Background technology
Along with the progress of time, the insulation degradation of electric equipment finally causes the situation of ground fault and short circuit accident a lot.The development mechanism of insulation degradation is complicated, but in general, the pattern of following two kinds of situations is arranged probably.
At first, first kind of situation be, partly begins leakage current from the breakage and the deterioration of cable skin and conductor support insulator, and the heat that produces owing to this leakage current, pressure, ion etc. make breakage and deterioration progress, thereby leakage current is increased.
Another kind of situation is a situation about finding in cable etc., and moisture soaks into to insulant tree-shapedly, and insulation damages takes place quickly, recovers again then to insulate.
The latter is known as intermittently arc grounding, owing to this phenomenon finishes at short notice, and does not have reproducibility, so be difficult to detect.
But, recently there be following the requirement in electric equipment: under the state of live wire, detect intermittently requirement of the technology of arc light earth current and the requirement of formulating the predictive diagnosis technology of predetermined arrestment plan.
In the prior art, between the neutral point of earthed voltage transformer (being called for short GPT later on) and the earth, switching device is set, closed circuit when turning round usually, open circuit and apply direct voltage when insulation degradation is diagnosed at the two poles of the earth of switching device, instrumentation is from the leakage current of electric equipment to the earth, surpass under the situation of predetermined reference value in its result, electric equipment is stopped, checking the insulation degradation of power line one by one.But, after using this device instrumentation, be judged as in the unusual cable, what have when reality is used also can use no problemly, perhaps, is being judged as just often, and but presenting on reality is used of having is unusual.This is caused by following reason: mensuration is to implement with direct current, uses the condition of using with alternating voltage different and apply the delicate different of voltage with reality.
In addition, in patent documentation 1-Japanese kokai publication hei 4-42726 communique, take out voltage between lines signal and the voltage between lines signal of other two-phases part and the ground signalling that obtains by the Zero-phase current detection of benchmark respectively, judge the ground connection phase by its phase place, in addition, according to Zero-phase current judgement accident circuit, but the ground connection can not carry out arc grounding intermittently the time is detected and the judgement of accident circuit.
In addition, in patent documentation 2-Japanese kokai publication hei 6-300807 communique, because input zero phase voltage, Zero-phase current and voltage between lines, therefore, even arc grounding intermittently, though can carry out the specific of the judgement of deterioration phase and accident circuit, also exist to detect the weak current that causes by noise etc., be judged as the intermittently situation of arc grounding and accident circuit mistakenly.
Like this, in above-mentioned prior art, the electric equipment that must stop in the actual user mode is checked insulation degradation, and the check result reliability is not high, and in addition, the ground connection when being difficult to carry out arc grounding is intermittently detected and the judgement of accident circuit.
Embodiment
Embodiments of the present invention below are described.
The hardware that Fig. 1 illustrates isolation diagnostic device constitutes.From external input signal, carry out calculation process by input part 1, input signal and operation result are stored in the memory 4 by CPU3.In addition, its formation can be carried out the demonstration of operation result and alarm by display part 5, exports operation result and alarm signal by efferent 6 to the outside.
Fig. 2 illustrates has isolation diagnostic device and the telemonitoring configuration example with the electric equipment of field monitor device.
At first, in Fig. 2, high tension distribution system equipment as the electric equipment right and wrong ground connection of object system, by the circuit breaker 8 that is connected with transformer 7, the bus 15 that is connected with circuit breaker 8, with a plurality of feed lines of drawing from bus 15 with circuit breaker 9~12, grounding transformer 13, be configured in each zero phase current transformer of going up mutually 50~53 and constitute.For the insulation degradation that carries out in these high tension distribution system equipment detects, take out Zero-phase current I from zero phase current transformer 50~53
0, take out voltage between lines and zero phase voltage V from grounding transformer 13
0, be input to isolation diagnostic device 14.In addition, to upper field monitor device 16 output testing results, the supervision in the field monitor device 16 self certainly utilizes the Internet and local area network (LAN) 17, remotely sends information to remote monitroing center 19 and Web terminal 18 etc.
The isolation diagnostic device 14 of one embodiment of the present of invention is taken into zero phase voltage V from grounding transformer 13
0With voltage between lines V1-2, V2-3, V3-1, from some Zero-phase current I that is taken into of zero phase current transformer 51~54
0, respectively as signal.Its contents processing as shown in Figure 3, by the zero phase voltage V of PEAK-HOLD20 conversion grounding transformer 13
0High frequency voltage, by effective value-adjusted value handling part 21 carry out the effective value computing and with the comparison operation of adjusted value, when adjusted value is above, by 36~38 couples of voltage between lines V1-2 of phase-shifts handling part, V2-3, V3-1 carries out the phase-shifts conversion, at this, (R mutually by the phase voltage after long-pending summation handling part 26~28 computings and the phase-shifts conversion, the S phase, the T phase voltage) long-pending summation, then, by maximum handling part 29 computing maximums, 30~32 couples of results carry out the AND computing by the AND handling part, as 64K (intermittent earth overvoltage relay) action operation result, by display part 33~35 phase-splitting display result.The PEAK-HOLD operational part, make phase-shifts 30 degree by phase-shifts handling part 36~38, after voltage between lines V1-2, V2-3, V3-1 be transformed into phase voltage, detect the trailing edge that handling part 22~24 detects phase voltage by trailing edge, carry out signal after OR handles according to 25 couples of results of OR handling part, carry out resetting of PEAK-HOLD.Why will be after being transformed into phase voltage, by the trailing edge PEAK-HOLD that resets, be because operation result (the long-pending and computing of phase voltage and PEAK-HOLD value) constitutes maximum sensitivity, when the trailing edge by phase voltage resets, no matter before or after the trailing edge of phase voltage, operation result all reduces.
On the other hand, to carry out result after effective value computing and the adjusted value comparison operation by effective value adjusted value handling part 21, detect handling part 39~41 by the phase place zone, with R mutually, S phase, T phase phase voltage comparison operation phase place zone, make the signal after the OR computing consistent by OR handling part 42 with the operation result in the zone shown in Fig. 6, in timer processing portion 43, rolling average maximum in 5 cycle portions of peak value retention value of zero phase voltage surpasses under the situation of adjusted value, makes the 64K action by 64K action handling part 44.
The computing example of timer shown in Fig. 7.When as figure zero phase waveform taking place, zero phase peak value is maximum 30V, but the rolling average maximum of 5 cycle portions of zero phase waveform is 24V, and the moving average maximum of the zero phase-shift in per 1 second is 24V.By with the rolling average maximum of 5 cycle portions as judging material, can prevent that the erroneous judgement that noise causes is disconnected.In addition, notice according to existing experimental result, intermittently the occurrence frequency of arc light grounding phenomenon many 0.1 second in 0.5 second, the situation more than 5 seconds does not take place, so be the adjusted value of timer with 1 second.Therefore, every through 1 second, zero phase peak value, the moving average maximum of zero phase-shift, the moving average maximum of the zero phase-shift in per 1 second are once resetted.
If implement above various computings, the zero phase voltage of the high frequency that takes place in the time of just can detecting arc grounding intermittently exactly, thus 64K is moved.
In addition, radio-frequency component with some Zero-phase currents of the zero phase current transformer 50~53 shown in PEAK-HOLD45 conversion Fig. 2, with long-pending and handling part 46, to by the zero phase voltage after the PEAK-HOLD20 computing and its result amasss and computing, in the result is under the situation of "+", just carry out the AND computing,, just be shown as the accident circuit with accident circuit display part 48 if the 64K of 64K action handling part 44 moves by AND handling part 47.If the result of long-pending and handling part 46 are "+" just can the particular incident circuit reason be, because during ground connection, electric current is towards the circuit diffluence that accident point is arranged, therefore, having the circuit Zero-phase current and zero phase voltage of accident point to become same-phase, is antiphase but do not have the circuit Zero-phase current of accident point and zero phase voltage, therefore, utilization get the long-pending of zero phase voltage and Zero-phase current and, can judge whether to comprise accident point.Therefore, if implement above such computing, just can judge whether it is the accident circuit exactly during arc grounding at intermittence.
In addition, by the efferent shown in Fig. 16, the instrumentation value, accident circuit, result of determination, the warning information that are stored in the memory 4 are outputed to the external device (ED)s such as field monitor device 16 that telemonitoring is used, even in remote place, also can be with reference to instrumentation value, accident circuit, result of determination, warning information.
Fig. 4 illustrates has isolation diagnostic device and the telemonitoring configuration example with the electric equipment of field monitor device.Be that with the difference of Fig. 2 electric equipment is different with connecting and composing of insulation monitor, in Fig. 2, on each feed line, all have an isolation diagnostic device, and in Fig. 4 is all, have only an isolation diagnostic device.
The isolation diagnostic device 14 ' of one embodiment of the present of invention, in the high tension distribution system equipment of the system of the non-ground connection shown in Fig. 4, be taken into zero phase voltage and voltage between lines and be taken into each self-monitoring Zero-phase current I from a plurality of zero phase current transformers 50~53 from grounding transformer 13
01~I
04, as signal.
Fig. 5 illustrates the functional block diagram of isolation diagnostic device 14 '.Be with the difference of Fig. 3, being input as of Zero-phase current is a plurality of, therefore, have PEAK-HOLD85~88, long-pending and handling part 89~92, AND handling part 93~96, accident circuit display part 97~100 in the importation of Zero-phase current, its formation can be carried out the judgement of a plurality of accident circuits simultaneously thereupon.
The contents processing of the isolation diagnostic device 14 ' of one embodiment of the present of invention as shown in Figure 5, by the zero phase voltage V of PEAK-HOLD60 conversion grounding transformer 13
0High frequency voltage, by effective value adjusted value handling part 61 carry out the effective value computing and with the comparison operation of adjusted value, when adjusted value is above, by phase-shifts handling part 76~78 phase-shifts conversion voltage between lines V1-2, V2-3, V3-1, at this, long-pending summation by the phase voltage of long-pending total handling part 66~68 computings and phase-shifts conversion (R mutually, S phase, T phase voltage), then, by maximum handling part 69 computing maximums, 70~72 couples of results carry out the AND computing by the AND handling part, as 64K action operation result, by display part 33~35 phase-splitting display result.The PEAK-HOLD operational part, make phase-shifts 30 degree by phase-shifts handling part 76~78, after voltage between lines V1-2, V2-3, V3-1 be transformed into phase voltage, detect the trailing edge that handling part 62~64 detects phase voltage by trailing edge, according to the result being carried out signal after the OR computing, carry out resetting of PEAK-HOLD by OR handling part 65.By trailing edge reset the reason of PEAK-HOLD with in isolation diagnostic device 14 explanation reason identical.
On the other hand, to carry out result after effective value computing and the adjusted value comparison operation by effective value adjusted value handling part 61, detect handling part 79~81 by the phase place zone, with R mutually, S phase, T phase phase voltage comparison operation phase place zone, make the signal that is undertaken after the OR computing by OR processor 82 consistent with the operation result in the zone shown in Fig. 6, in timer processing portion 83, rolling average maximum in 5 cycle portions of peak value retention value of zero phase voltage surpasses under the situation of adjusted value, makes the 64K action by 64K action handling part 84.About with the rolling average maximum of 5 cycle portions of peak value retention value of zero phase voltage as reason and the adjusted value of judging material, identical with isolation diagnostic device 14.
In addition, radio-frequency component with the Zero-phase current separately of PEAK-HOLD85~88 conversion zero phase current transformers 51~54, with long-pending and handling part 89~92, will by the zero phase voltage after the PEAK-HOLD60 computing and its result amasss and computing, in the result is under the situation of "+", carry out the AND computing by AND handling part 93~96, if the 64K of 64K action handling part 84 moves, just with accident circuit display part 97~100 demonstration accident circuits.If the result of long-pending and handling part 89~92 is "+" just can be specific for the reason of accident circuit be, electric current is towards the circuit diffluence that accident point is arranged during ground connection, therefore, there are the circuit Zero-phase current and zero phase voltage of accident point to become same-phase, but not having the circuit Zero-phase current of accident point and zero phase voltage is antiphase, therefore, utilize get the long-pending of zero phase voltage and Zero-phase current and, can judge the circuit that comprises accident point.
In addition, same with isolation diagnostic device 14, with instrumentation value, accident circuit, result of determination, the warning information that is stored in the memory 4, output to field monitor device 16 external device (ED)s such as grade that telemonitoring is used, even in remote place, also can be with reference to instrumentation value, accident circuit, result of determination, warning information.
As mentioned above,, do not make the electric equipment under the actual user mode stop just can carrying out the diagnosis of insulation degradation according to the present invention, and can be when intermittence, arc grounding took place, what specific ground connection was taken place has or not and the accident circuit, prevents that major accident is in possible trouble.