CN1880725B - Sand-filling one-step-forming enlarged anchor pile construction method and device therefor - Google Patents
Sand-filling one-step-forming enlarged anchor pile construction method and device therefor Download PDFInfo
- Publication number
- CN1880725B CN1880725B CN2005100100922A CN200510010092A CN1880725B CN 1880725 B CN1880725 B CN 1880725B CN 2005100100922 A CN2005100100922 A CN 2005100100922A CN 200510010092 A CN200510010092 A CN 200510010092A CN 1880725 B CN1880725 B CN 1880725B
- Authority
- CN
- China
- Prior art keywords
- anchor pole
- master muscle
- bracing frame
- sand
- mortar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims description 15
- 239000004576 sand Substances 0.000 claims abstract description 6
- 210000003205 muscle Anatomy 0.000 claims description 18
- 239000004570 mortar (masonry) Substances 0.000 claims description 13
- 239000004575 stone Substances 0.000 claims description 7
- 241001074085 Scophthalmus aquosus Species 0.000 claims description 6
- 230000015572 biosynthetic process Effects 0.000 claims description 3
- 238000005553 drilling Methods 0.000 claims description 3
- 239000000203 mixture Substances 0.000 claims description 3
- 238000000034 method Methods 0.000 abstract description 7
- 239000004568 cement Substances 0.000 abstract description 5
- 239000000314 lubricant Substances 0.000 abstract 1
- 238000010586 diagram Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 238000001802 infusion Methods 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
The invention relates to a method for constructing the sand pulp one-tie expanding anchor rod, and a relative device, wherein in traditional method, since the sand mud has lubricant function on the hole to reduce the friction, the main strength of anchor rod is low, and the cement pulp has high cost; in said invention, the anchor rod driller drills to the design depth, then drawing out the driller and pouring sand pulp or fine concrete, to form hole, and mounting anchor rod main bar, drawing back to complete the expanding head for three times, while the pouring pressure is between 0.5-9Mpa.
Description
Technical field:
The present invention relates to a kind of sand-filling one-step-forming enlarged anchor pile construction method and device thereof.
Background technology:
Behind the anchor pole traditional method elder generation preexisting hole that uses in the building foundation pit supporting at present, the skyhook reinforcing bar, cement injection becomes anchor pole again, this job practices operation is many, quality be difficult for to guarantee, moisture anchor pole in the soil layer particularly is earlier with behind the mud off, the skyhook reinforcing bar, cement injection clear hole displacement again, because mud has the frictional force of lubrication anchor pole to reduce to the hole, anchor pole main body intensity is low, cement paste cost height, shortcomings such as construction period length.
Summary of the invention:
The purpose of this invention is to provide and a kind ofly finish from creeping into to pour into once, technology is new, and quality is good, sand-filling one-step-forming enlarged anchor pile construction method that efficient is high and device thereof.
Above-mentioned purpose realizes by following technical scheme:
Annotate sand and once expand an anchor rod construction method, it is characterized in that: carry brill behind the jumbolter drilling to completion, annotate mortar or fine-stone concrete when carrying brill, the limit is carried and is bored marginal not mortar or fine-stone concrete pore-forming, lay anchor pole master muscle again, pull back then and finish enlarged footing, retract to send to and come and go more than three times, form complete mortar enlarged footing, grouting pressure is between 0.5~9Mpa.
Once expand an anchor pole device, its composition comprises: anchor pole master muscle, one group of bracing frame, on the described anchor pole master muscle hinge point is installed, describedly be fixed with one group of bracing frame that enlarges the ironwork leaf and be installed on the described hinge point, the termination of described bracing frame lower end is expanded with return and is stretched the spring tension, angle≤60 of bracing frame upper end and the formation of anchor pole master muscle °, lower end and anchor pole master muscle form≤30 °, upper end+lower end≤90 °.
This technical scheme has following beneficial effect:
1. sand-filling one-step-forming enlarged anchor pile construction method of the present invention and device thereof directly inject mortar without mud when becoming bolthole in water layer is arranged, and have guaranteed hole quality, and undergauge does not avoid mud off to reduce the phenomenon of frictional force.
2. sand-filling one-step-forming enlarged anchor pile construction method of the present invention and device thereof are finished from creeping into to pour into once, and the construction link program is few, and speed of application is fast,, technology is new, and quality is good, the efficient height.
3. sand-filling one-step-forming enlarged anchor pile construction method of the present invention and device thereof, resistance to plucking frictional force height, noise is little, below 30 decibels.
4. sand-filling one-step-forming enlarged anchor pile construction method of the present invention and device thereof, construction costs is low, saves cost.
Description of drawings:
Accompanying drawing 1 is the constructing structure schematic diagram that carries out the anchor pole pore-forming according to method of the present invention.
Accompanying drawing 2 is the constructing structure schematic diagrames when carrying out the infusion mortar according to method of the present invention.
Accompanying drawing 3 is the constructing structure schematic diagrames when laying anchor pole master muscle according to method of the present invention in bolthole.
Accompanying drawing 4 is to lay the constructing structure schematic diagram of anchor pole master muscle to projected depth according to method of the present invention in bolthole.
Accompanying drawing 5 is structural representations of sand-filling one-step-forming enlarged anchor pile construction equipment.
The specific embodiment of the present invention:
Embodiment 1:
Annotate sand and once expand an anchor rod construction method, carry brill behind the jumbolter drilling to completion, annotate mortar or fine-stone concrete when carrying brill, the limit is carried and is bored marginal not mortar or fine-stone concrete pore-forming, lay anchor pole master muscle again, pull back then and finish enlarged footing, retract to send to and come and go more than three times, form complete mortar enlarged footing, grouting pressure is between 0.5~9Mpa, when retracting anchor pole and become major part to have any problem, can adopt vibrating hammer and hydraulic tongs to send into and retract at skyhook, more can guarantee the formation quality of major part.Should work continuously at infusion mortar (fine-stone concrete or cement paste), should again creep into 500mm more than when resting midway and overlap.
Embodiment 2:
Embodiment 1 a described anchor pole device that once expands, its composition comprises: anchor pole master muscle 1, one group of bracing frame 5, on the described anchor pole master muscle 1 hinge point 3 is installed, the described bracing frame 5 that is fixed with one group of expansion ironwork leaf 2 is installed on the described hinge point 3, and spring 4 tensions are stretched with the return expansion in the termination of described bracing frame 5 lower ends, and enlarging ironwork leaf 2 can freely swing, be installed in the mortar body that pore-forming has poured into once expanding an anchor pole device, reintroduce 500mm after hanging down to the hole and form enlarged footing.
Embodiment 3:
The described anchor pole device that once expand of embodiment 2, angle≤60 that bracing frame 5 upper ends and anchor pole master muscle 1 form °, lower end and anchor pole master muscle 1 form≤30 °, upper end+lower end≤90 °.Bracing frame 5 lower ends put the return expansion and stretch spring 4, utilizing the return expansion to stretch spring 4 strains, by hinge point 3 expansion ironwork leaf 2 is outwards upheld, spring tension is 0.5~2Kg, when anchor pole master muscle 1 is installed in the hole, enlarge ironwork leaf 2 and play the leading truck effect at the bottom of the hole, expansion ironwork leaf still is not less than 1/3 part and is embedded in the anchor pole main body.
Claims (2)
1. a notes sand once expands an anchor rod construction method, it is characterized in that: carry brill behind the jumbolter drilling to completion, annotate mortar or fine-stone concrete when carrying brill, the limit is carried and is bored marginal not mortar or fine-stone concrete pore-forming, lay anchor pole master muscle again, pull back then and finish enlarged footing, retract to send to and come and go more than three times, form complete mortar enlarged footing, grouting pressure is between 0.5~9Mpa.
2. one kind is once expanded an anchor pole device, its composition comprises: anchor pole master muscle, one group of bracing frame, it is characterized in that: on the described anchor pole master muscle hinge point is installed, describedly be fixed with one group of bracing frame that enlarges the ironwork leaf and be installed on the described hinge point, the termination of described bracing frame lower end is expanded with return and is stretched the spring tension, angle≤60 of bracing frame upper end and the formation of anchor pole master muscle °, lower end and anchor pole master muscle form≤30 °, upper end+lower end≤90 °.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2005100100922A CN1880725B (en) | 2005-06-16 | 2005-06-16 | Sand-filling one-step-forming enlarged anchor pile construction method and device therefor |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN2005100100922A CN1880725B (en) | 2005-06-16 | 2005-06-16 | Sand-filling one-step-forming enlarged anchor pile construction method and device therefor |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1880725A CN1880725A (en) | 2006-12-20 |
| CN1880725B true CN1880725B (en) | 2010-04-14 |
Family
ID=37519054
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN2005100100922A Expired - Fee Related CN1880725B (en) | 2005-06-16 | 2005-06-16 | Sand-filling one-step-forming enlarged anchor pile construction method and device therefor |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1880725B (en) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103526754A (en) * | 2013-09-30 | 2014-01-22 | 中国建筑第八工程局有限公司 | Method for constructing head-expanded anchoring rod in sand-rich decomposed rock |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN2200692Y (en) * | 1994-07-16 | 1995-06-14 | 陈秋声 | Underreamer device |
| CN1110754A (en) * | 1994-08-08 | 1995-10-25 | 何庆林 | Large-head anchor rod construction method and special drilling machine |
| US5526720A (en) * | 1994-06-14 | 1996-06-18 | Locotos; Frank M. | Wrench device for mine roof bolts |
| CN2526490Y (en) * | 2002-01-24 | 2002-12-18 | 萧守让 | Special expanding drilling tool for screw drilling machine |
| CN1523197A (en) * | 2003-05-09 | 2004-08-25 | 陆观宏 | Drill expanding aiguille of anchor shaft, anchor cable, stake and drill expanding technology |
-
2005
- 2005-06-16 CN CN2005100100922A patent/CN1880725B/en not_active Expired - Fee Related
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US5526720A (en) * | 1994-06-14 | 1996-06-18 | Locotos; Frank M. | Wrench device for mine roof bolts |
| CN2200692Y (en) * | 1994-07-16 | 1995-06-14 | 陈秋声 | Underreamer device |
| CN1110754A (en) * | 1994-08-08 | 1995-10-25 | 何庆林 | Large-head anchor rod construction method and special drilling machine |
| CN2526490Y (en) * | 2002-01-24 | 2002-12-18 | 萧守让 | Special expanding drilling tool for screw drilling machine |
| CN1523197A (en) * | 2003-05-09 | 2004-08-25 | 陆观宏 | Drill expanding aiguille of anchor shaft, anchor cable, stake and drill expanding technology |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1880725A (en) | 2006-12-20 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN201031391Y (en) | Umbrella-shaped anti-pulling anchor | |
| CN100519951C (en) | Construction method for increasing dry auger boring pouring pile bearing capacity | |
| CN105604001A (en) | Stiffening core cement-soil tubular pile, construction method and cylindrical rotary stirring drilling tool | |
| CN103510510A (en) | Reinforced long spiral drilling concrete grouting pile and construction method thereof | |
| CN101070702A (en) | Single-hole composite anchoring pile | |
| CN102561377A (en) | Seismic-resistant-columned rock bolt foundation with enlarged toe and construction method of seismic-resistant-columned rock bolt foundation with enlarged toe | |
| CN103993598A (en) | Crashed stone grouting pile with lead holes implanted in cloth bag and construction method | |
| CN106836202A (en) | Bored in efficient pile tube soil, piling, dust, whitewash all-in-one and its construction technology | |
| CN104294823A (en) | Anti-floating pile structure of pre-stressed pipe pile and construction method | |
| CN101936004A (en) | Precast expanding pile as well as construction method and construction mechanical equipment thereof | |
| CN217298910U (en) | Multifunctional pressure-bearing bag type expansion anchor cable device | |
| CN100558990C (en) | Drilling grouting mixing method and device for bottom expansion and pressure grouting concrete | |
| CN1141461C (en) | Method for anchor bolt construction by double sleeve | |
| CN203594023U (en) | Enhanced type long auger drilling pressure-grouting concrete pile | |
| CN1880725B (en) | Sand-filling one-step-forming enlarged anchor pile construction method and device therefor | |
| CN101457522B (en) | Long spiral support disk pile construction method | |
| CN112252312B (en) | Construction method for enhancing integral stress performance of PHC pipe pile | |
| CN206693228U (en) | A kind of anchor pole and ground substrate plate anti-floating system | |
| CN201411691Y (en) | Anchor rod supporting device | |
| CN204174616U (en) | Pile for prestressed pipe anti-floating pile raft structure | |
| CN107747315B (en) | A kind of recycling method of the fashioned iron component for pattern foundation pit supporting structure | |
| CN113882419A (en) | End anchor type uplift resistant device suitable for lower expanded body pile | |
| CN213978932U (en) | Uplift pile with anchor rod | |
| CN203866821U (en) | Lead hole implant cloth bag gravel grouting pile | |
| CN108019209A (en) | The drawing anchor construction method deformed suitable for the overlying solum settlement of shallow tunnel |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C41 | Transfer of patent application or patent right or utility model | ||
| TR01 | Transfer of patent right |
Effective date of registration: 20160518 Address after: 150000 Xiangfang City, Heilongjiang province (formerly Power District) Chaoyang town Ping'an Village Patentee after: HEILONGJIANG HUAYAN PILING TECHNOLOGY R & D CO., LTD. Address before: Dynamic district of Harbin city Heilongjiang province 150046 Jin Heung Street side of No. 73-3 Patentee before: Cao Xingming |
|
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100414 Termination date: 20180616 |
|
| CF01 | Termination of patent right due to non-payment of annual fee |