CN1862281B - Battery management system and device with run time analysis report function - Google Patents

Battery management system and device with run time analysis report function Download PDF

Info

Publication number
CN1862281B
CN1862281B CN2006100783168A CN200610078316A CN1862281B CN 1862281 B CN1862281 B CN 1862281B CN 2006100783168 A CN2006100783168 A CN 2006100783168A CN 200610078316 A CN200610078316 A CN 200610078316A CN 1862281 B CN1862281 B CN 1862281B
Authority
CN
China
Prior art keywords
battery
working time
oms
test
report
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN2006100783168A
Other languages
Chinese (zh)
Other versions
CN1862281A (en
Inventor
乔纳森·B·昆特
史蒂文·H·德沃肯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BATTERY CORP
Original Assignee
BATTERY CORP
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Priority claimed from US11/125,631 external-priority patent/US7349816B2/en
Application filed by BATTERY CORP filed Critical BATTERY CORP
Publication of CN1862281A publication Critical patent/CN1862281A/en
Application granted granted Critical
Publication of CN1862281B publication Critical patent/CN1862281B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及大型固定电池的管理。本发明是一种对用作后备电源、并部署在广泛分散位置处的固定电池进行管理的综合方法。优化管理系统(OMSTM)的解决方案包括大标签(优选为串行的条形码识别标记)、电池测试和数据获取装置,以及基于web的软件。OMSTM系统能自动分析、确定并报告电池单元的预计运行时间,比如后备系统为保证重要设备运行所能提供充足电能的时间长短。这些组成部分共同工作,以提供用于管理大量易坏、昂贵和地理分散的资源的平台。

Figure 200610078316

The present invention relates to the management of large stationary batteries. The present invention is a comprehensive approach to the management of stationary batteries used as backup power and deployed at widely dispersed locations. The Optimizing Management System (OMS ) solution includes large tags (preferably serial barcode identification tags), battery testing and data acquisition devices, and web-based software. The OMS TM system can automatically analyze, determine and report the expected operating time of battery cells, such as how long the backup system can provide sufficient power to keep important equipment running. These components work together to provide a platform for managing large numbers of fragile, expensive, and geographically dispersed resources.

Figure 200610078316

Description

Battery management system and have the device of runtime analysis reporting
Technical field
The present invention relates to the management of large-scale self-contained battery.The present invention is a kind of to as back-up source and be deployed in system ensemble and the device that the self-contained battery of extensive dispersed locations manages.(the OMS of optimum management system TM) solution comprise battery label (be called " big label (Mega-Tag) " sometimes here, they are preferably the bar code recognition mark of serial), battery testing and data acquisition facility, and based on the OMS of web TMSoftware.These ingredient co-operation, the platform of perishable in a large number to be provided for managing, expensive and geographical resource of disperseing.
Background technology
The many peculiar problem that solution of the present invention is relevant with battery.Battery is perishable.That is to say that battery has limited preservation life-span and limited serviceable life.Have benefited from OMS TMThe lead-acid battery that the fixing industrial battery types of solution normally seals.Usually must in build date 6~10 months, these electromechanical assemblies be installed, otherwise their need charging again.In addition, these battery design of great majority serviceable life is 10 years, but generally only continues at the scene to use 2~6 years.Deviation between this designed life and actual life is a subject matter for the user of these batteries.
Self-contained battery is also big and heavy, and expensive.Usually this battery of a large amount of uses is to provide the back-up source that needs.Therefore, understand these devices extra resource management challenge is provided.
Battery comprises environmentally harmful dangerous substance.Strict rules and regulations are used to manage the waste treatment of battery.These rules and regulations also comprise the requirement that file is provided.The user must be able to provide the enough evidences that abide by rules and regulations, otherwise will face severe punishment.Provide the process height effort and the costliness of file, and most of observing is to replenish afterwards.
Usually two or four 12 volts unit is linked to be string, three 12 volts unit and is linked to be string and disposes battery, perhaps the unit with six or 12 2 volts is linked to be string and the deployment battery, with the power devices to 24 volts, 36 volts or 48 volts.Other series arrangement also is feasible.This electricity combination of battery has increased the difficulty of managing these memory devices.In a word, the management self-contained battery is difficult, and is not to use the core competence of most industries of these batteries usually.
In order to get the user mode of self-contained battery device clear, be necessary the routine test battery.According to test, the general fault of battery can be clearly.Yet, in many cases, even if battery is under the good situation, because the variation of loading demand might reserve electric energy deficiency.This situation usually takes place in many industries.For example, aspect wireless communications application, the battery backup device can provide four hours working time at first; Because transmitting site has increased additional communicator, have nothing for it but more load of battery provides electric energy, has therefore reduced the working time that is provided but As time goes on.(notice that " working time " refers to that back-up system can provide the time length of enough electric energy in order to keep the operation of visual plant.)
Therefore importantly available back-up source and existing loading demand are compared, so that the working time of prediction back-up source.Analyzer will be operated this critical function automatically working time.
Summary of the invention
OMS TM(optimum management system) follows the trail of the whole life-span of battery.It makes the company of a large amount of deployment self-contained batteries can manage the unmanageable resource owing to perishable, geographical dispersion.
OMS TMComprise that following co-operation is to provide the project of this unique services: the first, big label (being preferably the bar code recognition mark of serial) is fixed on each single battery.Comprise bar code reader and scan big label, then any given battery is carried out test with the battery tester (being preferably BatteryCorp BC-T2000 or BCCelltron Ultra or similar proving installation) that is connected to the serial ports of PC.Battery is deployed as the unit of the electrical interconnection of " string " usually, to increase voltage and output power.Each battery testing data point is together with being stored with single battery unit associated unique identification symbol value.The user uses the dec non-modem DEC cable that provides BatteryCorp BC-T2000 or BCCelltron Ultra (perhaps similar proving installation) to be connected to the serial ports of PC.Link software (be preferably T2000 link or BC Celltron Receive Utility software) makes data be sent to the PC internal storage facility that becomes from test and data acquisition facility.Then, the user signs in to proprietary network address, clicks the icon that uploads data; OMS TMUpload designated data files to proprietary web server.This this data file of web server process, storing relevant data is to OMS TMIn the suitable form of database.
The invention provides consolidated return and analysis option.This comprises operational report and financial report, and the detailed file that utilizes again.OMS TMAutomatically notification feature sends the prompting that needs test by Email to client technician.These Emails are based on user-defined business rules (can the nominative testing cycle and the interval of ROMPaq by business unit).
OMS TMSolution makes the user of self-contained battery can manage the various aspects that battery is disposed.It is the unique available instrument that can make the process automation of any given battery upstate of unique identification, test, assessment and report.It provides the information about installing, disposing, test, utilize and damage again.It provides the information of total information and long form, to be used for inside and outside use.
This solution has many advantages.It make the user can high-level efficiency, save into the self-contained battery that large-scale, the extensive dispersion of local management is disposed.It has increased the reliability of backup power equipment, because the existing now information about the battery performance state of operator.This system also helps the safety of potential poisonous device and utilizes, reduces the risk that does not conform to statutory regulation simultaneously.
The OMS of method invention as an alternative TMConcrete application be OMS TMClient's business rules is applied to upload test data, and indicates which battery of technician or which battery to be replaced automatically by sequence number.The technician no longer needs to make any decision, has therefore got rid of the subjectivity in handling.OMS TMNot only write report and describe the concrete condition that need be replaced battery in detail, also the autoelectrinic email message is sent to the corresponding techniques personnel with relevant installation instruction.
In order to move the designed optional module of aforementioned base apparatus is battery operation analyzer and report mechanism.In order to get the user mode of self-contained battery device clear, be necessary the routine test battery.According to test, the general fault of battery can be clearly.Yet, in many cases, even if battery is under the good situation, because the variation of loading demand might reserve electric energy deficiency.This situation usually takes place in many industries.For example, aspect wireless communications application, the battery backup device can provide four hours working time at first; Because transmitting site has increased additional communicator, have nothing for it but more load of battery provides electric energy, has therefore reduced the working time that is provided but As time goes on." working time " refers to that battery system can provide the time length of enough electric energy in order to keep the operation of visual plant.Therefore importantly available back-up source and existing loading demand are compared, so that dope the working time of back-up source.Analyzer will be operated this critical function automatically working time, not only have detailed standard to also have total standard.Thereby company should consider the availability of each position back-up source and the various summary forms of commercial unit.This is convenient to company, industry and or the appropriate execution of government standard.
Another purpose of the present invention provides a kind of battery management system, and this system can easily be applied to existing battery, and needn't change battery, and the various batteries that provided by different manufacturers easily are provided.
According to following disclosure and subsidiary claim, it is more obvious that other purpose and advantage will become.
Description of drawings
With reference in conjunction with the accompanying drawings to the following explanation of the embodiment of the invention, above-mentioned and further feature and purpose of the present invention and realize that its mode will become obviously, and can understand the present invention best, wherein:
Fig. 1 represents the label that the present invention uses;
Fig. 2 is the skeleton view with battery unit of the label that is associated with battery;
Fig. 3 is the battery testing that uses of the present invention and the view of data acquisition facility;
Fig. 4 is the process flow diagram of expression processing of the present invention;
Fig. 5 is company's summary report working time of example;
Fig. 6 analyzes working time of being used for the example of commercial unit summary;
Fig. 7 is the battery operation time series analysis detailed report of example.
Embodiment
The invention provides and coordinate the waste treatment of battery testing, maintenance, installation, realization and battery, and can extensively carry out these functions in the geographic area.The present invention is by BatteryCorp or similar ohm analyzer and based on the OMS of web TMPlatform is seamlessly in conjunction with these business.This new solution helps company to improve their backup power system, reduces cost simultaneously.
The preferred big label that Fig. 1 represents to be associated with single battery.This label is associated with the particular battery unit, so that the unique identification number that embeds in this label is associated with this particular battery all the time.Preferably, for guaranteeing this continuous association, as shown in Figure 2, use bonding agent that big label is fixed on the shell body of battery 5.
Big label is preferably the bar code label of the unique identifier that comprises associated batteries.Label shown in Fig. 1 preferably has following information: (1) service provider's title and telephone number; (2) bar code of unique identification number; (3) battery size; (4) the unique identification number of human-readable form.Owing to preferably comprise human-readable information and bar code identification number, therefore big label preferably is fixed on the human operator may place that battery just can see and scan that need not be shifted.
Fig. 3 represents test and the data acquisition facility that native system uses.Shown device is the BatteryCorpBC-T2000 device.But, can use different testers, this tester should be able to be imported data from bar code reader, and has the function of output data file.Bar code scanner or reader preferably with the battery tester direct communication, use and mutual reliably with convenient.The port 6 that this mode preferably is used for bar code reader by use and is used to be connected to computing machine is realized.Fig. 3 also shows port 7, A/C current input terminal mouth 8 and the on/off switch 9 that is used for two test probes.Since the present invention be can with the mutual flexible platform of the data file of multiple form, so data file can be multiple form.
Especially, cell tester should be able to be in internal memory store test results, test at every turn is associated with relevant unique scanning identifier.This tester also should be able to output test result such as ASCII text or Excel XLS form with the industrial standard file layout.This tester should be able to be carried out impedance or conductivity test (technology of IEEE approval).The company of many use self-contained batteries carries out impedance or conductivity test.These test-types are called as ohm and measure.The company of many use self-contained batteries carries out ohm and measures.
In alternative embodiment, this tester can be worked in coordination with infrared thermometer operation, and this infrared thermometer or be integrated on the cell tester is perhaps communicated by letter with this tester.This thermometer with the temperature that reads each battery with the relevant temperature of this particular battery unit unique identifier.This thermometer will provide the additional information about the tested person battery unit, and this additional information can be read, uploads and store.This thermometer will make no longer to be needed to write down battery unit environment temperature on every side with thermometer separately, and wherein environment temperature is stored with the battery testing data, and the reading more accurately of individual unit temperature is provided.
The proving installation file preferably has following heading message.At first, this document comprises position code.This sign indicating number link database of the present invention, the position of pilot cell.Secondly, environment temperature is stored together with detecting information, because battery temperature is relevant with expected life.Many battery manufacturers are because warranty request also needs this information.
The proving installation file preferably has following details.The first, be used to identify the unique identifier of single battery unit.The second, comprise testDate and time in the file.The 3rd, as single battery unit testing result's test value, be typically resistance value or electric conductivity value.Test value is the key mark of battery upstate.Impedance is big more or electricly lead low more (they are opposite measurements of same alike result), and the upstate of battery is poor more.The 4th, cross-over connection test (strap test) value, it is optional.The cross-over connection test is the interconnecting test between next battery (in string) in current battery itself and the sequence.The 5th, as the voltage of the voltage determination value of battery.Voltage is the one other identification of battery upstate, and also is the sign that is used for the unit state of battery charge.
Data base administration is another ingredient of the present invention.Each battery testing data point is together with being stored with this single battery unit associated unique identification symbol value.So just make trend analysis report and single battery detailed report become possibility.
In operation, the user uses the dec non-modem DEC cable that battery tester is connected to the serial ports or versabus (USB) interface of personal computer (PC), and the dec non-modem DEC cable belongs to the criterion calculation peripheral devices of easy acquisition.Link software makes the internal storage that data are sent to PC from test and the data acquisition facility facility that becomes.Usually, the user clicks at the graphic user interface (GUI) of software and goes up " transmission " button that shows.Response is " waiting pending data ".Prompting on the cell tester is directed to the user menu option of data download.
The user signs in to proprietary service provider website then.The user then clicks the icon that uploads data that shows in this GUI.Link software is uploaded designated data files to proprietary web server then.This this data file of web server process, thus relevant data is stored in OMS TMIn the suitable form of database.
The data element of being stored comprises:
A. unique identifier (ID)
B. carry out the user's of test ID
C. testDate and time
D. test-types (impedance or electricity are led)
E. thermometrically value
F. cross-over connection measured value (if available)
G. voltage
H. environment temperature
Then, the present invention generates consolidated return and analysis, preferably includes as follows:
A. battery testing history (position detail drawing)
B. battery testing summary (test and result general introduction)
C. not the test battery (verification tool)
D. battery is installed timeliness (based on installed date)
E. performance state report (based on user-defined state rule " by ", " well ", " warning " and " fault " analysis that battery is divided into groups)
F. replace forecast (estimating the analysis of the cost that will replace based on user-defined standard)
Automatically notice is another part of the present invention.This feature is based on user-defined business rules.These rules are test interval and ROMPaq, the interval of battery replacement automatically and ROMPaq usually.These business rules can be by commercial unit's regulation of client definition.Commercial unit can be geographic area, product line grouping etc.This provides great dirigibility for how the user uses aspect method for automatically notifying.All notices are preferably undertaken by Email or other electric transmission mode.
The high-level overview that Fig. 4 provides the present invention to handle.OMS TMSoftware needs the autoelectrinic mail notification of battery testing to send to the relevant technologies personnel each position.This processing is called automatic notice.The notified people that need test can be inner (being the client company employee) or outside (third party's) technician.Because the OMS that the user can use automatic notification feature to lose efficacy TMSoftware, and set up test plan alone, therefore this automatic notification feature is not that operation is essential to the invention.
The technician uses the cell tester test battery, and connects by network, is preferably for example global computer network of Internet, uploads the data to OMS TMProprietary database, this database is preferably placed on the server.When receiving the uploaded data file, OMS TMSoftware is handled these data immediately and is sent and reports that automatically (Auto Report) returns to this technician.This report with pilot cell whether all " by ", whether " by " test is perhaps arranged.This report can also provide the instruction of whether replacing particular battery or all batteries according to this client's business rules (replacing automatically) to this technician.If replace automatically and activate OMS TMSoftware will send adequate information to relevant field engineering personnel.OMS TMSoftware can provide and utilize file again, so that the battery that is replaced can suitably utilize again.
Automatically report generates via cell tester, and connects through network, preferably by for example global computer network of Internet, sends to OMS TMProprietary software and OMS TMDatabase.
Use the programming tool of Microsoft to make up OMS TMSoftware platform.This Integrated Development Environment (IDE) comprises the feature of accelerating exploitation, such as grammer management automatically, powerful editing machine, debugging, graphic design tool (comprising visual class and subclass) and integrated database access line by line.This platform is OO fully, thereby the advantage of complete inheritance, encapsulation property and polymorphism is provided to the developer.This has just greatly reduced design, coding and test duration, thereby produces high efficiency quick application and development (RAD) environment.
OMS TMThe method of work that platform adopts can be called commercial function modeling (BFM).Whole tendentiousness of development amount all center on business rules and method.This also can be called the object functionality model.Each function package specific business task, yet from the exploitation viewpoint, it has also inherited necessary any and all systemic-functions of execution preplanned mission.For example, the buying order object will accept request, and the visit necessary data is used all relevant business rules, the data that checking is sent, and more new database and generation response, all these is carried out in single software object.This is main architecture advantage.
The operating analysis module is based upon on the basic system, have or not such as the option of replacing, redeploy method or other is as reporting modules such as exception reportings.The operating analysis module according to battery and specification of equipment and the actual user mode after measuring relatively with present load report working time of estimation is provided.The operating analysis module provides key message for the back-up operation planning purpose.
In many cases, even if battery is under the good situation, because the variation of loading demand might reserve electric energy deficiency.This situation usually takes place in many industries.For example, aspect wireless communications application, the battery backup device can provide four hours working time at first; Because transmitting site has increased additional communicator, have nothing for it but more load of battery provides electric energy, has therefore reduced the working time that is provided but As time goes on.Picture uses herein, and " working time " refers to that back-up system can provide the time length of enough electric energy in order to keep the operation of visual plant.Therefore importantly available back-up source and existing loading demand are compared, so that dope the working time of back-up source.Analyzer will be operated this critical function automatically working time, not only have detailed standard to also have total standard.Thereby the availability of each position back-up source and the various summary forms of commercial unit can be checked by company.This is convenient to the appropriate execution of company, industry and/or government standard.
Working time, analyzer need be imported battery testing data and load information according to device type.Treatment step comprises:
User interface prompt requestor's range information, for example which commercial unit will be included in the report.
Working time analyzer then with regard to selected position to the up-to-date battery testing result of database query.
The listed equipment in position, every place is inquired, and calculate the total load of position, every place.
At locational every crosstalk pond, calculate available electric weight according to up-to-date test result and new battery specification.
For position, every place, be that new battery and existing situation are calculated total available power.
Estimated Time Of Operation is to calculate on the basis that electric weight demand and available power compare, and adjusts according to temperature.The battery discharge curve is used to calculate working time.This is the technical specification that is provided for every kind of battery size routine by the battery production merchant.It has been described load and battery and has been the relation between the time total amount that must voltage can supply electric weight (ampere).
Estimated Time Of Operation is with " specification " (how many pot lifes based on total load and new battery is) and " current " (how many pot lifes based on total load and the current user mode of battery is) to show.
Fig. 5 has shown company's summary report working time of an example.This preference pattern of report comprises following details:
Business Name;
The title of every part of commercial unit's report.
All remaining informations by commercial unit and all other unit descriptions:
Total number of positions;
The number of positions of being tested;
The percentage that tested position is shared;
Position counting and available working time the sum in 1 hour percentage;
Position counting and available working time are at the percentage of 1 to 2 hour sum;
Position counting and available working time are at the percentage of 2 to 4 hours sum;
Position counting and available working time are at the percentage of 4 to 6 hours sum;
Position counting and available working time are at the percentage of 6 to 8 hours sum;
Position counting and available working time are at the percentage of the sum more than 8 hours.
What Fig. 6 showed is commercial unit's analysis report working time of an example.This preference pattern of report comprises following details:
Business Name;
The title of commercial unit's report;
Be used for method that output is classified, lexicographic order that can the opsition dependent title, by preferably arrive the worst order of performance, by the worst to the best performance order or the order of pressing specification percentage;
With hour and minute the expression average operating time;
The average percentage of specification;
Be in 1 hour working time, 1 hour to 2 hours, 2 hours to 4 hours, 4 hours to 6 hours, the 6 hours countings to the number of positions more than 8 hours or 8 hours.
By described all remaining informations of each battery deployed position:
With hour and working time of specification of minute expression;
Actual run time as the percentage of specification;
With hour and the actual run time of minute expression, in suitable row, show, each row is described hour scope, comprises in 1 hour, 1 to 2 hour, 2 to 4 hours, 4 to 6 hours, 6 to 8 hours or more than 8 hours.
What Fig. 7 showed is the battery operation time detailed report of example.The report details preferably includes:
Business Name;
Commercial unit's title;
The user's standard that is used to report (just with hour specific run time standard of expression).
Detailed report information may comprise:
Positional information and climate type;
Battery production merchant, model, quantity and benchmark test value;
Electric weight demand with ampere and watt demonstration;
By the output that new battery provided, for example on this position present configuration;
According to the total load of new battery with hour and working time of the calculating of minute expression;
By the output that current battery provided, each up-to-date battery testing result;
According to the total load of existing battery with hour and working time of the calculating minute represented, with minimum and maximum time representations.
At last, OMS TMPlatform comprises abundant complete fastening means.It is the data of the various forms of I/O easily, from plain text to separate file to Excel to XML.In fact, the cell tester upload module is accepted the data of text and XLS form.OMS TMData source that also can any adaptation ODBC of direct access is such as Oracle, DB2 and other database.But we expect that the XML class will be particularly conducive to OMS TMAnd the seamless communication between any related system.
Be used to make up OMS TMAppointed product comprise:
● the Visual FoxPro of Microsoft 7.0 (IDE)
● West Wind Web connects (the basic class that is used for the web service)
● Macromedia HomeSite (HTML/JavaScript editing machine; Any operable editing machine)
● the IDAutomation.com bar code font
●Adobe?Acrobat?5.0
It is the framework that is used to make up the basic class that web uses that the web of West Wind technology connects.These classes are carried out the low order function of the authentication that is useful on, request management, dialogue management, data formatting and output.If the renewal version of said procedure is arranged, can preferably use it to upgrade version.
Because other modification or variation are significantly for those skilled in the art, therefore together with specific device principle of the present invention are described.Yet should be appreciated that what this description was just made by example, rather than to the limitation of the scope of the invention.

Claims (6)

1. estimate and report battery operation time method for one kind, comprising:
Obtain the position of battery unit;
The test result that querying database is relevant with this position;
Querying database is to the listed row equipment in described position;
For to this listed row calculation of equipments load total amount of described position;
Based on test result and battery specification is the metric of this position calculation available power;
Be the overall available power of this position calculation;
Based on relatively calculating the working time of estimating of electric weight demand and available power;
Based on the display result of estimating working time.
2. the method for claim 1, wherein said battery unit comprises a string battery.
3. the method for claim 1, wherein said result are shown as the time cycle of being determined by new battery and load total amount.
4. the method for claim 1, wherein said result are shown as the time cycle that the battery that used by reality and load total amount are determined.
5. the method for claim 1 further comprises the working time of estimating according to the temperature adjustment that is associated with battery unit.
6. the method for claim 1 further comprises the working time of utilizing the battery discharge curve calculation to estimate.
CN2006100783168A 2005-05-10 2006-05-09 Battery management system and device with run time analysis report function Expired - Fee Related CN1862281B (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
US11/125,631 US7349816B2 (en) 2003-12-30 2005-05-10 Battery management system and apparatus with runtime analysis reporting
US11/125,631 2005-05-10

Publications (2)

Publication Number Publication Date
CN1862281A CN1862281A (en) 2006-11-15
CN1862281B true CN1862281B (en) 2010-10-27

Family

ID=37389750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN2006100783168A Expired - Fee Related CN1862281B (en) 2005-05-10 2006-05-09 Battery management system and device with run time analysis report function

Country Status (1)

Country Link
CN (1) CN1862281B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106842036A (en) * 2016-12-09 2017-06-13 国网北京市电力公司 Data processing method and device for determining batteries operating time

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4803416A (en) * 1985-08-23 1989-02-07 Jacques Abiven Storage battery control device
CN1348544A (en) * 1999-04-23 2002-05-08 高通股份有限公司 System and method for accurately determining remaining battery life
CN1541337A (en) * 2002-05-14 2004-10-27 ������������ʽ���� Battery Capacity Calculation Method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4803416A (en) * 1985-08-23 1989-02-07 Jacques Abiven Storage battery control device
CN1348544A (en) * 1999-04-23 2002-05-08 高通股份有限公司 System and method for accurately determining remaining battery life
CN1541337A (en) * 2002-05-14 2004-10-27 ������������ʽ���� Battery Capacity Calculation Method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
JP特开平9-259935A 1997.10.03

Also Published As

Publication number Publication date
CN1862281A (en) 2006-11-15

Similar Documents

Publication Publication Date Title
US7317995B2 (en) Battery management system and apparatus
US7349816B2 (en) Battery management system and apparatus with runtime analysis reporting
US7915860B2 (en) Battery management system with runtime reserve analysis
US7616002B2 (en) Battery management system and apparatus with anomaly reporting
US7750639B2 (en) Battery management system with predictive failure analysis
JP6293985B1 (en) Battery test reporting system and method
US7003431B2 (en) Battery management system and apparatus
CA2605555A1 (en) Computer implemented systems and methods for pre-emptive service and improved use of service resources
zur Heiden et al. Predictive maintenance on the energy distribution grid–design and evaluation of a digital industrial platform in the context of a smart service system
CN110647567A (en) Auxiliary decision-making system for power outage planning based on terminal data fusion
CN109359900A (en) A kind of inspection management platform
CN110134053A (en) A kind of monitoring configuration method, device and the equipment of distribution transforming fault outage quick response
US7206704B2 (en) Battery management system and apparatus
Pathak et al. A service-oriented architecture for electric power transmission system asset management
CN1797837B (en) Battery management system and device
CN1862280B (en) Battery management system and device with abnormity report function
CN1862281B (en) Battery management system and device with run time analysis report function
CN1881666B (en) Battery management system and device
Wang et al. Smart grid information security-a research on standards
Stringham et al. Design of remote data collection devices for social impact indicators of products in developing countries
CN111798050A (en) Wisdom energy management system
Betharajoo et al. Safety Risk Assessment and Warning System at Engineering Laboratory Through IoT Technologies
Tong Smart grid information management system relying on MAS technology and complex scientific management thinking
CN118037268A (en) Equipment point detection method, device, equipment and storage medium
CN1808453A (en) Battery management system and device

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20101027