CN1759242A - 为风力涡轮机建造大型塔的方法 - Google Patents
为风力涡轮机建造大型塔的方法 Download PDFInfo
- Publication number
- CN1759242A CN1759242A CNA038261790A CN03826179A CN1759242A CN 1759242 A CN1759242 A CN 1759242A CN A038261790 A CNA038261790 A CN A038261790A CN 03826179 A CN03826179 A CN 03826179A CN 1759242 A CN1759242 A CN 1759242A
- Authority
- CN
- China
- Prior art keywords
- tower
- shell
- section
- flange
- sections
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/20—Arrangements for mounting or supporting wind motors; Masts or towers for wind motors
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
- E04H12/085—Details of flanges for tubular masts
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F03—MACHINES OR ENGINES FOR LIQUIDS; WIND, SPRING, OR WEIGHT MOTORS; PRODUCING MECHANICAL POWER OR A REACTIVE PROPULSIVE THRUST, NOT OTHERWISE PROVIDED FOR
- F03D—WIND MOTORS
- F03D13/00—Assembly, mounting or commissioning of wind motors; Arrangements specially adapted for transporting wind motor components
- F03D13/10—Assembly of wind motors; Arrangements for erecting wind motors
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F05—INDEXING SCHEMES RELATING TO ENGINES OR PUMPS IN VARIOUS SUBCLASSES OF CLASSES F01-F04
- F05B—INDEXING SCHEME RELATING TO WIND, SPRING, WEIGHT, INERTIA OR LIKE MOTORS, TO MACHINES OR ENGINES FOR LIQUIDS COVERED BY SUBCLASSES F03B, F03D AND F03G
- F05B2240/00—Components
- F05B2240/90—Mounting on supporting structures or systems
- F05B2240/91—Mounting on supporting structures or systems on a stationary structure
- F05B2240/912—Mounting on supporting structures or systems on a stationary structure on a tower
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B10/00—Integration of renewable energy sources in buildings
- Y02B10/30—Wind power
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mechanical Engineering (AREA)
- Sustainable Energy (AREA)
- Combustion & Propulsion (AREA)
- Sustainable Development (AREA)
- General Engineering & Computer Science (AREA)
- Architecture (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Wind Motors (AREA)
Abstract
为了运输大尺寸风车塔,本发明给出一种用于风车的钢塔(1),其包括多个圆柱或锥形塔部分(2),它的至少更宽的部分(2)再分割成两个或多个伸长的壳段(3),这些壳段通过例如由螺栓(10)拧紧在一起的垂直凸缘(6)组合为完整的塔部分(2),所述壳也分别提供有上部和下部水平凸缘(4),以允许塔部分(2)彼此在另一个上互连。
Description
技术领域
本发明涉及单壁钢塔部分的大尺寸风车塔,每个部分包括预制的壳段。
多年来实际中通常在工厂内单独建造钢塔部分,并且随后移动每个完整的部分到执行风车安装的地点。塔部分通常具有圆柱或稍微锥形形状,并且这些部分中每一个依次沿轴线被分割成适当数量的壳。
由于对于更大容量的风车以及由此产生的所需建造这种风车的更大尺寸的所有部件的不断增加的需求,因此获得了由下部结构带来的物理限制,例如在桥下部或者在隧道中的空隙。
因此,再分塔结构以便方便运输的观念将会是建议的明显方案。
背景技术
公开的DE19832921描述了一种特别用于风车塔结构,其具有大于6m的底部直径,该塔包括将会在建设地点安装的钢的内部和外部壳段,此处混凝土沉积在内部和外部壳之间的空间内,以便建立需要的强度以承受来自风压和磨坊头部的冲击。
在现有技术的塔中,要求内部和外部壳与混凝土芯配合使用,以提供所需的载荷承受能力。
而且,每个壳段均提供有垂直和水平的角边缘,这些角边缘具有通过例如螺栓用于互相连接段的多个通孔。这用于提供用作闸板壁的壳段所需的一些水平刚性。
风载荷随着风速的平方增加,因此磨坊塔越高,结构应当设计尺寸越强,这反过来意味着壁厚或者直径应当增加。
在载荷承载能力、刚性和固有频率的基础上限定优化直径,更高的塔结构的直径在垂直和水平尺寸方面将会超过允许的运输限制。发现需求更大直径的原因在于强度和刚性随钢板厚度的一次幂增加,而相对于直径它们分别以两次幂和三次幂增加。作为载荷承受能力的数学公式对应于抵抗力矩,其中D表示平均直径,t为厚度,
Q=(π/4)×D2×t,
而刚性(或偏转)对应于惯性矩,
I=(π/8)×D3×t。
因此,增加塔直径比板厚度更有益。
增加厚度将意味着更高的材料成本以及需求更重的运输车辆,运输车辆是卡车、火车、轮船或者直升机,而直径需要足够小以足够允许车辆高度不超过通常的4.2m,以便在桥下通过以及通过隧道。
为了包括并且利用增加的直径,太宽的部分需要沿着垂直线切割,因此壳能够在长度方向放下,同时载荷高度适于运输。
然而,这种方案具有在不适当的地方要求更大量人工工作的缺点并且会为分部件增加支撑结构,这正是其一直没有被视为合适方案的原因。
发明内容
本发明的目的在于提供用于风车的大直径塔结构,维持或降低当安装时结构的所有包含成本,并且该塔允许遵守通常后勤限制的运输。
本发明的另一目的在于提供一种准备塔的建设元件以及在卡车后在大型拖车上、在船之后在驳船上运输或者经由空中载运器运输的方法。
根据本发明,这些目的中之一通过用于风车的钢塔而获得,包括多个圆柱或锥形塔部分,更宽的部分再分割成两个或多个伸长的壳段,这些壳段通过例如由螺栓拧紧在一起的垂直凸缘组合为完整的塔部分,所述壳也分别提供有上部和下部水平凸缘,以允许塔部分彼此在另一个上互连。
而且,通过预制的壳段由单壁钢塔部分建造用于风车的大尺寸、圆柱或锥形塔而获得本发明的另一优点,其中至少更宽的部分沿着垂直线分割成段并且由沿着其边缘提供的凸缘互连,包括步骤:
a)通过具有需要曲率半径的轧制钢板来提供两个或多个塔壳段,所述壳共同形成完整的圆周塔部分,
b)沿着其自由边缘为每个壳段提供垂直和水平的连接凸缘,
c)在运输车架上安装一个或多个壳段,
d)运输所述支撑段到建造地点,
e)通过例如螺栓之类的连接构件沿着壳段的垂直边缘将壳段安装在一起,以提供塔部分,
f)经由例如螺栓之类的连接构件通过沿着塔部分的相对水平凸缘连接它们而在彼此顶部安装塔部分。
在该方法的有益实施例中,构成360°壳的轧制钢板焊接在一起以形成圆柱或圆锥塔部分,因此所述部分切割成需要数量的伸长壳段。
在该方法的另一有益实施例中并且在步骤a)以前,多个轧制伸长壳段沿着它们的相邻水平边缘焊接在一起以建立更大长度的塔壳段。
而且,该方法将优选包括凸缘在步骤b)中焊接在指向塔中心的位置。这留下塔的平衡外表面。
垂直凸缘相距各个壳的边缘优选以如下距离进行焊接:当它们拧紧在一起时,间隔杆能够夹在凸缘之间。在经由间隔杆互连两个相邻壳之后可见的垂直接头优选通过插入填充材料和/或填充元件进行覆盖。
在根据本发明的优选方法中,在偏置相邻塔部分的垂直分割线之后执行水平凸缘的互连。同时在运输到地点之前应当优选执行为每个壳准备必要的梯子等,由此尽可能减少安装地点的工作。
最后,在运输之前塔结构的所有部件优选在工厂内进行表面处理,以便相对在风车地点经常发生的侵蚀性环境条件产生最佳抗性。
塔的优选实施例示出塔部分中至少一个分割成基本相等弧长的三个段,即每个120°。
为了提供用于运输壳段的满意和实际长度,这种段能够有益地包括沿着它们的相邻水平边缘焊接在一起并且沿着最上和最下自由边缘与水平凸缘进行装配的至少两种长度的段,所述凸缘提供有用于互连螺栓的多个通孔。
在本发明的改进实施例中,当凸缘栓接在一起时,垂直凸缘焊接在以一距离偏置离开相应边缘的壳段上,留下在凸缘的相对表面之间的空间用于间隔杆夹在它们之间,这将允许有力及牢固的连接。所述间隔杆能够提供有配合在凸缘中的孔的通孔,并且优选在间隔杆中的每个孔将会具有切口,该切口从杆边缘延伸到所述孔内并且足够宽以允许杆在螺栓上侧向滑动。
如果在段和部分之间的垂直和/或水平接头分别通过插入填充材料和/或填充元件进行覆盖的话,那么获得塔的平滑外表面。
操作壳段的时间节省方面在于在运输到建造地点之前,它们能够通过以梯子部分和绳索夹具形式准备而便利地进行提供。
优选通过具有适当“拖车”或者车轮上的车架由陆地拖运提供运输,上述车架例如为具有多个支撑体的支撑框架形式,这些支撑体载有准备好运输长度的壳段。同时放在火车或者轮船上的其它形式的支撑框架也能够考虑用于运输。通过直升机,壳段可以通过端部直接提起并且运输到地点。
在风能地区需求的当前和将来大直径塔方面,根据本发明的塔以及描述建造这种塔的方法提供显著经济节省,并且由于它们在离开工厂之前能够准备有所有安装件,塔是直接可操作的,因此它们仅仅需要在建设地点进行连接。
附图说明
下面参照说明书附图描述根据本发明的塔和方法的有益实施例的实例,其中:
图1是根据本发明的风车塔部分的三个壳段中之一的正面侧视图,并且其由彼此相接焊接在一起的几种长度的壳构成,
图2是由在侧向上栓接在一起的三个段构成的塔部分的透视图,
图3是垂直于图平面延伸的在塔部分内部的垂直凸缘连接的详细视图,
图4分别是在图2中圈起的水平和垂直凸缘的详细视图,
图5是示出包括三个壳段的塔部分的横截面视图,以及
图6是准备好由卡车拖运的壳段。
具体实施方式
根据本发明建造的风车塔的壳段在图1中示出并且进一步的细节在图2-5中示出。该塔包括轧制钢板的多个壳段1,它们并肩栓接在一起组成完整的圆周塔部分2(参见图2和5),所述部分通过螺栓彼此固定在另一个上(参见图3和4)。在图2中,段3示出沿着邻接的上下边缘焊接在一起的几种长度的壳3。组合长度的壳段3的每个顶部和底部边缘提供有平面凸缘4,该凸缘4向内延伸并且载有大量通孔5以接收用于将多个部分牢固拧紧在一起的相应螺栓。
提供有大量通孔7的平面垂直凸缘6相距各个壳的边缘以如下距离进行焊接:当垂直的凸缘6通过螺栓10拧紧在一起时,伸长的间隔杆9能够夹在垂直的凸缘6之间。
在塔的外部上,垂直的接头11是可见的直到该接头由填充材料和/或填充元件12进行填充为止。
以类似的方式,在部分之间的水平接头可以制成不可见的。
在根据本发明的方法的实际实施例中,在运输到建设地点之前,塔壳段装配有例如梯子部分或者绳索夹具。通过将壳段放在支撑体1上而执行这种运输,支撑体1依次放在优选通过车轮15(图6)和卡车(未示出)可移动的支撑框架或结构13上。
显然通过考虑由下部结构给出的限制能够确定一个部分所分割成的壳段的数目;意味着低的桥、窄的隧道等。
而且,连接机构的选择决不限制为螺栓和螺母,但是它们是常见和合适的机构,特别也为了利用预制的表面处理,这应当保持未经触动的。
Claims (17)
1.一种用于风车的钢塔(1),包括多个圆柱或锥形塔部分(2),其至少更宽的部分(2)再分割成两个或多个伸长的壳段(3),这些壳段通过例如由螺栓(10)拧紧在一起的垂直凸缘(6)组合为完整的塔部分(2),所述壳也分别提供有上部和下部水平凸缘(4),以允许塔部分(2)彼此在另一个上互连。
2.如权利要求1所述的钢塔,其中,塔部分(2)中至少一个分割成基本相等弧长的三个段(3),即每个120°。
3.如权利要求1或2所述的钢塔,其中,壳段(3)包括沿着它们的相邻水平边缘焊接在一起并且沿着最上和最下自由边缘与水平凸缘(4)进行装配的至少两种长度的段(3),所述凸缘(4)提供有用于互连螺栓的多个通孔(5)。
4.如前面任一项权利要求所述的钢塔,其中,当凸缘栓接在一起时,垂直凸缘(6)焊接在以一距离偏置离开相应边缘的壳段(3)上,留下在凸缘(6)的相对表面之间的空间,用于间隔杆(9)夹在它们之间。
5.如前面任一项权利要求所述的钢塔,其中,所述间隔杆(9)提供有配合在凸缘(6)中的孔的通孔,并且优选在间隔杆(9)中的每个孔具有切口,该切口从杆(9)边缘延伸到所述孔内并且足够宽以允许杆(9)在螺栓(10)上的侧向滑动。
6.如前面任一项权利要求所述的钢塔,其中,在段(3)和部分(2)之间的垂直和/或水平接头分别通过插入填充材料和/或填充元件(12)进行覆盖。
7.如前面任一项权利要求所述的钢塔,其中,在运输到建造地点之前,通过以例如梯子部分和绳索夹具形式准备而提供壳段(3)。
8.通过预制的壳段(3)由单壁钢塔部分(2)建造用于风车的大尺寸、圆柱或锥形塔(1)的方法,其中至少更宽的部分(2)沿着垂直线(11)分割成段(3)并且由沿着其边缘提供的凸缘(4、6)互连,包括步骤:
a)通过具有需要曲率半径的轧制钢板来提供两个或多个塔壳段(3),所述壳共同形成完整的圆周塔部分(2),
b)沿着其自由边缘为每个壳段(3)提供垂直和水平的连接凸缘(6、4),
c)在运输车架或支撑框架(13)上安装一个或多个壳段(3),
d)运输所述支撑段(3)到建造地点,
e)通过例如螺栓之类的连接构件(10)沿着壳段(3)的垂直边缘(6)将壳段(3)安装在一起,以提供一个或多个塔部分(2),
f)经由例如螺栓之类的连接构件通过沿着塔部分(2)的相对水平凸缘(4)连接它们而在彼此顶部上安装塔部分(2)。
9.如权利要求8所述的方法,其中,所述轧制钢板在步骤a)中构成360°壳,其初始焊接在一起以形成圆柱或圆锥塔部分(2),并且随后切割成需要数量的伸长壳段(3)。
10.如权利要求8或9所述的方法,其中,在步骤a)以前,为伸长壳段(3)形式的优选数量的轧制钢板沿着它们的相邻水平边缘焊接在一起以建立更大长度的塔壳。
11.如前面任一项权利要求所述的方法,其中,凸缘(4、6)在步骤b)中焊接在指向塔(1)中心的位置。
12.如前面任一项权利要求所述的方法,其中,垂直凸缘(6)相距各个壳的边缘以如下距离进行焊接:当它们拧紧在一起时,间隔杆(9)能够夹在凸缘(6)之间。
13.如权利要求12所述的方法,其中,在经由中间的间隔杆(9)互连两个相邻壳之后可见的垂直接头(11)通过插入填充材料和/或填充元件(12)进行覆盖。
14.如前面任一项权利要求所述的方法,其中,在偏置相邻塔部分的垂直分割线(11)之后执行水平凸缘(4)的互连。
15.如前面任一项权利要求所述的方法,其中,在运输到地点之前执行为每个壳准备必要的梯子等。
16.如前面任一项权利要求所述的方法,其中,在运输到建造地点之前,塔结构(1)的所有部件在工厂内进行表面处理。
17.在根据权利要求8-16中任一项所述的方法的步骤c)和d)中使用的运输车架,其中,所述车架由用于运输的支撑框架(13)构成,具有载送准备好运输长度的壳段的多个支撑体(14),所述支撑框架(13)例如通过车轮(15)可移动,并且由卡车进行拖运。
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| PCT/EP2003/002888 WO2004083633A1 (en) | 2003-03-19 | 2003-03-19 | Method of constructing large towers for wind turbines |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1759242A true CN1759242A (zh) | 2006-04-12 |
| CN1759242B CN1759242B (zh) | 2010-05-26 |
Family
ID=33016796
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN038261790A Expired - Lifetime CN1759242B (zh) | 2003-03-19 | 2003-03-19 | 风车塔以及为风力涡轮机建造大型塔的方法 |
Country Status (10)
| Country | Link |
|---|---|
| US (1) | US7802412B2 (zh) |
| EP (1) | EP1606514B1 (zh) |
| CN (1) | CN1759242B (zh) |
| AT (1) | ATE377707T1 (zh) |
| AU (1) | AU2003212370B2 (zh) |
| CA (1) | CA2519277C (zh) |
| DE (1) | DE60317372T2 (zh) |
| ES (1) | ES2297130T3 (zh) |
| PT (1) | PT1606514E (zh) |
| WO (1) | WO2004083633A1 (zh) |
Cited By (12)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102011709A (zh) * | 2009-09-03 | 2011-04-13 | 通用电气公司 | 风力涡轮机塔架及制造该风力涡轮机塔架的系统和方法 |
| CN102224341A (zh) * | 2008-11-25 | 2011-10-19 | 维斯塔斯风力系统集团公司 | 制造风力涡轮机塔架结构的方法 |
| CN102439250A (zh) * | 2009-05-21 | 2012-05-02 | 阿尔斯通风力有限个人公司 | 用于风轮机塔结构的组件连接装置 |
| CN102606416A (zh) * | 2011-01-19 | 2012-07-25 | 通用电气公司 | 模块化塔架及其组装方法 |
| CN103492636A (zh) * | 2011-03-21 | 2014-01-01 | 安德里特斯公开股份有限公司 | 用于制造杨克式缸的方法 |
| CN103492094A (zh) * | 2011-04-27 | 2014-01-01 | 乌兹特工业设施建设制造有限公司 | 塔的制造方法 |
| CN103534482A (zh) * | 2011-05-16 | 2014-01-22 | 西门子公司 | 用于生产风轮机塔架部段的方法和风轮机塔架 |
| US9200468B2 (en) | 2011-06-10 | 2015-12-01 | Wobben Properties Gmbh | Wind energy plant tower |
| CN106460784A (zh) * | 2014-04-22 | 2017-02-22 | 维斯塔斯风力系统有限公司 | 连接风轮机塔架片段用的对准工具、系统以及方法 |
| CN107671365A (zh) * | 2016-08-02 | 2018-02-09 | 伊诺能源系统公司 | 塔的至少一个塔段的壳体的切断方法和移动式切断装置 |
| CN111894809A (zh) * | 2019-05-06 | 2020-11-06 | 北京天杉高科风电科技有限责任公司 | 拼装工装以及拼装方法 |
| CN112879233A (zh) * | 2020-12-28 | 2021-06-01 | 山东中车风电有限公司 | 片装式塔架、制造与安装方法及风电机组 |
Families Citing this family (103)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| AU2005211457B2 (en) * | 2004-02-04 | 2010-03-18 | Corus Staal Bv | Tower for a wind turbine, prefabricated metal wall part for use in a tower for a wind turbine and method for constructing a tower for a wind turbine |
| DK1856410T4 (en) * | 2004-11-10 | 2018-08-27 | Vestas Wind Sys As | A WINDOW FOR A WINDMILL, A PROCEDURE FOR MANUFACTURING A TOWER AND APPLICATIONS THEREOF |
| JP2008520861A (ja) * | 2004-11-23 | 2008-06-19 | ヴェスタス,ウィンド,システムズ エー/エス | 風力タービン、風力タービンの組み立て及び取り扱い方法、並びにその使用 |
| ES2326010B2 (es) * | 2006-08-16 | 2011-02-18 | Inneo21, S.L. | Estructura y procedimiento de montaje de torres de hormigon para turbinas eolicas. |
| DE202007003842U1 (de) * | 2007-03-15 | 2007-05-24 | Mecal Applied Mechanics B.V. | Mast für eine Windturbine |
| US20080236073A1 (en) | 2007-03-30 | 2008-10-02 | General Electric Company | Low cost rail-transportable wind turbine tower |
| DE102007018025A1 (de) | 2007-04-17 | 2008-10-23 | Nordex Energy Gmbh | Windenergieanlagenturm |
| WO2009056898A1 (es) * | 2007-11-02 | 2009-05-07 | Alejandro Cortina-Cordero | Torre de concreto postensado para generadores eolicos |
| BRPI0818315B1 (pt) * | 2007-10-09 | 2018-06-05 | O. Willis Jeffrey | "Estrutura de torre, conexão e método de montagem" |
| EP2047941A1 (en) * | 2007-10-11 | 2009-04-15 | Siemens Aktiengesellschaft | Method for the strengthening of a welded connexion, and/or for the increase of tolerance of a welded connexion in relation to fatigue load ; Element for a tower of a wind turbine ; Tower of a wind turbine and wind turbine |
| DE102008012664A1 (de) | 2008-01-30 | 2009-08-06 | Repower Systems Ag | Windenergieanlage und ein Turm oder Turmsegment und eine Türzarge dafür |
| CA2713368C (en) | 2008-02-06 | 2014-12-02 | Ib Andresen Industri A/S | Tower element |
| US20090223163A1 (en) * | 2008-03-10 | 2009-09-10 | Shu Ching Quek | Wind Turbine Tower Including An Induction Brazed Joint And A Method Of Fabricating The Wind Turbine Tower |
| ES2356679B1 (es) * | 2008-06-06 | 2011-11-28 | Manuel Torres Martinez | Torre para aerogenerador. |
| DE102008029651B3 (de) | 2008-06-24 | 2010-04-08 | Repower Systems Ag | Turm einer Windenergieanlage |
| WO2010055535A1 (en) * | 2008-11-17 | 2010-05-20 | Tecnopali Group S.P.A. | Tubular tower and construction procedure |
| DE102009013186B4 (de) | 2008-12-19 | 2015-05-28 | Senvion Se | Turm einer Windenergieanlage |
| SE534051C2 (sv) * | 2009-02-27 | 2011-04-12 | Roger Ericsson | Prefabricerat väggelement för tornkonstruktion, samt tornkonstruktion |
| US20120012727A1 (en) * | 2009-03-19 | 2012-01-19 | Telefonaktiebolaget Lm Ericsson (Publ) | Tubular Telecom Tower Structure |
| US20100257739A1 (en) * | 2009-06-30 | 2010-10-14 | Sujith Sathian | Methods and flange for assembling towers |
| IT1396433B1 (it) | 2009-11-16 | 2012-11-23 | Rolic Invest Sarl | Impianto eolico per la generazione di energia elettrica e metodo per realizzare un pilone del suddetto impianto eolico. |
| CN102834607B (zh) * | 2009-12-25 | 2016-07-06 | 苏州可汗极米科技有限公司 | 用于风力发电机的塔架 |
| DK2345810T3 (da) * | 2010-01-18 | 2013-01-02 | Siemens Ag | Indretning og fremgangsmåde til transportering af et vindturbinetårnsegment |
| US10189064B2 (en) | 2010-01-25 | 2019-01-29 | Keystone Tower Systems, Inc. | Control system and method for tapered structure construction |
| US8720153B2 (en) * | 2010-01-25 | 2014-05-13 | Keystone Tower Systems, Inc. | Tapered spiral welded structure |
| DE112010005382T5 (de) | 2010-03-12 | 2013-01-03 | Siemens Aktiengesellschaft | Wandabschnitt für einen Windkraftanlagenturm |
| EP2534376B1 (en) * | 2010-03-12 | 2015-07-29 | Siemens Aktiengesellschaft | Wall portion for a tower of a wind turbine |
| EP2375057B1 (en) * | 2010-03-31 | 2016-05-04 | Siemens Aktiengesellschaft | Wind turbine installation |
| EP2385245B1 (en) | 2010-05-05 | 2017-09-13 | Siemens Aktiengesellschaft | Steel tower for a wind turbine |
| US20110299937A1 (en) * | 2010-06-07 | 2011-12-08 | Jose Pablo Cortina-Ortega | Pre-stressed concrete foundation for a marine building structure |
| DE102010023263A1 (de) * | 2010-06-09 | 2011-12-15 | Repower Systems Ag | Adapterstück und Turm für eine Windenergieanlage |
| PL2569533T3 (pl) | 2010-07-13 | 2016-04-29 | Siemens Ag | Rusztowanie montażowe do montowania wieży turbiny wiatrowej lub sekcji wieży turbiny wiatrowej |
| EP2580468B1 (en) | 2010-07-13 | 2017-11-01 | Siemens Aktiengesellschaft | A lifting and guiding device for handling wind turbine tower sections |
| CA2803945C (en) | 2010-07-13 | 2018-08-21 | Tom Andresen | Method of assembling a tubular building structure by using screw sockets |
| US8572924B2 (en) * | 2010-07-30 | 2013-11-05 | Production Resource Group, Llc | Truss hub and parts with variable configurations |
| WO2012025985A1 (ja) * | 2010-08-24 | 2012-03-01 | 三菱重工業株式会社 | 風力発電装置及び風車用タワー施工方法 |
| WO2012041677A1 (de) * | 2010-09-30 | 2012-04-05 | Siemens Aktiengesellschaft | Verfahren zum verbinden mehrerer zylindrischer elemente des turms einer windkraftanlage |
| US9114751B2 (en) | 2010-11-02 | 2015-08-25 | Siemens Aktiengesellschaft | Universal tower transport stand |
| US20110140447A1 (en) * | 2010-11-10 | 2011-06-16 | Ingo Paura | Reinforcement assembly for use with a support tower of a wind turbine |
| KR101242505B1 (ko) * | 2010-12-27 | 2013-03-12 | 재단법인 포항산업과학연구원 | 풍력발전기용의 모듈러형 풍력발전탑 |
| EP2479430B8 (en) * | 2011-01-24 | 2014-11-19 | ALSTOM Renewable Technologies | Method for assembling shell segments for forming tower sections of a hybrid wind turbine tower |
| DE102011003208B4 (de) | 2011-01-26 | 2016-05-25 | Senvion Gmbh | Turm einer Windenergieanlage mit Stromleitmitteln |
| US8209913B2 (en) * | 2011-02-01 | 2012-07-03 | Mitsubishi Heavy Industries, Ltd. | Tubular structure and wind turbine generator |
| AU2012201882B8 (en) * | 2011-04-01 | 2015-08-13 | Axicom Pty Ltd | Standardised Monopole Strengthening |
| US8245458B2 (en) | 2011-05-17 | 2012-08-21 | General Electric Company | Wind turbine with tower support system and associated method of construction |
| US8915043B2 (en) | 2011-05-25 | 2014-12-23 | General Electric Company | Bolt connection for a wind tower lattice structure |
| CN110842049B (zh) | 2011-09-20 | 2023-01-13 | 吉斯通塔系统公司 | 锥形结构构造 |
| US8584429B2 (en) * | 2011-09-30 | 2013-11-19 | Tindall Corporation | Tower erection system and method |
| US8393118B2 (en) | 2011-12-22 | 2013-03-12 | General Electric Company | Friction damping bolt connection for a wind tower lattice structure |
| DE102012011770A1 (de) * | 2012-06-15 | 2013-12-19 | Siegthalerfabrik Gmbh | Flanschteil für einen Turm einer Windkraftanlage |
| DE102012106772A1 (de) | 2012-07-25 | 2014-01-30 | Thyssenkrupp Steel Europe Ag | Modularer Turm einer Windkraftanlage |
| DE102012015489A1 (de) | 2012-08-04 | 2014-02-06 | E.N.O. Energy Systems Gmbh | Verfahren zum Errichten eines Turmes aus Stahl einer Windenergieanlage und Turm aus Stahl für eine Windenergieanlage |
| US9153853B2 (en) * | 2012-08-24 | 2015-10-06 | Wake Skykeeper, Llc | Monopole tower reinforcement configuration and related methods |
| DE102012112415B4 (de) | 2012-12-17 | 2014-08-07 | Thyssenkrupp Steel Europe Ag | Übergangskörper zur Anordnung zwischen unterschiedlich ausgeführten Abschnitten eines Windkraftanlagenturms und Windkraftanlagenturm mit einem solchen Übergangskörper |
| USD760165S1 (en) | 2013-07-01 | 2016-06-28 | Marmen Inc | Tower |
| DE102013107059B4 (de) | 2013-07-04 | 2018-12-06 | SIAG Industrie GmbH | Verfahren zur Herstellung und zum Errichten eines Rohrturmbauwerks |
| US20150027068A1 (en) * | 2013-07-24 | 2015-01-29 | General Electric Company | Tower base assembly for a wind turbine |
| DE102013110495A1 (de) | 2013-09-23 | 2015-03-26 | Thyssenkrupp Steel Europe Ag | Übergangskörper zwischen Turmabschnitten einer Windkraftanlage und Turm einer Windkraftanlage umfassend einen Übergangskörper |
| DE102013016604A1 (de) | 2013-10-07 | 2015-04-09 | EcoEnterprises GmbH | Stahlrohrturm einer Windenergieanlage, sowie Verfahren zur Herstellung und Montage der Turmbauteile |
| DE102013225128A1 (de) | 2013-12-06 | 2015-06-11 | Wobben Properties Gmbh | Windenergieanlage und Windenergieanlagen-Turm |
| ES2538734B1 (es) * | 2013-12-20 | 2016-05-10 | Acciona Windpower, S.A. | Procedimiento de montaje de torres de hormigón de sección troncocónica y torre de hormigón montada con dicho procedimiento |
| DE202014101245U1 (de) | 2014-03-18 | 2014-04-09 | Planen-Schmitz GmbH | Schutzvorrichtung zum Abdecken einer Öffnung eines Turmes einer Windkraftanlage oder eines ähnlichen Bauwerks |
| EP3132138B1 (en) | 2014-04-14 | 2018-03-14 | Vestas Wind Systems A/S | Rotational lifting tool |
| CA2945422C (en) | 2014-04-14 | 2020-04-21 | Vestas Wind Systems A/S | Tower segment handling method and apparatus |
| WO2015161854A1 (en) * | 2014-04-22 | 2015-10-29 | Vestas Wind Systems A/S | Method and tool for assembling tower elements |
| EP3134644B1 (en) * | 2014-04-25 | 2018-04-04 | Vestas Wind Systems A/S | Tower section production process |
| USD776801S1 (en) * | 2014-06-24 | 2017-01-17 | Kobe Steel, Ltd | Heat exchanger tube |
| CN107076122B (zh) | 2014-10-06 | 2019-05-10 | 维斯塔斯风力系统有限公司 | 铰链式塔架节段及运输方法 |
| FR3029231B1 (fr) * | 2014-12-01 | 2016-12-30 | Lafarge Sa | Section en beton |
| DE102014118251B4 (de) * | 2014-12-09 | 2017-05-04 | SIAG Industrie GmbH | Verfahren zur Herstellung und zum Errichten eines Rohrturmbauwerks |
| DE102015115645A1 (de) | 2015-09-16 | 2017-03-16 | SIAG Industrie GmbH | Verfahren zur Herstellung und zum Errichten eines Rohrturmbauwerks |
| WO2016091500A1 (de) | 2014-12-09 | 2016-06-16 | SIAG Industrie GmbH | Türkonstruktion für ein rohrturmbauwerk |
| PT3277952T (pt) * | 2015-04-02 | 2019-06-05 | Arcelormittal | Troço de torre de turbina eólica, torre de turbina eólica e procedimento de montagem |
| DE102015211269A1 (de) | 2015-06-18 | 2016-12-22 | Wobben Properties Gmbh | Windenergieanlagen-Turm und Windenergieanlage |
| DE102015110344A1 (de) * | 2015-06-26 | 2016-12-29 | Eno Energy Systems Gmbh | Teilstück einer Turmsektion, ein Turm und ein Verfahren zum Herstellen eines Teilstücks einer Turmsektion |
| DE102015115646A1 (de) | 2015-09-16 | 2017-03-16 | SIAG Industrie GmbH | Türkonstruktion für ein Rohrturmbauwerk |
| DE102015014458A1 (de) | 2015-09-16 | 2017-03-16 | Senvion Gmbh | Türkonstruktion für ein Rohrturmbauwerk |
| DE102016002372A1 (de) * | 2016-02-19 | 2017-08-24 | Senvion Gmbh | Verfahren zur Montage eines Rohrturmsegments |
| DE102016206755A1 (de) | 2016-04-21 | 2017-10-26 | Thyssenkrupp Ag | Übergangskörper für einen Turm einer Windkraftanlage, Turm mit diesen sowie Verfahren zu dessen Errichtung |
| US9850674B1 (en) | 2016-10-13 | 2017-12-26 | General Electric Company | Vertical joint assembly for wind turbine towers |
| EP3315694A1 (en) * | 2016-10-27 | 2018-05-02 | Siemens Aktiengesellschaft | Tower structure |
| US10053886B2 (en) | 2016-11-29 | 2018-08-21 | General Electric Company | Connection assembly for wind turbine tower |
| US11780359B2 (en) | 2016-12-20 | 2023-10-10 | Michael Kloepfer | Cylindrical semi-trailer |
| CA3039568C (en) | 2016-12-20 | 2020-06-30 | Titan Trailers Inc. | Cylindrical cargo container construction |
| USD915945S1 (en) | 2016-12-20 | 2021-04-13 | Michael Kloepfer | Cylindrical semi-trailer |
| DE102017116873A1 (de) | 2017-07-26 | 2019-01-31 | Wobben Properties Gmbh | Windenergieanlagen-Stahlturmringsegment und Verfahren |
| WO2019056089A1 (en) | 2017-09-22 | 2019-03-28 | Titan Trailers Inc. | QUASI-CYLINDRICAL CONTAINER AND CONSTRUCTION |
| CN107654338B (zh) * | 2017-09-30 | 2019-09-03 | 新疆金风科技股份有限公司 | 塔段、塔架、风力发电机组及塔段的制造方法 |
| DE102017125716A1 (de) * | 2017-11-03 | 2019-05-09 | Eno Energy Systems Gmbh | Verfahren zum Errichten eines Turms mit einer mehrteiligen Turmsektion und Teilsektion einer mehrteiligen Turmsektion eines Turms |
| DE102017011046A1 (de) * | 2017-11-29 | 2019-05-29 | Senvion Gmbh | Turmsegment für eine Windenergieanlage und Verfahren zum Herstellen eines Turmsegments |
| CN108000076B (zh) * | 2017-12-29 | 2024-06-21 | 金风科技股份有限公司 | 塔筒段的制造方法、塔筒段、塔筒和风力发电机组 |
| US10676952B2 (en) | 2018-01-26 | 2020-06-09 | General Electric Company | System and method for stabilizing a wind turbine |
| USD930141S1 (en) | 2018-06-01 | 2021-09-07 | Durkee Hi-Tech Material (Wuhan) Group Co., Ltd. | Air-duct |
| CN108894930B (zh) * | 2018-06-28 | 2019-09-06 | 北京金风科创风电设备有限公司 | 支撑组件、拼装工装以及拼装方法 |
| CN109139386B (zh) * | 2018-09-30 | 2019-08-23 | 北京金风科创风电设备有限公司 | 塔筒段、塔筒、分割方法及风力发电机组 |
| CN109404224B (zh) * | 2018-12-10 | 2024-06-18 | 重庆大学 | 一种基于边缘加劲组合壳体的风电混合塔筒 |
| DE102019218358A1 (de) * | 2019-11-27 | 2021-05-27 | Thyssenkrupp Steel Europe Ag | Gitterstruktur für einen Turm einer Windenergieanlage und Turm einer Windenergieanlage |
| EP3845354B1 (de) | 2019-12-10 | 2024-08-28 | Wobben Properties GmbH | Verfahren zum herstellen von segmenten für einen turm, vorgespanntes segment, turmring, turm und windenergieanlage |
| USD950491S1 (en) * | 2021-02-05 | 2022-05-03 | Charles Bryan | Tower with wind or water rotor generators |
| US12006679B2 (en) * | 2021-06-17 | 2024-06-11 | Peter Winters | Building structure and methods of assembly |
| DE102022100725A1 (de) * | 2022-01-13 | 2023-07-13 | Bettels Betonfertigteile GmbH | Turm für eine Windenergieanlage und betreffende Windenergieanlage |
| CN116100263B (zh) * | 2023-03-08 | 2025-03-18 | 北京星航机电装备有限公司 | 一种大型薄壁筒体的制备方法 |
| EP4191056B1 (de) | 2023-03-27 | 2026-01-21 | Wobben Properties GmbH | Verfahren zum herstellen von teilschalen eines stahlturmringsegments eines turms einer windenergieanlage |
Family Cites Families (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US1265966A (en) * | 1913-05-17 | 1918-05-14 | Canton Culvert & Silo Company | Silo. |
| US1765946A (en) * | 1928-03-29 | 1930-06-24 | Lou F Knowlton | Tank and joint for forming same |
| DE1031952B (de) * | 1953-12-17 | 1958-06-12 | Aug Kloenne Fa | Streifenfoermiger Mantelteil eines Behaelters und Vorrichtung zur Herstellung des Mantelteiles |
| US3193129A (en) * | 1963-01-31 | 1965-07-06 | Berkefeld Filter Ges Und Celle | Multiple section container |
| US3561890A (en) * | 1969-06-05 | 1971-02-09 | Martin A Peterson | Windmill tower |
| US3935633A (en) * | 1974-04-16 | 1976-02-03 | Bunker Jack E | Tank fabrication process |
| DE2709114A1 (de) * | 1977-03-02 | 1978-09-07 | Zueblin Ag | Verfahren zur herstellung von unterirdischen transportwegen grossen durchmessers |
| DE3842026A1 (de) * | 1988-10-15 | 1990-07-19 | Dietrich F W Schiffer | Turm in hochstabiler, weitgehendst schwingungsfreier konstruktion u. a. fuer windkraftanlagen aus gfk oder kfk laminar- oder sandwichbauweise fuer schwerste belastungen in grossen hoehen |
| NL1011315C2 (nl) * | 1999-02-16 | 2000-08-17 | Janssens & Dieperink B V | Werkwijze voor het vervaardigen van een silo. |
| US6468008B2 (en) * | 1999-09-30 | 2002-10-22 | Great Lakes Manufacturing, Inc. | Apparatus for constraining the position of logs on a truck or trailer |
| DE20013774U1 (de) * | 2000-08-10 | 2000-11-23 | Arand, Wilfried, 14532 Kleinmachnow | Baumodul zum Herstellen von Brücken, Gebäuden und Türmen, z.B. für Windkraftanlagen |
-
2003
- 2003-03-19 US US10/549,807 patent/US7802412B2/en not_active Expired - Lifetime
- 2003-03-19 AU AU2003212370A patent/AU2003212370B2/en not_active Expired
- 2003-03-19 WO PCT/EP2003/002888 patent/WO2004083633A1/en not_active Ceased
- 2003-03-19 AT AT03708258T patent/ATE377707T1/de not_active IP Right Cessation
- 2003-03-19 ES ES03708258T patent/ES2297130T3/es not_active Expired - Lifetime
- 2003-03-19 DE DE60317372T patent/DE60317372T2/de not_active Expired - Lifetime
- 2003-03-19 EP EP03708258A patent/EP1606514B1/en not_active Revoked
- 2003-03-19 PT PT03708258T patent/PT1606514E/pt unknown
- 2003-03-19 CA CA2519277A patent/CA2519277C/en not_active Expired - Lifetime
- 2003-03-19 CN CN038261790A patent/CN1759242B/zh not_active Expired - Lifetime
Cited By (18)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102224341B (zh) * | 2008-11-25 | 2014-01-08 | 维斯塔斯风力系统集团公司 | 制造风力涡轮机塔架结构的方法 |
| CN102224341A (zh) * | 2008-11-25 | 2011-10-19 | 维斯塔斯风力系统集团公司 | 制造风力涡轮机塔架结构的方法 |
| CN102439250A (zh) * | 2009-05-21 | 2012-05-02 | 阿尔斯通风力有限个人公司 | 用于风轮机塔结构的组件连接装置 |
| CN102439250B (zh) * | 2009-05-21 | 2014-07-09 | 阿尔斯通风力有限个人公司 | 用于风轮机塔结构的组件连接装置 |
| CN102011709A (zh) * | 2009-09-03 | 2011-04-13 | 通用电气公司 | 风力涡轮机塔架及制造该风力涡轮机塔架的系统和方法 |
| CN102606416A (zh) * | 2011-01-19 | 2012-07-25 | 通用电气公司 | 模块化塔架及其组装方法 |
| CN103492636A (zh) * | 2011-03-21 | 2014-01-01 | 安德里特斯公开股份有限公司 | 用于制造杨克式缸的方法 |
| CN103492094A (zh) * | 2011-04-27 | 2014-01-01 | 乌兹特工业设施建设制造有限公司 | 塔的制造方法 |
| CN103534482A (zh) * | 2011-05-16 | 2014-01-22 | 西门子公司 | 用于生产风轮机塔架部段的方法和风轮机塔架 |
| CN103534482B (zh) * | 2011-05-16 | 2017-03-01 | 西门子公司 | 用于生产风轮机塔架部段的方法和风轮机塔架 |
| US9200468B2 (en) | 2011-06-10 | 2015-12-01 | Wobben Properties Gmbh | Wind energy plant tower |
| TWI579458B (zh) * | 2011-06-10 | 2017-04-21 | 渥班 俄洛伊斯 | 風力發電設備塔柱 |
| CN106460784A (zh) * | 2014-04-22 | 2017-02-22 | 维斯塔斯风力系统有限公司 | 连接风轮机塔架片段用的对准工具、系统以及方法 |
| CN106460784B (zh) * | 2014-04-22 | 2019-07-02 | 维斯塔斯风力系统有限公司 | 连接风轮机塔架片段用的对准工具、系统以及方法 |
| CN107671365A (zh) * | 2016-08-02 | 2018-02-09 | 伊诺能源系统公司 | 塔的至少一个塔段的壳体的切断方法和移动式切断装置 |
| CN111894809A (zh) * | 2019-05-06 | 2020-11-06 | 北京天杉高科风电科技有限责任公司 | 拼装工装以及拼装方法 |
| CN111894809B (zh) * | 2019-05-06 | 2022-03-04 | 北京天杉高科风电科技有限责任公司 | 拼装工装以及拼装方法 |
| CN112879233A (zh) * | 2020-12-28 | 2021-06-01 | 山东中车风电有限公司 | 片装式塔架、制造与安装方法及风电机组 |
Also Published As
| Publication number | Publication date |
|---|---|
| EP1606514A1 (en) | 2005-12-21 |
| DE60317372T2 (de) | 2008-08-21 |
| PT1606514E (pt) | 2008-02-15 |
| EP1606514B1 (en) | 2007-11-07 |
| ATE377707T1 (de) | 2007-11-15 |
| ES2297130T3 (es) | 2008-05-01 |
| US7802412B2 (en) | 2010-09-28 |
| AU2003212370A1 (en) | 2004-10-11 |
| CA2519277C (en) | 2011-07-12 |
| DE60317372D1 (de) | 2007-12-20 |
| CA2519277A1 (en) | 2004-09-30 |
| WO2004083633A1 (en) | 2004-09-30 |
| AU2003212370B2 (en) | 2009-03-12 |
| CN1759242B (zh) | 2010-05-26 |
| US20060272244A1 (en) | 2006-12-07 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1759242A (zh) | 为风力涡轮机建造大型塔的方法 | |
| CN101328864B (zh) | 风力涡轮机塔架和用于建造风力涡轮机塔架的方法 | |
| US7160085B2 (en) | Wind turbine | |
| US20100162652A1 (en) | Segment for a Tower, Tower Constructed from Tower Segments, Element for a segment for a Tower, Method for the Pre-Assembly of segments for a Tower, Method for the Assembly of a Tower Containing Segments | |
| US20080236073A1 (en) | Low cost rail-transportable wind turbine tower | |
| US20060213145A1 (en) | Lattice-skin hybrid tower | |
| EP2345810B1 (en) | Arrangement and method of transportation for wind turbine tower segment | |
| US8215874B2 (en) | Modular foundation designs and methods | |
| CN101063509A (zh) | 塔连接装置、生产塔基的方法和塔基 | |
| US20100132269A1 (en) | Rail-transportable wind turbine tower | |
| CN1867769A (zh) | 用于海上风力发电设备的底座 | |
| CN1447773A (zh) | 用于搬运单位载荷的装置 | |
| CN202989765U (zh) | 一种拼接式波纹钢板承重柱 | |
| CN222081355U (zh) | 一种船舶分段转运托架 | |
| CN217352388U (zh) | 一种可用于钢吊箱拼装施工的桩基钻孔平台 | |
| CN1944920A (zh) | 在凿井期间起立大型箱式钢结构永久井架的方法 | |
| CN102464284B (zh) | 浓密机分块吊装和运输方法 | |
| CN119616057A (zh) | 一种桁架和大跨钢梁混合安装结构及安装方法 | |
| WO2025229635A1 (en) | Modular construction and foundation system with stackable structural segments for scalable transport and on-site assembly | |
| CN117627882A (zh) | 一种风电模块化大型主机底座 | |
| CN118441581A (zh) | 一种大倾角变截面无背索斜拉桥主塔施工的钢支架 | |
| CN119262589A (zh) | 兼做输电线路抢修塔基础的设备快速装卸储运箱体及方法 | |
| CN110453713A (zh) | 一种带支撑结构的多筒组合基础结构及其施工方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CX01 | Expiry of patent term |
Granted publication date: 20100526 |
|
| CX01 | Expiry of patent term |