CN201206470Y - Yield press anchor cable - Google Patents
Yield press anchor cable Download PDFInfo
- Publication number
- CN201206470Y CN201206470Y CNU2008200374599U CN200820037459U CN201206470Y CN 201206470 Y CN201206470 Y CN 201206470Y CN U2008200374599 U CNU2008200374599 U CN U2008200374599U CN 200820037459 U CN200820037459 U CN 200820037459U CN 201206470 Y CN201206470 Y CN 201206470Y
- Authority
- CN
- China
- Prior art keywords
- anchor cable
- anchor
- roadway
- support
- yielding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
一种让压锚索,适用于矿山、隧道和地下工程支护的让压。它由锚索索体,设在锚索索体的托盘,固定锚索索体的尾部的锚索锁具和设在锚索索体和锚索锁具之间的让压装置构成,锚索索体的头部设有锚固剂搅拌头。在巷道开掘时与锚杆支护同时进行,具有协调锚杆和锚索联合支护中锚索延伸率低与锚杆变形不匹配的作用,使锚杆锚索同时发挥各自的承载作用,巷道一次成型,加快了巷道施工,降低了支护成本,锚索在巷道有较大变形的情况下可避免被拉断,具有能充分提供支护力的优点,无需滞后施工,同时能有效的保证巷道的稳定性。其结构简单,施工方便,支护效果好,具有广泛的实用性。
A yielding anchor cable is suitable for yielding in mines, tunnels and underground engineering support. It consists of an anchor cable body, a tray on the anchor cable body, an anchor cable lock that fixes the tail of the anchor cable body, and a pressure relief device between the anchor cable body and the anchor cable lock. The head is provided with an anchoring agent stirring head. When the roadway is excavated and the bolt support is carried out simultaneously, it has the effect of coordinating the low elongation rate of the anchor cable and the mismatch of the deformation of the anchor rod in the joint support of the anchor rod and the anchor cable, so that the anchor rod and the anchor cable can play their respective bearing roles at the same time, and the roadway One-time molding speeds up the construction of the roadway and reduces the support cost. The anchor cable can avoid being broken when the roadway has a large deformation. roadway stability. The utility model has the advantages of simple structure, convenient construction, good supporting effect and wide practicability.
Description
技术领域 technical field
本实用新型涉及一种锚索,尤其是一种用于矿山、隧道和地下工程支护的让压锚索。The utility model relates to an anchor cable, in particular to a yield anchor cable used for supporting mines, tunnels and underground engineering.
背景技术 Background technique
我国煤矿地质条件比较复杂,随着矿井开采强度的增加和采深的不断加大,适合普通锚杆支护的巷道所占比重越来越小,而巷道稳定性较差的IV,V类巷道所占比重越来越大,尤其是受深部冲击地压影响的巷道,放顶煤开采的厚煤层动压巷道、软岩巷道及复合顶板巷道所占比重增加最为明显。这些巷道单纯用普通锚杆支护不能保持巷道的稳定,必须采用锚索进行补强加固。当前在煤矿巷道中采用锚杆与锚索联合支护,变得越来越普遍。在锚杆与锚索联合支护中,存在协调性的问题。相互协调的联合支护既能最大限度地发挥锚杆和锚索各自的支护性能,又能根据其各自的支护特性,通过相互协调和联合,取得最大的支护效果。The geological conditions of my country's coal mines are relatively complex. With the increase of mine mining intensity and mining depth, the proportion of roadways suitable for ordinary bolt support is getting smaller and smaller, while the roadways of types IV and V with poor roadway stability The proportion is increasing, especially in roadways affected by deep rockburst, and the proportion of thick coal seam dynamic pressure roadways, soft rock roadways and composite roof roadways for top-coal caving mining has increased most obviously. The stability of these roadways cannot be maintained simply by using ordinary anchor bolts, and anchor cables must be used for reinforcement. At present, the joint support of bolt and anchor cable is used in coal mine roadway, which is becoming more and more common. In the joint support of anchor rod and anchor cable, there is a problem of coordination. The coordinated joint support can not only maximize the respective support performance of the anchor rod and anchor cable, but also achieve the maximum support effect through mutual coordination and combination according to their respective support characteristics.
小直径预应力锚索作为一种补强技术,在煤矿锚杆支护中得到了广泛运用。它的作用是将锚杆支护形成的次生承载层与围岩的关键层相连,充分调动深部围岩的承载能力,使更大范围的岩体共同承载,提高支护系统的稳定性。小孔径预应力锚索使用《预应力混凝土用钢绞线》国家标准(GB/T5224-1995)中的1×7标准型钢绞线,这种钢绞线具有抗破坏力高、韧性好、低松弛的特点,既有一定刚度又有一定柔性,可弯曲并实现自身搅拌树脂药卷快速安装,适合在空间尺寸较小的煤巷中使用。煤矿上广泛使用的小直径锚索(15.24mm和17.8mm)的工程特性上看,钢绞线的延伸率仅有3.5%,而锚索的工程延伸率为1.8%,而锚杆的延伸率普遍在20%~25%之间。以工程中常用的6m的锚索与2m的锚杆联合支护体系计,锚索的最大延伸量为108mm,而锚杆的最大延伸量为400mm,可以看出两者之间抗变形能力相差较大,故锚杆和锚索承载不同步,容易产生锚索首先被拉断后锚杆才开始发挥承载作用。As a reinforcement technology, small-diameter prestressed anchor cables have been widely used in coal mine bolt support. Its function is to connect the secondary bearing layer formed by bolt support with the key layer of the surrounding rock, fully mobilize the bearing capacity of the deep surrounding rock, make a wider range of rock mass bear the load together, and improve the stability of the support system. The small-diameter prestressed anchor cable uses the 1×7 standard steel strand in the national standard "Steel Strand for Prestressed Concrete" (GB/T5224-1995). This steel strand has high damage resistance, good toughness, and low The characteristics of relaxation, both rigidity and flexibility, can be bent and realize the rapid installation of self-stirring resin rolls, suitable for use in coal roadways with small space dimensions. From the engineering characteristics of the small-diameter anchor cables (15.24mm and 17.8mm) widely used in coal mines, the elongation of the steel strand is only 3.5%, while the engineering elongation of the anchor cable is 1.8%, while the elongation of the anchor rod is only 3.5%. Generally between 20% and 25%. Based on the combined support system of 6m anchor cable and 2m anchor rod commonly used in engineering, the maximum extension of the anchor cable is 108mm, while the maximum extension of the anchor rod is 400mm. It can be seen that the deformation resistance between the two is different. Larger, so the load of the anchor rod and the anchor cable is not synchronized, and it is easy to cause the anchor rod to start to play a bearing role after the anchor cable is pulled off first.
发明内容 Contents of the invention
本实用新型的目的是克服已有技术中存在的问题,提供一种结构简单,施工方便,支护效果好的让压锚索。The purpose of the utility model is to overcome the problems existing in the prior art, and provide a simple structure, convenient construction, and good support effect to give way to the anchor cable.
本实用新型的让压锚索,包括锚索索体,设在锚索索体的托盘,固定锚索索体的尾部的锚索锁具,所述托盘与锚索锁具之间设有让压装置,锚索索体的头部设有锚固剂搅拌头。The yielding anchor cable of the utility model includes an anchor cable body, a tray arranged on the anchor cable body, and an anchor cable lock for fixing the tail of the anchor cable body, and a pressure relief device is arranged between the tray and the anchor cable lock. , the head of the anchor cable body is provided with an anchoring agent stirring head.
所述的让压装置由一个中部凸起、能提供50~100mm的变形空间的让压管和设在让压管两端的垫圈构成。The pressure relief device is composed of a pressure relief pipe with a protrusion in the middle, which can provide a deformation space of 50-100 mm, and washers arranged at both ends of the pressure relief pipe.
本实用新型,充分考虑巷道的卸压原理和锚杆支护的变形特点,采用中空让压管,同时在锚索端头增加了锚固剂搅拌头,这样能充分搅拌锚固剂增强锚固效果。在巷道开掘时与锚杆支护同时进行,具有协调锚杆和锚索联合支护中锚索延伸率低与锚杆变形不匹配的作用,使锚杆锚索同时发挥各自的承载作用,巷道一次成型,加快了巷道施工,降低了支护成本,锚索在巷道有较大变形的情况下可避免被拉断,具有能充分提供支护力的优点,无需滞后施工,同时能有效的保证巷道的稳定性。其结构简单,施工方便,支护效果好,具有广泛的实用性。The utility model fully considers the pressure relief principle of the roadway and the deformation characteristics of the bolt support, adopts a hollow pressure relief tube, and adds an anchoring agent stirring head at the end of the anchor cable, so that the anchoring agent can be fully stirred to enhance the anchoring effect. When the roadway is excavated and the bolt support is carried out simultaneously, it has the effect of coordinating the low elongation rate of the anchor cable and the mismatch of the deformation of the anchor rod in the joint support of the anchor rod and the anchor cable, so that the anchor rod and the anchor cable can play their respective bearing roles at the same time, and the roadway One-time molding speeds up the construction of the roadway and reduces the support cost. The anchor cable can avoid being broken when the roadway has a large deformation. roadway stability. The utility model has the advantages of simple structure, convenient construction, good supporting effect and wide practicability.
附图说明 Description of drawings
图1是本实用新型的结构图;Fig. 1 is a structural diagram of the utility model;
图2是图1的A—A视图。Fig. 2 is the A-A view of Fig. 1 .
图中:1-锚索锁具;2-垫圈;3-让压管;4-托盘;5-锚索索体;6-锚固剂搅拌头;7-钢绞线。In the figure: 1 - anchor cable lock; 2 - washer; 3 - yield pipe; 4 - tray; 5 - anchor cable body; 6 - anchoring agent stirring head; 7 - steel strand.
具体实施方式 Detailed ways
下面结合附图对本实用新型的一个实施例作进一步的描述:An embodiment of the present utility model is further described below in conjunction with accompanying drawing:
图1所示,让压锚索由锚索锁具1、让压装置、托盘4、锚索索体5和锚固剂搅拌头6构成。锚索索体5由七股钢绞线构成,图2所示。让压装置由一个中部凸起、能提供50~100mm的变形空间的让压管3和设在让压管3两端的垫圈2构成。锚固剂搅拌头6设在锚索索体5的头部,让压装置和托盘4穿套在锚索索体5上,由锚索锁具1固定,锚索锁具1由垫圈和螺母构成。As shown in FIG. 1 , the pressure anchor cable is composed of an anchor cable lock 1 , a pressure relief device, a tray 4 , an anchor cable body 5 and an anchoring agent stirring head 6 . The anchor cable body 5 is made of seven steel strands, as shown in FIG. 2 . The pressure relief device is composed of a pressure relief pipe 3 with a protrusion in the middle, which can provide a deformation space of 50-100 mm, and washers 2 arranged at both ends of the pressure relief pipe 3 . Anchor agent stirring head 6 is located at the head of anchor cable body 5, and pressure device and tray 4 are worn on anchor cable body 5, fixed by anchor cable lock 1, and anchor cable lock 1 is made of washer and nut.
工作用原理:巷道初掘时由于围岩受到扰动,打破了原岩应力原来的平衡关系,围岩中局部区域会出现应力集中,这些次生应力将会使围岩产生变形直到形成新的平衡关系。巷道开挖后,在设置锚杆的同时设置本让压锚索,通过锚杆的加固作用形成锚岩支护体,而锚索则将所形成的锚岩支护体固定在上覆稳定岩层上。当围岩发生较大变形时,锚杆承载力增加,变形加大。本让压锚索相应的承载和变形也增大,但由于让压管的作用,围岩变形时首先将让压管压扁,使锚索在承载力增加的同时变形与锚杆变形保持协调。既能允许围岩有一定变形,释放围岩变形能形成新的平衡状态,又能使锚索保持承载力,避免被破坏围岩在一定变形范围内可以保持自身稳定。Working principle: When the roadway is initially excavated, the surrounding rock is disturbed, which breaks the original balance of the stress of the original rock. Stress concentration will occur in some areas of the surrounding rock. These secondary stresses will deform the surrounding rock until a new balance is formed. relation. After the roadway is excavated, set the anchor cable at the same time as the anchor rod, and form the anchor rock support body through the reinforcement of the anchor rod, and the anchor cable will fix the formed anchor rock support body on the overlying stable rock layer superior. When the surrounding rock is greatly deformed, the bearing capacity of the bolt increases and the deformation increases. The corresponding load and deformation of the yielding anchor cable also increase, but due to the effect of the yielding tube, the surrounding rock will first flatten the yielding tube when the surrounding rock deforms, so that the deformation of the anchor cable can be coordinated with the deformation of the anchor rod while the bearing capacity increases . It can not only allow the surrounding rock to have a certain deformation, release the deformation of the surrounding rock to form a new equilibrium state, but also enable the anchor cable to maintain the bearing capacity, avoid being damaged and the surrounding rock can maintain its own stability within a certain deformation range.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200374599U CN201206470Y (en) | 2008-05-29 | 2008-05-29 | Yield press anchor cable |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200374599U CN201206470Y (en) | 2008-05-29 | 2008-05-29 | Yield press anchor cable |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201206470Y true CN201206470Y (en) | 2009-03-11 |
Family
ID=40465537
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008200374599U Expired - Fee Related CN201206470Y (en) | 2008-05-29 | 2008-05-29 | Yield press anchor cable |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201206470Y (en) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101929347A (en) * | 2010-08-17 | 2010-12-29 | 中南大学 | A Coordinated Deformation Energy Absorbing Bolt Suitable for High Stress and Large Deformation Rock Mass Mining |
| CN102002946A (en) * | 2010-10-23 | 2011-04-06 | 山东科技大学 | Anchor bolt or anchor cable pre-stressed control element and processing and usage method thereof |
| CN102322267A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Method for preventing and controlling rock burst in soft rock of deep well |
| CN103244162A (en) * | 2013-05-27 | 2013-08-14 | 湖南科技大学 | Compressible base plate device and anchor cable anchorage method by device |
| CN103410543A (en) * | 2013-08-13 | 2013-11-27 | 中国矿业大学 | Pressure yielding internally-grouted anchor cable |
| CN104100281A (en) * | 2014-06-16 | 2014-10-15 | 山东科技大学 | Mining multilevel pressure-relief anti-scouring support device, support system and use methods thereof |
| CN107939428A (en) * | 2017-12-29 | 2018-04-20 | 中天合创能源有限责任公司 | A kind of cable bolting system with impact resistance |
| CN109295973A (en) * | 2018-09-27 | 2019-02-01 | 中国人民解放军军事科学院国防工程研究院 | A dynamic load prestressed anchor cable head shock absorption yielding system and method |
| CN110924999A (en) * | 2019-12-12 | 2020-03-27 | 山东里能鲁西矿业有限公司 | Anchor-withdrawing yielding device |
| CN111608710A (en) * | 2020-06-09 | 2020-09-01 | 河海大学 | Full-length hollow drainage and resistance-increasing pressure anchor |
| CN116181386A (en) * | 2023-03-31 | 2023-05-30 | 安徽理工大学 | A pressure-guided broken wire protection device for anchor cables |
| CN119593788A (en) * | 2024-12-06 | 2025-03-11 | 山西潞安环保能源开发股份有限公司五阳煤矿 | High-prestress large-elongation anchor structure and supporting method thereof |
-
2008
- 2008-05-29 CN CNU2008200374599U patent/CN201206470Y/en not_active Expired - Fee Related
Cited By (14)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN101929347A (en) * | 2010-08-17 | 2010-12-29 | 中南大学 | A Coordinated Deformation Energy Absorbing Bolt Suitable for High Stress and Large Deformation Rock Mass Mining |
| CN102002946A (en) * | 2010-10-23 | 2011-04-06 | 山东科技大学 | Anchor bolt or anchor cable pre-stressed control element and processing and usage method thereof |
| CN102002946B (en) * | 2010-10-23 | 2012-07-25 | 山东科技大学 | Anchor bolt or anchor cable pre-stressed control element and processing and usage method thereof |
| CN102322267A (en) * | 2011-09-12 | 2012-01-18 | 山东科技大学 | Method for preventing and controlling rock burst in soft rock of deep well |
| CN103244162A (en) * | 2013-05-27 | 2013-08-14 | 湖南科技大学 | Compressible base plate device and anchor cable anchorage method by device |
| CN103410543A (en) * | 2013-08-13 | 2013-11-27 | 中国矿业大学 | Pressure yielding internally-grouted anchor cable |
| CN104100281A (en) * | 2014-06-16 | 2014-10-15 | 山东科技大学 | Mining multilevel pressure-relief anti-scouring support device, support system and use methods thereof |
| CN107939428A (en) * | 2017-12-29 | 2018-04-20 | 中天合创能源有限责任公司 | A kind of cable bolting system with impact resistance |
| CN109295973A (en) * | 2018-09-27 | 2019-02-01 | 中国人民解放军军事科学院国防工程研究院 | A dynamic load prestressed anchor cable head shock absorption yielding system and method |
| CN110924999A (en) * | 2019-12-12 | 2020-03-27 | 山东里能鲁西矿业有限公司 | Anchor-withdrawing yielding device |
| CN111608710A (en) * | 2020-06-09 | 2020-09-01 | 河海大学 | Full-length hollow drainage and resistance-increasing pressure anchor |
| CN116181386A (en) * | 2023-03-31 | 2023-05-30 | 安徽理工大学 | A pressure-guided broken wire protection device for anchor cables |
| CN119593788A (en) * | 2024-12-06 | 2025-03-11 | 山西潞安环保能源开发股份有限公司五阳煤矿 | High-prestress large-elongation anchor structure and supporting method thereof |
| CN119593788B (en) * | 2024-12-06 | 2025-10-28 | 山西潞安环保能源开发股份有限公司五阳煤矿 | High-prestress large-elongation anchor structure and supporting method thereof |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201206470Y (en) | Yield press anchor cable | |
| US11268383B2 (en) | Type of energy-absorbing rock bolt device with umbrella-shaped structure | |
| CN200996296Y (en) | High-strength decompressing slip-casting rockbolt | |
| CN201236718Y (en) | Inner slip-casting anchor cable | |
| CN201103397Y (en) | Yielding deformed steel bar slip-casting anchor bar | |
| CN101858225A (en) | Constant-resistance large-deformation anchor rod | |
| CN202431287U (en) | Combined telescopic anchor rod | |
| CN106812543B (en) | It is a kind of can multistage energy consumption collaboration allow the roadway support structure and joining method of pressure | |
| CN102877862A (en) | Confined concrete quantitative yielding lagging jack based on mine U-shaped steel | |
| CN107060851A (en) | Twin-stage constant resistance and large deformation anchoring piece | |
| CN201835847U (en) | Ultralong anchor rod | |
| CN205089345U (en) | Anchor rope is put by pressure equipment | |
| CN107605510B (en) | A cable-type steel grid arch frame and its construction method | |
| CN203546717U (en) | Recycled prestress anchor rod | |
| CN211448692U (en) | Multistage anti supporting construction that lets of high ground stress soft rock large deformation tunnel | |
| CN201835848U (en) | Extensible glass fiber reinforced plastic metal combined anchor rod | |
| CN104481565B (en) | A kind of pressure dispersing type large deformation self adaptation anchor pole | |
| CN101338681B (en) | Shield Tunnel Segment Hole Entry Pretensioning Device | |
| CN201753609U (en) | Yielding anchor cable device | |
| CN213039301U (en) | A rockburst-resistant end-expanded composite bolt | |
| CN203939513U (en) | Glass fibre reinforced plastics rockbolts supporting and protection structure and glass fibre reinforced plastics rockbolts | |
| CN103215947A (en) | Novel freezing pipe | |
| CN103982211A (en) | High-strength large-deformation piston-type resistance-increasing anchor rod | |
| CN106837395A (en) | A kind of mine anchor rod with Telescopic | |
| CN102953684A (en) | Drill rod with ream bit |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090311 Termination date: 20160529 |