CN1738122A - Information access intensivism building new method - Google Patents
Information access intensivism building new method Download PDFInfo
- Publication number
- CN1738122A CN1738122A CN 200510075669 CN200510075669A CN1738122A CN 1738122 A CN1738122 A CN 1738122A CN 200510075669 CN200510075669 CN 200510075669 CN 200510075669 A CN200510075669 A CN 200510075669A CN 1738122 A CN1738122 A CN 1738122A
- Authority
- CN
- China
- Prior art keywords
- pipe
- pipeline
- sub
- son
- child
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
Disclosed a information channel ensemble building method, is characterized that: using the technique of same pipe, same channel and same well to replace the former small-bore pipe groups with one big diameter pipe whose material can be same to the small-bore pipe, or replace the small-bore steel pipe, plastic pipe and plastic alloy pipe with the big diameter cement pipe; then by special device, drawing the inserted pipe tightly and fixing it on the two ends of big pipe to avoid it from bended and coiling, so the following pipes can get through successfully with most number. When the optical (electric) cable is needed to arranged, the pipe can be inserted into channel at any time, according to the actual need. The pipes are divided into regions as their horizontal positions and colors to be managed correctly. Said invention can reduce cost and the risk of investment markedly to increase the economic benefits. It can be used in the development of city road and underground information net.
Description
One, technical field:
The invention belongs to the information infrastructure building field, is a kind of improvement to existing information (communication, broadcasting and TV, digital broadband etc.) underground piping intensive construction technology.
Two, background technology:
Since China Telecom splits and set up into telecommunications, move, UNICOM, Tie Tong, Netcom, defend logical, after the how tame information operator such as Jitong, add units such as radio and television and digital broadband service, the information service industry of China is in the intense market competition state of feudal lords vyiying for the throne, foundation works as information service industry, therefore be that laying of information pipeline is professional occurs fighting separately and the situation of unordered confusion, some city managers with foresight determine to strengthen the management of this respect for this reason, launch respectively related regulations and policies and set up the management mode of independently also implementation of information pipeline construction enterprises " unified planning; the unified construction; unified management " and the technical scheme of " being total to well " with ditch, the construction mode of promptly so-called " intensification ", the practice through has in a few years obtained certain economic benefits and social benefit.
Yet, the present problem that also has two aspects.The one, though organization and construction mode are new, but technical scheme is still reasonable inadequately, it is the information pipeline that cast and tubing still adopt the man information of original list operator to continue to use, be small-bore plastic film capicitor, walled tube, antipriming pipe and jaywalk on the major trunk roads and the little steel pipe of crossing the river span river, mould compo pipe etc., this pipeline that just each information operator was laid separately originally is the building method of simple set quantitatively, its construction investment is big, the pore utilance is low, waste is bigger, does not embody the advantage (seeing Fig. 1 for details) of intensive construction fully.The 2nd, when implementing intensive construction in development zone newly developed, because chronic between the pipeline of roughing-in and use, therefore the investment recovery is slow, investment risk is big, each information operator construction enthusiasm is not high, often miss the good opportunity that underground piping and synchronous road are built, thereby increased the cost of later construction greatly.As investing by country or investment enterprise, also exist investment risk to reach the pore number greatly and be difficult to problems such as design prediction etc., for this reason, be necessary original technical scheme is introspected and improved.By analysis, the purpose of laying the subsurface information pipeline is nothing but two, the one, " occupying the underground space ", the 2nd, " provide and wear the cable environment ", the two was realized simultaneously originally, so investment is very big.Now in order to reduce investment, use " occupying the underground space " instead and go on foot the way of walking with " provide and wear the cable environment " two, promptly when road construction, lay large diameter pipeline cheaply earlier, at first occupy road underground space, then when information user's demand having been arranged cloth given out light () cable immediately, in the heavy caliber underground piping, penetrate corresponding plastics pipe at any time, provide the good cable environment of wearing with this according at that time consumption demand.This is a new technical scheme, and this scheme has following advantage:
1, comparatively more cheap at next bigbore plastic tube of cross section same case than the package price of the small-bore plastic tube of One's name is legion, therefore can reduce gross investment (seeing Fig. 1, Fig. 2 for details).As further on material, improving, adopt the heavy caliber pipe of cement to substitute original moulding pipe, steel pipe and mould compo pipe, then more will reduce the pipeline cost exponentially.
2, the bigger pore number design prediction of difficulty has been become the design of large pipeline total sectional area, the forecasting problem that can thick lines ground solves the pipeline number, such as: major trunk roads design φ 300mm pore, subsidiary road design φ 250mm pore, branch road design φ 200mm pore or the like, so just needn't too move the suggestion of asking each information operator, regain the initiative.
3, employing is worn plastics pipe before wearing light () cable, promptly according to the actual requirements " with one, wear one " or " with several, wear several " method, though changed original only with a stand pipe but want four ways that penetrate φ 100mm pipe together, thereby significantly reduce idle child pipe quantity and reduce initial investment, its key be solved since sub-pipe crooked in large pipeline, twine and can not a problem that penetrate.
4, owing to having only a large pipeline, so in each link such as construction, examination, maintenance, all can save a large amount of expenses.
Three, summary of the invention:
Information access intensivism building new method of the present invention, mainly form by six aspect contents:
1, the underground piping of all information operators lays employing " same pipe, Tong Gou, Tong Jing " " three together " principle, substitutes numerous small-bore pipe groups with large diameter pipeline and closes, and reduces the cost of pipeline.
2, on pipe material, the both available material identical with small-bore pipeline, more available heavy caliber pipe of cement substitutes and to cross and the steel pipe of cross a river, mould compo pipe, reach the pipe of moulding on the arterial highway, so both increased the compression strength of pipeline, but anticorrosion again, anti-aging, antitheft more can reduce the pipeline cost at double.The heavy caliber pipe of cement is compared with the honeycombed cement pipe of once using in early days, and price advantage still obviously exists, and constructs, safeguards more convenient.
When 3, each sub-pipe penetrates, subsidiaryly simultaneously penetrate an isometric nylon rope or steel wire, be used for the direct tractive of next second son pipe, just needn't again use threader when wearing the son pipe so next time, and save original elder generation and " draw " the back one procedure of " the drawing " in " leading ".
4, the sub-pipe of the plastics of having worn in the large pipeline is tightened up stretching and is fixed in the pipeline, therefore this a little Guan Buhui natural torsion, winding mutually in pipeline, sub-pipe does not penetrate after can not influencing, and finally can penetrate as much as possible, make the engineering whole economic efficiency reach maximization (through practice, the maximum reality of son pipe can penetrate number for theoretical value about 70%).Originally must all can be worn the way that penetrates pipeline behind the son pipe bundling more simultaneously so needn't adopt, but employing according to the actual requirements " with one, wear one " or " with several, wear several " way, to reduce the idle quantity and the initial investment of sub-pipe.
Along with the stretching and fixing arm of tension progressively increases, it is no longer crooked that the face pipe will be piled up and push down down to the child pipe on upper strata and light () cable, at this moment, looks concrete condition and following sub-pipe fixing device can be removed, to reduce expenses and space resources.
5, the plastics pipe to having penetrated in the large pipeline, adopt horizontal level partition and color classification way of combining, the child pipe that is same information operator is tried one's best between vertical distribution, each operator according to the horizontal direction partition, and at child pipe two ends together, divide, define child pipe under each information operator with this identical child pipe bundling of color.Be white, position keep left (1) such as telecommunications; Netcom is yellow, position keep left (2); UNICOM is green, position (3) placed in the middle; Move and to be blue look, position keep right (4); Broadcasting and TV are red, position keep right (5) or the like.(seeing Fig. 2 for details)
6, the penetrating, strain and fixing can use specific purpose tool to increase work efficiency of sub-pipe mainly contains " draw bar ", " tightly managing machine " reaches " fixture ".
" draw bar " can draw single stand pipe and pass underground pore, when it connects with son pipe loading and unloading very convenient, when especially in big pore, wearing last a few stand pipe, can guide in small space that arm is smooth and easy to be passed.(seeing Fig. 4 for details)
The effect of " tightly managing machine " is that the child pipe that will put in large pipeline is progressively strained, and when manpower is difficult arm is strained when stretching, and it can bring into play useful effect.(seeing Fig. 5 for details)
The effect of " fixture " is to make the son pipe keep the stretching state of tension always, avoids producing natural torsion and winding in pipeline, guarantees when other sub-pipe will penetrate from now on unblocked.(seeing Fig. 3, Fig. 6,7,8 for details)
Its economic benefit of information access intensivism building new method of the present invention is very remarkable, and existing is that example is calculated analysis to suppose that each information operator lays eight branch pipe(tube)s altogether:
1, during the jaywalk of information pipeline, add the cement total incapsulation with a φ 300mm internal diameter pipe of cement and substitute eight DN100mm steel pipe cohorts, its pipeline cost can descend 5/6.
2, the information pipeline crosses the river when striding the river, substitutes eight DN100mm steel pipe cohorts with a φ 300mm internal diameter steel pipe, and under the close situation of wall thickness, its pipeline cost can descend 1/2.
3, substitute eight PE φ 102mm pipe cohorts with a φ 300mm internal diameter PVC bellows on major trunk roads, its pipeline cost can descend 1/2.
4, because the underground piping number changes one into by eight, therefore easy construction reduces labour cost, but the logical cancel all of checking and accepting of the examination of complexity during final acceptance of construction, pipe-line maintenance does not from now on simultaneously also exist every branch pipe(tube) to carry out periodic flushing and examination is logical, reduce maintenance cost, three additions can reduce expense about 10% at least.
Four, description of drawings:
Fig. 1 is the nest of tubes structural representation before improving, and generally is made up of pipe (1) and wherein child pipe (2) and antipriming pipe (3).
Fig. 2 is pipe inner structure and subregion schematic diagram after improving, is made up of large pipeline (6) and son pipe cohort (1)~(5), and (1)~(5) are represented the child pipe cohort under five information operators respectively, and the outer thick lines of each cohort are the bundling scope.
Fig. 3 is son pipe two ends fixing means schematic diagrames.Anchor ear (2) bundle pipe (3) clamps and rests outside the crosspiece (1) that is close to large pipeline (4) outside, thereby every stand pipe is fixed on the large pipeline two ends.
Fig. 4 is the structure chart of " draw bar ".
Fig. 5 is the structure chart of " tightly managing machine ".
Fig. 6, Fig. 7, Fig. 8 are " fixture " structure chart.
Five, embodiment:
1, need lay type and about quantity of light () cable on this road according to each information operator, the external diameter of determinant pipe and quantity are leaving the internal diameter that estimates the large pipeline that need lay under the suitable headspace situation.
2, according to road and the route of pipe line by actual conditions, the material and the model of decision large pipeline.
3, finish the construction drawing design.
4, buying tubing and accessory, organizing construction and final acceptance of construction.
5, estimate according to the traffic carrying capacity of each information operator, the distributed areas of big pore cross section neutron tube are made rational planning for, divided, and each information operator pairing son pipe color is stipulated.
6, according to the give out light demand of () cable of each information operator cloth, model, color and the quantity of the sub-pipe of decision plastics.
7, according to the zone of dividing and the color of sub-pipe, the child pipe is penetrated in the big pore by propping up, at one end use under " fixture " fixing situation, with " tightly managing machine " other end is strained, and it is fastening with another pair " fixture ", make each the stand Guan Jun that has put on be in the stretching state of tension, the usefulness that supplies each information operator to wear light () cable.When last straton pipe and optical cable guarantee all to push down down the face pipe, when making it not recover bending again, look concrete condition and following " fixture " can be removed.
8, as required, the operation of son pipe be can wear at any time, subsidiary simultaneously penetrate a nylon rope or steel wire needed when each sub-pipe penetrates.
9, in inspection shaft large pipeline exit, the son pipe port of export of wearing close the position, that color is identical ties together, and the affiliated child pipe of each information operator is come into plain view.
Claims (7)
1, a kind of new method of information access intensivism building, the existing method that adds " nest of tubes combination " with " being total to well with ditch " is compared, it is characterized in that the combination of the nest of tubes of many small-bore pipelines laid and change a large diameter pipeline into and lay, promptly carry out " three with " method of " same pipe, Tong Gou, Tong Jing ".
2, the described new method of claim 1, when selecting the material of large diameter pipeline for use, can break through original common way, except that adopting the constant way of material, it is characterized in that substituting and crossed originally and steel pipe that cross a river is used, mould the plastic tube of using on compo pipe and the alternative major trunk roads, thereby reduce the pipeline cost at double with the heavy caliber pipe of cement.
3, the described new method of claim 1, sub-tubulose attitude in its large pipeline is with different originally, it is characterized in that last one, two layer child pipe is not to be in original free state in the large pipeline, but be tightened up stretching and be fixed in the large pipeline, with avoid the son pipe to produce natural torsion and twine mutually and influence after the penetrating of sub-pipe.When last straton pipe and optical cable guarantee all to push down down the face pipe, when making it not recover bending again, following sub-pipe can be loosened into free state.
4, the described new method of claim 1, penetrate the quantity of sub-pipe with different originally at every turn, it is characterized in that adopting according to actual needs at that time " with one, wear one " or " with several, wear several " method, though rather than original only all can must be worn the sub method that penetrates pipeline behind the bundling more simultaneously of managing with one.
5, claim 1,4 described new methods, wearing on the method for sub-pipe, different with the existing method of using threader elder generation " drawing " back " to lead ", when it is characterized in that each sub-pipe penetrates, a subsidiary simultaneously isometric nylon rope or the steel wire of penetrating, " leading " of being used for next second son pipe goes into, and need not " draw " with regard to only needing " leading " when wearing the son pipe so next time, also needn't re-use threader.
6, the described new method of claim 1, because son pipe One's name is legion in the large pipeline, need set up the management method of a cover science, it is characterized in that the antithetical phrase pipe adopts according to horizontal direction position partition and the method that combines by the color classification bundling, it is the child pipe of the same information operator vertical distribution of trying one's best, horizontal partition between each information operator, at two ends together same color pipe bundling, divide, define child pipe under each information operator with this, the child pipe under each information operator is come into plain view.
7, claim 1,3,4 described new methods the penetrating, strain and fixedly the time, can use specific purpose tool to increase work efficiency of sub-pipe, mainly contain " draw bar ", " tightly managing machine " reaches " fixture ".
Wherein " draw bar " is characterised in that by pull bar (1), tense-lax nut (2), expansion sleeve (3), pull-off spring (4), hexagon socket head cap screw (5), vertebra post (6) and forms.When " draw bar " inserts sub-pipe port, rotation tense-lax nut (2), vertebra post (6) expands expansion sleeve (3), the child pipe is tightly blocked, draw sub-pipe and penetrate pipeline, after the group pipe passes pipeline, as long as reverse rotation tense-lax nut (2), expansion sleeve (3) shrinks voluntarily, thereby " draw bar " easily taken out in the child pipe.(seeing Fig. 4 for details)
Wherein " tightly manage machine " and be characterised in that and form by lever (1), base (2), spring leaf (4), movable sleeve (5), fixed cover (6).Stir movable sleeve (5) by lever (1) during operation and do outwards motion, spring leaf (4) in its cover is clamped also outwards motion of son pipe (3), when movable sleeve (5) when moving inwards, spring leaf can not be clamped son pipe (3) and move inwards, because the spring leaf in the cover (6) that is fixed blocks.Son pipe (3) can only outwards be done one-way movement when movable sleeve (5) reciprocating motion like this, thereby the bundle pipe is progressively strained.(seeing Fig. 5 for details)
Wherein " fixture " is characterised in that by crosspiece (1), anchor ear (2) or spring clip (5) and forms.During use the horizontal large pipeline end face that rests of crosspiece (1), bundle pipe (3) is tightly clamped and is laid on outside the crosspiece (1) with anchor ear (2) or spring clip (5), and the every stand pipe (3) in the pipeline just is fixed on the large pipeline two ends by crosspiece (1) and anchor ear (2) or spring clip (5) like this.(seeing Fig. 3, Fig. 6, Fig. 7, Fig. 8 for details)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200510075669 CN1738122B (en) | 2005-05-10 | 2005-06-10 | Information access intensivism building new method |
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN200520019982.5 | 2005-05-10 | ||
| CN200520019982 | 2005-05-10 | ||
| CN 200510075669 CN1738122B (en) | 2005-05-10 | 2005-06-10 | Information access intensivism building new method |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1738122A true CN1738122A (en) | 2006-02-22 |
| CN1738122B CN1738122B (en) | 2010-05-05 |
Family
ID=36080821
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200510075669 Expired - Fee Related CN1738122B (en) | 2005-05-10 | 2005-06-10 | Information access intensivism building new method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1738122B (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108894183A (en) * | 2018-06-25 | 2018-11-27 | 广东省建筑设计研究院 | A kind of quality of water environment improves the construction method of shallow tunnel integrated system |
| CN111769492A (en) * | 2020-07-14 | 2020-10-13 | 江苏中新电材集团有限公司 | An easy-to-replace and expandable intelligent home improvement wiring pre-buried pipe and wiring method |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2567757B2 (en) * | 1991-06-27 | 1996-12-25 | 未来工業株式会社 | Method of laying wiring / piping material in pipe, laying device for this, and pipe for wiring / piping used for this |
| CN2336372Y (en) * | 1998-03-29 | 1999-09-01 | 刘学德 | Plastic sub-tube with lead wire |
| CN2383257Y (en) * | 1999-06-18 | 2000-06-14 | 浙江省东阳市龙威实业有限公司 | Porous square combined tube |
-
2005
- 2005-06-10 CN CN 200510075669 patent/CN1738122B/en not_active Expired - Fee Related
Cited By (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108894183A (en) * | 2018-06-25 | 2018-11-27 | 广东省建筑设计研究院 | A kind of quality of water environment improves the construction method of shallow tunnel integrated system |
| CN108894183B (en) * | 2018-06-25 | 2020-11-10 | 广东省建筑设计研究院 | A construction method of shallow tunnel integrated system for improving water environment quality |
| CN111769492A (en) * | 2020-07-14 | 2020-10-13 | 江苏中新电材集团有限公司 | An easy-to-replace and expandable intelligent home improvement wiring pre-buried pipe and wiring method |
| CN111769492B (en) * | 2020-07-14 | 2022-01-28 | 江苏中新电材集团有限公司 | Easily-replaceable expandable intelligent home decoration wiring embedded pipe and wiring mode |
Also Published As
| Publication number | Publication date |
|---|---|
| CN1738122B (en) | 2010-05-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| WO2021223400A1 (en) | Prefabricated combined assembly-type anti-floating tensile prestressed anchor rod member and construction method therefor | |
| CN106284082A (en) | Main rope of suspension bridge strand preforming and erection construction method | |
| CN104846747B (en) | A kind of self-anchored suspension bridge suspender tension technique based on self equilibrium systems | |
| CN109781619A (en) | A kind of fixture and detection method for detecting the bonding performance of fiber cement substrate | |
| CN1738122A (en) | Information access intensivism building new method | |
| CN102296829A (en) | Method for constructing three-dimensional cable net curtain wall and node connection member used in same | |
| CN211646042U (en) | Novel road and bridge crack consolidate device | |
| CN115045512B (en) | Integral beam penetrating device and method for prestressed ultra-long circumferential steel beam of nuclear power station | |
| CN204418770U (en) | A kind of LNG of being applicable to holds the prestress wire buttress system of storage tank entirely | |
| CN100380152C (en) | An optical cable laid in a sewer pipe and a laying method thereof | |
| CN116732895B (en) | A method for installing a horizontal tunnel anchor main cable | |
| CN103882871B (en) | A kind of antiseepage dam, salt pan fast construction method | |
| CN113668549B (en) | Turnover type green supporting system and construction method thereof | |
| RU2520542C1 (en) | Composite fibre-glass reinforcement (versions) | |
| US20190224884A1 (en) | Production Of Pre-Stressed Concrete Structures Using Fibrous Reinforcing Tendons | |
| CN206135311U (en) | A rail set that is used for cable turn poling to lay | |
| CN114855617A (en) | External prestress construction method for newly-built variable-cross-section continuous beam bridge | |
| CN109027446A (en) | Thermoplastic continuous fibers presoak kernmantle hot melt winding bellows and its manufacturing equipment | |
| CN104389453A (en) | Pre-stressed steel strand buttress system applicable for super-large type LNG (Liquefied Natural Gas) full-capacity storage tank | |
| CN2657022Y (en) | Optical cable laying in drain pipe line | |
| CN211441238U (en) | An underground high-pressure glass fiber reinforced plastic tubing and production device for layered water injection | |
| CN2668964Y (en) | Plastic hollow wall winding composite structure pipe | |
| CN118600825A (en) | A frame bridge system with side chamber and embedded prestressed structure and construction method thereof | |
| CN201670799U (en) | Composite billet bar bundling fixture for drawing optical fiber multifilament | |
| CN208748499U (en) | Layout structure of prestressed beam body after beam body growth |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| C17 | Cessation of patent right | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20100505 Termination date: 20110610 |