CN201133817Y - Super high-rise steel structure steel column measurement correction base - Google Patents

Super high-rise steel structure steel column measurement correction base Download PDF

Info

Publication number
CN201133817Y
CN201133817Y CNU2007201735392U CN200720173539U CN201133817Y CN 201133817 Y CN201133817 Y CN 201133817Y CN U2007201735392 U CNU2007201735392 U CN U2007201735392U CN 200720173539 U CN200720173539 U CN 200720173539U CN 201133817 Y CN201133817 Y CN 201133817Y
Authority
CN
China
Prior art keywords
steel
platform
instrument
point platform
steel structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201735392U
Other languages
Chinese (zh)
Inventor
张胜良
陆静文
岳国辉
彭兴江
刘宏昌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Original Assignee
Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
China Construction First Group Corp Ltd
China Construction First Group Construction and Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd, China Construction First Group Corp Ltd, China Construction First Group Construction and Development Co Ltd filed Critical Beijing Zhongjian Huahai Engineering Surveying And Mapping Co ltd
Priority to CNU2007201735392U priority Critical patent/CN201133817Y/en
Application granted granted Critical
Publication of CN201133817Y publication Critical patent/CN201133817Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Length Measuring Devices By Optical Means (AREA)

Abstract

The utility model provides a super high-rise steel structure steel column measures correction base, its datum point platform concave part wraps steel member outside right angle part, and datum point platform lower extreme supports the bracing and welded fastening on the steel member, has the laser hole on the datum point platform, and welded fastening supports above the datum point platform, supports a fixed instrument platform, has a bolt hole that is used for connecting the measuring instrument on the instrument platform. The device is suitable for steel structure construction measurement, and when the steel structure frame is installed before the floor slab construction, no measuring operation surface exists at the high altitude, and a measuring instrument cannot be erected. The utility model discloses a can attach to and measure on the lateral wall of steel construction, improve measurement accuracy, ensure the safety of personnel and equipment.

Description

Superelevation layer steel construction steel column measurement update pedestal
Affiliated technical field
The utility model has related to building construction measurement.This measurement update pedestal has solved the difficult problem of no operatton face when superelevation layer steel construction particular surroundings is measured.
Background technology
When the structural steelwork construction survey, when steel structure frame was installed prior to floor slab construction, the scope of operation was not measured in the high-altitude, can't set up surveying instrument.
The utility model content
This patent is applied to the construction survey of the three phases A of China International Trade Centre stage engineering Steel Structure Installation.This utility model is applicable to the Construction of Steel Structure measurement, and when steel structure frame was installed prior to floor slab construction, the scope of operation was not measured in the high-altitude, can't set up surveying instrument.This utility model can be measured on the sidewall attached to steel construction, has improved measuring accuracy, has guaranteed the safety of personnel and equipment.
The technical scheme that its technical matters that solves the utility model adopts is: reference point platform recess is encased right angle, steel member outside part, diagonal brace is supported in reference point platform lower end, and also welding is fixing on the steel member, on the reference point platform, laser hole is arranged, weld fixed support above the reference point platform, fix an instrument platform in the support, a bolt hole that is used to connect surveying instrument is arranged on the instrument platform.
(1) control line:
Determine to install and measure the position of proofreading and correct pedestal for four jiaos in work layer.
(2) fixedly connected:
Reference point platform recess is encased right angle, steel member outside part, and employing is welded to connect; Diagonal brace is supported in reference point platform lower end, and also welding is fixing on the steel member.
(3) draw the survey benchmark:
Adopt laser vertical instrument that the reference mark is thrown and measure the reference point platform, must draw simultaneously at every turn and survey four reference points, form closed figures.
(4) measurement update:
Set up total powerstation when proofreading and correct the steel column verticality on a reference mark, after strict centering was just flat, another reference point of backsight was finished orientation, adopts total powerstation polar method or collimation line method, control steel column verticality.
The beneficial effects of the utility model are:
(1) measuring accuracy height:
Steel frame was prior to floor slab construction in working in the past, and the steel frame construction exceeds 4 to 5 layers on floor even higher, and the high-altitude does not have the scope of operation, can't transmit datum mark, instrument can only be set up on the low layer floor, causes the instrument elevation angle too big, and measuring accuracy is low.This utility model can steel column attached to the lifting operation layer on, both can be used as the transmission reference point, can directly measure again, improved measuring accuracy greatly.
(2) flexible efficient height:
The utility model can arbitrarily be installed, dismantle according to on-site actual situations processing along with the continuous rising of Construction of Steel Structure, establishes the station flexibly, can repeatability use, for in-site measurement provides a great convenience.
(3) stability is high:
The distortion of himself compact conformation of this member is little, adopts with steel column to be welded to connect, and advantages of higher stability and security are arranged, many unfavorable factors such as overcome the site operation collision, scrunch.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is the utility model structural map.
1. instrument platforms among the figure, 2. bolt hole 3. supports, 4. laser hole, 5. reference point platform 6. steel members.
Embodiment
Reference point platform 5 recesses are encased right angle, steel member 6 outside part, and employing is welded to connect; To support 3 fixingly, on reference point platform 5, draw the survey benchmark, surveying instrument will be connected with bolt hole 2, and be erected on the instrument platform 1 and measure by laser hole 4 with reference point platform 5 welding.

Claims (1)

1. superelevation layer steel construction steel column measurement update pedestal, it is characterized in that: reference point platform (5) recess encases right angle, steel member (6) outside part, diagonal brace is supported in reference point platform lower end, and also welding is fixing on the steel member, laser hole (4) is arranged on reference point platform (5), welding fixed support (3) above the reference point platform (5), support on (3) and fix an instrument platform (1), a bolt hole (2) that is used to connect surveying instrument is arranged on the instrument platform (1).
CNU2007201735392U 2007-10-08 2007-10-08 Super high-rise steel structure steel column measurement correction base Expired - Fee Related CN201133817Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201735392U CN201133817Y (en) 2007-10-08 2007-10-08 Super high-rise steel structure steel column measurement correction base

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201735392U CN201133817Y (en) 2007-10-08 2007-10-08 Super high-rise steel structure steel column measurement correction base

Publications (1)

Publication Number Publication Date
CN201133817Y true CN201133817Y (en) 2008-10-15

Family

ID=40062088

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201735392U Expired - Fee Related CN201133817Y (en) 2007-10-08 2007-10-08 Super high-rise steel structure steel column measurement correction base

Country Status (1)

Country Link
CN (1) CN201133817Y (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596488A (en) * 2015-01-28 2015-05-06 中国建筑一局(集团)有限公司 Support device for building construction measurement and method for controlling vertical direction of wall
CN110440770A (en) * 2018-05-04 2019-11-12 中建三局集团有限公司 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104596488A (en) * 2015-01-28 2015-05-06 中国建筑一局(集团)有限公司 Support device for building construction measurement and method for controlling vertical direction of wall
CN110440770A (en) * 2018-05-04 2019-11-12 中建三局集团有限公司 A kind of instrument support and its measurement method suitable for steel construction measurement correction

Similar Documents

Publication Publication Date Title
CN107090775B (en) A kind of full framing space beam-ends cable guide pipe construction localization method
CN110219326B (en) Reverse construction method one-column one-pile underwater verticality adjusting construction process
CN102828470B (en) Method for locating main girder cable sleeve of cable-stayed bridge
CN109610457B (en) Pile foundation casing center positioning device and positioning method thereof
CN111721273A (en) A laser vertical line measuring device and laser vertical line measuring system
CN210238595U (en) One-column one-pile underwater verticality adjusting construction device by reverse construction method
CN102828469A (en) Positioning mounting construction method for triangular steel constructed pillar of inclined-leg steel box
CN201133817Y (en) Super high-rise steel structure steel column measurement correction base
CN204139628U (en) Large cantilever asymmetric space multistory truss auxiliary sliding device
CN211735397U (en) Positioning and guiding device for lattice column bored pile construction
CN102966254A (en) Measuring tower used for construction of stub matching method and arrangement thereof
CN108179749B (en) Lattice column positioner and positioning method thereof
CN206345617U (en) Building tower crane attachment device is received in a kind of
CN112833844B (en) Verticality measurement method and special platform for steel columns in residential buildings
CN210507148U (en) Positioning and adjusting device for main tower cable guide pipe of cable-stayed bridge
CN105735228A (en) Construction method and installation accuracy control method of rack systems of high-lift rack climbing type ship lift
CN201133827Y (en) Measuring instrument support
CN214149223U (en) Special platform for measuring verticality of steel column of residential building
CN201574491U (en) Pre-embedded large-diameter bolt fixing bracket
CN215168216U (en) A prefabricated post temporary fixation device and system for on backfill foundation
CN210658479U (en) A device for checking the pile position of the pile foundation in the construction of the impact drilling
CN202787088U (en) Embedded template structure for cable sleeve of main beam of stayed-cable bridge
CN104596488B (en) Support device for building construction measurement and method for controlling vertical direction of wall
CN206815191U (en) A kind of full framing space beam-ends cable guide pipe positioner
CN207395740U (en) Multifunctional measuring instrument pedestal

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20081015

Termination date: 20161008