Late poured band structure adopting profiled bar short beam to improve shear force Download PDFInfo
- Publication number
- CN201261916Y CN201261916Y CNU2008203020628U CN200820302062U CN201261916Y CN 201261916 Y CN201261916 Y CN 201261916Y CN U2008203020628 U CNU2008203020628 U CN U2008203020628U CN 200820302062 U CN200820302062 U CN 200820302062U CN 201261916 Y CN201261916 Y CN 201261916Y
- Authority
- CN
- China
- Prior art keywords
- shaped steel
- shearing resistance
- ater
- short beam
- casting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 65
- 239000010959 steel Substances 0.000 claims abstract description 65
- 238000010008 shearing Methods 0.000 claims abstract description 38
- 238000005266 casting Methods 0.000 claims description 39
- 210000003205 muscle Anatomy 0.000 claims description 20
- 239000004567 concrete Substances 0.000 claims description 11
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 claims description 8
- 229910052742 iron Inorganic materials 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 229910001294 Reinforcing steel Inorganic materials 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 9
- 239000011150 reinforced concrete Substances 0.000 abstract description 2
- 230000002708 enhancing effect Effects 0.000 abstract 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000009408 flooring Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 239000003351 stiffener Substances 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Rod-Shaped Construction Members (AREA)
Abstract
Description
Claims (5)
- [claim 1] a kind of ater-casting structure that adopts the shaped steel short beam to improve shearing resistance, comprise two beam slabs that are oppositely arranged (1), it is characterized in that: be embedded with shaped steel short beam (2) in the beam slab (1), shaped steel short beam (2) one ends are embedded in the beam slab (1), shaped steel short beam (2) other end stretches out outside the beam slab (1), is provided with steel concrete ater-casting (3) between two relative shaped steel short beams (2).
- [claim 2] employing shaped steel according to claim 1 short beam improves the ater-casting structure of shearing resistance, and it is characterized in that: described shaped steel short beam (2) is provided with one group of lengthways main steel bar (4) that welds together with shaped steel short beam (2).
- [claim 3] employing shaped steel according to claim 2 short beam improves the ater-casting structure of shearing resistance, it is characterized in that: described ater-casting is provided with steel bar framework in (3), steel bar framework comprises one group of shearing resistance stirrup (5) and one group of side anchor muscle (6), shearing resistance stirrup (5) is arranged along the length direction of shaped steel short beam (2), side anchor muscle (6) is arranged along the short transverse and the width of shaped steel short beam (2), and shearing resistance stirrup (5) is connected with the iron wire colligation with the infall of side anchor muscle (6).
- [claim 4] employing shaped steel according to claim 3 short beam improves the ater-casting structure of shearing resistance, it is characterized in that: shearing resistance stirrup (5) and side anchor muscle (6) adopt the HRB335 grade reinforcing steel; The spacing of shearing resistance stirrup (5) and side anchor muscle (6) is not more than 200mm; The diameter of lengthways main steel bar (4), shearing resistance stirrup (5) and the used reinforcing bar of side anchor muscle (6) is not less than Φ 14.
- According to the ater-casting structure of claim 2 or 3 described employing shaped steel short beams raising shearings resistance, it is characterized in that: described ater-casting (3) form with the concrete casting that label is not less than C25 [claim 5].
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008203020628U CN201261916Y (en) | 2008-09-09 | 2008-09-09 | Late poured band structure adopting profiled bar short beam to improve shear force |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008203020628U CN201261916Y (en) | 2008-09-09 | 2008-09-09 | Late poured band structure adopting profiled bar short beam to improve shear force |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201261916Y true CN201261916Y (en) | 2009-06-24 |
Family
ID=40808390
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008203020628U Expired - Fee Related CN201261916Y (en) | 2008-09-09 | 2008-09-09 | Late poured band structure adopting profiled bar short beam to improve shear force |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201261916Y (en) |
Cited By (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102251582A (en) * | 2011-05-16 | 2011-11-23 | 姚攀峰 | Barrier-free decoration structure of high and low incorporated buildings and construction method thereof |
| CN102587412A (en) * | 2012-02-13 | 2012-07-18 | 中天建设集团有限公司 | Stage construction basement support change method using underground continuous wall as separation containment |
| CN103122677A (en) * | 2012-12-04 | 2013-05-29 | 北京工业大学 | Corner-reinforced steel bone-steel tube concrete composite column and manufacturing method thereof |
| CN105003089A (en) * | 2015-07-21 | 2015-10-28 | 上海建工七建集团有限公司 | Construction method for detaching temporary braces of post-pouring settlement belts in advance |
| CN107009497A (en) * | 2017-05-04 | 2017-08-04 | 绵阳市川交公路规划勘察设计有限公司 | A kind of production technology of anchor recess formula pre-stressed bridge beam slab |
| CN108755973A (en) * | 2018-07-19 | 2018-11-06 | 中建三局集团有限公司 | A kind of Cantilever Beams construction joint position H profile steel embedded system |
| CN111236965A (en) * | 2020-01-23 | 2020-06-05 | 中铁二院工程集团有限责任公司 | In-situ jacking and assembling construction method for fabricated tunnel lining structure |
| CN111271078A (en) * | 2020-01-23 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Construction method for assembling sectional longitudinal translation in prefabricated tunnel lining structure tunnel |
| CN111271087A (en) * | 2020-01-23 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Construction method for arch prefabricated lining structure with post-cast strip connection |
| CN111456759A (en) * | 2020-01-23 | 2020-07-28 | 中铁二院工程集团有限责任公司 | A prefabricated tunnel lining structure |
| CN117188517A (en) * | 2023-09-13 | 2023-12-08 | 中国建筑第二工程局有限公司 | A transition node with reserved openings in the basement without beam and column caps and its construction method |
-
2008
- 2008-09-09 CN CNU2008203020628U patent/CN201261916Y/en not_active Expired - Fee Related
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102251582B (en) * | 2011-05-16 | 2013-08-21 | 北京国泰建设集团有限公司 | Barrier-free decoration structure of high and low incorporated buildings and construction method thereof |
| CN102251582A (en) * | 2011-05-16 | 2011-11-23 | 姚攀峰 | Barrier-free decoration structure of high and low incorporated buildings and construction method thereof |
| CN102587412A (en) * | 2012-02-13 | 2012-07-18 | 中天建设集团有限公司 | Stage construction basement support change method using underground continuous wall as separation containment |
| CN102587412B (en) * | 2012-02-13 | 2014-06-11 | 中天建设集团有限公司 | Stage construction basement support change method using underground continuous wall as separation containment |
| CN103122677A (en) * | 2012-12-04 | 2013-05-29 | 北京工业大学 | Corner-reinforced steel bone-steel tube concrete composite column and manufacturing method thereof |
| CN103122677B (en) * | 2012-12-04 | 2016-04-27 | 北京工业大学 | Reinforced reinforcing bar-the steel tube concrete superposed column in bight and the practice |
| CN105003089A (en) * | 2015-07-21 | 2015-10-28 | 上海建工七建集团有限公司 | Construction method for detaching temporary braces of post-pouring settlement belts in advance |
| CN107009497B (en) * | 2017-05-04 | 2019-11-08 | 江苏惠淳建设有限公司 | A kind of production technology of anchor recess formula pre-stressed bridge beam slab |
| CN107009497A (en) * | 2017-05-04 | 2017-08-04 | 绵阳市川交公路规划勘察设计有限公司 | A kind of production technology of anchor recess formula pre-stressed bridge beam slab |
| CN108755973A (en) * | 2018-07-19 | 2018-11-06 | 中建三局集团有限公司 | A kind of Cantilever Beams construction joint position H profile steel embedded system |
| CN108755973B (en) * | 2018-07-19 | 2024-03-01 | 中建三局集团有限公司 | H-shaped steel embedded system at cantilever beam construction joint part |
| CN111236965A (en) * | 2020-01-23 | 2020-06-05 | 中铁二院工程集团有限责任公司 | In-situ jacking and assembling construction method for fabricated tunnel lining structure |
| CN111271078A (en) * | 2020-01-23 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Construction method for assembling sectional longitudinal translation in prefabricated tunnel lining structure tunnel |
| CN111271087A (en) * | 2020-01-23 | 2020-06-12 | 中铁二院工程集团有限责任公司 | Construction method for arch prefabricated lining structure with post-cast strip connection |
| CN111456759A (en) * | 2020-01-23 | 2020-07-28 | 中铁二院工程集团有限责任公司 | A prefabricated tunnel lining structure |
| CN111271078B (en) * | 2020-01-23 | 2022-05-10 | 中铁二院工程集团有限责任公司 | Construction method for assembling sectional longitudinal translation in prefabricated tunnel lining structure tunnel |
| CN111271087B (en) * | 2020-01-23 | 2022-06-10 | 中铁二院工程集团有限责任公司 | Construction method for arch prefabricated lining structure with post-cast strip connection |
| CN117188517A (en) * | 2023-09-13 | 2023-12-08 | 中国建筑第二工程局有限公司 | A transition node with reserved openings in the basement without beam and column caps and its construction method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201261916Y (en) | Late poured band structure adopting profiled bar short beam to improve shear force | |
| CN110004822A (en) | Wet joint connection design of precast concrete beam | |
| CN203320417U (en) | Composite beam bridge deck structure with replaceable bridge deck slab | |
| CN103088920A (en) | Pre-tensioning prestressed composite beam structural system and construction method thereof | |
| WO2010021428A1 (en) | Opening steel composite girder and method for manufacturing the same | |
| CN102926504B (en) | Construction method of steel and concrete overlapped beam combined part | |
| CN201704836U (en) | Reinforced concrete prefabricated component plate with rib | |
| CN201649433U (en) | Ribbed reinforced concrete prefabricated part plate | |
| CN208981568U (en) | A kind of huge combination column with section steel and concrete and shear wall connection structure | |
| CN203096949U (en) | Pre-tensioning method prestressing force superposed beam structural system | |
| CN201460009U (en) | Precast concrete unit | |
| CN102808372B (en) | The integral precast overlapping bridge of a kind of freely-supported and construction method | |
| CN204899033U (en) | Shaped steel concrete combination flat beam | |
| CN201261917Y (en) | Late poured band structure adopting hidden bracket to improve shear force | |
| CN110318557B (en) | Prestressed concrete hollow slab reinforcing device and method | |
| CN202829324U (en) | Large tonnage crane beam prestressed precast component | |
| CN203097109U (en) | Pre-tensioning pre-stressing superposed secondary beam prefabricated component | |
| CN203998719U (en) | A kind of high-building construction tower crane adheres to uses shaped steel anchor structure | |
| CN202831392U (en) | Connecting steel component for joint part of steel reinforced concrete laminated beams | |
| CN214883049U (en) | Reinforced structure for strengthening whole stress of precast hollow slab beam bridge | |
| CN116695563A (en) | Light bridge deck of ultra-high performance concrete and steel combined structure | |
| CN202829323U (en) | Two multi-span precast prestressed crane beam | |
| CN213509134U (en) | Steel pipe truss prestressed hollow superimposed sheet | |
| CN102776828A (en) | Irregular-shaped precast beam used for bridges | |
| CN201424726Y (en) | Rib steel reinforcement concrete prefabricated part plate |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| ASS | Succession or assignment of patent right |
Owner name: GUIYANG ALUMINUM AND MAGNESIUM DESIGN INSTITUTE CO Free format text: FORMER OWNER: GUIYANG ALUMINIUM AND MAGNESIUM DESIGN INST. Effective date: 20110602 |
|
| C41 | Transfer of patent application or patent right or utility model | ||
| COR | Change of bibliographic data |
Free format text: CORRECT: ADDRESS; FROM: 550004 NO. 208, BEIJING ROAD, GUIYANG CITY, GUIZHOU PROVINCE TO: 550081 NO.2, JINZHU ROAD, JINYANG NEW DISTRICT, GUIYANG CITY, GUIZHOU PROVINCE |
|
| TR01 | Transfer of patent right |
Effective date of registration: 20110602 Address after: 550081 Guiyang Province, Jinyang New District, Zhu Zhu Road, No. 2 Patentee after: Guiyang Aluminum & Magnesium Design Institute Co., Ltd. Address before: 550004 No. 208, Beijing Road, Guiyang, Guizhou Patentee before: Guiyang Aluminium and Magnesium Design Inst. |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090624 Termination date: 20150909 |
|
| EXPY | Termination of patent right or utility model |