium castables can provide suitable sintering strength, effectively increase the replacement frequency, prolong the service life and reduce the cost.

附图说明 Description of drawings

图1是电炉用预组合出钢口套砖的结构示意图;Fig. 1 is the structural representation of the pre-assembled tapping hole brick of electric furnace;

图2是电炉用预组合出钢口套砖外围座砖示意图;Fig. 2 is a schematic diagram of the peripheral seat brick of a pre-assembled tapping hole brick for an electric furnace;

图3是图2的俯视图;Fig. 3 is the top view of Fig. 2;

图4是图2中凹面的放大图;Figure 4 is an enlarged view of the concave surface in Figure 2;

图5时图2中凸面的放大图;Figure 5 is an enlarged view of the convex surface in Figure 2;

图6是电炉用预组合出钢口套砖端砖的结构示意图;Fig. 6 is a structural schematic diagram of a pre-assembled tapping hole brick end brick for an electric furnace;

图7是图6的俯视图;Figure 7 is a top view of Figure 6;

图8是电炉用预组合出钢口套砖整体工作砖的结构示意图;Fig. 8 is a schematic structural view of the integral working brick of the pre-assembled tapping hole brick for electric furnace;

图9是图8的侧视图。FIG. 9 is a side view of FIG. 8 .

具体实施方式 Detailed ways

一种电炉用预组合出钢口套砖,包括外围座砖2、端砖1、镁质浇注料3和整体工作砖4,其中外围座砖2采用特殊形状的镁碳砖,外围座砖2的砖体上端面有一凹面5,下端面有一凸面6,若干块外围座砖通过凹凸面匹配连接,并用填缝胶粘接成具有一定的结构强度的组合砖体,在外围座砖2内设有整体工作砖4,在外围座砖2与整体工作砖4之间填充镁质浇注料3,在外围座砖2的一端安装有端砖1,端砖1的砖体上制有与外围座砖匹配的凹面7,装配时端砖1与外围座砖2的砖体凹凸面紧密胶粘。A pre-assembled tapping hole brick for an electric furnace, including a peripheral seat brick 2, an end brick 1, a magnesia castable 3 and an integral working brick 4, wherein the peripheral seat brick 2 adopts a special-shaped magnesia-carbon brick, and the peripheral seat brick 2 There is a concave surface 5 on the upper end surface of the brick body, and a convex surface 6 on the lower end surface. Several peripheral seat bricks are matched and connected through the concave and convex surfaces, and are bonded with a caulking glue to form a combined brick body with a certain structural strength. There is an integral working brick 4, and the magnesia castable 3 is filled between the peripheral seat brick 2 and the integral working brick 4, and an end brick 1 is installed on one end of the peripheral seat brick 2, and the brick body of the end brick 1 is made with a peripheral seat The concave surface 7 matched by the bricks, when assembled, the concave-convex surface of the brick body of the end brick 1 and the peripheral seat brick 2 is closely glued.

Claims (1)

1、一种电炉用预组合出钢口套砖,其特征在于:包括外围座砖、端砖、镁质浇注料和整体工作砖,外围座砖的砖体上端面有一凹面,下端面有一凸面,在外围座砖内设有整体工作砖,在外围座砖与整体工作砖之间填充镁质浇注料,在外围座砖的一端安装有端砖,端砖的砖体上制有与外围座砖匹配的凹面,装配时端砖与外围座砖的砖体凹凸面紧密胶粘。1. A pre-assembled tapping hole brick for an electric furnace, characterized in that it includes peripheral seat bricks, end bricks, magnesia castables and integral working bricks, the upper end of the peripheral seat brick has a concave surface, and the lower end surface has a convex surface , there is an integral working brick in the peripheral seat brick, magnesia castable is filled between the peripheral seat brick and the integral working brick, an end brick is installed at one end of the peripheral seat brick, and the brick body of the end brick is made with the peripheral seat The concave surface of the brick matches, and the end brick is closely glued to the concave and convex surface of the brick body of the peripheral seat brick during assembly.
CNU2009200110167U 2009-02-27 2009-02-27 Pre-assembly steel-tapping hole sleeve brick for electric furnace Expired - Fee Related CN201359437Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200110167U CN201359437Y (en) 2009-02-27 2009-02-27 Pre-assembly steel-tapping hole sleeve brick for electric furnace

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200110167U CN201359437Y (en) 2009-02-27 2009-02-27 Pre-assembly steel-tapping hole sleeve brick for electric furnace

Publications (1)

Publication Number Publication Date
CN201359437Y true CN201359437Y (en) 2009-12-09

Family

ID=41425202

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200110167U Expired - Fee Related CN201359437Y (en) 2009-02-27 2009-02-27 Pre-assembly steel-tapping hole sleeve brick for electric furnace

Country Status (1)

Country Link
CN (1) CN201359437Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102310192A (en) * 2011-10-08 2012-01-11 维苏威高级陶瓷(苏州)有限公司 Novel combined type brick cup
CN103602780A (en) * 2013-10-21 2014-02-26 张家港联峰钢铁研究所有限公司 Replacing method of converter tap hole
CN107841591A (en) * 2017-12-20 2018-03-27 马鞍山钢铁股份有限公司 A kind of novel converter tapping hole brick cup
CN113088597A (en) * 2021-04-28 2021-07-09 北京联合荣大工程材料股份有限公司 Blast furnace taphole structure

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102310192A (en) * 2011-10-08 2012-01-11 维苏威高级陶瓷(苏州)有限公司 Novel combined type brick cup
CN103602780A (en) * 2013-10-21 2014-02-26 张家港联峰钢铁研究所有限公司 Replacing method of converter tap hole
CN107841591A (en) * 2017-12-20 2018-03-27 马鞍山钢铁股份有限公司 A kind of novel converter tapping hole brick cup
CN113088597A (en) * 2021-04-28 2021-07-09 北京联合荣大工程材料股份有限公司 Blast furnace taphole structure

Similar Documents

Publication Publication Date Title
CN103736985B (en) A kind of ladle working lining and slag lining thereof build by laying method
CN201359437Y (en) Pre-assembly steel-tapping hole sleeve brick for electric furnace
CN202126183U (en) Arc furnace lining with composite structure
CN201801532U (en) Main runner of iron-storing iron runner of single-taphole blast furnace
CN201702360U (en) Steel ladle with slope-shaped ladle bottom
CN202519276U (en) Iron tap channel combination
CN208083449U (en) A kind of replaceable ladle prefabricated component
CN201289301Y (en) Copple for medium-frequency induction furnace and mold for manufacturing the same
CN209443031U (en) Combined type slide board brick is used in a kind of tapping of blocking dregs of converter furnace sliding plate
CN201876117U (en) Aluminum scrap recycling and smelting furnace
CN213388767U (en) RH dip pipe structure
CN212320413U (en) Refractory material lining structure for sintering machine air box
CN202329196U (en) Groove carbon block for molten iron flow groove of ore-smelting electric furnace
CN202139244U (en) Iron-smelting blast furnace body structure
CN203265612U (en) Novel steel ladle
CN202450115U (en) Tapping channel device at furnace mouth of argon oxygen refining furnace
CN203269958U (en) Blast-furnace tapping channel
CN201828148U (en) Integrated nose brick
CN201669421U (en) Quick change upper nozzle for stopper rod flow control
CN111560486A (en) Blast furnace bottom building method for guiding furnace bottom to be in shape of boiler bottom
CN223422708U (en) An induction furnace steel trough prefabricated part
CN202039086U (en) Arc furnace capable of realizing slag steel tapping and slag free tapping
CN204975304U (en) KR stirs hot metal bottle
CN201670846U (en) Embedded swing nozzle prefabricated part
CN201381344Y (en) Improved RH stove hot-bending pipe

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091209

Termination date: 20130227