[go: up one dir, main page]

CN201172579Y - 一种钻孔桩钢筋笼安装吊具 - Google Patents

一种钻孔桩钢筋笼安装吊具 Download PDF

Info

Publication number
CN201172579Y
CN201172579Y CNU2008200895863U CN200820089586U CN201172579Y CN 201172579 Y CN201172579 Y CN 201172579Y CN U2008200895863 U CNU2008200895863 U CN U2008200895863U CN 200820089586 U CN200820089586 U CN 200820089586U CN 201172579 Y CN201172579 Y CN 201172579Y
Authority
CN
China
Prior art keywords
steel
pin
steel bar
hanging
channel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2008200895863U
Other languages
English (en)
Inventor
孟祥鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fourth Engineering Co Ltd of China Railway Construction Bridge Engineering Bureau Group Co Ltd
Original Assignee
Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd filed Critical Fourth Engineering Co Ltd of China Railway 13th Bureau Group Co Ltd
Priority to CNU2008200895863U priority Critical patent/CN201172579Y/zh
Application granted granted Critical
Publication of CN201172579Y publication Critical patent/CN201172579Y/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

一种钻孔桩钢筋笼安装吊具,它涉及钻孔桩钢筋笼吊装用具。它解决了现有钢筋笼在吊装过程中易变形或吊散,变形导致安装困难和碰撞孔壁引起沉淀层或塌孔现象,在吊装过程中安全性差的问题。本实用新型在两个槽钢横梁(3)的两端部之间纵向固定有钢板(2),在槽钢横梁(3)两端钢板(2)的内侧纵向钢板的中间位置分别设有第一销轴(4-1),在每个钢板(2)的下半部上开有一销孔,每个销孔内分别设有第二销轴(4-2),滑轮(5)分别设在第二销轴(4-2)上,油丝绳(1)的两端分别与每个第一销轴(4-1)固定连接。本实用新型易于下钢筋笼子,钢筋笼不易发生变形,不碰撞孔壁,没有沉淀层和坍塌现象,节省施工成本、缩短工期、提高了质量。

Description

一种钻孔桩钢筋笼安装吊具
技术领域
本实用新型涉及钻孔桩钢筋笼吊装用具。
背景技术
现有的钻孔桩钢筋笼子的吊装采用汽车吊直接吊装钢筋笼的加劲箍筋进行起吊,这样吊装方式,在钢筋笼子较长时钢筋笼左右摇摆吊装困难,而且钢筋笼在吊装过程中易变形甚至吊散,钢筋笼变形会导致安装困难、变形后会使钢筋笼碰撞孔壁引起沉淀层过厚或塌孔等现象,给施工带来很大的麻烦和不便。在吊装过程中的安全可靠性差,施工质量难以保证。
实用新型内容
本实用新型为了解决现有在钢筋笼较长时钢筋笼左右摇摆吊装困难,而且钢筋笼在吊装过程中易变形甚至吊散,钢筋笼子变形会导致钢筋笼子安装困难、变形后会使钢筋笼子碰撞孔壁引起沉淀层过厚或塌孔等现象,吊装过程中安全性差,施工质量难以保证的问题,提供了一种钻孔桩钢筋笼安装吊具,解决上述问题的具体技术方案如下:
本实用新型的吊具由油丝绳1、两块钢板2、两个槽钢横梁3、两个第一销轴4-1、两个第二销轴4-2和两个滑轮5组成,在两个槽钢横梁3的两端部之间各固定有一块钢板2,在槽钢横梁3两端钢板2的内侧中间位置设有两个第一销轴4-1,在每块钢板2的下半部上开有一销孔,每个销孔内分别设有一个第二销轴4-2,两个滑轮5分别设在第二销轴4-2上,油丝绳1的两端分别与每个第一销轴4-1固定连接。
本实用新型的吊具在施工中易于钢筋笼子的安装,钢筋笼吊装过程中不易发生变形,不碰撞孔壁,避免了沉淀层和坍塌现象的发生,缩短了工期,提高了施工速度、节省了施工成本,提高了钻孔桩的施工质量。本实用新型的吊具是活动的,安装和拆卸简便,一个人就能够完成安装和拆除,并在多个工地周转重复使用,桩越多越能体现出它的经济性;制做简单、快捷,适用于不同直径的钻孔桩钢筋笼的吊装施工,受外界因素影响的机会大大减少,有效的保证了钢筋笼子的顺(垂)直度。
附图说明
图1是本实用新型的结构示意图,图2是图1的俯视图,图3是图1的侧视图。
具体实施方式
具体实施方式一:结合图1、图2、图3描述本实施方式。本实施方式由油丝绳1、两块钢板2、两个槽钢横梁3、两个第一销轴4-1、两个第二销轴4-2和两个滑轮5组成,在两个槽钢横梁3的两端部之间各固定有一块钢板2,在槽钢横梁3两端钢板2的内侧中间位置设有两个第一销轴4-1,在每块钢板2的下半部上开有一销孔,每个销孔内分别设有一个第二销轴4-2,两个滑轮5分别设在第二销轴4-2上,油丝绳1的两端分别与每个第一销轴4-1固定连接。
具体实施方式二:本实施方式的钢板2的厚度为1.5~2cm。
具体实施方式三:本实施方式在嫩江特大桥试桩工程中采用此吊具进行吊装施工,该工程地质为细砂,孔深为53米~78米,桩径为1.2米~1.6米,该地质很容易造成塌孔现象,采用本吊具进行钢筋笼子的吊装施工有效控制了钢筋笼子的变形,没有碰撞孔壁,施工速度也大大加快,同时也保证了施工的安全性和质量。
工作原理:
本吊具用汽车吊直接吊在吊具的钢丝绳1上,滑轮5和自备钢丝绳与钢筋笼连接,吊装过程中吊车作用力在吊具上,在由吊具传导在钢筋笼子上,吊具槽钢横梁作横向支撑不会使钢筋笼子受到吊力而变形。吊具的横梁和滑轮可使钢筋笼子垂直吊起减小因笼子过长而触地的弯力。让下钢筋笼子这一施工工序完全处于受控状态,使吊具充分发挥其作用。吊装速度快,钢筋笼子的吊装过程中不易发生变形,并且有效的控制了每节钢筋笼子的顺(垂)直度,避免了下钢筋笼时碰撞孔壁引起沉淀层过厚或坍塌等现象,保证了钻孔桩施工质量。

Claims (2)

1、一种钻孔桩钢筋笼安装吊具,它由油丝绳(1)、两块钢板(2)、两个槽钢横梁(3)、两个第一销轴(4-1)、两个第二销轴(4-2)和两个滑轮(5)组成,其特征在于在两个槽钢横梁(3)的两端部之间各固定有一块钢板(2),在槽钢横梁(3)两端钢板(2)的内侧中间位置设有两个第一销轴(4-1),在每块钢板(2)的下半部上开有一销孔,每个销孔内分别设有一个第二销轴(4-2),两个滑轮(5)分别设在第二销轴(4-2)上,油丝绳(1)的两端分别与每个第一销轴(4-1)固定连接。
2、根据权利要求1所述的一种钻孔桩钢筋笼安装吊具,其特征在于钢板(2)的厚度为1.5~2cm。
CNU2008200895863U 2008-03-26 2008-03-26 一种钻孔桩钢筋笼安装吊具 Expired - Fee Related CN201172579Y (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200895863U CN201172579Y (zh) 2008-03-26 2008-03-26 一种钻孔桩钢筋笼安装吊具

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200895863U CN201172579Y (zh) 2008-03-26 2008-03-26 一种钻孔桩钢筋笼安装吊具

Publications (1)

Publication Number Publication Date
CN201172579Y true CN201172579Y (zh) 2008-12-31

Family

ID=40199689

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200895863U Expired - Fee Related CN201172579Y (zh) 2008-03-26 2008-03-26 一种钻孔桩钢筋笼安装吊具

Country Status (1)

Country Link
CN (1) CN201172579Y (zh)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102092626A (zh) * 2011-01-12 2011-06-15 河南省矿山起重机有限公司 钢筋笼吊具
CN102120544A (zh) * 2011-02-23 2011-07-13 上海华钢不锈钢有限公司 安置大型不锈钢u型管木箱的吊运装置
CN104058329A (zh) * 2014-03-28 2014-09-24 中交第一航务工程局有限公司 一种竖向钢筋绑扎用吊具
CN106087990A (zh) * 2016-08-16 2016-11-09 国家电网公司 可移动式钢筋笼安装设备
CN109095351A (zh) * 2018-10-10 2018-12-28 中建隧道建设有限公司 一种可回收钢筋笼吊筋吊装方法

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102092626A (zh) * 2011-01-12 2011-06-15 河南省矿山起重机有限公司 钢筋笼吊具
CN102092626B (zh) * 2011-01-12 2012-12-12 河南省矿山起重机有限公司 钢筋笼吊具
CN102120544A (zh) * 2011-02-23 2011-07-13 上海华钢不锈钢有限公司 安置大型不锈钢u型管木箱的吊运装置
CN104058329A (zh) * 2014-03-28 2014-09-24 中交第一航务工程局有限公司 一种竖向钢筋绑扎用吊具
CN106087990A (zh) * 2016-08-16 2016-11-09 国家电网公司 可移动式钢筋笼安装设备
CN109095351A (zh) * 2018-10-10 2018-12-28 中建隧道建设有限公司 一种可回收钢筋笼吊筋吊装方法

Similar Documents

Publication Publication Date Title
CN104963301B (zh) 用于墩顶梁段与桥墩拆除的拖拉平移下放装置及方法
CN201172579Y (zh) 一种钻孔桩钢筋笼安装吊具
CN201495027U (zh) 轧机牌坊吊装工具
CN204899238U (zh) 一种单元式幕墙板块吊装装置
CN102777030A (zh) 一种电梯井道模板施工平台搭设方法
CN104005569A (zh) 一种托梁拔柱施工方法
CN108468433A (zh) 一种厂房金属屋面内板的施工工装
CN212295160U (zh) 一种预制装配式混凝土剪力墙
CN204703534U (zh) 一种大型幕墙单元板块双轨道吊装装置
CN207176713U (zh) 一种减小侧摩阻力的桩基结构
CN202449737U (zh) 一种电动单梁起重机主梁
CN101580214A (zh) 大型设备液压顶升方法
CN204625045U (zh) 一种钢结构吊装用门型支架式吊装装置
CN214883535U (zh) 一种重型动力触探仪
CN202023353U (zh) 建筑施工整体提升脚手架
CN205575534U (zh) 格构式井字形架体提升设备
CN211169496U (zh) 一种带配重的pc墙板快速吊装装置
CN202718380U (zh) 一种高层建筑施工用液压爬架
CN203807946U (zh) 一种轨道梁的架设装置
CN204081468U (zh) 一种剪力墙加固模板结构
CN210263422U (zh) 预制墙板与钢柱连接结构
CN219653713U (zh) 一种重型桩基钢筋笼定位装置
CN203782579U (zh) 一种大跨度支撑系统的反拖拉拆除装置
CN205838299U (zh) 一种简易吊装装置
CN219860103U (zh) 一种锤击桩用吊桩装置

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C56 Change in the name or address of the patentee

Owner name: CHINA RAILWAY BRIDGE BUREAU GROUP FOURTH ENGINEERI

Free format text: FORMER NAME: THE FOURTH ENGINEERING COMPANY OF CHINA RAILWAY NO.13 BUREAU GROUP

CP01 Change in the name or title of a patent holder

Address after: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee after: Middle iron is built the 4th Engineering Co., Ltd of group of Bridge Project office

Address before: 150008 No. 459 Xianfeng Road, Daowai District, Heilongjiang, Harbin

Patentee before: The Fourth Engineering Co., Ltd. of China Railway 13 Civil

CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081231

Termination date: 20160326

CF01 Termination of patent right due to non-payment of annual fee