CN201296900Y - Temporary locking device for combined box beam seaming section of corrugated steel web plate - Google Patents
Temporary locking device for combined box beam seaming section of corrugated steel web plate Download PDFInfo
- Publication number
- CN201296900Y CN201296900Y CNU2008201322958U CN200820132295U CN201296900Y CN 201296900 Y CN201296900 Y CN 201296900Y CN U2008201322958 U CNU2008201322958 U CN U2008201322958U CN 200820132295 U CN200820132295 U CN 200820132295U CN 201296900 Y CN201296900 Y CN 201296900Y
- Authority
- CN
- China
- Prior art keywords
- steel
- locking device
- steel extension
- box beam
- closure segment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 56
- 239000010959 steel Substances 0.000 title claims abstract description 56
- 238000004826 seaming Methods 0.000 title abstract 6
- 239000002131 composite material Substances 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 14
- 239000000463 material Substances 0.000 abstract 1
- 239000004567 concrete Substances 0.000 description 9
- 238000005516 engineering process Methods 0.000 description 4
- 230000008602 contraction Effects 0.000 description 3
- 238000001816 cooling Methods 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000003068 static effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 239000011513 prestressed concrete Substances 0.000 description 1
- 230000007704 transition Effects 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (3)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201322958U CN201296900Y (en) | 2008-08-20 | 2008-08-20 | Temporary locking device for combined box beam seaming section of corrugated steel web plate |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008201322958U CN201296900Y (en) | 2008-08-20 | 2008-08-20 | Temporary locking device for combined box beam seaming section of corrugated steel web plate |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201296900Y true CN201296900Y (en) | 2009-08-26 |
Family
ID=41042876
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008201322958U Expired - Lifetime CN201296900Y (en) | 2008-08-20 | 2008-08-20 | Temporary locking device for combined box beam seaming section of corrugated steel web plate |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201296900Y (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104047234A (en) * | 2014-04-02 | 2014-09-17 | 中铁二院工程集团有限责任公司 | Self load bearing side span closure construction method for corrugated steel web plate continuous rigid frame bridge |
| CN104746434A (en) * | 2015-03-31 | 2015-07-01 | 中铁第五勘察设计院集团有限公司 | Closure segment formwork system without dismantling outer formwork |
| CN106012793A (en) * | 2016-07-07 | 2016-10-12 | 上海外经集团控股有限公司 | Positioning structure and method for corrugated steel webs |
| CN107100088A (en) * | 2017-06-27 | 2017-08-29 | 中铁第四勘察设计院集团有限公司 | The ultrashort closure segment and its construction method of rotator construction bridge |
| CN107724252A (en) * | 2017-09-15 | 2018-02-23 | 浙江申诚环境工程有限公司 | Continuous box girder hanging basket cantilever method construction and close up block |
| CN108867315A (en) * | 2018-07-11 | 2018-11-23 | 中国葛洲坝集团第二工程有限公司 | The pre-locked method of large bridge steel reinforced concrete adapter section |
| CN109505247A (en) * | 2018-11-23 | 2019-03-22 | 中交第三航务工程局有限公司 | Self-anchored suspension bridge closure segment construction technology |
| CN112523062A (en) * | 2020-12-16 | 2021-03-19 | 重庆交通大学 | Steel-concrete combined box girder viaduct structure |
| CN114922078A (en) * | 2022-05-24 | 2022-08-19 | 中铁十六局集团有限公司 | Synchronous and rapid construction method for different sections of corrugated steel web PC composite beam |
| CN115162176A (en) * | 2022-07-01 | 2022-10-11 | 中交路桥建设有限公司 | Whole-hole prefabricated box girder pier top closure consolidation supporting method |
| NL2039126A (en) * | 2024-06-11 | 2025-01-27 | China Harbour Eng Co Ltd | Connection structure and construction method of closure section of continuous bridge beam |
-
2008
- 2008-08-20 CN CNU2008201322958U patent/CN201296900Y/en not_active Expired - Lifetime
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104047234B (en) * | 2014-04-02 | 2016-05-11 | 中铁二院工程集团有限责任公司 | Wavelike steel webplate continuous rigid frame bridge self-supporting end bay closure construction method |
| CN104047234A (en) * | 2014-04-02 | 2014-09-17 | 中铁二院工程集团有限责任公司 | Self load bearing side span closure construction method for corrugated steel web plate continuous rigid frame bridge |
| CN104746434A (en) * | 2015-03-31 | 2015-07-01 | 中铁第五勘察设计院集团有限公司 | Closure segment formwork system without dismantling outer formwork |
| CN106012793A (en) * | 2016-07-07 | 2016-10-12 | 上海外经集团控股有限公司 | Positioning structure and method for corrugated steel webs |
| CN107100088B (en) * | 2017-06-27 | 2023-02-28 | 中铁第四勘察设计院集团有限公司 | Ultrashort closure section of swivel construction bridge and construction method thereof |
| CN107100088A (en) * | 2017-06-27 | 2017-08-29 | 中铁第四勘察设计院集团有限公司 | The ultrashort closure segment and its construction method of rotator construction bridge |
| CN107724252A (en) * | 2017-09-15 | 2018-02-23 | 浙江申诚环境工程有限公司 | Continuous box girder hanging basket cantilever method construction and close up block |
| CN108867315A (en) * | 2018-07-11 | 2018-11-23 | 中国葛洲坝集团第二工程有限公司 | The pre-locked method of large bridge steel reinforced concrete adapter section |
| CN109505247A (en) * | 2018-11-23 | 2019-03-22 | 中交第三航务工程局有限公司 | Self-anchored suspension bridge closure segment construction technology |
| CN112523062A (en) * | 2020-12-16 | 2021-03-19 | 重庆交通大学 | Steel-concrete combined box girder viaduct structure |
| CN114922078A (en) * | 2022-05-24 | 2022-08-19 | 中铁十六局集团有限公司 | Synchronous and rapid construction method for different sections of corrugated steel web PC composite beam |
| CN115162176A (en) * | 2022-07-01 | 2022-10-11 | 中交路桥建设有限公司 | Whole-hole prefabricated box girder pier top closure consolidation supporting method |
| NL2039126A (en) * | 2024-06-11 | 2025-01-27 | China Harbour Eng Co Ltd | Connection structure and construction method of closure section of continuous bridge beam |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201296900Y (en) | Temporary locking device for combined box beam seaming section of corrugated steel web plate | |
| CN102016195B (en) | Grid type supporting plate structure and its construction method | |
| KR101012759B1 (en) | Concrete box girder for bridges with ultra-high strength concrete wing cantilevers and box girder bridges using the same | |
| CN103437425A (en) | Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method | |
| CN102839677B (en) | Multifunctional rectangular connecting piece for internal support of foundation pit | |
| CN101215855A (en) | Combination beam | |
| CN101440598B (en) | Steel box-concrete composite box-slab arch structure and its construction method | |
| CN202248298U (en) | Section steel concrete frame node | |
| CN105735541A (en) | Steel structure girderless floor slab column structure | |
| CN105088969A (en) | Closure method for multi-tower single-cable-plane cable-stayed bridge | |
| CN109024224A (en) | A kind of steel lagging jack and concrete pedestal attachment device | |
| KR101200563B1 (en) | Steel composite bridge and construction method using steel cross beams to connect steel molds | |
| KR101582599B1 (en) | Bridge construction method for forming continuous point part of pier using copping for connecting girder | |
| CN201794164U (en) | Reinforced guy rope intersecting joint | |
| CN214459551U (en) | Bolt welding type combined continuous beam between segments | |
| EP3450748B1 (en) | Connecting structure for steel tube truss and tower barrel of lattice wind power generation tower | |
| CN105088971A (en) | Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge | |
| CN106088379B (en) | A kind of shear-deformable nodal point connecting of BRB lockings and its installation method | |
| KR20120036614A (en) | Method of longitudinal connection for double steel box girder using tendon and connection plate and method steel box girder bridge using the same | |
| CN217292809U (en) | Tension counterforce device for manufacturing prestressed beam by pre-tensioning method | |
| CN201301518Y (en) | A strengthened corrugated steel web plate shear connector for combined box girder | |
| KR101707010B1 (en) | Method of introduction of prestress for segmental girder | |
| CN101525918A (en) | Method for making winged steel tube-concrete composite beam | |
| CN215715983U (en) | A beam-column energy-dissipating connector | |
| CN205382498U (en) | Assembled anchor rope stock frame |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: HENAN DAJIAN STEEL STRUCTURE CO., LTD. Free format text: FORMER OWNER: BEIJING JINTAI ANLIAN BRIDGE STEEL STRUCTURE TECHNOLOGY CO., LTD. Effective date: 20100612 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 100027 1197, 11/F, BLOCK A, JIACHENG PLAZA, NO.18, XIAGUANGLI, EAST THIRD RING NORTH ROAD, CHAOYANG DISTRICT, BEIJING TO: 462500 GANGCHENG AVENUE (EAST SECTION), PINGDINGSHAN WUGANG CITY, HENAN PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20100612 Address after: Gangcheng Avenue East Pingdingshan Wugang city of Henan province in 462500 Patentee after: Henan Dajian Steel Co., Ltd. Address before: 100027 Beijing city Chaoyang District East Third Ring Road No. 18 Xiaguang Jiacheng Plaza A block 11 layer 1197 Patentee before: Beijing Jintaianlian Bridge Steel Construction Technology Co., Ltd. |
|
| ASS | Succession or assignment of patent right |
Owner name: HENAN DAJIAN BRIDGE STEEL STRUCTURE CO., LTD. Free format text: FORMER OWNER: HE'NAN DAJIAN STEEL CONSTRUCTION CO., LTD. Effective date: 20141204 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 462500 PINGDINGSHAN, HENAN PROVINCE TO: 450000 ZHENGZHOU, HENAN PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20141204 Address after: 450000, No. 10, block A, China World Trade Center center, No. 39, Huayuan Road, Henan, Zhengzhou Patentee after: HENAN DAJIAN BRIDE STEEL STRUCTURE CO., LTD. Address before: Gangcheng Avenue East Pingdingshan Wugang city of Henan province in 462500 Patentee before: Henan Dajian Steel Co., Ltd. |
|
| CX01 | Expiry of patent term | ||
| CX01 | Expiry of patent term |
Granted publication date: 20090826 |