Horizontal well separate mining and combined mining pipe column Download PDFInfo
- Publication number
- CN201165866Y CN201165866Y CNU2008200790876U CN200820079087U CN201165866Y CN 201165866 Y CN201165866 Y CN 201165866Y CN U2008200790876 U CNU2008200790876 U CN U2008200790876U CN 200820079087 U CN200820079087 U CN 200820079087U CN 201165866 Y CN201165866 Y CN 201165866Y
- Authority
- CN
- China
- Prior art keywords
- pipe
- string
- production
- packer
- sand control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000005065 mining Methods 0.000 title description 19
- 238000004519 manufacturing process Methods 0.000 claims abstract description 69
- 239000004576 sand Substances 0.000 claims abstract description 27
- 238000007789 sealing Methods 0.000 claims abstract description 26
- 210000002445 nipple Anatomy 0.000 claims abstract description 3
- XQCFHQBGMWUEMY-ZPUQHVIOSA-N Nitrovin Chemical compound C=1C=C([N+]([O-])=O)OC=1\C=C\C(=NNC(=N)N)\C=C\C1=CC=C([N+]([O-])=O)O1 XQCFHQBGMWUEMY-ZPUQHVIOSA-N 0.000 claims description 3
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 230000007812 deficiency Effects 0.000 abstract 1
- 238000011084 recovery Methods 0.000 abstract 1
- 229910000831 Steel Inorganic materials 0.000 description 6
- 239000010959 steel Substances 0.000 description 6
- 238000000034 method Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 2
- 239000002002 slurry Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 230000002457 bidirectional effect Effects 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 238000002627 tracheal intubation Methods 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Images
Landscapes
- Earth Drilling (AREA)
Abstract
一种水平井分采合采管柱。为了克服现有水平井分层开采作业管柱不能满足同时开采2个油层作业需要的不足,本实用新型在井眼内安装有尾管管串(30),尾管管串(30)内安装有生产管串(40);尾管管串(30)的盲堵(23)、防砂筛管II(22)、封隔器(21)、密封筒(26)、盲管(19)、防砂筛管I(17)、封隔器(15)、套管(14)、尾管悬挂器(8)、回接套管(2)由下至上依次连接;生产管串(40)的插入式密封装置(20)、油管(18)、球座(13)、坐落短节(12)、生产滑套(11)、封隔器(10)、压井滑套(9)由下至上依次连接;插入式密封装置(20)位于尾管管串(30)的密封筒(14)内。其有益效果是一趟管柱实现分采/合采不同油层的需要。
Disclosed is a separate and combined recovery pipe string for a horizontal well. In order to overcome the deficiency that the existing horizontal well layered production operation string cannot meet the needs of simultaneous exploitation of two oil layers, the utility model is equipped with a liner pipe string (30) in the wellbore, and a liner pipe string (30) is installed inside the liner pipe string (30). There are production pipe strings (40); blind plugs (23) of liner pipe strings (30), sand control screen II (22), packers (21), sealing cylinders (26), blind pipes (19), sand control Screen pipe I (17), packer (15), casing (14), liner hanger (8), and tie-back casing (2) are connected sequentially from bottom to top; the plug-in type of production string (40) Sealing device (20), tubing (18), ball seat (13), seating nipple (12), production sleeve (11), packer (10), and kill sleeve (9) are connected sequentially from bottom to top ; The plug-in sealing device (20) is located in the sealing cylinder (14) of the tail pipe string (30). The beneficial effect is that one string realizes the requirement of separate production/combined production of different oil layers.
Description
所属技术领域Technical field
本实用新型涉及一种油气开发作业的水平井开采管柱,特别是涉及一种水平井分采合采管柱,也适合阶梯水平井分采合采管柱。The utility model relates to a horizontal well production pipe string for oil and gas development operations, in particular to a horizontal well separate production and combined production pipe string, which is also suitable for step horizontal well separate production and combined production pipe strings.
背景技术 Background technique
2004年10月27日公开的中国实用新型专利《分层防砂开采工艺管柱》,水平井悬挂封隔器下部的分采管柱,在2个采油层段分别安装有滤砂管,滤砂管的两端安装有扶正器;2个滤砂管中间的封隔层段由2个双向皮碗封隔器进行封隔,2个封隔器之间安装有控制阀;控制阀为抽汲活塞式,具有单流阀的功能;管柱下端安装有丝堵封堵管柱。该技术通过控制阀的工作状态,能够实现封上采下、封中间采两端的开采作业。该技术需要固井、射孔等作业,作业过程繁复,采出的液体从同一油管中流出,不能满足同时开采2个油层的作业需要。In the Chinese utility model patent "Layered Sand Control Production Process Pipe String" published on October 27, 2004, the separate production pipe string under the packer is suspended in the horizontal well, and sand filter pipes and sand filter pipes are installed in the two oil production intervals respectively. Centralizers are installed at both ends of the pipe; the isolated layer in the middle of the two sand filter pipes is sealed by two bidirectional cup packers, and a control valve is installed between the two packers; Piston type, with the function of a check valve; the lower end of the pipe string is installed with a plug to plug the pipe string. By controlling the working state of the valve, this technology can realize the mining operations at both ends of the upper and lower mining, and the middle and middle mining. This technology requires cementing, perforating and other operations, the operation process is complicated, and the produced liquid flows out from the same oil pipe, which cannot meet the operation needs of simultaneous exploitation of two oil layers.
实用新型内容Utility model content
为了克服现有的水平井分层开采作业管柱存在的作业过程繁复、不能满足同时开采2个油层作业需要的不足,本实用新型提供一种水平井分采合采管柱,可广泛用于水平井、阶梯水平井的分采/合采作业。In order to overcome the shortcomings of the existing horizontal well layered mining operation strings, which are complicated in the operation process and unable to meet the needs of simultaneous exploitation of two oil layers, the utility model provides a horizontal well separate mining combined production string, which can be widely used in Separate production/combined production of horizontal wells and stepped horizontal wells.
本实用新型解决上述技术问题所采用的技术方案是:水平井分采合采管柱包括套管、油管、封隔器、防砂筛管、盲堵,直井段套管固井,水平井段为裸眼井,水平井段有2个开采层段,防砂筛管安装在开采层段位置,管柱端部安装有盲堵,在井眼内安装有尾管管串,尾管管串内安装有生产管串;尾管管串的盲堵、防砂筛管II、封隔器、密封筒、盲管、防砂筛管I、封隔器、套管、尾管悬挂器、回接套管由下至上依次连接;生产管串的插入式密封装置、油管、球座、坐落短节、生产滑套、封隔器、压井滑套由下至上依次连接;防砂筛管I位于产层I,防砂筛管II位于产层II;插入式密封装置位于尾管管串的密封筒内。The technical solution adopted by the utility model to solve the above-mentioned technical problems is: the horizontal well separate production combined production string includes casing, oil pipe, packer, sand control screen, blind plugging, casing cementing in the vertical well section, and the horizontal well section is For open hole wells, there are two production intervals in the horizontal well section, sand control screens are installed in the production intervals, blind plugs are installed at the end of the pipe string, and liner strings are installed in the wellbore. Production pipe string; blind plugging of liner pipe string, sand control screen II, packer, sealing cylinder, blind pipe, sand control screen I, packer, casing, liner hanger, tie-back casing from below connected in order from the top; the plug-in sealing device of the production string, the tubing, the ball seat, the seating pup, the production sleeve, the packer, and the kill sleeve are connected sequentially from bottom to top; the sand control screen I is located in the production layer I, and The screen pipe II is located in the production layer II; the plug-in sealing device is located in the sealing cylinder of the liner string.
本实用新型的有益效果是,设计合理、操作方便、工作可靠,一趟管柱完成开采作业,节约了起下管柱的作业成本;通过钢丝作业选择不同油层的开采,满足分采/合采不同油层的作业需要;采用液压方式完成封隔器的坐封和解封,减少了钢丝作业次数,降低了作业难度。The beneficial effects of the utility model are that the design is reasonable, the operation is convenient, and the work is reliable, and the mining operation is completed in one trip, which saves the operating cost of lifting and lowering the string; the mining of different oil layers is selected through the steel wire operation to meet the needs of separate mining/combined mining The operation needs of different oil layers; the hydraulic method is used to complete the setting and unsealing of the packer, which reduces the number of steel wire operations and reduces the difficulty of the operation.
附图说明 Description of drawings
图1是本实用新型水平井分采合采管柱结构示意图。Fig. 1 is a schematic diagram of the structure of the utility model horizontal well separate production combined production pipe string.
图2是本实用新型第2实施例阶梯水平井分采合采管柱结构示意图。Fig. 2 is a schematic structural view of the separate production and combined production string of the stepped horizontal well according to the second embodiment of the utility model.
图中:1.油管挂,2.回接套管,3.安全阀控制管线,4.安全阀总成,5.油管,6.套管,7.伸缩节,8.尾管悬挂器,9.压井滑套,10.封隔器,11.生产滑套,12.坐落短节,13.球座,14.套管,15.封隔器,16.水平井段,17.防砂筛管I,18.油管,19.盲管,20.插入式密封装置,21.封隔器,22.防砂筛管II,23.盲堵,24.产层I,25.产层II,26.密封筒,30.尾管管串,31.直井段,32.阶梯水平井过渡井段,40.生产管串。In the figure: 1. Oil pipe hanger, 2. Tie-back casing, 3. Safety valve control pipeline, 4. Safety valve assembly, 5. Oil pipe, 6. Casing, 7. Expansion joint, 8. Liner hanger, 9. Killing sleeve, 10. Packer, 11. Production sleeve, 12. Seat sub, 13. Ball seat, 14. Casing, 15. Packer, 16. Horizontal section, 17. Sand control Screen I, 18. Oil pipe, 19. Blind pipe, 20. Plug-in sealing device, 21. Packer, 22. Sand control screen II, 23. Blind plugging, 24. Production zone I, 25. Production zone II, 26. Sealing tube, 30. Liner pipe string, 31. Vertical well section, 32. Step horizontal well transition well section, 40. Production pipe string.
具体实施方式 Detailed ways
下面结合附图1、附图2和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing 1, accompanying drawing 2 and embodiment the utility model is further described.
本实用新型水平井分采合采管柱,包括套管6、油管5、封隔器10、防砂筛管I17、防砂筛管II22、盲堵23,直井段31用套管6固井,水平井段16为裸眼井段;水平井段16有2个开采层段,分别为产层I24和产层II25;在井眼内安装有尾管管串30,尾管管串30内安装有生产管串40。The utility model horizontal well separate mining combined production pipe string includes
尾管管串30的盲堵23、防砂筛管II22、封隔器21、密封筒26、盲管19、防砂筛管I 17、封隔器15、套管14、尾管悬挂器8、回接套管2由下至上依次连接。防砂筛管I 17位于产层I 24井段,防砂筛管II22位于产层II25井段。回接套管2位于直井段31,回接套管2上安装有尾管悬挂器8。封隔器15和封隔器21选用遇油膨胀封隔器为佳,便于在裸眼水平井段16内实现密封;封隔器15和封隔器21与裸眼水平井段16形成对应产层I 24的密封环空,实现产层I 24和产层II25与直井段31环空的分隔。
生产管串40的插入式密封装置20、油管18、球座13、坐落短节12、生产滑套11、封隔器10、压井滑套9由下至上依次连接。中间为通孔的插入式密封装置20位于尾管管串30的密封筒14内,其外圆与密封筒14内孔形成密封,插入式密封装置20、盲管19、油管18与生产管串40上部的封隔器10形成对应产层I 24的密封环空。封隔器10可以选用插管式液压封隔器。The plug-in
生产管串40的压井滑套9上方由下至上还依次连接有油管5、安全阀总成4、安全阀控制管线3,管串上部与油管挂1连接。在生产管串40上部安装伸缩节7,用于补偿由于温度和压力的变化引起油管长度的伸缩。The top of the
应用本实用新型水平井分采合采管柱作业,首先下入尾管管串30,到位后对套管6固井,回接,扫盲板后替浆(根据插入密封筒选择下部替浆管具);然后下入生产管串40,插入式密封装置20插入密封筒26内,形成密封;替轻质油膨胀坐封遇油膨胀封隔器15和遇油膨胀封隔器21,坐封封隔器10,并验封,开井求产。Applying the utility model of horizontal well separate production and combined production pipe string operation, firstly, the
分采作业时,关闭生产滑套11,保持油管18通径,进行产层II25开采作业;向坐落短节12中投入堵塞器,用钢丝作业打开生产滑套11,进行产层I 24的开采作业。During separate mining operations, close the
合采作业时,钢丝作业取出堵塞器,油管18至上部的油管5为通径,打开生产滑套11,即可实现产层I 24、产层II25两个产层同时开采。During the combined production operation, the steel wire operation takes out the plug, the
本实用新型水平井分采合采管柱不仅可以应用于普通水平井中2个产层的分采、合采作业,还适用于阶梯水平井中不同产层的开采作业,在阶梯水平井中两层中间的阶梯水平井过渡井段32处采用油管18即可。The utility model horizontal well separate production and combined production pipe string can not only be applied to the separate production and combined production of two production layers in ordinary horizontal wells, but also suitable for the mining operations of different production layers in stepped horizontal wells. The
本实用新型水平井分采合采管柱设计合理,液压封隔器悬挂能力强,永久锚定,寿命长;单趟作业,投球座封,液压封隔器锁定密封和上部油管可起出和重新插入;遇油膨胀封隔器和防砂筛管能够有效实现防砂目的;一趟管柱作业节约了起下管柱作业费用;通过钢丝作业即可选择分采/合采开采作业形式;采用液压方式完成封隔器的坐封和解封,减少钢丝作业次数,降低作业难度,可广泛用于水平井、阶梯水平井的分采/合采作业。The utility model has a reasonable design of the separate and combined mining pipe string for the horizontal well, the hydraulic packer has strong suspension ability, is permanently anchored, and has a long service life; single-trip operation, ball-seating sealing, hydraulic packer locking and sealing, and the upper tubing can be pulled out and in and out. Re-insert; oil-swellable packers and sand control screens can effectively achieve the purpose of sand control; one string operation saves the cost of lifting and lowering the string; the operation form of separate mining/combined mining can be selected through steel wire operation; hydraulic pressure is adopted This method completes the setting and unsealing of the packer, reduces the number of steel wire operations and reduces the difficulty of the operation, and can be widely used in separate/combined production of horizontal wells and stepped horizontal wells.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200790876U CN201165866Y (en) | 2008-03-04 | 2008-03-04 | Horizontal well separate mining and combined mining pipe column |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2008200790876U CN201165866Y (en) | 2008-03-04 | 2008-03-04 | Horizontal well separate mining and combined mining pipe column |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201165866Y true CN201165866Y (en) | 2008-12-17 |
Family
ID=40191252
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2008200790876U Expired - Lifetime CN201165866Y (en) | 2008-03-04 | 2008-03-04 | Horizontal well separate mining and combined mining pipe column |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201165866Y (en) |
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102022104A (en) * | 2010-11-06 | 2011-04-20 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102383764A (en) * | 2010-09-01 | 2012-03-21 | 大港油田集团有限责任公司 | Sand-blocking-preventing oil-extraction production tubular column |
| CN102536172A (en) * | 2012-02-23 | 2012-07-04 | 石云夫 | Sectional production tubular pile for horizontal well |
| CN102758599A (en) * | 2012-08-03 | 2012-10-31 | 中国海洋石油总公司 | Separate mining and combined mining pipe column for sieve pipe well completion horizontal well and mining method thereof |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN104453801A (en) * | 2014-04-29 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Composite coal-formed gas reservoir commingling production method and screen pipe special for same |
| CN105134141A (en) * | 2015-08-25 | 2015-12-09 | 中国石油天然气股份有限公司 | Process pipe column |
| CN105545221A (en) * | 2016-03-04 | 2016-05-04 | 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 | Shale gas well no-killing production tubular column capable of being lifted up and put down under no pressure and construction method |
| CN107939358A (en) * | 2017-11-28 | 2018-04-20 | 中国石油化工股份有限公司 | Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method |
| CN108699894A (en) * | 2016-03-23 | 2018-10-23 | 哈里伯顿能源服务公司 | Quick locking adapter for large-caliber feeding tool |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN109236186A (en) * | 2018-10-30 | 2019-01-18 | 中国石油大学(华东) | New well drilling casing and big wellbore multilateral well quick drill completion method |
| CN109267943A (en) * | 2017-07-17 | 2019-01-25 | 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 | A kind of tieback string |
| CN110107230A (en) * | 2019-05-17 | 2019-08-09 | 张强 | The layering gas recovery device of the double-deck tubing string |
| CN110630227A (en) * | 2019-10-22 | 2019-12-31 | 东营市瑞丰石油技术发展有限责任公司 | Running tool, layered oil production pipe column and layered oil production pipe column running method |
| CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Completion Apparatus and Method for Refracturing Horizontal Wells |
| US11359464B2 (en) * | 2016-12-06 | 2022-06-14 | Total E&P Danmark A/S | Methods and apparatus for creating wellbores |
-
2008
- 2008-03-04 CN CNU2008200790876U patent/CN201165866Y/en not_active Expired - Lifetime
Cited By (23)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102383764A (en) * | 2010-09-01 | 2012-03-21 | 大港油田集团有限责任公司 | Sand-blocking-preventing oil-extraction production tubular column |
| CN102022104B (en) * | 2010-11-06 | 2013-08-14 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102022104A (en) * | 2010-11-06 | 2011-04-20 | 大庆油田有限责任公司 | Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method |
| CN102536172A (en) * | 2012-02-23 | 2012-07-04 | 石云夫 | Sectional production tubular pile for horizontal well |
| CN103573229B (en) * | 2012-07-24 | 2016-12-21 | 中国海洋石油总公司 | A kind of bore hole DP technology and separation tubing string thereof |
| CN103573229A (en) * | 2012-07-24 | 2014-02-12 | 中国海洋石油总公司 | Open hole oil production technology and separated pipe string |
| CN102758599A (en) * | 2012-08-03 | 2012-10-31 | 中国海洋石油总公司 | Separate mining and combined mining pipe column for sieve pipe well completion horizontal well and mining method thereof |
| CN104453801A (en) * | 2014-04-29 | 2015-03-25 | 贵州省煤层气页岩气工程技术研究中心 | Composite coal-formed gas reservoir commingling production method and screen pipe special for same |
| CN105134141A (en) * | 2015-08-25 | 2015-12-09 | 中国石油天然气股份有限公司 | Process pipe column |
| CN105545221B (en) * | 2016-03-04 | 2017-11-24 | 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 | A kind of shale gas well no killing well is not with pressure to remove flow string and construction method |
| CN105545221A (en) * | 2016-03-04 | 2016-05-04 | 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 | Shale gas well no-killing production tubular column capable of being lifted up and put down under no pressure and construction method |
| CN108699894A (en) * | 2016-03-23 | 2018-10-23 | 哈里伯顿能源服务公司 | Quick locking adapter for large-caliber feeding tool |
| US11359464B2 (en) * | 2016-12-06 | 2022-06-14 | Total E&P Danmark A/S | Methods and apparatus for creating wellbores |
| CN108798539A (en) * | 2017-05-05 | 2018-11-13 | 中国石油化工股份有限公司 | Horizontal well sand control commingled column |
| CN108798539B (en) * | 2017-05-05 | 2024-05-24 | 中国石油化工股份有限公司 | Sand-proof combined production string for horizontal well |
| CN109267943A (en) * | 2017-07-17 | 2019-01-25 | 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 | A kind of tieback string |
| CN107939358A (en) * | 2017-11-28 | 2018-04-20 | 中国石油化工股份有限公司 | Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method |
| CN109236186A (en) * | 2018-10-30 | 2019-01-18 | 中国石油大学(华东) | New well drilling casing and big wellbore multilateral well quick drill completion method |
| CN109236186B (en) * | 2018-10-30 | 2020-03-06 | 中国石油大学(华东) | Drilling Casing and Rapid Drilling and Completion Method for Multilateral Wells in Large Boreholes |
| CN110107230A (en) * | 2019-05-17 | 2019-08-09 | 张强 | The layering gas recovery device of the double-deck tubing string |
| CN111997578A (en) * | 2019-05-27 | 2020-11-27 | 中国石油天然气股份有限公司 | Completion Apparatus and Method for Refracturing Horizontal Wells |
| CN110630227B (en) * | 2019-10-22 | 2024-05-03 | 东营市瑞丰石油技术发展有限责任公司 | Running tool, layered oil production string and layered oil production string running method |
| CN110630227A (en) * | 2019-10-22 | 2019-12-31 | 东营市瑞丰石油技术发展有限责任公司 | Running tool, layered oil production pipe column and layered oil production pipe column running method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201165866Y (en) | Horizontal well separate mining and combined mining pipe column | |
| CN101864921B (en) | Well completion and oil production string of horizontal well and well completion and oil production processes thereof | |
| CN102808584B (en) | Mechanical water plugging pipe string and method for multi-point water outlet in multi-stage fracturing horizontal well with casing completion | |
| AU2010322366B2 (en) | Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore | |
| CN201705276U (en) | Well completion and flow string of horizontal well | |
| CN202900205U (en) | Multifunctional oil testing and completion integrated string | |
| CN201705219U (en) | Lateral drilling gravel pack completion string | |
| CN202578589U (en) | Multi-functional pipe string with well cleaning, testing and layered water injection | |
| CN102979495A (en) | Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof | |
| CN205225215U (en) | A mining device for layered mining of two sets of oil layers | |
| CN104373103B (en) | A temporary plugging and repeated fracturing pipe string in old well fractures capable of large displacement construction and its method | |
| CN112127802A (en) | Infinite grade full-bore staged fracturing sand control pipe column and production method thereof | |
| CN112267866B (en) | Production string and method for staged fracturing of small-diameter pipes for sidetracking and small-bore wells | |
| CN201412134Y (en) | Small casing pipe multi-layer fracturing process pipe column | |
| CN117868768A (en) | Infinite-stage casing pipe internal fracturing sand prevention integrated tubular column and use method thereof | |
| CN202152670U (en) | Horizontal Well Sectional Measures Construction String | |
| CN203939477U (en) | An integrated pipe string for oil testing and well completion operations | |
| CN104074487A (en) | Packer | |
| CN207177750U (en) | Integrated string | |
| CN202810675U (en) | Mechanical water plugging pipe string for multi-stage fracturing horizontal well with casing completion and multi-point water outlet | |
| CN205349316U (en) | Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression | |
| CN112282718B (en) | Combined pipe string for sidetracking well and slim hole well and use method | |
| CN2866812Y (en) | Integrated pipe string for layered fracturing and layered production in natural gas wells | |
| CN204371286U (en) | A temporary plugging refracturing string in old well fractures that can be constructed with large displacement | |
| CN201486542U (en) | Separable separate-layer fracturing process pipe column |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20081217 |
|
| CX01 | Expiry of patent term |