CN200973001Y - Mounting cable support - Google Patents

Mounting cable support Download PDF

Info

Publication number
CN200973001Y
CN200973001Y CN 200620076347 CN200620076347U CN200973001Y CN 200973001 Y CN200973001 Y CN 200973001Y CN 200620076347 CN200620076347 CN 200620076347 CN 200620076347 U CN200620076347 U CN 200620076347U CN 200973001 Y CN200973001 Y CN 200973001Y
Authority
CN
China
Prior art keywords
support
groove
channel strut
strut
vertical
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620076347
Other languages
Chinese (zh)
Inventor
成尊先
齐力
沈伯清
徐彪
邝伟锋
刘苑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGZHOU GUANGYAN M&E ENGINEERING Co Ltd
Original Assignee
GUANGZHOU GUANGYAN M&E ENGINEERING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGZHOU GUANGYAN M&E ENGINEERING Co Ltd filed Critical GUANGZHOU GUANGYAN M&E ENGINEERING Co Ltd
Priority to CN 200620076347 priority Critical patent/CN200973001Y/en
Application granted granted Critical
Publication of CN200973001Y publication Critical patent/CN200973001Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Laying Of Electric Cables Or Lines Outside (AREA)
  • Installation Of Indoor Wiring (AREA)

Abstract

The utility model pertains to the technical field of an electric power facilities auxiliary device, in particular to an assembled cable support, which comprises a groove-shaped strut and at least one support arranged on the groove-shaped strut, wherein the root of the support is provided with a vertical puncheon; the vertical puncheon is positioned in the groove in the groove-like strut; the end of the support is provided with a cantilever protruding outside; the upper part of the vertical puncheon is provide with a pin hole capable of connecting with the two side walls of the groove-shaped strut; the outboard of the groove-shaped strut side wall is provided with a longitudinal punching locating groove; the base wall in the groove is provided with a longitudinal punching locating groove. The cantilever on the support is provided with a cable platform. The utility model is convenient to install and operate. The material is easy to process. The length of the groove-shaped support of the cable support and the quantity of layers and the interval spacing of the horizontal supports can be set at will. The transportation is convenient.

Description

The assembled cable bearer
Technical field
The utility model relates to electric power facility servicing unit technical field, especially a kind of assembled cable bearer.
Background technology
Cable bearer is the member that is used for the power industry handling cable, is widely used in the conveying of underground trench formula cable and the conveying of subway tunnel cable; On the one hand, the subway cause of China is started late, but present development is rapid, and increasing city utilizes the subway transportation to alleviate traffic pressure, and various facilities that match with subway and equipment have also obtained more development and use.Power transformating and supplying facility servicing unit in the subway tunnel has all used cable bearer; On the other hand, the increasing overhead wire in city transform underground cable as and send electricity, all is provided with cable bearer in the underground trench.Cable bearer is used to set up cable and mainly partly forms by being fixed on column part on trench or the tunnel-side and the stull that is fixed on the column, the column of cable bearer and stull have the various ways structure, welding integral type, casting integrated formula, separate assembling are arranged on the structure, and there are steel part, ironcasting of originally using and the composite material element of now using in used material aspect more more.The cable bearer of integral structure exists the problem of versatility difference and the high shortcoming of big cost of transportation that takes up room to different tunnels, and there is the problem that trouble is installed in existing split assembled cable bearer, as China Patent No. ZL03208554.0 disclosed a kind of " modular cable support ", include column and stull, stull and column removably connect, at least two fastening bolts have been adopted in each stull of the place of removably connecting, there is following defective in this disclosed assembled cable bearer: one, installation workload is big, two, column processing trouble, three, every layer of stull spacing is unadjustable.
Summary of the invention
Big for the installation workload that overcomes existing modular cable, materials processing is inconvenient, the nonadjustable deficiency of structure, the utility model provides another kind of assembled cable bearer.
The technical scheme that its technical problem that solves the utility model adopts is: a kind of assembled cable bearer, include channel strut and at least one and be installed on support on the channel strut, the vertical body of wall sidewall that is fixed in of described channel strut, opening is outside, the root of support is vertical short column, vertical short column can place in the groove of channel strut, bracket end is for having outwardly directed cantilever, the pin-and-hole that can carry out pin joint with the channel strut two side is arranged at vertical short column top, arranged outside at the channel strut sidewall has the location notch that punches outside vertical length, the position of the pin-and-hole of the position of the location notch that punches outward when being placed in the channel strut groove.
Diapire is provided with the location notch that punches in vertical length in simultaneously can the channel strut groove.
Described outer punching location notch and interior punching location notch cross section are triangle or circular arc.
The cantilever of described support is provided with ties up the cable boss.
Channel strut of the present utility model can cut into arbitrarily different length, support can be installed in optional position on the channel strut punch fixing, so can be assembled into the cable bearer that support has the different numbers of plies and different spacing with support by channel strut of the present utility model.
The beneficial effects of the utility model are, fitting operation of the present utility model is convenient, and material is convenient to processing, and the channel strut length of cable bearer and the number of plies of stull support and spacing can be provided with arbitrarily.
Description of drawings
Below in conjunction with drawings and Examples the utility model is further specified.
Fig. 1 is a front view of the present utility model.
Fig. 2 is the A-A cutaway view of Fig. 1.
1. channel struts among the figure, 2. support, 11. outer punching location notchs, punching location notchs in 12., 21. vertical short columns, 22. cantilevers, 211. pin-and-holes, 221. tie up the cable boss.
Embodiment
The utility model is described in further detail below in conjunction with the drawings and specific embodiments, assembled cable bearer as shown in Figure 1, include channel strut 1 and at least one and be installed on support 2 on the channel strut 1, the root of support 2 is vertical short column 21, vertical short column 21 can place in the groove of channel strut 1, support 2 ends are for having outwardly directed cantilever 22, the pin-and-hole 211 that can carry out pin joint with channel strut 1 two side is arranged at vertical short column 21 tops, arranged outside at channel strut 1 sidewall has the location notch 11 that punches outside vertical length, the position of the pin-and-hole 21 the when position of the location notch 11 that punches outward places in channel strut 1 groove corresponding to support 2.Channel strut 1 on Fig. 1 has adopted the shortening technique of painting, and support 2 has just been drawn one.Have for both sides in conjunction with punch outward location notch 11 of vertical length of the arranged outside of channel strut 1 sidewall shown in Figure 1 as Fig. 2, can freely select for use when the structure that this both sides all have more helps to punch.
In conjunction with Fig. 1, diapire is provided with punching location notch 12 in vertical length in channel strut 1 groove as Fig. 2.Described outer punching location notch 11 and interior punching location notch 12 cross sections are to have the triangle shown in Fig. 1,2.Select for use the triangular-section relatively to help the punch operation of postorder.
The cantilever 22 of described support 2 is provided with ties up cable boss 221.Reason is because vibration can cause cable the coming off of cable at cantilever 22 top offsets or when laying, and requirement can be bundled in cable on the cantilever 22, on the cantilever 22 of the present utility model with tie up the edges and corners that contact of restricting and all be arranged to circular arc.
The channel strut of combination cable support of the present utility model adopts shape or composite material drawing and extruding section bar, do not establish earlier installing hole on the section bar, only establish inside and outside punching location notch, taking up room of section bar and support is little, cost of transportation is low, and channel strut 1 and support 2 can be made channel strut 1 in different erecting beies with installation requirement and have the cable bearer that different length, support 2 have the different numbers of plies and different spacing.
Installation process of the present utility model can be such: the channel strut section bar is cut into the length of requirement, and 12 punchings of punching location notch are fixed in tunnel-side to channel strut 1 in utilizing; Again the vertical short column 21 of support 2 is placed in the groove, on corresponding to channel strut 1 sidewall of pin-and-hole 211 positions, utilize outer 11 dozens of through holes of location notch and pin joint is fixed or bolt of punching, support 1 utilizes the short column structure of root and pin joint structure to make support possess bearing capacity, and it is better to be higher than loading end for the 211 position operated by rotary motion of the pin-and-hole on the support 1.

Claims (4)

1, a kind of assembled cable bearer, it is characterized in that: include channel strut (1) and at least one and be installed on support (2) on the channel strut (1), the vertical body of wall sidewall that is fixed in of described channel strut (1), opening is outside, the root of support (2) is vertical short column (21), vertical short column (21) can place in the groove of channel strut (1), support (2) end is for having outwardly directed cantilever (22), the pin-and-hole (211) that can carry out pin joint with channel strut (1) two side is arranged at vertical short column (21) top, arranged outside at channel strut (1) sidewall has the location notch (11) that punches outside vertical length, the position of the pin-and-hole (21) the when position of the location notch (11) that punches outward places in channel strut (1) groove corresponding to support (2).
2, assembled cable bearer according to claim 1 is characterized in that: diapire is provided with punching location notch (12) in vertical length in channel strut (1) groove.
3, assembled cable bearer according to claim 2 is characterized in that: described outer punching location notch (11) and interior punching location notch (12) cross section are triangle or circular arc.
4, assembled cable bearer according to claim 1 is characterized in that: the cantilever (22) of described support (2) is provided with ties up cable boss (221).
CN 200620076347 2006-09-04 2006-09-04 Mounting cable support Expired - Fee Related CN200973001Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620076347 CN200973001Y (en) 2006-09-04 2006-09-04 Mounting cable support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620076347 CN200973001Y (en) 2006-09-04 2006-09-04 Mounting cable support

Publications (1)

Publication Number Publication Date
CN200973001Y true CN200973001Y (en) 2007-11-07

Family

ID=38884251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620076347 Expired - Fee Related CN200973001Y (en) 2006-09-04 2006-09-04 Mounting cable support

Country Status (1)

Country Link
CN (1) CN200973001Y (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413603B (en) * 2008-11-21 2012-01-25 重庆杰友电气材料有限公司 Assembled high molecule composite material cable stand and manufacture method thereof
CN102966799A (en) * 2012-11-16 2013-03-13 新安县电业公司 Antirust aluminum alloy supporting frame in cable trench
CN103004041A (en) * 2010-05-19 2013-03-27 泛达公司 Cable Tray Cable Routing System
CN104810776A (en) * 2015-02-10 2015-07-29 江苏腾宇电能设备有限公司 Novel welding-free detachable bracket
CN107425418A (en) * 2017-08-18 2017-12-01 国网上海市电力公司 A kind of cabling arrangements of 500kV underground substations
CN108418152A (en) * 2018-03-30 2018-08-17 华缘新材料股份有限公司 A kind of composite material cable bracket
CN115992913A (en) * 2023-02-13 2023-04-21 苏州昶耀精密机械有限公司 Rotary Transfer Fitting

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101413603B (en) * 2008-11-21 2012-01-25 重庆杰友电气材料有限公司 Assembled high molecule composite material cable stand and manufacture method thereof
CN103004041A (en) * 2010-05-19 2013-03-27 泛达公司 Cable Tray Cable Routing System
CN102966799A (en) * 2012-11-16 2013-03-13 新安县电业公司 Antirust aluminum alloy supporting frame in cable trench
CN104810776A (en) * 2015-02-10 2015-07-29 江苏腾宇电能设备有限公司 Novel welding-free detachable bracket
CN107425418A (en) * 2017-08-18 2017-12-01 国网上海市电力公司 A kind of cabling arrangements of 500kV underground substations
CN108418152A (en) * 2018-03-30 2018-08-17 华缘新材料股份有限公司 A kind of composite material cable bracket
CN108418152B (en) * 2018-03-30 2024-04-26 华缘新材料股份有限公司 Composite cable bracket
CN115992913A (en) * 2023-02-13 2023-04-21 苏州昶耀精密机械有限公司 Rotary Transfer Fitting

Similar Documents

Publication Publication Date Title
CN200973001Y (en) Mounting cable support
CN101967881B (en) Hydraulic synchronous jacking device of die carrier system
CN201226426Y (en) Suspension type cable bracket for downhole tunnel top
CN202003772U (en) Wire harness pre-assembling tool for rail vehicle
CN101604879A (en) A kind of termination of low-pressure high-power motor
CN201159337Y (en) Series connection mechanism of cable bridge rack
CN201487381U (en) Assembled cable bearer
CN2663391Y (en) Insulated elevating platform
CN214295591U (en) Pantograph gasbag assembly fixture
CN214615228U (en) Block assembled rail top air duct for underground station
CN203562722U (en) Conjunction box connected by overlapping lugs
CN216992415U (en) Column type porcelain insulator bottom perforating device
CN215670438U (en) Suspended ceiling mounting structure
CN215980305U (en) Heavy bearing support
CN213897759U (en) Ceiling device connected with steel beam
CN217399725U (en) Cable trench structure that double row was arranged
CN221282758U (en) Cable bridge for viaduct
CN114941377A (en) Assembly type concrete unit module structure and construction method thereof
CN203081019U (en) Universal installation base of wire pole or lamp pole
CN105151003A (en) Wiper motor system assembly structure
CN201405720Y (en) A kind of fixed bracket of forklift battery and forklift
CN220325205U (en) Winding displacement equipment convenient to installation
CN223039522U (en) Cable layer fixing device
CN112962856A (en) Suspended ceiling mounting structure
CN223006634U (en) Cable layout structure of transformer

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20071107

Termination date: 20150904