[go: up one dir, main page]

CN201347560Y - 一种煤矿塌陷区输电杆塔复合板基础 - Google Patents

一种煤矿塌陷区输电杆塔复合板基础 Download PDF

Info

Publication number
CN201347560Y
CN201347560Y CNU2009200387907U CN200920038790U CN201347560Y CN 201347560 Y CN201347560 Y CN 201347560Y CN U2009200387907 U CNU2009200387907 U CN U2009200387907U CN 200920038790 U CN200920038790 U CN 200920038790U CN 201347560 Y CN201347560 Y CN 201347560Y
Authority
CN
China
Prior art keywords
foundation
composite slab
concrete
coal mine
flexible
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2009200387907U
Other languages
English (en)
Inventor
袁广林
张云飞
林志添
舒前进
吴刚
王东权
苗生龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China University of Mining and Technology Beijing CUMTB
Jiangsu Electric Power Design Institute
Xuzhou Power Supply Co of State Grid Jiangsu Electric Power Co Ltd
Original Assignee
China University of Mining and Technology Beijing CUMTB
Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd
Jiangsu Electric Power Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China University of Mining and Technology Beijing CUMTB, Xuzhou Power Supply Co of Jiangsu Electric Power Co Ltd, Jiangsu Electric Power Design Institute filed Critical China University of Mining and Technology Beijing CUMTB
Priority to CNU2009200387907U priority Critical patent/CN201347560Y/zh
Application granted granted Critical
Publication of CN201347560Y publication Critical patent/CN201347560Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Foundations (AREA)

Abstract

一种煤矿塌陷区输电杆塔复合板基础,在铁塔塔架的支脚下设有柔性混凝土独立基础,柔性混凝土独立基础设在混凝土复合板上,混凝土复合板和柔性独立基础之间设有滑动层,混凝土复合板下部设有按设计高度铺垫的砂垫层。该结构有效地增加了塔架基础的整体性,能显著减少地表垂直变形和水平变形在输电杆塔上产生的附加应力,使其能够经受采动的影响,保证输电杆塔的安全,同时便于柔性独立基础的恢复就位。最适于在塌陷区新建输电杆塔的保护,其施工简单,效果好,具有广泛的实用性。

Description

一种煤矿塌陷区输电杆塔复合板基础
技术领域
本实用新型涉及一种输电杆塔复合板基础,尤其是一种煤矿塌陷区高压输电线路的输电杆塔复合板基础。
背景技术
煤炭是我国的主要能源,在我国的一次能源消费中,煤炭占70%左右。由于煤炭从地下采出后,其上方覆盖岩层失去支撑,引起采空区上方地表产生移动与变形。地表的移动与变形直接影响到建(构)筑物的基础,从而导致建(构)筑物发生破坏。
近年来,随着近年来坑口电厂的建设和电网的不断发展,越来越多的输电线路需经过采动区。另一方面,随着地下开采范围的扩大,严重影响到已有高压输电线路杆塔的安全,对塌陷区(采动区)上的高压输电线路和塔架造成了很大威胁和危害。因此,开展采动区抗变形输电塔架和基础的研究,对确保高压输电线路杆塔的安全具有重要的意义。
发明内容
本实用新型的目的是克服已有技术中的不足,提供一种抗变形能力强,施工简单,造价低的煤矿塌陷区输电杆塔复合板基础。
为实现上述目的,本实用新型的煤矿塌陷区输电杆塔复合板基础,在铁塔塔架的支脚下设有柔性混凝土独立基础,柔性混凝土独立基础设在混凝土复合板上,混凝土复合板和柔性独立基础之间设有滑动层,混凝土复合板下部设有按设计高度铺垫的砂垫层。
所述的滑动层由中间夹石墨粉或云母片的两层沥青油毡或砂层及其上的两层沥青油毡组成;所述的复合板由钢筋混凝土制成;所述的砂垫层的厚度大于300mm。
本实用新型的有益效果:该结构有效地增加了塔架基础的整体性,能显著减少地表垂直变形和水平变形在输电杆塔上产生的附加应力,使其能够经受采动的影响,保证输电杆塔的安全,同时便于柔性独立基础的回复就位,尤其适用于塌陷区高压输电线路的高压输电铁塔。其结构简单,抗变形能力强,施工简单,造价低。
附图说明
附图是本实用新型的煤矿塌陷区输电杆塔复合板基础结构图。
图中:1.铁塔塔架,2.柔性混凝土独立基础,3.滑动层,4.混凝土复合板,5.砂垫层。
具体实施方式
下面将结合附图中的实施例对本实用新型作进一步的描述:
本实用新型的煤矿塌陷区输电杆塔复合板基础,由铁塔塔架1、柔性独立基础2、滑动层3、混凝土复合板4、砂垫层5组成。铁塔塔架1的支脚下设置柔性混凝土独立基础2,柔性混凝土独立基础2设在混凝土复合板4上,混凝土复合板4和柔性独立基础2之间设置滑动层3,滑动层3由中间夹石墨粉或云母片的两层沥青油毡或具有一定厚度的砂层及其上的两层沥青油毡组成。混凝土复合板4下部按设计高度铺垫砂垫层5,复合板4由钢筋混凝土制成;砂垫层5的厚度大于300mm。
工作过程:首先根据设计要求开挖地基达设计深度后,采用中砂施工砂垫层5,分层夯实达设计厚度,再依次施工钢筋混凝土复合板4、滑动层3、柔性独立基础2。柔性独立基础2施工完成后,安装铁塔塔架1。

Claims (4)

1.一种煤矿塌陷区输电杆塔复合板基础,其特征在于:在铁塔塔架(1)的支脚下设有柔性混凝土独立基础(2),柔性混凝土独立基础(2)设在混凝土复合板(4)上,混凝土复合板(4)和柔性独立基础(2)之间设有滑动层(3),混凝土复合板(4)下部设有按设计高度铺垫的砂垫层(5)。
2.根据权利要求1所述的煤矿塌陷区输电杆塔复合板基础,其特征在于:所述的滑动层(3)由中间夹石墨粉或云母片的两层沥青油毡或砂层及其上的两层沥青油毡组成。
3.根据权利要求1所述的煤矿塌陷区输电杆塔复合板基础,其特征在于:所述的复合板(4)由钢筋混凝土制成。
4.根据权利要求1所述的煤矿塌陷区输电杆塔复合板基础,其特征在于:所述的砂垫层(5)的厚度大于300mm。
CNU2009200387907U 2009-01-09 2009-01-09 一种煤矿塌陷区输电杆塔复合板基础 Expired - Fee Related CN201347560Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2009200387907U CN201347560Y (zh) 2009-01-09 2009-01-09 一种煤矿塌陷区输电杆塔复合板基础

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2009200387907U CN201347560Y (zh) 2009-01-09 2009-01-09 一种煤矿塌陷区输电杆塔复合板基础

Publications (1)

Publication Number Publication Date
CN201347560Y true CN201347560Y (zh) 2009-11-18

Family

ID=41367032

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2009200387907U Expired - Fee Related CN201347560Y (zh) 2009-01-09 2009-01-09 一种煤矿塌陷区输电杆塔复合板基础

Country Status (1)

Country Link
CN (1) CN201347560Y (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956479A (zh) * 2010-09-20 2011-01-26 中国矿业大学(北京) 原基础加装的高压线塔可提升且抗采动变形装置
CN103046572A (zh) * 2012-12-27 2013-04-17 中国矿业大学 一种采动区输电铁塔复合防护板基础的设计方法
CN103074885A (zh) * 2013-01-05 2013-05-01 华南理工大学 一种用于基础沉降控制的方法
CN103266620A (zh) * 2013-05-16 2013-08-28 国家电网公司 输电线路经煤矸石区域杆塔的组立方法
CN104018513A (zh) * 2014-06-03 2014-09-03 中国矿业大学 采煤沉陷区防护板基础挠曲变形和截面弯矩的计算方法
CN104164888A (zh) * 2014-09-24 2014-11-26 国家电网公司 一种煤矿采动区特高压输电铁塔混凝土抗变形基础
CN106120844A (zh) * 2016-08-20 2016-11-16 苏州高精特专信息科技有限公司 一种基于万向节铰接的电线塔防塌陷地基
CN106368236A (zh) * 2016-10-14 2017-02-01 国网山西省电力公司晋城供电公司 一种采空区自适应调整基础的装置及方法

Cited By (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101956479B (zh) * 2010-09-20 2012-01-04 中国矿业大学(北京) 原基础加装的高压线塔可提升且抗采动变形装置
CN101956479A (zh) * 2010-09-20 2011-01-26 中国矿业大学(北京) 原基础加装的高压线塔可提升且抗采动变形装置
CN103046572B (zh) * 2012-12-27 2015-09-09 中国矿业大学 一种采动区输电铁塔复合防护板基础的设计方法
CN103046572A (zh) * 2012-12-27 2013-04-17 中国矿业大学 一种采动区输电铁塔复合防护板基础的设计方法
CN103074885A (zh) * 2013-01-05 2013-05-01 华南理工大学 一种用于基础沉降控制的方法
WO2014106432A1 (zh) * 2013-01-05 2014-07-10 华南理工大学 一种用于基础沉降控制的方法
CN103266620B (zh) * 2013-05-16 2015-09-16 国家电网公司 输电线路经煤矸石区域杆塔的组立方法
CN103266620A (zh) * 2013-05-16 2013-08-28 国家电网公司 输电线路经煤矸石区域杆塔的组立方法
CN104018513A (zh) * 2014-06-03 2014-09-03 中国矿业大学 采煤沉陷区防护板基础挠曲变形和截面弯矩的计算方法
CN104018513B (zh) * 2014-06-03 2016-06-08 中国矿业大学 采煤沉陷区防护板基础挠曲变形和截面弯矩的计算方法
CN104164888A (zh) * 2014-09-24 2014-11-26 国家电网公司 一种煤矿采动区特高压输电铁塔混凝土抗变形基础
CN106120844A (zh) * 2016-08-20 2016-11-16 苏州高精特专信息科技有限公司 一种基于万向节铰接的电线塔防塌陷地基
CN106120844B (zh) * 2016-08-20 2018-08-21 安徽阳光水泥有限公司 一种基于万向节铰接的电线塔防塌陷地基
CN106368236A (zh) * 2016-10-14 2017-02-01 国网山西省电力公司晋城供电公司 一种采空区自适应调整基础的装置及方法

Similar Documents

Publication Publication Date Title
CN201347560Y (zh) 一种煤矿塌陷区输电杆塔复合板基础
CN201771517U (zh) 一种隧道支护结构
CN104120686B (zh) 一种高弹模垫座式复合坝
CN201649116U (zh) 一种煤矿塌陷区输电杆塔中空混凝土复合板基础
CN201232194Y (zh) 一种抗变形输电杆塔
CN202416967U (zh) 煤矿沉陷区倾斜输电铁塔塔腿主材长度调节装置
CN103542174B (zh) 一种煤矿塌陷区管道敷设方法
Wang et al. Optimization of construction scheme and supporting technology for HJS soft rock tunnel
CN204919585U (zh) 用于煤矿采空区高压输电线路的大板基础
CN204098056U (zh) 煤矿采动区特高压输电铁塔混凝土抗变形基础
CN1804239A (zh) 塌陷区抗变形建筑物基础施工方法
CN201915385U (zh) 一种隧道内湿陷性黄土基础处理的挤密桩
CN205934862U (zh) 一种局部高模量堆石面板坝结构
CN101691765B (zh) 复杂地基双灰井柱应力解除协调纠倾法
CN203925516U (zh) 一种深部巷道可缩性复合支护结构
CN104164888A (zh) 一种煤矿采动区特高压输电铁塔混凝土抗变形基础
Fan et al. Water pressure and stress characteristics of lining structure in water rich karst tunnel
Sun et al. Advance of mining technology for coals under buildings in China
CN202899090U (zh) 圆弧形砼心墙土石坝
CN201284481Y (zh) 同步施工防护脚手装置
CN204510251U (zh) 采动区输电线路塔基抗变形吸能结构
CN206299388U (zh) 一种应对冲击地压强度40‑60MPa的支护结构
CN110528564A (zh) 输电线路联合板杆双锚板基础结构的上板的设计方法
CN204266211U (zh) 一种竹箱拱重力挡墙式基坑支护
CN204401642U (zh) 一种彩钢板房预制装配式基础

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20091118

Termination date: 20170109

CF01 Termination of patent right due to non-payment of annual fee