CN201121407Y - Formwork turnover equipment of climbing scaffold for chimney construction - Google Patents
Formwork turnover equipment of climbing scaffold for chimney construction Download PDFInfo
- Publication number
- CN201121407Y CN201121407Y CNU2007200434932U CN200720043493U CN201121407Y CN 201121407 Y CN201121407 Y CN 201121407Y CN U2007200434932 U CNU2007200434932 U CN U2007200434932U CN 200720043493 U CN200720043493 U CN 200720043493U CN 201121407 Y CN201121407 Y CN 201121407Y
- Authority
- CN
- China
- Prior art keywords
- base
- chimney
- movable
- movable turntable
- guide sleeve
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000009415 formwork Methods 0.000 title claims abstract description 29
- 238000010276 construction Methods 0.000 title claims abstract description 11
- 230000009194 climbing Effects 0.000 title claims abstract description 10
- 230000007306 turnover Effects 0.000 title abstract description 5
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 11
- 239000010959 steel Substances 0.000 claims abstract description 11
- 238000000275 quality assurance Methods 0.000 abstract 1
- 230000003028 elevating effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Movable Scaffolding (AREA)
Abstract
Description
所属技术领域Technical field
本实用新型涉及烟囱施工的爬升脚手架的翻模板设备。The utility model relates to a formwork turning device for a climbing scaffold for chimney construction.
背景技术 Background technique
现有的烟囱施工的翻模板,是采用沿烟囱墙体架设脚手架,再固定模板,进行混凝土的浇灌。其不足之处在于:脚手架及翻模板设备繁杂,操作费力,工效又慢,且质量得不到保证。The turnover formwork of existing chimney construction is to adopt to set up scaffolding along chimney body of wall, fix formwork again, carry out the pouring of concrete. Its disadvantages are: the scaffolding and turning formwork equipment is complicated, the operation is laborious, the work efficiency is slow, and the quality cannot be guaranteed.
实用新型内容Utility model content
本实用新型的目的是为了克服上述不足之处而提供烟囱施工的爬升脚手架的翻模板设备,脚手架及翻模板设备紧凑,操作方便,工效又快,且质量得到保证。The purpose of this utility model is to overcome above-mentioned inadequacies and provide the turning formwork equipment of the climbing scaffold of chimney construction, scaffolding and turning formwork equipment are compact, easy to operate, work efficiency is fast, and quality is guaranteed.
本实用新型解决其技术问题所采用的技术方案是:烟囱施工的爬升脚手架的翻模板设备,在烟囱建筑物的内墙用螺栓固定支承架及伸缩节,横撑在烟囱的内径。在支承架上固定有圆形底座,在底座上有一圆孔,底座上方有活动转盘,活动转盘和底座之间装有平面轴承,活动转盘上有轴伸在底座的圆孔内使其作旋转。在活动转盘和底座之间的靠边部位有插销,在活动转盘不要求旋转时,将插销插上。在活动转盘上固定有导套。导套的上端和横梁相连接,横梁上方装有液压千斤顶。在地面上安装有支承钢杆,支承钢杆穿过底座、活动转盘、导套、横梁、液压千斤顶。在横梁两边各安装有两只提升架,在提升架上装有活动支腿,活动支腿分别和烟囱的内模板、外模板相连接。模板装好后,浇灌混凝土,混凝土凝结后,拆除模板,液压千斤顶在支承钢杆上爬升,带动提升架向上提升,继续安装模板。The technical scheme adopted by the utility model to solve its technical problems is: the turning formwork equipment of the climbing scaffolding of chimney construction, the inner wall of chimney building is used to fix support frame and expansion joint with bolts, and the cross brace is on the inner diameter of chimney. A circular base is fixed on the supporting frame, and there is a round hole on the base. There is a movable turntable above the base. A plane bearing is installed between the movable turntable and the base. There is a shaft on the movable turntable extending in the round hole of the base to make it rotate. . There is a latch at the edge position between the movable turntable and the base, and when the movable turntable does not require rotation, the latch is inserted. A guide sleeve is fixed on the movable turntable. The upper end of the guide sleeve is connected with the beam, and a hydraulic jack is arranged above the beam. A supporting steel rod is installed on the ground, and the supporting steel rod passes through the base, the movable turntable, the guide sleeve, the beam and the hydraulic jack. Two elevating frames are respectively installed on both sides of the beam, and movable outriggers are arranged on the elevating frames, and the movable outriggers are respectively connected with the inner formwork and the outer formwork of the chimney. After the formwork is installed, concrete is poured, and after the concrete is set, the formwork is removed, and the hydraulic jack climbs up on the supporting steel rod, driving the lifting frame to lift upwards, and the formwork is continued to be installed.
本实用新型的有效效果是,应用本实用新型的烟囱施工的爬升脚手架的翻模板设备,脚手架及翻模板设备紧凑,操作方便,工效又快,且质量得到保证。The effective effect of the utility model is that the formwork equipment of the climbing scaffold used in the chimney construction of the utility model, the scaffolding and the formwork equipment are compact, easy to operate, fast in work efficiency, and guaranteed in quality.
附图说明 Description of drawings
图为本实用新型的烟囱施工的爬升脚手架的翻模板设备的结构示意图。图中1-斜撑杆,2-烟囱墙体,3-伸缩节,4-螺栓,5-提升架,6-模板,7-活动支腿,8-横梁,9-液压千斤顶,10-支承钢杆,11-导套,12-活动转盘,13-平面轴承,14-底座,15-支承架。The figure is a structural schematic diagram of the turning formwork equipment for the climbing scaffold of the chimney construction of the utility model. In the figure 1-diagonal brace, 2-chimney wall, 3-expansion joint, 4-bolt, 5-lift frame, 6-formwork, 7-movable outrigger, 8-beam, 9-hydraulic jack, 10-support Steel rod, 11-guide sleeve, 12-movable turntable, 13-plane bearing, 14-base, 15-support frame.
具体实施方法Specific implementation method
烟囱施工的爬升脚手架的翻模板设备,在烟囱建筑物的内墙用螺栓固定支承架(15)及伸缩节(3),横撑在烟囱的内径。在支承架(15)上固定有圆形底座(14),在底座(14)上有一圆孔,底座(14)上方有活动转盘(12),活动转盘(12)和底座(14)之间装有平面轴承(13),活动转盘(12)上有轴伸在底座(14)的圆孔内使其作旋转。在活动转盘(12)和底座(14)之间的靠边部位有插销,在活动转盘(12)不要求旋转时,将插销插上。在活动转盘(12)上固定有导套(11)。导套(11)的上端和横梁(8)相连接,横梁(8)上方装有液压千斤顶(9)。在地面上安装有支承钢杆(10),支承钢杆(10)穿过底座(14)、活动转盘(12)、导套(11)、横梁(8)、液压千斤顶(9)。在横梁(8)两边各安装有两只提升架(5),在提升架(5)上装有活动支腿(7),活动支腿(7)分别和烟囱的内模板、外模板相连接。模板(6)装好后,浇灌混凝土,混凝土凝结后,拆除模板(6),液压千斤顶(9)在支承钢杆(10)上爬升,带动提升架(5)向上提升,继续安装模板。The turn-over formwork equipment of the climbing scaffold of chimney construction uses bolted support frame (15) and expansion joint (3) at the inner wall of chimney building, and cross brace is on the inner diameter of chimney. A circular base (14) is fixed on the support frame (15), a circular hole is arranged on the base (14), and a movable turntable (12) is arranged above the base (14), between the movable turntable (12) and the base (14) Plane bearing (13) is housed, and axle stretches in the circular hole of base (14) and makes it rotate on movable rotating disk (12). There is a latch at the edge position between the movable rotating disk (12) and the base (14), and when the movable rotating disk (12) does not require rotation, the latch is inserted. A guide sleeve (11) is fixed on the movable rotating disk (12). The upper end of guide sleeve (11) is connected with crossbeam (8), and hydraulic jack (9) is equipped with above crossbeam (8). Support steel rod (10) is installed on the ground, and support steel rod (10) passes base (14), movable rotating disk (12), guide sleeve (11), crossbeam (8), hydraulic jack (9). Two elevating frames (5) are respectively installed on crossbeam (8) both sides, and movable support leg (7) is housed on elevating frame (5), and movable support leg (7) is connected with the inner formwork, the outer formwork of chimney respectively. After formwork (6) installed, pouring concrete, after concrete set, remove formwork (6), hydraulic jack (9) climbs on support steel bar (10), drives hoist frame (5) to promote upwards, continues to install formwork.
Claims (2)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200434932U CN201121407Y (en) | 2007-11-05 | 2007-11-05 | Formwork turnover equipment of climbing scaffold for chimney construction |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNU2007200434932U CN201121407Y (en) | 2007-11-05 | 2007-11-05 | Formwork turnover equipment of climbing scaffold for chimney construction |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN201121407Y true CN201121407Y (en) | 2008-09-24 |
Family
ID=40008632
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNU2007200434932U Expired - Lifetime CN201121407Y (en) | 2007-11-05 | 2007-11-05 | Formwork turnover equipment of climbing scaffold for chimney construction |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN201121407Y (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105113794A (en) * | 2015-08-17 | 2015-12-02 | 中建五局第三建设有限公司 | Tripod rollover construction method for curved surface thin-wall structure |
| CN112343330A (en) * | 2020-11-11 | 2021-02-09 | 广西建工集团冶金建设有限公司 | Cylinder wall construction method and cylinder wall template structure of large-diameter reinforced concrete cylinder |
-
2007
- 2007-11-05 CN CNU2007200434932U patent/CN201121407Y/en not_active Expired - Lifetime
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN105113794A (en) * | 2015-08-17 | 2015-12-02 | 中建五局第三建设有限公司 | Tripod rollover construction method for curved surface thin-wall structure |
| CN112343330A (en) * | 2020-11-11 | 2021-02-09 | 广西建工集团冶金建设有限公司 | Cylinder wall construction method and cylinder wall template structure of large-diameter reinforced concrete cylinder |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN206088920U (en) | Construction scaffold | |
| CN206580456U (en) | A kind of shield tunnel box culvert tipping arrangement | |
| CN201121407Y (en) | Formwork turnover equipment of climbing scaffold for chimney construction | |
| CN211164702U (en) | Beam slab bar planting drilling tool | |
| CN203048446U (en) | Lifting device of submersible stirrer | |
| CN211548680U (en) | A scaffolding for building construction | |
| CN201240817Y (en) | Triangular hoisting jack | |
| CN110304593B (en) | PC column vertical lifting auxiliary device | |
| CN206521755U (en) | A kind of dismounting device of building foundation pit prestressing force shaped steel combination inner bracing member | |
| CN217810535U (en) | From climbing formula steel bar locating support | |
| CN207130296U (en) | Converter installation measure support | |
| CN207176732U (en) | Segmented moves simple rack chassis | |
| CN205804945U (en) | A kind of full hall scaffold | |
| CN205616503U (en) | Permanent magnet wind power generator movable support frock | |
| CN202346650U (en) | Suspension arm for 400 KN crane | |
| CN210480668U (en) | Device for integrally transporting tensioning equipment in box chamber | |
| CN211498527U (en) | Bailey Beam Bracket Removal Device | |
| CN208996055U (en) | A kind of bracing members axle power application jack fixing device | |
| CN218522169U (en) | A movable assembled steel structure installation support platform | |
| CN207861755U (en) | A kind of single-arm rotating workpiece is hung in place | |
| CN221917099U (en) | Roadbed plate transferring device | |
| CN212471370U (en) | A construction machinery and equipment maintenance platform | |
| CN216512435U (en) | Shaft hoist and mount truss device | |
| CN206769413U (en) | A kind of new fixing device that can integrally lift assembling reinforcement | |
| CN211971587U (en) | A simple hand-push universal crane that can be lifted and lowered |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: 226100 Jiangsu city of Nantong Province Haimen Shishan Road No. 131 Patentee after: Jiangsu Nantong three construction group Limited by Share Ltd Address before: 226100 Haimen Road, Haimen, Jiangsu, No. 131 Patentee before: Jiangsu Nantong No.3 Construction Group Co., Ltd. |
|
| CP03 | Change of name, title or address | ||
| CX01 | Expiry of patent term |
Granted publication date: 20080924 |