[go: up one dir, main page]

CN204827526U - 一种翻笼卸矿斜坡的防护装置 - Google Patents

一种翻笼卸矿斜坡的防护装置 Download PDF

Info

Publication number
CN204827526U
CN204827526U CN201520542806.3U CN201520542806U CN204827526U CN 204827526 U CN204827526 U CN 204827526U CN 201520542806 U CN201520542806 U CN 201520542806U CN 204827526 U CN204827526 U CN 204827526U
Authority
CN
China
Prior art keywords
slope
rail
cardump
unloads
ore
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201520542806.3U
Other languages
English (en)
Inventor
赵国亮
胡芬花
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinchuan Group Co Ltd
Original Assignee
Jinchuan Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinchuan Group Co Ltd filed Critical Jinchuan Group Co Ltd
Priority to CN201520542806.3U priority Critical patent/CN204827526U/zh
Application granted granted Critical
Publication of CN204827526U publication Critical patent/CN204827526U/zh
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

本实用新型公开了一种翻笼卸矿斜坡的防护装置,包括混凝土砌成的卸矿斜坡,斜坡坡面从上到下纵向铺设有相互平行的钢轨,钢轨之间通过连接件连接,相邻钢轨之间设有限位件,连接件的两端部分别固接有弧形板卡,弧形板卡上连接有锚杆,锚杆固定于斜坡体内。本实用新型能够有效减小矿石、废石对混凝土砌体表面的破坏,避免了对砌体配筋造成损坏,延长卸矿斜坡使用寿命,降低维护成本,采用矿山废旧钢轨加工制作,降低投入成本。

Description

一种翻笼卸矿斜坡的防护装置
技术领域
本实用新型属于矿山开采领域,涉及储矿坑,具体涉及一种翻笼卸矿斜坡的防护装置。
背景技术
对于采用竖井开拓的矿山,井下矿石、废石装入固定式矿车后由罐笼通过副井提升至地表,在地表,利用安装的配套翻转式翻笼将矿车内矿石翻卸至储矿仓。储矿仓建设要求有一定高差,翻卸的矿石经一定角度的斜坡滚入储矿仓。通常矿石、废石翻卸时砸击砌体斜坡,对砌体斜坡造成损害,使砌体表面剥落,形成大坑,甚至砸断砌体内部的配筋;且矿石、废石长时间对砌体斜坡的砸击会缩短砌体使用寿命,增加维护建设成本;对砌体斜坡的维修会影响矿石、废石的翻卸,对矿山的正常生产造成影响。
实用新型内容
本实用新型为了解决现有技术中存在的上述问题,提供了一种翻笼卸矿斜坡的防护装置。
本实用新型采用如下技术方案:一种翻笼卸矿斜坡的防护装置,包括混凝土砌成的卸矿斜坡,斜坡坡面从上到下纵向铺设有相互平行的钢轨,钢轨之间通过连接件连接,相邻钢轨之间设有限位件,连接件的两端部分别固接有弧形板卡,弧形板卡上连接有锚杆,锚杆固定于斜坡体内。
进一步的,相邻钢轨下翼缘板之间连接。
进一步的,每一连接件的两端头分别固接有与其垂直的钢板。
优选的,限位件安装于所述的连接件上。
优选的,所述锚杆为螺纹钢锚杆。
本实用新型的有益效果是:本实用新型解决了矿石、废石翻卸时砸击砌体斜坡,对砌体斜坡造成损害,使砌体表面剥落,形成大坑,甚至砸断砌体内部的配筋,进而也解决了矿石、废石长时间对砌体斜坡的砸击缩短砌体使用寿命,增加维护建设成本,影响矿山正常生产的问题;本实用新型能够有效减小矿石、废石对混凝土砌体表面的破坏,避免了对砌体配筋造成损坏,延长卸矿斜坡使用寿命,降低维护成本,采用矿山废旧钢轨加工制作,降低投入成本。相邻钢轨底板之间固接防护结实可靠,避免钢轨受到矿石撞击发生移位;连接件将钢轨稳固,结构简单且结实可靠;连接件的两端头分别固接有与其垂直的钢板,避免了弧形板卡受到矿石撞击从连接件端头脱落。受到矿石撞击时限位件的存在避免钢轨发生大的移位;通过螺纹钢锚杆埋入混凝土砌体内固定坚实牢固。
附图说明
图1.本实用新型结构示意图;
图2.本实用新型图1中的M部分的局部放大图;
图3.本实用新型的使用状态图;
图4.本实用新型图3的侧视图。
具体实施方式
如图1-4所示,一种翻笼卸矿斜坡的防护装置,包括混凝土砌成的卸矿斜坡,斜坡坡面从上到下纵向铺设有相互平行的钢轨3,相邻钢轨下翼缘板9之间可采用焊接连接,钢轨之间通过连接件5连接,连接件5采用钢管,该钢管穿过每一钢轨的腹板,相邻钢轨之间设有限位件4,限位件4安装于所述的连接件上,钢管的两端部采用螺栓7分别用弧形板卡2固定,弧形板卡2上连接有螺纹钢锚杆6,螺纹钢锚杆6固定于斜坡体8内,每一连接件5的两端头分别固接有与其垂直的钢板1。
当矿车进入地表储矿仓的翻笼,翻笼带动矿车翻转,将矿石沿卸矿斜坡滚入储矿仓,矿石、废石翻卸后直接砸在斜坡上铺设的废旧钢轨3上,从而减少了矿石、废石与混凝土砌成的斜坡体8的表面接触,从而保护了混凝土砌成的斜坡,延长卸矿斜坡使用寿命,降低维护成本,避免影响生产。

Claims (5)

1.一种翻笼卸矿斜坡的防护装置,包括混凝土砌成的卸矿斜坡,其特征在于:斜坡坡面从上到下纵向铺设有相互平行的钢轨(3),钢轨之间通过连接件(5)连接,相邻钢轨之间设有限位件(4),连接件的两端部分别固接有弧形板卡(2),弧形板卡(2)上连接有锚杆(6),锚杆(6)固定于斜坡体(8)内。
2.如权利要求1所述的一种翻笼卸矿斜坡的防护装置,其特征在于:相邻钢轨下翼缘板(9)之间连接。
3.如权利要求1所述的一种翻笼卸矿斜坡的防护装置,其特征在于:每一连接件(5)的两端头分别固接有与其垂直的钢板(1)。
4.如权利要求1-3任一项所述的一种翻笼卸矿斜坡的防护装置,其特征在于:限位件(4)安装于所述的连接件(5)上。
5.如权利要求1-3任一项所述的一种翻笼卸矿斜坡的防护装置,其特征在于:所述锚杆(6)为螺纹钢锚杆。
CN201520542806.3U 2015-07-24 2015-07-24 一种翻笼卸矿斜坡的防护装置 Expired - Fee Related CN204827526U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201520542806.3U CN204827526U (zh) 2015-07-24 2015-07-24 一种翻笼卸矿斜坡的防护装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201520542806.3U CN204827526U (zh) 2015-07-24 2015-07-24 一种翻笼卸矿斜坡的防护装置

Publications (1)

Publication Number Publication Date
CN204827526U true CN204827526U (zh) 2015-12-02

Family

ID=54685137

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201520542806.3U Expired - Fee Related CN204827526U (zh) 2015-07-24 2015-07-24 一种翻笼卸矿斜坡的防护装置

Country Status (1)

Country Link
CN (1) CN204827526U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019943A (zh) * 2015-07-24 2015-11-04 金川集团股份有限公司 一种翻笼卸矿斜坡的防护装置

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105019943A (zh) * 2015-07-24 2015-11-04 金川集团股份有限公司 一种翻笼卸矿斜坡的防护装置

Similar Documents

Publication Publication Date Title
CN201747387U (zh) 巷道支护支架
CN103075165B (zh) 煤巷纵向梁复合式支护方法
CN102704965B (zh) 一种防止剧烈采动影响巷道顶板垮冒方法
CN103388481B (zh) 一种用于治理底鼓的组合式预制板及治理底鼓的方法
CN102926504B (zh) 一种钢混叠合梁结合部施工方法
CN204532363U (zh) 巷道的组合拱支护装置
CN104847381A (zh) 一种深部巷道缓冲-吸能高抗力耦合支护方法
CN202324012U (zh) 地下室防水施工后浇带构件
CN204827526U (zh) 一种翻笼卸矿斜坡的防护装置
CN102080551B (zh) 软弱破碎围岩隧道初期支护仰拱三幅施工方法
CN102155249A (zh) 一种采空区下方巷道顶板支护方法
CN114658459A (zh) 一种底鼓巷道用可移动式底板钢混支架及施工方法
CN104712348A (zh) 一种坚硬直接顶下大采高工作面沿空小煤柱巷道支护方法
CN205804372U (zh) 一种适于非煤露天矿边坡滑坡治理的桩‑锚‑梁一体化结构
CN206554947U (zh) 一种煤矿沿空巷道支护装置
CN205100993U (zh) 出矿水平巷道断面支护结构
CN105019943A (zh) 一种翻笼卸矿斜坡的防护装置
CN203403558U (zh) 剪力墙
CN201826860U (zh) 新型抗变形矿用工字钢支架
CN204825933U (zh) 一种用于钢轨护坡中钢轨间的稳固机构
CN201902216U (zh) 一种通道支护装置
CN205154208U (zh) 一种新型多功能锚杆
CN214695232U (zh) 一种边坡治理预裂爆破中安全防护装置
CN216008508U (zh) 一种煤矿巷道喷射支护装置
CN201546738U (zh) 煤矿深井箕斗装载硐室支护

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20151202

CF01 Termination of patent right due to non-payment of annual fee