CN201007041Y - Concrete prefabricated element hanging connecting mechanism - Google Patents

Concrete prefabricated element hanging connecting mechanism Download PDF

Info

Publication number
CN201007041Y
CN201007041Y CNU2007201235461U CN200720123546U CN201007041Y CN 201007041 Y CN201007041 Y CN 201007041Y CN U2007201235461 U CNU2007201235461 U CN U2007201235461U CN 200720123546 U CN200720123546 U CN 200720123546U CN 201007041 Y CN201007041 Y CN 201007041Y
Authority
CN
China
Prior art keywords
bolt
ring
concrete prefabricated
suspended
prefabricated element
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2007201235461U
Other languages
Chinese (zh)
Inventor
周嵬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2007201235461U priority Critical patent/CN201007041Y/en
Application granted granted Critical
Publication of CN201007041Y publication Critical patent/CN201007041Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Disclosed is a precast concrete element suspended connecting device comprising an embedded reinforcement and a suspended ring, one end of the embedded reinforcement is fixedly connected with a screw cap, the suspended ring is fixedly connected with one end of a bolt, the screw cap and the bolt are connected actively, the suspended ring is high-strength cable or a welded integration of steer ring and bolt. One or more bends are provided at the tail of the embedded reinforcement according to bearing ability needs. The utility model embeds reinforcement with screw cap in the building block and is engaged with screw with suspended ring, the device is not only convenient to connect and suspend, but also is instant to detach the suspended ring after suspending thereby saving late cutting action, the detached suspended ring is reusable thereby saving reinforcement and reducing project cost, the functions of the connecting device are extensive.

Description

A kind of concrete prefabricated element lifting linkage
Technical field
The utility model relates to the technological improvement of concrete prefabricated element, is specifically related to a kind of linkage that makes things convenient for the concrete prefabricated element lifting.
Background technology
Develop rapidly along with architectural construction technology, the prefabricated units of steel concrete are used widely in growing field, for example bridge, pipeline tunnel, industry and civilian construction or the like, but the employing concrete prefabricated element is the reduction of erection time both, the surcharges such as rack template of also having saved site operation simultaneously reduce construction costs.The lifting of concrete prefabricated element is for convenience installed, and the common practice is when embedded bar at present, adopts the way that exposes joint.Promptly,, crane lifts by crane installation so that linking up with at the surperficial reserved steel bar hoisting ring of prefabricated units.The problem that this structure exists be these reserved steel bar hoisting rings after lifting is finished, not only need with special machine with embedded bar expose suspension ring cutting, and cut ring can not reuse, and can only reclaim as scrap iron, must increase construction cost.
The utility model content
At the prior art above shortcomings, the purpose of this utility model provides a kind of convenient a kind of concrete prefabricated element lifting linkage that lifts, effectively reduces construction cost.
The purpose of this utility model is achieved in that a kind of concrete prefabricated element lifting linkage, comprises embedded bar and hoisting ring, it is characterized in that the fixedly connected nut of an end of embedded bar, the fixedly connected bolt of hoisting ring; Described nut and bolt flexibly connect.
Described hoisting ring is welded by high strength steel strand or steel loop and bolt.
The afterbody of described embedded bar is provided with one or more according to the needs of bearing capacity and bends up.
Compared to existing technology, the utlity model has following advantage:
1,, and be used with the bolt of band suspension ring by the pre-buried reinforcing bar that has nut in prefabricated units, not only convenient the connection and lifting, and also lifting goes back the quick release suspension ring after finishing, and saved the later stage cutting action;
2, the hoisting ring (strap bolt) after the dismounting can repeated multiple times use, and has saved reinforcing bar, reduces construction costs;
3, guarantee that as seen building unit has smooth beautiful outward appearance, have only the nut mouth;
4, the function of described linkage can also be expanded: such as the installation that is used for the bridge guard against error railing, perhaps installation of stair or the like in the building construction can substitute the way that is connected of traditional boring and setscrew, improves speed of application;
5, the afterbody of embedded bar bends up and can improve bearing capacity, and has transmission force property preferably, and the problem of effectively avoiding stress to concentrate allows Edge Distance less, can be used for thin prefabricated units;
6, production technology is simple.
Description of drawings
Fig. 1 is the structural representation of the utility model one embodiment;
Fig. 2 is the partial top view of Fig. 1;
Fig. 3 is a kind of function extended mode of the utility model schematic diagram.
The specific embodiment
As shown in Figure 1 and Figure 2, concrete prefabricated element lifting linkage of the present utility model flexibly connects by the embedded bar 5 of the fixedly connected nut 4 of an end with nut 4 and the hoisting ring 1 of strap bolt 2 is formed, and described nut 4 flexibly connects with bolt 2; Hoisting ring 1 is welded by high strength steel strand or steel loop and bolt.Embedded bar 5 is located among the concrete prefabricated element 1O during use, and nut 4 is located at the surface of concrete prefabricated element 10.Among the figure, F is that the concrete prefabricated element lifting is subjected to force direction.
The afterbody of described embedded bar is provided with one or more according to the needs of bearing capacity and bends up 6.
The length of reserved steel bar 5 is selected according to bearing capacity, and bearing the member dead weights of different sizes, the afterbody of reinforcing bar can be provided with as required and one or morely bend up 6, thereby can better bear the shear force that is transmitted by nut in hoisting process.Simultaneously, shearing bearing capacity can also be greatly enhanced by the chevron shaped auxiliary reinforcement 7 on the embedded bar vertical direction.Auxiliary reinforcement 7 can effectively be connected by plastics pullover 3 with main reinforcement 5.
Adopt the utility model by bolt and nut suspension ring are connected easily with prefabricated units, lifting can also be dismantled after finishing fast, has saved the later stage cutting action; And suspension ring can repeated multiple times use saving reinforcing bar, reduction construction costs; Guarantee that simultaneously as seen building unit has smooth beautiful outward appearance, have only the nut mouth.
Referring to Fig. 3, the function of described linkage can also be expanded: connect guardrail 9 by bolt 8, substitute the way that is connected of traditional boring and setscrew, improve speed of application greatly.Such as the installation of stair in the railing of bridge road or the building construction or the like.

Claims (3)

1. a concrete prefabricated element lifts linkage, comprise embedded bar (5) and hoisting ring (1), the fixedly connected nut of an end (4) that it is characterized in that embedded bar (5), the fixedly connected bolt of hoisting ring (1) (2), described nut (4) flexibly connects with bolt (2).
2. a kind of concrete prefabricated element lifting linkage according to claim 1 is characterized in that described hoisting ring (1) welds one by high strength steel strand or steel loop with bolt (2) and forms.
3. a kind of concrete prefabricated element lifting linkage according to claim 1, the afterbody that it is characterized in that described embedded bar (5) is provided with one or more and bends up (6).
CNU2007201235461U 2007-02-08 2007-02-08 Concrete prefabricated element hanging connecting mechanism Expired - Fee Related CN201007041Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2007201235461U CN201007041Y (en) 2007-02-08 2007-02-08 Concrete prefabricated element hanging connecting mechanism

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2007201235461U CN201007041Y (en) 2007-02-08 2007-02-08 Concrete prefabricated element hanging connecting mechanism

Publications (1)

Publication Number Publication Date
CN201007041Y true CN201007041Y (en) 2008-01-16

Family

ID=39002986

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2007201235461U Expired - Fee Related CN201007041Y (en) 2007-02-08 2007-02-08 Concrete prefabricated element hanging connecting mechanism

Country Status (1)

Country Link
CN (1) CN201007041Y (en)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102337762A (en) * 2011-07-18 2012-02-01 从卫民 Hoisting and connecting device of prefabricated sheet for laminated floor slab
CN102388194A (en) * 2009-03-26 2012-03-21 普费法控股股份有限公司 load bearing device
CN103620130A (en) * 2011-06-20 2014-03-05 佩克集团有限公司 Connecting device for joining adjacent pre-cast concrete sections and method for joining a first and a second pre-cast concrete section
CN105019669A (en) * 2015-07-24 2015-11-04 上海市城市建设设计研究总院 U-shaped suspension ring structure
CN105155758A (en) * 2015-06-17 2015-12-16 镇江港和新型建材有限公司 Novel concrete member
CN105464387A (en) * 2015-12-25 2016-04-06 中铁十四局集团有限公司 Precast beam steel strand hanging ring
CN107816135A (en) * 2017-09-27 2018-03-20 李峰 The processing method of reinforced frame, concrete component and concrete component
CN108532467A (en) * 2018-04-26 2018-09-14 浙江交工集团股份有限公司 A kind of prefabricated components suspension centre structure
CN108755974A (en) * 2018-07-28 2018-11-06 中城投集团第六工程局有限公司 The connection structure and construction method of the integral prefabricated partition plate of cantilever stair
CN110043046A (en) * 2019-05-27 2019-07-23 沈阳建筑大学 A kind of dedicated built-in hanger of prefabricated components and installation method
CN110805265A (en) * 2019-11-08 2020-02-18 中铁二局集团有限公司 Method for arranging overhanging outer frame hanging ring

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102388194A (en) * 2009-03-26 2012-03-21 普费法控股股份有限公司 load bearing device
CN102388194B (en) * 2009-03-26 2014-12-31 普费法控股股份有限公司 load bearing device
CN103620130A (en) * 2011-06-20 2014-03-05 佩克集团有限公司 Connecting device for joining adjacent pre-cast concrete sections and method for joining a first and a second pre-cast concrete section
CN102337762A (en) * 2011-07-18 2012-02-01 从卫民 Hoisting and connecting device of prefabricated sheet for laminated floor slab
CN105155758A (en) * 2015-06-17 2015-12-16 镇江港和新型建材有限公司 Novel concrete member
CN105019669A (en) * 2015-07-24 2015-11-04 上海市城市建设设计研究总院 U-shaped suspension ring structure
CN105464387A (en) * 2015-12-25 2016-04-06 中铁十四局集团有限公司 Precast beam steel strand hanging ring
CN107816135A (en) * 2017-09-27 2018-03-20 李峰 The processing method of reinforced frame, concrete component and concrete component
CN108532467A (en) * 2018-04-26 2018-09-14 浙江交工集团股份有限公司 A kind of prefabricated components suspension centre structure
CN108755974A (en) * 2018-07-28 2018-11-06 中城投集团第六工程局有限公司 The connection structure and construction method of the integral prefabricated partition plate of cantilever stair
CN110043046A (en) * 2019-05-27 2019-07-23 沈阳建筑大学 A kind of dedicated built-in hanger of prefabricated components and installation method
CN110805265A (en) * 2019-11-08 2020-02-18 中铁二局集团有限公司 Method for arranging overhanging outer frame hanging ring

Similar Documents

Publication Publication Date Title
CN201007041Y (en) Concrete prefabricated element hanging connecting mechanism
CN201546436U (en) Platform for construction of high-altitude suspension structures
CN102011369B (en) Construction method of steel shells of bridge closure segments striding over various roads
CN206903022U (en) A kind of steel bar truss floor support plate
CN102926504A (en) Connecting steel construction member for steel and concrete overlapped beam combined part and construction method thereof
CN205348724U (en) Detachable wire rope rings anchor structure of external scaffolding of encorbelmenting
CN215439273U (en) Pipe jacking pipe joint lifting and overturning device
CN103552911B (en) A kind of movable boom hoisting and the construction installation method of use thereof
CN105862859A (en) Thick steel bar prestress anchor rod tensioning method
CN206538910U (en) The curtain wall construction column template reinforcement system of horn mouth formula
CN205241086U (en) Template hoist and mount and ann gun carriage of disassembling and using
CN110172915A (en) A kind of high tower shaped form crossbeam Joint Re-bar Construction
CN203200665U (en) Prestressing steel strand threading device for bridge construction
CN202520315U (en) Tunnel ventilation shaft wall lining-supporting system
CN208734057U (en) A kind of wall-connecting piece
CN108547383A (en) A kind of lifting diagonal brace integration embedded part and application method
CN208440996U (en) A kind of novel inlet pipe
CN208328704U (en) A kind of mould plate technique system promoting bridge concrete anti-collision guard bar quality
CN103437292B (en) The lifting combination unit of inclined in two-way A shape king-tower cable stayed bridge template
CN208792746U (en) A kind of expansion joint regularization same tool steel plate template
CN106049896A (en) Dismantling method for resisting impact load in high-altitude overhanging steel-structure-platform dismantling process
CN105196405B (en) Supporting equipment for bridge precast hollow slab lateral mould and using method of supporting equipment
CN212269195U (en) Quick handling sectional fixture of small-size component
CN211775098U (en) Steel construction strength nature post and reinforcing bar connection structure
CN202954577U (en) Bearing beam reinforcing structure of large-tonnage self-climbing tower crane wall-attached embedded part

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20080116

Termination date: 20110208