[go: up one dir, main page]

CN201165866Y - Horizontal well separate mining and combined mining pipe column - Google Patents

Horizontal well separate mining and combined mining pipe column Download PDF

Info

Publication number
CN201165866Y
CN201165866Y CNU2008200790876U CN200820079087U CN201165866Y CN 201165866 Y CN201165866 Y CN 201165866Y CN U2008200790876 U CNU2008200790876 U CN U2008200790876U CN 200820079087 U CN200820079087 U CN 200820079087U CN 201165866 Y CN201165866 Y CN 201165866Y
Authority
CN
China
Prior art keywords
pipe
string
production
packer
sand control
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200790876U
Other languages
Chinese (zh)
Inventor
陈亮
王昕宇
钟付琴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SINOPETROLEUM TECHNOLOGY Inc
Original Assignee
SINOPETROLEUM TECHNOLOGY Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SINOPETROLEUM TECHNOLOGY Inc filed Critical SINOPETROLEUM TECHNOLOGY Inc
Priority to CNU2008200790876U priority Critical patent/CN201165866Y/en
Application granted granted Critical
Publication of CN201165866Y publication Critical patent/CN201165866Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Earth Drilling (AREA)

Abstract

一种水平井分采合采管柱。为了克服现有水平井分层开采作业管柱不能满足同时开采2个油层作业需要的不足,本实用新型在井眼内安装有尾管管串(30),尾管管串(30)内安装有生产管串(40);尾管管串(30)的盲堵(23)、防砂筛管II(22)、封隔器(21)、密封筒(26)、盲管(19)、防砂筛管I(17)、封隔器(15)、套管(14)、尾管悬挂器(8)、回接套管(2)由下至上依次连接;生产管串(40)的插入式密封装置(20)、油管(18)、球座(13)、坐落短节(12)、生产滑套(11)、封隔器(10)、压井滑套(9)由下至上依次连接;插入式密封装置(20)位于尾管管串(30)的密封筒(14)内。其有益效果是一趟管柱实现分采/合采不同油层的需要。

Figure 200820079087

Disclosed is a separate and combined recovery pipe string for a horizontal well. In order to overcome the deficiency that the existing horizontal well layered production operation string cannot meet the needs of simultaneous exploitation of two oil layers, the utility model is equipped with a liner pipe string (30) in the wellbore, and a liner pipe string (30) is installed inside the liner pipe string (30). There are production pipe strings (40); blind plugs (23) of liner pipe strings (30), sand control screen II (22), packers (21), sealing cylinders (26), blind pipes (19), sand control Screen pipe I (17), packer (15), casing (14), liner hanger (8), and tie-back casing (2) are connected sequentially from bottom to top; the plug-in type of production string (40) Sealing device (20), tubing (18), ball seat (13), seating nipple (12), production sleeve (11), packer (10), and kill sleeve (9) are connected sequentially from bottom to top ; The plug-in sealing device (20) is located in the sealing cylinder (14) of the tail pipe string (30). The beneficial effect is that one string realizes the requirement of separate production/combined production of different oil layers.

Figure 200820079087

Description

水平井分采合采管柱 Horizontal well separate production combined production string

所属技术领域Technical field

本实用新型涉及一种油气开发作业的水平井开采管柱,特别是涉及一种水平井分采合采管柱,也适合阶梯水平井分采合采管柱。The utility model relates to a horizontal well production pipe string for oil and gas development operations, in particular to a horizontal well separate production and combined production pipe string, which is also suitable for step horizontal well separate production and combined production pipe strings.

背景技术 Background technique

2004年10月27日公开的中国实用新型专利《分层防砂开采工艺管柱》,水平井悬挂封隔器下部的分采管柱,在2个采油层段分别安装有滤砂管,滤砂管的两端安装有扶正器;2个滤砂管中间的封隔层段由2个双向皮碗封隔器进行封隔,2个封隔器之间安装有控制阀;控制阀为抽汲活塞式,具有单流阀的功能;管柱下端安装有丝堵封堵管柱。该技术通过控制阀的工作状态,能够实现封上采下、封中间采两端的开采作业。该技术需要固井、射孔等作业,作业过程繁复,采出的液体从同一油管中流出,不能满足同时开采2个油层的作业需要。In the Chinese utility model patent "Layered Sand Control Production Process Pipe String" published on October 27, 2004, the separate production pipe string under the packer is suspended in the horizontal well, and sand filter pipes and sand filter pipes are installed in the two oil production intervals respectively. Centralizers are installed at both ends of the pipe; the isolated layer in the middle of the two sand filter pipes is sealed by two bidirectional cup packers, and a control valve is installed between the two packers; Piston type, with the function of a check valve; the lower end of the pipe string is installed with a plug to plug the pipe string. By controlling the working state of the valve, this technology can realize the mining operations at both ends of the upper and lower mining, and the middle and middle mining. This technology requires cementing, perforating and other operations, the operation process is complicated, and the produced liquid flows out from the same oil pipe, which cannot meet the operation needs of simultaneous exploitation of two oil layers.

实用新型内容Utility model content

为了克服现有的水平井分层开采作业管柱存在的作业过程繁复、不能满足同时开采2个油层作业需要的不足,本实用新型提供一种水平井分采合采管柱,可广泛用于水平井、阶梯水平井的分采/合采作业。In order to overcome the shortcomings of the existing horizontal well layered mining operation strings, which are complicated in the operation process and unable to meet the needs of simultaneous exploitation of two oil layers, the utility model provides a horizontal well separate mining combined production string, which can be widely used in Separate production/combined production of horizontal wells and stepped horizontal wells.

本实用新型解决上述技术问题所采用的技术方案是:水平井分采合采管柱包括套管、油管、封隔器、防砂筛管、盲堵,直井段套管固井,水平井段为裸眼井,水平井段有2个开采层段,防砂筛管安装在开采层段位置,管柱端部安装有盲堵,在井眼内安装有尾管管串,尾管管串内安装有生产管串;尾管管串的盲堵、防砂筛管II、封隔器、密封筒、盲管、防砂筛管I、封隔器、套管、尾管悬挂器、回接套管由下至上依次连接;生产管串的插入式密封装置、油管、球座、坐落短节、生产滑套、封隔器、压井滑套由下至上依次连接;防砂筛管I位于产层I,防砂筛管II位于产层II;插入式密封装置位于尾管管串的密封筒内。The technical solution adopted by the utility model to solve the above-mentioned technical problems is: the horizontal well separate production combined production string includes casing, oil pipe, packer, sand control screen, blind plugging, casing cementing in the vertical well section, and the horizontal well section is For open hole wells, there are two production intervals in the horizontal well section, sand control screens are installed in the production intervals, blind plugs are installed at the end of the pipe string, and liner strings are installed in the wellbore. Production pipe string; blind plugging of liner pipe string, sand control screen II, packer, sealing cylinder, blind pipe, sand control screen I, packer, casing, liner hanger, tie-back casing from below connected in order from the top; the plug-in sealing device of the production string, the tubing, the ball seat, the seating pup, the production sleeve, the packer, and the kill sleeve are connected sequentially from bottom to top; the sand control screen I is located in the production layer I, and The screen pipe II is located in the production layer II; the plug-in sealing device is located in the sealing cylinder of the liner string.

本实用新型的有益效果是,设计合理、操作方便、工作可靠,一趟管柱完成开采作业,节约了起下管柱的作业成本;通过钢丝作业选择不同油层的开采,满足分采/合采不同油层的作业需要;采用液压方式完成封隔器的坐封和解封,减少了钢丝作业次数,降低了作业难度。The beneficial effects of the utility model are that the design is reasonable, the operation is convenient, and the work is reliable, and the mining operation is completed in one trip, which saves the operating cost of lifting and lowering the string; the mining of different oil layers is selected through the steel wire operation to meet the needs of separate mining/combined mining The operation needs of different oil layers; the hydraulic method is used to complete the setting and unsealing of the packer, which reduces the number of steel wire operations and reduces the difficulty of the operation.

附图说明 Description of drawings

图1是本实用新型水平井分采合采管柱结构示意图。Fig. 1 is a schematic diagram of the structure of the utility model horizontal well separate production combined production pipe string.

图2是本实用新型第2实施例阶梯水平井分采合采管柱结构示意图。Fig. 2 is a schematic structural view of the separate production and combined production string of the stepped horizontal well according to the second embodiment of the utility model.

图中:1.油管挂,2.回接套管,3.安全阀控制管线,4.安全阀总成,5.油管,6.套管,7.伸缩节,8.尾管悬挂器,9.压井滑套,10.封隔器,11.生产滑套,12.坐落短节,13.球座,14.套管,15.封隔器,16.水平井段,17.防砂筛管I,18.油管,19.盲管,20.插入式密封装置,21.封隔器,22.防砂筛管II,23.盲堵,24.产层I,25.产层II,26.密封筒,30.尾管管串,31.直井段,32.阶梯水平井过渡井段,40.生产管串。In the figure: 1. Oil pipe hanger, 2. Tie-back casing, 3. Safety valve control pipeline, 4. Safety valve assembly, 5. Oil pipe, 6. Casing, 7. Expansion joint, 8. Liner hanger, 9. Killing sleeve, 10. Packer, 11. Production sleeve, 12. Seat sub, 13. Ball seat, 14. Casing, 15. Packer, 16. Horizontal section, 17. Sand control Screen I, 18. Oil pipe, 19. Blind pipe, 20. Plug-in sealing device, 21. Packer, 22. Sand control screen II, 23. Blind plugging, 24. Production zone I, 25. Production zone II, 26. Sealing tube, 30. Liner pipe string, 31. Vertical well section, 32. Step horizontal well transition well section, 40. Production pipe string.

具体实施方式 Detailed ways

下面结合附图1、附图2和实施例对本实用新型作进一步说明。Below in conjunction with accompanying drawing 1, accompanying drawing 2 and embodiment the utility model is further described.

本实用新型水平井分采合采管柱,包括套管6、油管5、封隔器10、防砂筛管I17、防砂筛管II22、盲堵23,直井段31用套管6固井,水平井段16为裸眼井段;水平井段16有2个开采层段,分别为产层I24和产层II25;在井眼内安装有尾管管串30,尾管管串30内安装有生产管串40。The utility model horizontal well separate mining combined production pipe string includes casing 6, tubing 5, packer 10, sand control screen I17, sand control screen II22, blind plug 23, vertical well section 31 is cemented with casing 6, water The flat well section 16 is an open hole section; the horizontal well section 16 has two production intervals, namely production layer I24 and production layer II25; a liner string 30 is installed in the wellbore, and a production pipe string 40.

尾管管串30的盲堵23、防砂筛管II22、封隔器21、密封筒26、盲管19、防砂筛管I 17、封隔器15、套管14、尾管悬挂器8、回接套管2由下至上依次连接。防砂筛管I 17位于产层I 24井段,防砂筛管II22位于产层II25井段。回接套管2位于直井段31,回接套管2上安装有尾管悬挂器8。封隔器15和封隔器21选用遇油膨胀封隔器为佳,便于在裸眼水平井段16内实现密封;封隔器15和封隔器21与裸眼水平井段16形成对应产层I 24的密封环空,实现产层I 24和产层II25与直井段31环空的分隔。Blind plug 23 of liner pipe string 30, sand control screen II 22, packer 21, sealing cylinder 26, blind pipe 19, sand control screen I 17, packer 15, casing 14, liner hanger 8, back The connecting sleeves 2 are connected sequentially from bottom to top. The sand control screen I17 is located in the well section of the production layer I24, and the sand control screen II22 is located in the well section of the production layer II25. The tieback casing 2 is located in the vertical well section 31 , and a liner hanger 8 is installed on the tieback casing 2 . Packer 15 and packer 21 are preferably oil-swellable packers, which are convenient for sealing in the open-hole horizontal well section 16; packer 15 and packer 21 form the corresponding pay zone I The sealing annulus of 24 realizes the separation of production layers I 24 and II 25 from the annulus of vertical section 31.

生产管串40的插入式密封装置20、油管18、球座13、坐落短节12、生产滑套11、封隔器10、压井滑套9由下至上依次连接。中间为通孔的插入式密封装置20位于尾管管串30的密封筒14内,其外圆与密封筒14内孔形成密封,插入式密封装置20、盲管19、油管18与生产管串40上部的封隔器10形成对应产层I 24的密封环空。封隔器10可以选用插管式液压封隔器。The plug-in sealing device 20, tubing 18, ball seat 13, seating nipple 12, production sleeve 11, packer 10, and kill sleeve 9 of the production string 40 are connected sequentially from bottom to top. The plug-in sealing device 20 with a through hole in the middle is located in the sealing cylinder 14 of the liner pipe string 30, and its outer circle forms a seal with the inner hole of the sealing cylinder 14. The packer 10 at the upper part of 40 forms a sealed annulus corresponding to the production layer 124. The packer 10 can be an intubation hydraulic packer.

生产管串40的压井滑套9上方由下至上还依次连接有油管5、安全阀总成4、安全阀控制管线3,管串上部与油管挂1连接。在生产管串40上部安装伸缩节7,用于补偿由于温度和压力的变化引起油管长度的伸缩。The top of the kill sleeve 9 of the production pipe string 40 is connected with the oil pipe 5, the safety valve assembly 4, and the safety valve control pipeline 3 in sequence from bottom to top, and the upper part of the pipe string is connected with the oil pipe hanger 1. An expansion joint 7 is installed on the upper part of the production pipe string 40 to compensate for the expansion and contraction of the length of the oil pipe due to changes in temperature and pressure.

应用本实用新型水平井分采合采管柱作业,首先下入尾管管串30,到位后对套管6固井,回接,扫盲板后替浆(根据插入密封筒选择下部替浆管具);然后下入生产管串40,插入式密封装置20插入密封筒26内,形成密封;替轻质油膨胀坐封遇油膨胀封隔器15和遇油膨胀封隔器21,坐封封隔器10,并验封,开井求产。Applying the utility model of horizontal well separate production and combined production pipe string operation, firstly, the liner pipe string 30 is lowered, and after it is in place, the casing 6 is cemented, connected back, and the slurry is replaced after the blanking plate (select the lower slurry replacement pipe according to the insertion of the sealing cylinder) tool); then run into the production pipe string 40, the plug-in sealing device 20 is inserted into the sealing cylinder 26 to form a seal; set the oil-expandable packer 15 and the oil-expandable packer 21 for light oil expansion, set The packer 10 is checked and sealed, and the well is opened for production.

分采作业时,关闭生产滑套11,保持油管18通径,进行产层II25开采作业;向坐落短节12中投入堵塞器,用钢丝作业打开生产滑套11,进行产层I 24的开采作业。During separate mining operations, close the production sliding sleeve 11, keep the diameter of the tubing 18, and carry out production layer II25 mining operation; put a plug into the pup joint 12, open the production sliding sleeve 11 with steel wire operation, and carry out production layer I24 mining Operation.

合采作业时,钢丝作业取出堵塞器,油管18至上部的油管5为通径,打开生产滑套11,即可实现产层I 24、产层II25两个产层同时开采。During the combined production operation, the steel wire operation takes out the plug, the oil pipe 18 to the upper oil pipe 5 is the through diameter, and the production sliding sleeve 11 is opened, so that the two production layers of production layer I 24 and production layer II 25 can be exploited simultaneously.

本实用新型水平井分采合采管柱不仅可以应用于普通水平井中2个产层的分采、合采作业,还适用于阶梯水平井中不同产层的开采作业,在阶梯水平井中两层中间的阶梯水平井过渡井段32处采用油管18即可。The utility model horizontal well separate production and combined production pipe string can not only be applied to the separate production and combined production of two production layers in ordinary horizontal wells, but also suitable for the mining operations of different production layers in stepped horizontal wells. The tubing 18 can be used at the transition section 32 of the stepped horizontal well.

本实用新型水平井分采合采管柱设计合理,液压封隔器悬挂能力强,永久锚定,寿命长;单趟作业,投球座封,液压封隔器锁定密封和上部油管可起出和重新插入;遇油膨胀封隔器和防砂筛管能够有效实现防砂目的;一趟管柱作业节约了起下管柱作业费用;通过钢丝作业即可选择分采/合采开采作业形式;采用液压方式完成封隔器的坐封和解封,减少钢丝作业次数,降低作业难度,可广泛用于水平井、阶梯水平井的分采/合采作业。The utility model has a reasonable design of the separate and combined mining pipe string for the horizontal well, the hydraulic packer has strong suspension ability, is permanently anchored, and has a long service life; single-trip operation, ball-seating sealing, hydraulic packer locking and sealing, and the upper tubing can be pulled out and in and out. Re-insert; oil-swellable packers and sand control screens can effectively achieve the purpose of sand control; one string operation saves the cost of lifting and lowering the string; the operation form of separate mining/combined mining can be selected through steel wire operation; hydraulic pressure is adopted This method completes the setting and unsealing of the packer, reduces the number of steel wire operations and reduces the difficulty of the operation, and can be widely used in separate/combined production of horizontal wells and stepped horizontal wells.

Claims (4)

1. a horizontal well branch is adopted to close and is adopted tubing string, comprise sleeve pipe, oil pipe, packer, sand control screen, blind plugging, straight well section casing cementing, net horizontal section is an open hole well, net horizontal section has 2 production ranges, and sand control screen is installed in the production range position, and the tubing string end is equipped with blind plugging, it is characterized in that: tail pipe pipe string (30) is installed in well, is equipped with in the tail pipe pipe string (30) and produces pipe string (40);
The blind plugging (23) of tail pipe pipe string (30), sand control screen II (22), packer (21), sealing drum (26), blind pipe (19), sand control screen I (17), packer (15), sleeve pipe (14), extension hanger (8), tie-back casing (2) connect from the bottom to top successively;
Produce pipe string (40) plug-in type sealing device (20), oil pipe (18), ball seat (13), be located pipe nipple (12), produce sliding sleeve (11), packer (10), kill-job sliding sleeve (9) and connect successively from the bottom to top;
Sand control screen I (17) is positioned at payzone I (24); Sand control screen II (22) is positioned at payzone II (25); Plug-in type sealing device (20) is positioned at the sealing drum (14) of tail pipe pipe string (30).
2. horizontal well branch according to claim 1 is adopted to close and adopted tubing string, it is characterized in that: described tie-back casing (2) is positioned at straight well section (31), and extension hanger (8) is installed on the tie-back casing (2).
3. horizontal well branch according to claim 2 is adopted to close and adopted tubing string, it is characterized in that: described packer (15), packer (21) are for meeting oily swell packers.
4. horizontal well branch according to claim 2 is adopted to close and adopted tubing string, it is characterized in that: described packer (10) is the cannula type hydraulic packer.
CNU2008200790876U 2008-03-04 2008-03-04 Horizontal well separate mining and combined mining pipe column Expired - Lifetime CN201165866Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200790876U CN201165866Y (en) 2008-03-04 2008-03-04 Horizontal well separate mining and combined mining pipe column

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200790876U CN201165866Y (en) 2008-03-04 2008-03-04 Horizontal well separate mining and combined mining pipe column

Publications (1)

Publication Number Publication Date
CN201165866Y true CN201165866Y (en) 2008-12-17

Family

ID=40191252

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200790876U Expired - Lifetime CN201165866Y (en) 2008-03-04 2008-03-04 Horizontal well separate mining and combined mining pipe column

Country Status (1)

Country Link
CN (1) CN201165866Y (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN102383764A (en) * 2010-09-01 2012-03-21 大港油田集团有限责任公司 Sand-blocking-preventing oil-extraction production tubular column
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN102758599A (en) * 2012-08-03 2012-10-31 中国海洋石油总公司 Separate mining and combined mining pipe column for sieve pipe well completion horizontal well and mining method thereof
CN103573229A (en) * 2012-07-24 2014-02-12 中国海洋石油总公司 Open hole oil production technology and separated pipe string
CN104453801A (en) * 2014-04-29 2015-03-25 贵州省煤层气页岩气工程技术研究中心 Composite coal-formed gas reservoir commingling production method and screen pipe special for same
CN105134141A (en) * 2015-08-25 2015-12-09 中国石油天然气股份有限公司 Process pipe column
CN105545221A (en) * 2016-03-04 2016-05-04 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 Shale gas well no-killing production tubular column capable of being lifted up and put down under no pressure and construction method
CN107939358A (en) * 2017-11-28 2018-04-20 中国石油化工股份有限公司 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method
CN108699894A (en) * 2016-03-23 2018-10-23 哈里伯顿能源服务公司 Quick locking adapter for large-caliber feeding tool
CN108798539A (en) * 2017-05-05 2018-11-13 中国石油化工股份有限公司 Horizontal well sand control commingled column
CN109236186A (en) * 2018-10-30 2019-01-18 中国石油大学(华东) New well drilling casing and big wellbore multilateral well quick drill completion method
CN109267943A (en) * 2017-07-17 2019-01-25 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of tieback string
CN110107230A (en) * 2019-05-17 2019-08-09 张强 The layering gas recovery device of the double-deck tubing string
CN110630227A (en) * 2019-10-22 2019-12-31 东营市瑞丰石油技术发展有限责任公司 Running tool, layered oil production pipe column and layered oil production pipe column running method
CN111997578A (en) * 2019-05-27 2020-11-27 中国石油天然气股份有限公司 Completion Apparatus and Method for Refracturing Horizontal Wells
US11359464B2 (en) * 2016-12-06 2022-06-14 Total E&P Danmark A/S Methods and apparatus for creating wellbores

Cited By (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102383764A (en) * 2010-09-01 2012-03-21 大港油田集团有限责任公司 Sand-blocking-preventing oil-extraction production tubular column
CN102022104B (en) * 2010-11-06 2013-08-14 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN102022104A (en) * 2010-11-06 2011-04-20 大庆油田有限责任公司 Open-hole packer for open-hole horizontal well and preset connector fracturing well completion method
CN102536172A (en) * 2012-02-23 2012-07-04 石云夫 Sectional production tubular pile for horizontal well
CN103573229B (en) * 2012-07-24 2016-12-21 中国海洋石油总公司 A kind of bore hole DP technology and separation tubing string thereof
CN103573229A (en) * 2012-07-24 2014-02-12 中国海洋石油总公司 Open hole oil production technology and separated pipe string
CN102758599A (en) * 2012-08-03 2012-10-31 中国海洋石油总公司 Separate mining and combined mining pipe column for sieve pipe well completion horizontal well and mining method thereof
CN104453801A (en) * 2014-04-29 2015-03-25 贵州省煤层气页岩气工程技术研究中心 Composite coal-formed gas reservoir commingling production method and screen pipe special for same
CN105134141A (en) * 2015-08-25 2015-12-09 中国石油天然气股份有限公司 Process pipe column
CN105545221B (en) * 2016-03-04 2017-11-24 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 A kind of shale gas well no killing well is not with pressure to remove flow string and construction method
CN105545221A (en) * 2016-03-04 2016-05-04 中国石油化工股份有限公司江汉油田分公司石油工程技术研究院 Shale gas well no-killing production tubular column capable of being lifted up and put down under no pressure and construction method
CN108699894A (en) * 2016-03-23 2018-10-23 哈里伯顿能源服务公司 Quick locking adapter for large-caliber feeding tool
US11359464B2 (en) * 2016-12-06 2022-06-14 Total E&P Danmark A/S Methods and apparatus for creating wellbores
CN108798539A (en) * 2017-05-05 2018-11-13 中国石油化工股份有限公司 Horizontal well sand control commingled column
CN108798539B (en) * 2017-05-05 2024-05-24 中国石油化工股份有限公司 Sand-proof combined production string for horizontal well
CN109267943A (en) * 2017-07-17 2019-01-25 中国石油化工股份有限公司华北油气分公司石油工程技术研究院 A kind of tieback string
CN107939358A (en) * 2017-11-28 2018-04-20 中国石油化工股份有限公司 Carbonate rock hydrocarbon reservoir open hole completion tubing string and post-processing method
CN109236186A (en) * 2018-10-30 2019-01-18 中国石油大学(华东) New well drilling casing and big wellbore multilateral well quick drill completion method
CN109236186B (en) * 2018-10-30 2020-03-06 中国石油大学(华东) Drilling Casing and Rapid Drilling and Completion Method for Multilateral Wells in Large Boreholes
CN110107230A (en) * 2019-05-17 2019-08-09 张强 The layering gas recovery device of the double-deck tubing string
CN111997578A (en) * 2019-05-27 2020-11-27 中国石油天然气股份有限公司 Completion Apparatus and Method for Refracturing Horizontal Wells
CN110630227B (en) * 2019-10-22 2024-05-03 东营市瑞丰石油技术发展有限责任公司 Running tool, layered oil production string and layered oil production string running method
CN110630227A (en) * 2019-10-22 2019-12-31 东营市瑞丰石油技术发展有限责任公司 Running tool, layered oil production pipe column and layered oil production pipe column running method

Similar Documents

Publication Publication Date Title
CN201165866Y (en) Horizontal well separate mining and combined mining pipe column
CN101864921B (en) Well completion and oil production string of horizontal well and well completion and oil production processes thereof
CN102808584B (en) Mechanical water plugging pipe string and method for multi-point water outlet in multi-stage fracturing horizontal well with casing completion
AU2010322366B2 (en) Open-hole packer for alternate path gravel packing, and method for completing an open-hole wellbore
CN201705276U (en) Well completion and flow string of horizontal well
CN202900205U (en) Multifunctional oil testing and completion integrated string
CN201705219U (en) Lateral drilling gravel pack completion string
CN202578589U (en) Multi-functional pipe string with well cleaning, testing and layered water injection
CN102979495A (en) Multi-cluster current limiting fracturing string of open hole horizontal well and fracturing method thereof
CN205225215U (en) A mining device for layered mining of two sets of oil layers
CN104373103B (en) A temporary plugging and repeated fracturing pipe string in old well fractures capable of large displacement construction and its method
CN112127802A (en) Infinite grade full-bore staged fracturing sand control pipe column and production method thereof
CN112267866B (en) Production string and method for staged fracturing of small-diameter pipes for sidetracking and small-bore wells
CN201412134Y (en) Small casing pipe multi-layer fracturing process pipe column
CN117868768A (en) Infinite-stage casing pipe internal fracturing sand prevention integrated tubular column and use method thereof
CN202152670U (en) Horizontal Well Sectional Measures Construction String
CN203939477U (en) An integrated pipe string for oil testing and well completion operations
CN104074487A (en) Packer
CN207177750U (en) Integrated string
CN202810675U (en) Mechanical water plugging pipe string for multi-stage fracturing horizontal well with casing completion and multi-point water outlet
CN205349316U (en) Two single deck tape -recorder staged fracturing technology tubular columns that seal of compression
CN112282718B (en) Combined pipe string for sidetracking well and slim hole well and use method
CN2866812Y (en) Integrated pipe string for layered fracturing and layered production in natural gas wells
CN204371286U (en) A temporary plugging refracturing string in old well fractures that can be constructed with large displacement
CN201486542U (en) Separable separate-layer fracturing process pipe column

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term

Granted publication date: 20081217

CX01 Expiry of patent term