CN1609343A - Structure of king crab type light dyke-dam and method - Google Patents
Structure of king crab type light dyke-dam and method Download PDFInfo
- Publication number
- CN1609343A CN1609343A CN 200410055468 CN200410055468A CN1609343A CN 1609343 A CN1609343 A CN 1609343A CN 200410055468 CN200410055468 CN 200410055468 CN 200410055468 A CN200410055468 A CN 200410055468A CN 1609343 A CN1609343 A CN 1609343A
- Authority
- CN
- China
- Prior art keywords
- dams
- dykes
- dam
- duricrust
- king crab
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Revetment (AREA)
Abstract
The present invention is rainbow type light dam structure and its construction process, and relates to dam building technology. The dam casing is made with high strength material, supported with ribs in the easy-to-deform parts and filled with other material. In soft foundation, light cushion layer is set in some easy-to-subside part; and in girt foundation, continuous antiseepage plates are inserted. The whole dam is integrated for balanced load, strengthened integral stability and raised strength.
Description
Technical field
The present invention relates to the Building technology of dykes and dams (cofferdam, roadbed, shelves cob wall).Be a kind of biomimetic features and method of novel soft foundation fill.The method that a kind of batch production is produced the dykes and dams member and carried out quick fill.
Background technology
This is right and proper for thousands of years theory for " confront soldiers with generals and stem water with earth ".This seems simple dam configuration is not that nothing can be studied, since arrogant Yu harnesses the river, and the historical summary that can examine, the dykes and dams technology is to threaten the people's lives peacefulness always, is perplexing the great research topic of socio-economic development.Along with the development of environmental science, geological sciences, computer technology, two phase flow and Fei Niu stream technology, people have the development of advancing by leaps and bounds to the dykes and dams Study on Technology.To the research of dykes and dams stress stability, the research of failure mechanism, the research of structural meterials, the research and the relevant problem of soft foundation, a large amount of reports and patent are arranged all both at home and abroad.But prior art does not all relate to the biomimetic features and the method for fill, the research of light material bed course, do not solve the differential settlement slippage problem that produces because of the weight of dam body is unbalanced yet, more do not relate to the fill method rapidly and efficiently of the prefabricated dykes and dams member of batch production.King crab formula lightweight dam configuration of the present invention and method not only have tough and tensile shell mechanism, and balanced an amount of weight makes dykes and dams that globality be arranged, and have in just gentlely, temper toughness with gentleness, and what can adapt to ground heavyly moves variation.And cost is low, the duration short, it is wide to be suitable for.By retrieving domestic and international patent documentation and 25 relevant databases, from the data that searches out, do not found to have identical research.
Owing to be covered with marine sediment layer since the deep Quaternary Period on the coastal beach, it is characterized in that: the water content height, void ratio is big, and transmission coefficient is little, buries deeply, and bearing capacity and shear strength are low, and be highly sensitive, and consolidation time is grown or the like.It is typical soft foundation.So exist following problem in design and fill: (1) soft foundation: general processing method is to avoid soft foundation or excavate soft layer, but buries deep a lot of engineerings for soft base, and this way does not gear to actual circumstances.Can only fill on soft base.(2) levee body is overweight: for soft base, gravity dam is not good more heavily more, on the one hand, the overweight excess hydrostatic pressure that causes in the dam soil increases, and effective stress reduces, and shear strength reduces, under Wave Load, the bottom principal direction of stress is not stopped paying out to give birth to and is changed, and causes ground to destroy; On the other hand, dam body is overweight will easily cause unrestrained more at design link restriction levee crown height, unrestrained more current scour dykes and dams are washed into zanjon earlier behind wave wall, the wave wall depression is toppled over, form the casual top overflow of seawater and wash away earth embankment, make the slump layer by layer of piece stone revetment until scabbling levee body.(3) the loose barrier properties of dykes and dams material is poor: filling the dykes and dams that cause with mud and stone, concerning ten borough chief's dikes, all is discrete material, and ground has change slightly, and the slit is just arranged, and water will leak out.The levee body seepage is a big hidden danger, and placed rockfill erosion control masonry quality is poor, and loosening easily distortion causes water to infiltrate and washes in a pan erosion levee body earth material.(4) poor stability: often occur differential settlement, landslide, displacement in the construction period or after building up, suffer heavy losses once chance earthquake, typhoon, dyke is ruined, inwelling.(5) fixed slowly long in time limit: the transmission coefficient of bury is 10
6-10
8Levee body earthwork heap does not get on, and can't stand, and the engineering time is long, although adopted measures such as plastic draining board, geotextiles and sand cushion, and still will be according to the strict control of bearing capacity of foundation soil rate of loading.In case slippage occurs, just need to stay and could continue construction in a year or so, can't the mechanization rapid construction.(6) side's amount is big: the used material of dykes and dams generally all is a large amount of earth and stone material, because levee body earthwork heap does not get on, can't stand, the depositional gradient of the levee body earthwork reaches 1: 16 than greatly during construction, and suffer the erosion of wind, wave, ice, and make idle side's amount quite big, expense is very high.Or the like.
Summary of the invention
King crab also claims the east king crab, formal name used at school Tachypleus Tridentatus, and arthropod, the crust of cephalothorax is half-moon-shaped, and the crust of belly is hexagon, and six pairs of appendages are arranged, six pairs of sheet nectopods.Be distributed in the Pacific Ocean, common in the tidal-flat area, two of male and female always together.Its hard shell, the structure of arch form, the complete bodily form, if the volt on beach, even big again stormy waves tide is not moved it yet, again Xiong Meng shark all how not it.And dykes and dams are just needing structure like this and characteristic.
The Building technology of dykes and dams (cofferdam, roadbed, shelves cob wall) comprises that ground processing, dam embankment, stability analysis, wave resistance energy dissipating, antiseepage hold one's breath, heavyly move observation etc.The present invention is directed to the problem that dyke exists, at traditional in the past dykes and dams in theory, propose a new fill structure and a method---the structure and the method for king crab formula lightweight dykes and dams.Its essential characteristic is: dykes and dams are seen as a king crab formula biosystem, the architectural characteristic design construction dykes and dams of imitative king crab.Promptly make the shell of dykes and dams, or the shell of dykes and dams part,, insert other packing material then, make it to produce loss of weight, reinforcement, antiseepage, isolation, effect that heap is high, improve dykes and dams intensity with the yielding position of iliacus materials for support dykes and dams with high-strength material.In soft foundation, adopt the lightweight bed course to be located at the position of easy depression slippage, thereby alleviate the weight at the easy depression of dykes and dams position, adjust the dykes and dams balance, with balanced dykes and dams loading, strengthen resistance to overturning.On gravel foundation, plug continuous barrier sheet, to overcome seepage.Whole dykes and dams join together, support each other, rely on each other, check and balance, and support mutually.And insert ground deeply with a plurality of bases of dam, it is gentle that dykes and dams are had just, temper toughness with gentleness, and molten with ground be one, with the elimination differential settlement, guarantee the safety of dykes and dams.
Its fundamental technics method comprises: lightweight dam body, hard structure dam shell, isolate antiseepage, deeply insert base of dam, be linked to be integral body.
1. lightweight dam body: for soft foundation, although adopted measures such as plastic draining board, geotextiles and sand cushion, ground is not iron-plated.Because the lack of uniformity of dyke (dam), must make loading inconsistent of ground under the dykes and dams, and produce differential settlement.The lightweight dam body is set just can effectively be addressed this problem.Promptly the intensity according to ground adopts light material or hollow structure material as dam body, and the outside covers earth, stone and turf etc.Lightweight dike core method is arranged, and promptly whole dam core adopts light material or hollow structural members to build, and alleviates dykes and dams weight, strengthens the dykes and dams bulk strength.Local completion method is promptly buried light material at a certain position of dykes and dams underground as the position of the easiest depression, to adjust the dykes and dams balance.Dam foot mat method is promptly spread the light material that one deck has certain intensity at the bottom of dykes and dams pad, to enlarge the scope of foundation load power diffusion, simultaneously the soft soil that crouches is down had restrictive function.Mix method, promptly mix lightweight filler in the dyke (dam) earthwork or concrete, make cubic metre of earth dehydration fast, unit weight reduces, and intensity increases, and it is stable to stand, and the slope is than improving.
2. hard structure dam shell: because stormy waves is major reasons that dykes and dams destroy to the erosion of dykes and dams, so the high strength hard dam shell is very necessary.Make the shell of dykes and dams with high-strength material, or the shell of dykes and dams part, and support in it, form the structure of stablizing three firm light, insert discrete material then with rib and lacing wire form.
3. isolation antiseepage: when building dykes and dams on the bigger ground of transmission coefficient, ground and levee body seepage are a big hidden danger.Traditional dykes and dams ground has change slightly, and dam body just has the slit, and water will leak out, and the loosening easily distortion of placed rockfill erosion control masonry causes water to infiltrate and washes in a pan erosion levee body earth material.So isolating antiseepage can not be ambiguous.Especially on gravel foundation, need to plug continuous barrier sheet.Barrier sheet adopts the I type plate member or the M type plate member of king crab formula lightweight dykes and dams.Plugging the degree of depth decides on the transmission coefficient of ground.
4. insert base of dam deeply: because the rheological characteristic of foundation soil in the depression problem that solves dykes and dams, can not be ignored the displacement problem of dykes and dams.Promptly in the structure of dykes and dams, have a plurality of bases of dam that are connected with dam body to insert soft base, reduce slippage, and molten with ground be one.
5. be linked to be integral body: for conventional dam, constituting the big again block of dam body, still is discrete material also, is necessary they are joined together.No matter be barrier sheet, or the hard dam shell, or lightweight bed course hollow structure material, adopt methods such as securing member, tongue and groove, male and female seam, overlapping, buckle or welding, whole dykes and dams member is joined together.Support each other, rely on each other, check and balance, support mutually.
Description of drawings
Fig. 1 is the basic block diagram of king crab formula lightweight dykes and dams.Fig. 2 is the sectional view of two kinds of stakes of duricrust sheet pile structure.Fig. 3 is the sheet pile structure interface chart.Fig. 4 is bamboo offset plate A type dykes and dams component diagrams.Fig. 5 figure is bamboo offset plate H type dykes and dams component diagrams.Fig. 6 is the I type plate member of king crab formula lightweight dykes and dams.7 figure are the M type plate member of king crab formula lightweight dykes and dams.Fig. 8 is the dykes and dams that duricrust sheet pile structure or plate member are formed.For Fig. 9 is the shelves cob wall that duricrust sheet pile structure or plate member are formed.Figure 10 is the man-made island of duricrust sheet pile structure or the trap of plate member.The duricrust esting structure that Figure 11 forms for the trapezoidal element member.The duricrust esting structure that Figure 12 forms for the rectangular element member.Figure 13 is the king crab formula lightweight dykes and dams of drum structure.
Structural shape commonly used has: duricrust light structures, duricrust sheet pile structure, duricrust esting structure, duricrust drum structure.
1. the duricrust light structures as shown in Figure 1, comprises duricrust (2), lightweight bed course (3), packing material (1), barrier sheet (4), upper opening (6), footing (5) etc.Make thin-wall shell with high-strength material, the top of this shell is provided with opening, and the bottom is provided with the footing of the soft base of deep insertion, and is placed on the dike line of the face of being coated with, and inserts discrete material from upper opening then.Be characterized in stablizing, antiseepage, anti-erosion.Be applicable to soft foundation and gravel foundation.The material of king crab formula lightweight dykes and dams comprises sheathing material, rib material, housing packing material and lightweight course.The high-strength material of described shell and rib can be selected the various materials that intensity is big, weather resistance is corroded for use, such as steel, polymer composite, steel concrete, glass fiber reinforced plastic, plastics, metal sheet, and bamboo offset plate or the like.Described housing packing material is that packing material can be suited measures to local conditions, and gathers materials on the spot, and main principle is that cheap getting expects conveniently to be generally the earth that takes nearby.The lightweight course requires proportion little, can select foamed plastics for use, as polystyrene, polyethylene, polypropylene, polyvinyl chloride or the like foaming, and these material coefficient of foaming big (can reach about 80 times), low, the in light weight (0.2~0.4kN/m of price
3), intensity height (compressive resistance 0.35MPa, flexural strength 0.3~0.5Mpa), the good (water absorption rate 0.0~0.2g/100cm of permeability resistance
2), chemical stability is good.For improving intensity, convenient construction, but doping.Also can adopt coal ash light haydite and hollow structural members to replace.
Shell, barrier sheet and lightweight bed course can be by prefabricated near plant produced dykes and dams member or the building site, and the scene of transporting to is then constructed.Also can directly make at the scene.The housing packing material generally fetches earth outside dam site.We have developed remote applied pipeline transportation method of a kind of undisturbed soil and equipment (patent is arranged in addition) specially, and filling is filled out in the remote conveying that has solved undisturbed soil.As the supporting means of lightweight hard-shell dyke, also provide the equipment assurance for extensive fill fast.Should notice during construction that the dykes and dams whole machine balancing is to guarantee its sedimentation unanimity.
Bamboo offset plate king crab formula lightweight dykes and dams are to do shell with the bamboo offset plate, do the lightweight bed course with straw, Spartina alterniflora or bavin bar, then the earth that takes nearby of filling.Be applicable to the quick fill of soft base.Fig. 4 is bamboo offset plate A type dykes and dams members, and Fig. 5 is bamboo offset plate H type dykes and dams members, is the dykes and dams member that batch production is made.It is in two Shell Plates (11) support rib dividing plate (12) to be arranged, and is fastening with wood screw (13) between Shell Plate (11) and rib dividing plate (12), and upper opening and bottom base of dam stud with and strengthen embracing an iron (14), also is used for the connection of levels.The two ends of Shell Plate (11) have a plurality of connection holes, are used for the connection between the dam body level.
2. duricrust sheet pile structure, as shown in Figure 8, comprise sheet pile (21), lacing wire (22), filler (23), top board (20) etc., both on soft foundation (24), with vibrating hammer duricrust sheet pile (21) is inserted ground (24) both sides, with lacing wire (22) sheet pile is linked up, light material and earth are inserted in the centre, and closely knit fixed bonnet is with top board (20).Described sheet pile structure (21) is made up of plate (9) and stake (10) as shown in Figure 3, and the two ends of plate (9) are provided with interface and are interlockingly connected with stake (10).Stake (10) is divided into distich stake (7) and multi-joint stake (8) again.As shown in Figure 2, can join together sheet pile is multidirectional.Perhaps the two ends of plate have and connect buckle device (16) and male and female catching groove, need not stake, and light just can join together with plate.Company's buckle device (16) at two ends and male and female catching groove are provided with projection (19) and clip hook (18), make the horizontal direction between plate and the plate that enough intensity be arranged, and can not break off relations.Plate body (17) is divided into I type plate member (as shown in Figure 6) and M type plate member (as shown in Figure 7).Length according to plate has a plurality of apertures (15) on plate body (17), be used to install lacing wire.
Duricrust sheet pile structure or plate member are usually in order to construct the man-made island of retaining wall, impervious wall, dam and trap.Be earlier along fixedly duricrust and the lacing wire of installation earth anchor of dike line, after insert filler, discharging consolidation again, Gu basic bank protection, surfacing.Fig. 9 is a kind of retaining wall, with vibrating hammer sheet pile member (26) is inserted ground (29) along the dike line earlier, and the aspect ratio horizontal plane (25) of sheet pile member exceeds certain size, and earth anchor lacing wire (28) is installed, and inserts earth (27) then.Described lacing wire can be adopted reinforcing bar, steel and plastic complex tie bar strip, nylon rope, geo-grid etc.Figure 10 is the man-made island of a kind of duricrust sheet pile structure or the trap of plate member.At first become the circular outer ring (32) and the passage (30) of man-made island, again (31) hydraulic reclamation earth in circle by duricrust sheet pile structure or plate member circle.Then through discharging consolidation, vacuum preloading, Gu basic bank protection, surfacing forms man-made island.This method still is the good method that man-made island and lake dredging up dredging are simultaneously built in fill.
3. duricrust esting structure comprises hollow duricrust member, light filler, bankets, composition such as covering layer.The top of hollow unit member is provided with opening (34), and footing is provided with and joins buckle (35), presses the height and the width of dam designs, but the esting multilayer is arranged, and be linked to be integral body with also spreading more.Hollow duricrust member divides rectangular element member (36) (as shown in figure 12) and trapezoidal element member (33) (as shown in figure 11).Unit member top is provided with opening (34) filler and can therefrom passes in and out, and the filler of filling in the unit member can adopt silt particle, light filler or hollow structure as required, and general dykes and dams centre bottom (38) is light filler, and the both sides of dykes and dams are high-gravity filler (37).When hollow duricrust member adopts macromolecular material, covering layer should be set, in case material is aging.Footing connection buckle (35) can make each unit member join together.Be characterized in that structure fixes, folded tearing open conveniently can change the height and the width of dykes and dams at any time, need when high many estings which floor, need when wide many and spread several.Be applicable to various dam constructions.
4. duricrust drum structure is made up of shelves water drum (39), sealing drum (40), antiseepage cloth (41), airtight and watertight padding (42), retainer ring etc.Shelves water drum (39), sealing drum (40) are generally made by steel plate.Bottom between the drum is full of antiseepage cloth (41) and airtight and watertight padding (42), and clay or non-dispersible underwater concrete are adopted in airtight and watertight padding (42) usually.The ring that is fixedly connected is arranged at grade middle part and the top of water drum (39), contacts in order to the relative position of fixing duricrust drum and with the tight of ground.Be applicable to that the construction plant is narrow, the cofferdam of the engineering that can not stop.It is little to be characterized in that institute encloses area, does not influence water, is difficult for the erosion base of dam, and assembling and disassembling is convenient.
The said structure form respectively has characteristics, can suit measures to local conditions flexible Application.A kind of form of structure can be whole dykes and dams, can be certain part of dykes and dams, also can be by the combination of a plurality of unit.Combined factors such as the dykes and dams size should be freezing according to ground soil property, height of water level, stormy waves, standard class, packed bulk density are determined.Just generally speaking, height of dam is fixed, and bearing capacity of foundation soil is low more, and then size is just big more at the bottom of lightweight bed course and the dam.
The specific embodiment
Embodiment 1, and the seabeach Petroleum Exploration Engineering in certain oil field is built drilling platform (man-made island) and transport channel (dykes and dams) in the intertidal zone, need not have oil just discarded with several years when oil is arranged.Originally built with cubic meter of stone heap, because the ground weakness, tidewater washes away in addition, just sinks in a couple of days, has sunk and fills out, and has filled out and heavy.Both big cost height, cisco unity malfunction were again measured by the side.According to ground and actual conditions, the dam body pattern adopts the inventive method, is of a size of: height of dam 5m, dam crest 5m, 17m at the bottom of the dam for this reason.Because dam crest requires to be open to traffic, shell is a steel concrete, the thick 15cm of dam crest cover plate, and other duricrust is got 10cm; The dam body packing material fetches earth on the spot, and unit weight is 17kN/m
3The lightweight bed course is a foam, unit weight 0.4kN/m
3If the dam crest effect has mobile load 12kN/m
2Show that through slope stability analysis calculating for identical geological conditions and section external form, the building stones dykes and dams that generally banket will be prior to foundation instability, if add hard shell, its safety factor can double many; If the dykes and dams of side slope (1: 2.5) design routinely, the stability of its dam body own will increase, but compare with king crab formula lightweight dykes and dams, owing to have bigger body weight, its whole stability against sliding will decrease, and safety factor has only 0.6 times of king crab formula lightweight dykes and dams.By the comparative analysis of three kinds of situations, advantage of the present invention has obtained sufficient embodiment: the duricrust that adds will improve the dam body slope coefficient, compare with conventional side slope earth dam, and it is nearly 45% to reduce the earth fill amount, has strengthened barrier performance simultaneously; The utilization of its light material, it is heavy further to have alleviated the dam, can save the investment of dykes and dams based process, and improve whole stability against sliding.Have with native Dai Shi, save cost, characteristics such as speed of application improves, and is reliable and stable.
Embodiment 2, certain sluice alteration work.
Because the water drainage standard of former design 2 * 3m gate is lower, can not satisfy flood fighting water drainage requirement.In order to strengthen flood carrying capacity, abolish original two hole sluice, reconstruction 5 * 5m five hole sluice.The engineering upstream is the reservoir area, and the downstream is the sea, is subjected to typhoon, heavy rain, tidal effect bigger.Existing flood has tide again, and the hydrology changes greatly, bring difficulty and risk for cofferdam construction and maintenance, and by traditional cofferdam, the weir pin is wide, and earth volume is big, and stability is poor, does not remove thorough or the like.Adopt structural approach of the present invention, 7m height, the wide arch form steel plate monocoque of 17m are set, and in the steel plate duricrust, fill the thick concrete of 0.5m.Underwater portion adds flocculant, adopts non-dispersible underwater concrete.Analyze as calculated: the M on the arbitrary section, Q, N meet the demands.Under effect of water pressure, this programme satisfies intensity, stable and safe requirement.Solved engineering roadblock.Yet need 2 months with former scheme cofferdam building, remove and take 1 month, need 480,000 yuan of costs.And this project adopts the present invention, and the cofferdam is constructed and used 21 day time just to come into operation, and engineering completion back is torn open with crane and hung the cofferdam, removes and does not thoroughly stay foundation, and steel are reusable still.Reduced earthwork greatly, reduced cost, cost saving is more than 20 ten thousand yuan altogether, and the shortening cofferdam is constructed, the dismounting time, does not have the slope erosion problem simultaneously, does not also need repairing midway.Final engineering is cited as good.Be characterized in that the cofferdam floor space is few, speed of application is fast, and the wind and wave resistance performance is strong.Be applicable to that the place is narrow and keep off engineerings such as damp demanding man-made island, pioneer road, interim cofferdam.
Embodiment 3, certain water-distribution station water inlet extension project.
This water-distribution station water inlet is the source of certain city's people's lives and industrial and agricultural production water.Because the water inlet degree of depth is not enough, the width deficiency often has dirt to stop up in addition, has a strong impact on water supply since the operation.So require under the situation that does not influence water supply, widen water inlet and deepen channel of approach, rebuild trashrack.Maximum water depth 6m, flow velocity 2m/s, the construction plant is narrow, and rock foundation is uneven, and requires to excavate basic hole and build steel concrete under situation about continuing to flow.Adopt duricrust drum form of structure of the present invention.Iron-clad cylinder cofferdam is made up of inside and outside work durm, antiseepage cloth, encapsulant, retainer ring etc.Distance determines that according to geology and infiltration situation and encapsulant transmission coefficient the size in iron-clad cylinder cofferdam is calculated according to the needs and the water conservancy project Code for design of steel structures of enclosing workspace, and exceeds 0.5m than peak level between two work durms.By the prefabricated work durm of size, place fixing intact with loop wheel machine earlier.Then, with the clay that geotextiles is bundled into, be placed between two work durms and punning closely knit, then the water in the tube is drained, a small amount of infiltration is arranged in the operation process, draw water with operation limit, little water pump limit.Both guaranteed construction quality with the method, and can not solve engineering roadblock again because of cutout influences water supply.This project is cited as excellent engineering.
Advantage of the present invention
(1) improved the stability of dykes and dams.Owing to adopted lightweight bed course method, on the one hand, alleviated the weight of the easy sunk spots of dykes and dams, improved the intensity and the globality of dam body, adjusted the stress balance of dykes and dams, avoided differential settlement and landslide; On the other hand, light material is equivalent to one has the bed course of certain intensity to be laid on the soft foundation, has enlarged load power range of scatter, and pressure is evenly distributed, and simultaneously the soil body that crouches is down had effect of contraction, has limited the lateral deformation of ground.
(2) accelerated construction speed.Traditional job practices must strict control rate of loading when soft foundation fills earth and stone material, treat ground consolidation intensity improve after loading again, and the weak soil heap do not get on, the raising of the degree of consolidation is very slow, and is long in time limit.The present invention has adopted the hard structure dam shell fundamentally to solve foundation strength and cubic metre of earth high problem of heap, helps mechanization, extensive construction, so shortened the duration greatly, has improved building speed.
(3) the idle side who has reduced dam body measures.Owing to adopted hard structure dam shell and light material or hollow unit member, make cubic metre of earth easy heap high, can increase sloping ratio, as bringing up to 1 from 1: 16: 1.5-4, can reduce a large amount of cubic metres of earth and stone.Dam body weight saving also can reduce layer earth volume of holding one's breath.In the area that lacks stone material,, also can save a large amount of cubic meters of stone with native Dai Shi.
(4) plastics pollution.The lightweight dykes and dams adopt waste plastic and flyash as light material, concentrate and imbed under the dykes and dams, sink to the low layer of dykes and dams with the passage of time, are the dykes and dams solid foundation, are again the good methods of plastics pollution.
(5) improve anti-permeability performance.Owing to plug continuous barrier sheet on gravel foundation, shell and the material that barrier sheet material selection intensity is big, barrier properties good, weather resistance is corroded have changed permeation pathway, have reduced the infiltration capacity of dykes and dams, have improved anti-permeability performance.
(6) safe life of raising dykes and dams.Because whole dykes and dams member joins together, a plurality of bases of dam are inserted ground deeply, and it is gentle that dykes and dams are had just, temper toughness with gentleness, and molten with ground be one, with the elimination differential settlement, guarantee the safety of dykes and dams.And characteristics such as the lightweight dykes and dams adopt that material has that chemical stability is good, the ageing-resistant ability height of corrosion resistant, antibiotic antibiont ability are strong, as long as native stone covers good durability is just arranged well.
In addition, king crab formula lightweight dykes and dams also have earthquake resisting performance preferably.
The present invention is applicable to dykes and dams cofferdam man-made island building, and especially soft basic fill, interim fill and quick fill are to the quality that improves dyke, accelerate building speed, promote that embankment safety is stable, administer environment and rescue and relief work all has positive meaning.In the seashore port works, highway bridge construction, the oil field development probing, beach aquaculture, the regulation of gardens, desert, the lake dredging up dredging all has vast market prospect.
Claims (10)
1. the structure and the method for king crab formula lightweight dykes and dams, relate to dykes and dams (cofferdam, roadbed, the shelves cob wall) Building technology, be a kind of biomimetic features and method of the novel quick fill of soft foundation, comprise the ground processing, dam embankment, stability analysis, the wave resistance energy dissipating, antiseepage is held one's breath, sink and move observation etc., it is characterized in that: the dykes and dams of the architectural characteristic design construction of imitative king crab, contain monocoque, the lightweight bed course, be linked to be whole technology and method, promptly make the shell of dykes and dams or certain part with high-strength material, the iliacus materials for support is in it, insert filler then, be encased inside easily heavy sliding position with light material, plug barrier sheet in easily oozing ground, base of dam is inserted ground deeply, and member is linked to be integral body.
2. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1, it is characterized in that: with light material or hollow structural members as dam body or be encased inside a part of the easy depression slippage of dykes and dams, the outside covers the fill method of earth, stone and turf, comprise lightweight dike core method, local completion method, dam foot mat method mixes method.
3. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1, it is characterized in that: the shell of making the structural housing or the dykes and dams part of dykes and dams with high-strength material, and support in it with rib and lacing wire form, insert the fill method of other materials then, comprise the duricrust light structures, the duricrust sheet pile structure, duricrust esting structure, duricrust drum structure.
4. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: whole dykes and dams member joins together with methods such as securing member, tongue and groove, male and female seam, overlapping, buckle or welding.
5. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: have the aperture of a plurality of connection lacing wires, be provided with the duricrust sheet pile structure dykes and dams that the sheet pile of male and female catching groove and lacing wire etc. are formed.
6. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1, it is characterized in that: the top of hollow unit member is provided with opening, and footing is provided with the connection buckle, is arranged with also shop by the esting multilayer more, and is linked to be integrally formed duricrust esting structure dykes and dams mutually.
7. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: filling antiseepage cloth and airtight and watertight padding between shelves water drum and the sealing drum, middle and upper part are provided with the duricrust drum structure dykes and dams of the ring that is fixedly connected.
8. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: the method that man-made island is built in lake dredging up fill simultaneously is earlier along fixedly duricrust and the lacing wire of installation earth anchor of dike line, after insert filler, prepressing water discharge is fixed again, Gu basic bank protection, surfacing.
9. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: two bamboo offset plate supports the rib dividing plate is arranged, upper opening and bottom base of dam stud with to be strengthened embracing iron, and two ends have the dykes and dams member of a plurality of connection holes.
10. the structure and the method for king crab formula lightweight dykes and dams as claimed in claim 1 is characterized in that: be provided with projection and clip hook easily oozing on the linkage that I type that ground plugs or M type plug the member two ends.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200410055468 CN1609343A (en) | 2004-08-06 | 2004-08-06 | Structure of king crab type light dyke-dam and method |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN 200410055468 CN1609343A (en) | 2004-08-06 | 2004-08-06 | Structure of king crab type light dyke-dam and method |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN1609343A true CN1609343A (en) | 2005-04-27 |
Family
ID=34764244
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN 200410055468 Pending CN1609343A (en) | 2004-08-06 | 2004-08-06 | Structure of king crab type light dyke-dam and method |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN1609343A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103352457A (en) * | 2013-07-20 | 2013-10-16 | 陈炯辉 | Soft foundation reinforcing method |
| CN106049213A (en) * | 2016-07-27 | 2016-10-26 | 宁波市交通规划设计研究院有限公司 | Control method and structure of non-uniform settlement of highway soft soil roadbed |
| CN106400636A (en) * | 2016-10-20 | 2017-02-15 | 宁波市交通规划设计研究院有限公司 | Control method for multilayer road soft soil roadbed differential settlement |
| CN109948303A (en) * | 2019-04-16 | 2019-06-28 | 广东华坤建设集团有限公司 | The beach such as mud shallow water location energy conservation and environmental protection pipeline laying construction analysis method |
| CN110396978A (en) * | 2019-07-16 | 2019-11-01 | 淮安市水利规划服务中心 | Improve the method that river ecological structure promotes urban rives water ecological environment |
-
2004
- 2004-08-06 CN CN 200410055468 patent/CN1609343A/en active Pending
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103352457A (en) * | 2013-07-20 | 2013-10-16 | 陈炯辉 | Soft foundation reinforcing method |
| CN106049213A (en) * | 2016-07-27 | 2016-10-26 | 宁波市交通规划设计研究院有限公司 | Control method and structure of non-uniform settlement of highway soft soil roadbed |
| CN106400636A (en) * | 2016-10-20 | 2017-02-15 | 宁波市交通规划设计研究院有限公司 | Control method for multilayer road soft soil roadbed differential settlement |
| CN106400636B (en) * | 2016-10-20 | 2018-08-21 | 宁波市交通规划设计研究院有限公司 | A kind of control method of the soft soil roadbed differential settlement of Multi-layer road |
| CN109948303A (en) * | 2019-04-16 | 2019-06-28 | 广东华坤建设集团有限公司 | The beach such as mud shallow water location energy conservation and environmental protection pipeline laying construction analysis method |
| CN110396978A (en) * | 2019-07-16 | 2019-11-01 | 淮安市水利规划服务中心 | Improve the method that river ecological structure promotes urban rives water ecological environment |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5697736A (en) | Seawalls and shoreline reinforcement systems | |
| Oh et al. | Using submerged geotextile tubes in the protection of the E. Korean shore | |
| CN1837511B (en) | Double-rowed cofferdam and method for manufacturing the same | |
| CN105178245A (en) | Large filling bag ecological embankment and revetment building method for river lake channel | |
| CN106013054B (en) | A kind of Ecotype Concrete sheet pile and its construction method | |
| CN106930231B (en) | A kind of construction method applied to engineering flood bank reinforcing of passing the flood period | |
| CN111335100A (en) | Embankment structure suitable for coastal areas and its construction method | |
| CN202925511U (en) | Sheet-pile wharf structure for soft soil foundation | |
| CN209482246U (en) | An unloading sheet pile seawall structure | |
| CN105887757A (en) | Ecological slope protection composite retaining wall structure and construction method | |
| CN1773022A (en) | Fast soft foundation dyke building method and technology | |
| CN110725277A (en) | A scour-resistant ecological management method for the riparian zone | |
| CN204151796U (en) | A kind of reinforcement eco-concrete bank protection | |
| JP2016156147A (en) | Construction method of coastal soil structure against large tsunami by high rigidity geosynthetic reinforced soil retaining wall construction with rigid integral wall construction | |
| TW201028510A (en) | An assembling and fixing structure for linking waste tires as one bunch | |
| CN104060573B (en) | Quick fill method on coral island | |
| CN207244552U (en) | A kind of ecology flexible geogrid reinforcement harbour | |
| Perry | Innovative methods for levee rehabilitation | |
| CN1609343A (en) | Structure of king crab type light dyke-dam and method | |
| CN205776070U (en) | Ecological revetment is combined retaining wall structure | |
| CN212052161U (en) | Embankment structure suitable for coastal areas | |
| CN107761663A (en) | A kind of sheep pile wharf structure and its construction method | |
| KR20140052350A (en) | Scour protection system for shore and its installation methods | |
| CN103821106B (en) | Small-sized fishing port and channel revetment structure | |
| CN209307794U (en) | Low-level bog area hydraulic reclamation ultra fine sand road structure |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C12 | Rejection of a patent application after its publication | ||
| RJ01 | Rejection of invention patent application after publication |