CN205176215U - Integrated circuit board test fixture of SMARTRACK system - Google Patents
Integrated circuit board test fixture of SMARTRACK system Download PDFInfo
- Publication number
- CN205176215U CN205176215U CN201521033575.XU CN201521033575U CN205176215U CN 205176215 U CN205176215 U CN 205176215U CN 201521033575 U CN201521033575 U CN 201521033575U CN 205176215 U CN205176215 U CN 205176215U
- Authority
- CN
- China
- Prior art keywords
- tool
- smartrack
- power supply
- measurement jig
- system board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
Description
技术领域 technical field
本实用新型涉及服务器系统测试技术,具体的说是一种SMARTRACK系统板卡测试治具。 The utility model relates to a server system test technology, in particular to a SMARTRACK system board card test fixture.
背景技术 Background technique
随着科技的不断进步,信息化已经逐渐覆盖到社会的各个领域。信息化的快速发展直接促使网络数据量的急速增加。这就对网络数据量的存储提出了很高的要求。为满足日益增长的数据量的存储、加工和服务的需求,SMARTRACK服务器应运而生。 With the continuous advancement of science and technology, informatization has gradually covered all fields of society. The rapid development of informatization directly leads to the rapid increase of network data volume. This puts high demands on the storage of network data volume. In order to meet the needs of storage, processing and service of the increasing amount of data, SMARTRACK server came into being.
SMARTRACK系统基础板卡包括:主板、供电转接板、二级电源板、节点背板、节点中板、管理主板六块板卡。每个板卡在生产完成后都会进行FCT(在线功能测试),以保证整合成整个系统后能够正常运转。 SMARTRACK system basic board includes six boards: main board, power supply adapter board, secondary power board, node backplane, node middle board, and management board. Each board will undergo FCT (on-line functional test) after production to ensure that it can operate normally after being integrated into the entire system.
信号的FCT测试,需要将所有系统板卡安装在机柜中进行测试。但是由于系统板卡较多,并且板卡的生产周期不同步(例如:主板生产周期较长,外围板卡生产周期相对较短),不可能等待所有的板卡生产完毕之后,组装成系统,然后进行在线功能测试。原有SMARTRACK系统板卡测试浪费大量时间,操作手续繁琐,致使SMARTRACK系统板卡测试周期较长。 For the FCT test of the signal, all system boards need to be installed in the cabinet for testing. However, due to the large number of boards in the system, and the production cycle of the boards is not synchronized (for example: the production cycle of the main board is long, and the production cycle of the peripheral boards is relatively short), it is impossible to wait for all the boards to be produced before assembling them into a system. Then perform an online function test. The original SMARTRACK system board test wastes a lot of time, and the operation procedures are cumbersome, resulting in a longer SMARTRACK system board test cycle.
发明内容 Contents of the invention
本实用新型针对目前需求以及现有技术发展的不足之处,提供一种SMARTRACK系统板卡测试治具。 The utility model provides a SMARTRACK system board card test fixture aiming at the current demand and the shortcomings of the development of the prior art.
本实用新型所述一种SMARTRACK系统板卡测试治具,解决上述技术问题采用的技术方案如下:所述SMARTRACK系统板卡测试治具,其结构包含治具1和治具2两个板卡,所述治具1为节点中板,能够起到节点中板的作用,所述治具2为服务器主板;该测试治具还包括管理主板、节点背板、二级电源板及供电转接板;所述治具1与治具2之间通过PMBUS线缆连接通信,同时治具1分别与管理主板RMC、节点背板连接通信,所述节点背板与二级电源板连接通信,所述二级电源板与供电转接板连接通信,所述供电转接板连接至治具2上同时给治具2供电。 A kind of SMARTRACK system board test fixture described in the utility model, the technical scheme adopted for solving the above-mentioned technical problems is as follows: the SMARTRACK system board test fixture, its structure includes two boards of fixture 1 and fixture 2, The fixture 1 is a node middle board, which can play the role of a node middle board, and the fixture 2 is a server mainboard; the test fixture also includes a management main board, a node backplane, a secondary power supply board and a power supply adapter board ; The fixture 1 and the fixture 2 are connected and communicated by a PMBUS cable, and the fixture 1 is connected and communicated with the management board RMC and the node backplane respectively, and the node backplane is connected and communicated with the secondary power board, and the The secondary power supply board communicates with the power supply adapter board, and the power supply adapter board is connected to the jig 2 and supplies power to the jig 2 at the same time.
优选的,所述治具1上设置有一标准PCIEX16连接器,治具1通过PCIEX16与管理主板相连。 Preferably, the jig 1 is provided with a standard PCIEX16 connector, and the jig 1 is connected to the management board through the PCIEX16.
优选的,所述治具1上还设置一标准PCIEX1连接器,治具1通过PCIEX1与节点背板相连,传输待测的重要信号。 Preferably, a standard PCIEX1 connector is also provided on the fixture 1, and the fixture 1 is connected to the node backplane through PCIEX1 to transmit important signals to be tested.
优选的,所述治具1上还预留一个8PIN的电源连接器用于供电。 Preferably, an 8PIN power connector is reserved on the jig 1 for power supply.
优选的,所述治具2上设置一标准PCIEX16连接器,治具2通过PCIEX16与供电转接板相连,所述治具1和治具2上分别设置有标准PMBUS接口连接器,治具1和治具2通过PMBUS线缆连接通信;治具1通过PMBUS线缆连接到治具2上能够读取供电转接板上的功耗。 Preferably, a standard PCIEX16 connector is set on the fixture 2, and the fixture 2 is connected to the power supply adapter board through PCIEX16. The fixture 1 and the fixture 2 are respectively provided with a standard PMBUS interface connector, and the fixture 1 Connect and communicate with jig 2 through a PMBUS cable; jig 1 is connected to jig 2 through a PMBUS cable to read the power consumption on the power supply adapter board.
优选的,所述治具1上预留了两组PMBUS线缆连接器,可灵活的实现1U1、1U2两种配置的选择。 Preferably, two sets of PMBUS cable connectors are reserved on the fixture 1, which can flexibly realize the choice of two configurations of 1U1 and 1U2.
优选的,所述治具2上设置一温度传感器来模拟BMC,所述治具1能够读取BMC的I2C数据。 Preferably, a temperature sensor is set on the jig 2 to simulate a BMC, and the jig 1 can read the I2C data of the BMC.
优选的,所述治具2上还设置了三个LED来侦测BMC的RST信号、一个LED来作为电源PSU的powergood信号,以及一个LED作为P12V的指示信号。 Preferably, three LEDs are set on the jig 2 to detect the RST signal of the BMC, one LED is used as the powergood signal of the power supply PSU, and one LED is used as the indication signal of P12V.
优选的,所述治具2上还设置有一拨码开关,通过该拨码开关能够开启或关闭该测试治具。 Preferably, the fixture 2 is also provided with a dial switch, through which the test fixture can be turned on or off.
优选的,所述SMARTRACK系统板卡测试治具还包括一电源模块,所述电源模块和二级电源板上分别设置一2*4标准供电接口连接器,通过这两个2*4标准供电接口连接器实现电源模块给二级电源板连接供电。 Preferably, the SMARTRACK system board test fixture also includes a power module, and a 2*4 standard power supply interface connector is respectively arranged on the power module and the secondary power supply board, through which two 2*4 standard power supply interfaces The connector enables the power module to supply power to the secondary power board connection.
本实用新型所述一种SMARTRACK系统板卡测试治具与现有技术相比具有的有益效果是:通过该测试治具可实现管理主板、节点中板、节点背板、二级电源板、供电转接板、主板等六块SMARTRACK系统必要板卡重要信号的测试工作,测量信号广泛;同时实现了I2C信号、GPIO信号、PRESENT信号、NODE_ON信号、RESET信号等重要信号的测试,可为系统提供一个系统全面的信号测试;测试方法快捷有效,可在最大程度上缩短板卡开发与生产的周期,能大大缩短服务器的生产测试周期,提高项目整体开发速度。同时,根据不同机型可以进行1U1机柜、1U2机柜(一个节点两块主板)的测试;增强了该测试治具的通用性,有效地降低产品的开发成本,提高市场竞争力。 Compared with the prior art, a kind of SMARTRACK system board test fixture described in the utility model has the beneficial effect that: the management main board, node middle board, node backboard, secondary power supply board, power supply can be realized through the test fixture. The test work of important signals of six SMARTRACK system necessary boards and cards, including the adapter board and main board, has a wide range of measurement signals; at the same time, it realizes the test of important signals such as I2C signal, GPIO signal, PRESENT signal, NODE_ON signal, RESET signal, etc., which can provide the system with A systematic and comprehensive signal test; the test method is fast and effective, which can shorten the development and production cycle of the board to the greatest extent, can greatly shorten the production test cycle of the server, and improve the overall development speed of the project. At the same time, according to different models, 1U1 cabinets and 1U2 cabinets (one node with two motherboards) can be tested; the versatility of the test fixture is enhanced, the product development cost is effectively reduced, and the market competitiveness is improved.
附图说明 Description of drawings
附图1为所述SMARTRACK系统板卡测试治具的结构框图。 Accompanying drawing 1 is the structural block diagram of described SMARTRACK system board test fixture.
具体实施方式 detailed description
为使本实用新型的目的、技术方案和优点更加清楚明白,以下结合具体实施例,并参照附图,对本实用新型所述一种SMARTRACK系统板卡测试治具进一步详细说明。 In order to make the purpose, technical solution and advantages of the utility model clearer, the following will further describe the SMARTRACK system board test fixture described in the utility model in detail in combination with specific embodiments and with reference to the accompanying drawings.
本实用新型提供一种SMARTRACK系统板卡测试治具,通过该测试治具实现了系统功耗、系统温度、系统电压信息的读取,能够支持SMARTRACK系统板卡的测试,覆盖了组成SMARTRACK系统的所有必要板卡;实现了SMARTRACK系统所有管理信号的测试,可为系统提供一个系统全面的信号测试;重要信号覆盖广,测试方法快捷有效;能大大缩短服务器的生产测试周期,可在最大程度上缩短板卡开发与生产的周期。 The utility model provides a SMARTRACK system board test fixture, through which the reading of system power consumption, system temperature and system voltage information can be realized, and the test of the SMARTRACK system board can be supported, covering the components of the SMARTRACK system All necessary boards; realize the test of all management signals of the SMARTRACK system, which can provide a comprehensive signal test for the system; important signal coverage is wide, and the test method is fast and effective; it can greatly shorten the production test cycle of the server, and can be used to the greatest extent Shorten the cycle of board development and production.
实施例: Example:
本实施例所述一种SMARTRACK系统板卡测试治具,该测试治具包含治具1和治具2两个板卡,可支持SMARTRACK系统级测试;其中,所述治具1为节点中板,能够起到节点中板的作用,所述治具2为服务器主板;所述测试治具1和测试治具2两个板卡串联在重要系统板卡组成的外围板卡链路中。 A SMARTRACK system board test fixture described in this embodiment, the test fixture includes two boards, fixture 1 and fixture 2, and can support SMARTRACK system-level testing; wherein, the fixture 1 is a node middle board , can play the role of the middle board of the node, the fixture 2 is a server mainboard; the two boards of the test fixture 1 and the test fixture 2 are connected in series in the peripheral board link composed of important system boards.
附图1为本实施例所述SMARTRACK系统板卡测试治具的结构框图,如附图1所示, Accompanying drawing 1 is the structural block diagram of SMARTRACK system board test fixture described in the present embodiment, as shown in accompanying drawing 1,
所述SMARTRACK系统板卡测试治具还包括管理主板、节点背板、二级电源板、供电转接板等重要系统主板;所述治具1与治具2之间通过PMBUS线缆连接通信,同时治具1分别与管理主板RMC、节点背板连接通信,所述节点背板与二级电源板连接通信,所述二级电源板与供电转接板连接通信,所述供电转接板连接至治具2上同时给治具2供电。 The SMARTRACK system board test fixture also includes important system mainboards such as a management mainboard, a node backplane, a secondary power supply board, and a power supply adapter board; the fixture 1 and the fixture 2 are connected and communicated by a PMBUS cable, At the same time, fixture 1 is respectively connected and communicated with the management board RMC and the node backplane, the node backplane is connected and communicated with the secondary power supply board, the secondary power supply board is connected and communicated with the power supply adapter Go to fixture 2 and supply power to fixture 2 at the same time.
本实施例所述SMARTRACK系统板卡测试治具,根据需要测试的信号选择治具1的主IC,兼顾成本与资源因素,所述管理主板RMC选做治具1的主控板。所述治具1上设置有一标准PCIEX16连接器,治具1通过PCIEX16与管理主板RMC相连,用来发送数据包,读取治具2上的信息;同时治具1上还设置一标准PCIEX1连接器,治具1通过PCIEX1与节点背板相连,传输待测的重要信号。此外,所述治具1上还预留一个8PIN的电源连接器,用于供电。 The SMARTRACK system board test jig described in this embodiment selects the main IC of the jig 1 according to the signal to be tested, taking into account cost and resource factors, and the management board RMC is selected as the main control board of the jig 1. The jig 1 is provided with a standard PCIEX16 connector, and the jig 1 is connected with the management board RMC through the PCIEX16 to send data packets and read the information on the jig 2; at the same time, a standard PCIEX1 connection is also set on the jig 1 Fixture 1 is connected to the backplane of the node through PCIEX1 to transmit important signals to be tested. In addition, an 8PIN power connector is reserved on the jig 1 for power supply.
本实施例所述SMARTRACK系统板卡测试治具,所述治具2上设置一标准PCIEX16连接器,治具2通过PCIEX16与供电转接板相连,所述治具1和治具2上分别设置有标准PMBUS接口连接器,两者的标准PMBUS接口连接器通过PMBUS线缆相连,治具1和治具2通过PMBUS线缆实现连接通信;测试治具1通过PMBUS线缆连接到治具2上来读取供电转接板上的功耗。此外,所述治具1上预留了两组PMBUS线缆连接器,可灵活的实现1U1、1U2两种配置的选择。 The SMARTRACK system board test jig described in this embodiment, a standard PCIEX16 connector is set on the jig 2, the jig 2 is connected with the power supply adapter board through the PCIEX16, and the jig 1 and the jig 2 are respectively set There is a standard PMBUS interface connector, and the standard PMBUS interface connectors of the two are connected through a PMBUS cable, and fixture 1 and fixture 2 are connected and communicated through a PMBUS cable; test fixture 1 is connected to fixture 2 through a PMBUS cable Read the power consumption on the power adapter board. In addition, two sets of PMBUS cable connectors are reserved on the fixture 1, which can flexibly realize the choice of two configurations of 1U1 and 1U2.
本实施例所述SMARTRACK系统板卡测试治具,所述治具2上设置一温度传感器来模拟BMC,所述治具1能够读取BMC的I2C数据。同时,所述治具2上还设置了三个LED来侦测BMC的RST信号、一个LED来作为PSU(电源)的powergood信号,以及一个LED作为P12V的指示信号。此外,所述治具2上还设置有一拨码开关,通过该拨码开关能够开启或关闭该测试治具。在治具2上将节点在位信号NODE_ON连接到GND,当治具2连接到系统中时,能够用于检测节点在位信号的功能。 In the SMARTRACK system board test fixture described in this embodiment, a temperature sensor is set on the fixture 2 to simulate a BMC, and the fixture 1 can read the I2C data of the BMC. At the same time, three LEDs are set on the jig 2 to detect the RST signal of the BMC, one LED is used as the powergood signal of the PSU (power supply), and one LED is used as the indication signal of the P12V. In addition, the fixture 2 is also provided with a dial switch, through which the test fixture can be turned on or off. Connect the node presence signal NODE_ON to GND on the jig 2. When the jig 2 is connected to the system, it can be used to detect the function of the node presence signal.
本实施例所述SMARTRACK系统板卡测试治具,还包括一电源模块,所述电源模块和二级电源板上分别设置一2*4标准供电接口连接器,通过这两个2*4标准供电接口连接器的连接实现电源模块给二级电源板供电,进而维持整个测试治具供电工作。 The SMARTRACK system board test fixture described in this embodiment also includes a power supply module, and a 2*4 standard power supply interface connector is respectively arranged on the power supply module and the secondary power supply board, and power is supplied by these two 2*4 standard The connection of the interface connector enables the power supply module to supply power to the secondary power board, thereby maintaining the power supply work of the entire test fixture.
从本实施例所述SMARTRACK系统板卡测试治具的技术方案可知,通过该测试治具,可实现管理主板、节点中板、节点背板、二级电源板、供电转接板、主板等六块SMARTRACK系统必要板卡重要信号的测试工作,测量信号广泛;同时实现了I2C信号、GPIO信号、PRESENT信号、NODE_ON信号、RESET信号等重要信号的测试,可为系统提供一个系统全面的信号测试。同时根据不同机型可以进行1U1机柜、1U2机柜(一个节点两块主板)的测试;增强了该测试治具的通用性,有效地降低产品的开发成本。 From the technical solution of the SMARTRACK system board test fixture described in this embodiment, it can be known that through the test fixture, the management board, node mid-board, node backplane, secondary power supply board, power supply adapter board, main board and other six functions can be realized. It can test the important signals of the necessary boards and cards of the SMARTRACK system, and measure a wide range of signals; at the same time, it realizes the testing of important signals such as I2C signal, GPIO signal, PRESENT signal, NODE_ON signal, RESET signal, etc., which can provide a comprehensive signal test for the system. At the same time, according to different models, the test of 1U1 cabinet and 1U2 cabinet (one node with two motherboards) can be carried out; the versatility of the test fixture is enhanced, and the product development cost is effectively reduced.
上述具体实施方式仅是本实用新型的具体个案,本实用新型的专利保护范围包括但不限于上述具体实施方式,任何符合本实用新型的权利要求书的且任何所属技术领域的普通技术人员对其所做的适当变化或替换,皆应落入本实用新型的专利保护范围。 The above-mentioned specific embodiments are only specific cases of the present utility model, and the scope of patent protection of the present utility model includes but not limited to the above-mentioned specific embodiments. Appropriate changes or substitutions made should fall within the patent protection scope of the present utility model.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521033575.XU CN205176215U (en) | 2015-12-14 | 2015-12-14 | Integrated circuit board test fixture of SMARTRACK system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201521033575.XU CN205176215U (en) | 2015-12-14 | 2015-12-14 | Integrated circuit board test fixture of SMARTRACK system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN205176215U true CN205176215U (en) | 2016-04-20 |
Family
ID=55740191
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201521033575.XU Expired - Fee Related CN205176215U (en) | 2015-12-14 | 2015-12-14 | Integrated circuit board test fixture of SMARTRACK system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN205176215U (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107423175A (en) * | 2017-06-29 | 2017-12-01 | 郑州云海信息技术有限公司 | Server test mounting seat and the measurement jig that server CPU module can be replaced |
| CN110058143A (en) * | 2019-04-17 | 2019-07-26 | 苏州浪潮智能科技有限公司 | A kind of novel server board Bode diagram test fixture and its application method |
| TWI671629B (en) * | 2018-12-15 | 2019-09-11 | 英業達股份有限公司 | Rack and electronic device set in the rack test system and method thereof |
| CN111913842A (en) * | 2020-06-17 | 2020-11-10 | 深圳市风云实业有限公司 | ATCA case multi-board card complete machine interface test method |
| WO2023065194A1 (en) * | 2021-10-21 | 2023-04-27 | 华为技术有限公司 | Test system and test apparatus |
-
2015
- 2015-12-14 CN CN201521033575.XU patent/CN205176215U/en not_active Expired - Fee Related
Cited By (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN107423175A (en) * | 2017-06-29 | 2017-12-01 | 郑州云海信息技术有限公司 | Server test mounting seat and the measurement jig that server CPU module can be replaced |
| CN107423175B (en) * | 2017-06-29 | 2021-02-02 | 苏州浪潮智能科技有限公司 | Mounting base for server test and test fixture capable of replacing server GPU module |
| TWI671629B (en) * | 2018-12-15 | 2019-09-11 | 英業達股份有限公司 | Rack and electronic device set in the rack test system and method thereof |
| CN110058143A (en) * | 2019-04-17 | 2019-07-26 | 苏州浪潮智能科技有限公司 | A kind of novel server board Bode diagram test fixture and its application method |
| CN111913842A (en) * | 2020-06-17 | 2020-11-10 | 深圳市风云实业有限公司 | ATCA case multi-board card complete machine interface test method |
| CN111913842B (en) * | 2020-06-17 | 2024-03-26 | 深圳市风云实业有限公司 | Test method for complete machine interface of ATCA (advanced telecom computing architecture) chassis multi-board card |
| WO2023065194A1 (en) * | 2021-10-21 | 2023-04-27 | 华为技术有限公司 | Test system and test apparatus |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN205176215U (en) | Integrated circuit board test fixture of SMARTRACK system | |
| CN202362409U (en) | Device for automatically testing cables of aircraft engine | |
| CN111026596A (en) | Test platform architecture and method for computer mainboard standard | |
| CN103744769A (en) | Rapid error positioning method of power supply of server based on complex programmable logic device (CPLD) | |
| CN103457804A (en) | Consistency testing platform of train network communication products | |
| CN106772206A (en) | Portable carrier module detector | |
| CN203178491U (en) | GPS multi-module parallel testing device | |
| CN202995451U (en) | A vehicle-mounted controller automatic testing device | |
| CN112034410A (en) | Detection tool module of multi-core modular electric energy meter | |
| CN106842152A (en) | Airborne fire control radar online system failure diagnosis | |
| CN103149539A (en) | Multifunctional power source test system | |
| US8775691B1 (en) | Detecting firmware version for an input/output adapter | |
| CN204964698U (en) | A circuit board inspection system | |
| CN116340073A (en) | Test method, device and system | |
| CN205301993U (en) | Programmable logic controler module testing platform | |
| CN118656260B (en) | Test fixture, test system and test method | |
| CN207008599U (en) | A server motherboard test board | |
| CN102929767A (en) | Memory bank insertion state acquisition circuit and memory bank information management system | |
| CN108196211A (en) | A kind of number table automatic verification system | |
| JP2013068609A (en) | Test card | |
| CN106774809A (en) | A kind of test system of hard disk power consumption | |
| CN202453478U (en) | Laptop battery monitoring system | |
| CN106546899A (en) | A kind of electric energy meter RS-485 chip Auto-Test Systems | |
| CN203275589U (en) | Test system based on CAN bus | |
| CN210835147U (en) | Modular function board card measuring platform |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160420 Termination date: 20161214 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |