CN1592165A - Frequency domain load equalizing controlling method for use while initial access in wide band CDMA system - Google Patents
Frequency domain load equalizing controlling method for use while initial access in wide band CDMA system Download PDFInfo
- Publication number
- CN1592165A CN1592165A CN 03140455 CN03140455A CN1592165A CN 1592165 A CN1592165 A CN 1592165A CN 03140455 CN03140455 CN 03140455 CN 03140455 A CN03140455 A CN 03140455A CN 1592165 A CN1592165 A CN 1592165A
- Authority
- CN
- China
- Prior art keywords
- frequency
- cell
- district
- load
- subscriber equipment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
宽带码分多址系统中初始接入时的频间负荷均衡控制方法,涉及WCDMA中的负荷均衡。包括:RNC从Node B处获取接收宽带功率RTWP和发射载波功率TCP值;在UE初始接入时,RNC根据情况决定UE是否有必要均衡至异频小区;如果决定将该UE均衡至异频小区,则异频小区作为目标小区,在向该UE发送的连接建立消息中,发送相应异频小区的信息;如果决定不均衡至异频小区,则当前小区作为目标小区,发送本小区的信息;UE在目标小区中返回建立完成消息。本发明所述的方法简单、逻辑合理、效率高,能够实现整个系统容量的最大化,方便后续UE的顺利接入。
The invention relates to an inter-frequency load balance control method during initial access in a wideband code division multiple access system, which relates to load balance in WCDMA. Including: RNC acquires received wideband power RTWP and transmitted carrier power TCP value from Node B; when UE initially accesses, RNC decides whether it is necessary for UE to equalize to a different-frequency cell according to the situation; if it decides to balance the UE to a different-frequency cell , then the different-frequency cell is used as the target cell, and the information of the corresponding different-frequency cell is sent in the connection establishment message sent to the UE; if it is decided not to balance to the different-frequency cell, the current cell is used as the target cell, and the information of the current cell is sent; The UE returns an establishment complete message in the target cell. The method described in the present invention is simple, logical and efficient, can realize the maximization of the capacity of the whole system, and facilitate the smooth access of subsequent UEs.
Description
技术领域technical field
本发明涉及宽带码分多址(Wideband Code Division Multiple Access)系统(以下简称WCDMA)中一种负荷均衡方法,特别是根据小区及其同址同覆盖小区的负荷测量值,即利用接收总宽带功率(Received Total Wide band Power)(以下简称RTWP)和/或发射载波功率(Transmitted Carrier Power)(以下简称TCP)的情况来确定在有用户设备(User Equipment,以下简称UE)初始接入时的频间负荷均衡具体方法。The invention relates to a load balancing method in a Wideband Code Division Multiple Access (WCDMA) system (hereinafter referred to as WCDMA), especially according to the load measurement value of a cell and its co-located and co-covered sub-district, that is, using the received total broadband power (Received Total Wide Band Power) (hereinafter referred to as RTWP) and/or transmitted carrier power (Transmitted Carrier Power) (hereinafter referred to as TCP) to determine the frequency when there is user equipment (User Equipment, hereinafter referred to as UE) initial access The specific method of load balancing among users.
背景技术Background technique
随着移动通讯系统的广泛应用和快速发展,移动系统中的很多关键技术也日趋完善,在实现用户正常通信的同时也必须要考虑如何获得最好的性能,取得对于系统和用户设备都能获得较好的令人满意的效果,从系统的角度而言,希望尽可能接入更多的用户。With the wide application and rapid development of mobile communication systems, many key technologies in mobile systems are becoming more and more perfect. While realizing normal communication of users, it is also necessary to consider how to obtain the best performance, and obtain the best performance for both the system and user equipment. Better satisfactory results, from the perspective of the system, it is hoped to access as many users as possible.
在WCDMA系统中,UE在移动的过程中,所处的无线环境是时刻在变化着的,在UE远离基站或无线环境变坏的时候,如果仍然保持原来的速率传输,为了保证其服务质量QoS(Quality of Service),在闭环功率控制的作用下,基站必然会以更大的功率发送信号,系统的容量也会随之发生变化。In the WCDMA system, the wireless environment of the UE is changing all the time during the mobile process. When the UE is far away from the base station or the wireless environment deteriorates, if the original transmission rate is still maintained, in order to ensure its service quality QoS (Quality of Service), under the effect of closed-loop power control, the base station will inevitably send signals with greater power, and the capacity of the system will also change accordingly.
WCDMA系统与其他系统(如GSM系统和CDMA系统)相比有许多特殊之处,软容量、支持变速率业务是其一个大的特征,如果能够通过适当措施可以使UE在负荷较小的小区中接收服务,对于系统来说,可以更好地保证负荷较高小区中后续UE的接入;对于用户来说,可以得到相对较好的服务质量。对于采用同站址同覆盖的异频小区的区域,多个同覆盖异载频小区的容量之和构成了该区域所能达到的总容量,如何实现多载频地区容量的最大化,是值得研究的一个课题。Compared with other systems (such as GSM system and CDMA system), WCDMA system has many special features. Soft capacity and support for variable rate services are its major features. If appropriate measures can be taken, UE can be used in a cell with a small load. Receive service, for the system, can better ensure the access of subsequent UEs in the cell with higher load; for the user, it can get relatively better service quality. For areas with different frequency cells with the same site coverage and the same coverage, the sum of the capacities of multiple cells with the same coverage and different carrier frequencies constitutes the total capacity that can be achieved in this area. How to maximize the capacity of multi-carrier frequency areas is worthwhile. A subject of research.
专利申请号为00127302.7的专利“一种移动通信系统中负载平衡预处理的方法”,说明了在移动通信系统中,通过测量相邻各小区的负荷情况,修改系统信息参数,即控制用户选择小区的参数,从而达到引导用户在负荷相对较低的小区中接入。该专利所述的思想,只能用于同频小区的处理,针对的是在尚未接入系统的潜在用户,而对于存在异频小区的情况如何处理,该专利没有能够给予说明,对于已经接入系统的用户如何处理,专利中也没有相应的处理方法。The patent application number is 00127302.7 "A method of load balancing preprocessing in a mobile communication system", which explains that in a mobile communication system, by measuring the load conditions of adjacent cells, modifying system information parameters, that is, controlling users to select cells parameters, so as to guide users to access in cells with relatively low load. The idea described in this patent can only be used for the processing of same-frequency cells, and it is aimed at potential users who have not yet accessed the system. However, the patent does not give an explanation on how to deal with the situation of inter-frequency cells. There is no corresponding processing method in the patent as to how to deal with users entering the system.
发明内容Contents of the invention
本发明的目的是解决现有技术规范中没有针对WCDMA系统的负荷均衡具体实现方法,特别是针对具备同站址同覆盖异频小区,而提出了一种在初始接入时基于负荷测量的频间负荷均衡方法。The purpose of the present invention is to solve the problem that there is no specific implementation method for load balancing in the WCDMA system in the existing technical specifications, especially for a cell with the same site, the same coverage, and different frequencies, and proposes a frequency based on load measurement during initial access. load balancing method.
本发明的技术方案包括如下步骤:Technical scheme of the present invention comprises the steps:
(1)无线网络控制器RNC(Radio Network Controller)从Node B处获取反映负荷状况的接收宽带功率RTWP和发射载波功率TCP值;(1) The radio network controller RNC (Radio Network Controller) obtains the receiving broadband power RTWP and transmitting carrier power TCP values reflecting the load condition from the Node B;
(2)在UE初始接入时,RNC根据预先设定的门限参数以及UE当前接入的小区负荷和同站址同覆盖异频小区的负荷,决定UE是否有必要均衡至异频小区;(2) When the UE initially accesses, the RNC determines whether it is necessary for the UE to balance to a different-frequency cell according to the preset threshold parameters, the load of the cell currently accessed by the UE, and the load of the same-site and same-coverage different-frequency cell;
(3)如果决定将该UE均衡至异频小区,则异频小区作为目标小区,在向该UE发送的连接建立消息中,发送相应异频小区的信息;如果决定不均衡至异频小区,则当前小区作为目标小区,发送本小区的信息;(3) If it is decided to balance the UE to a different-frequency cell, the different-frequency cell will be used as the target cell, and the information of the corresponding different-frequency cell will be sent in the connection establishment message sent to the UE; if it is decided not to balance to a different-frequency cell, Then the current cell is used as the target cell, and the information of this cell is sent;
(4)UE在目标小区(该目标小区可能是本小区也可能是连接建立消息中指定的异频小区)中返回建立完成消息。(4) The UE returns an establishment complete message in the target cell (the target cell may be the own cell or the inter-frequency cell specified in the connection establishment message).
在步骤(1)中无线网络控制器(RNC)获取小区负荷状况的接收宽带功率RTWP和发射载波功率TCP值,包括如下步骤;In step (1), the radio network controller (RNC) obtains the received broadband power RTWP and the transmitted carrier power TCP value of the load condition of the cell, including the following steps;
(1.1)RNC向Node B发送针对小区公共测量控制命令,要求测量接收宽带功率RTWP和/或发射载波功率TCP值,并设定上报的条件,对于周期上报方式而言,需要设定上报的周期等,对于事件上报而言,需要设定上报的门限、触发时间等;(1.1) The RNC sends a public measurement control command for the cell to the Node B, requiring the measurement of the received broadband power RTWP and/or the transmitted carrier power TCP value, and setting the reporting conditions. For the periodic reporting method, the reporting period needs to be set etc. For event reporting, it is necessary to set the reporting threshold, trigger time, etc.;
(1.2)Node B对相应小区的上行接收宽带功率RTWP和/或发射载波功率TCP值,在达到RNC发来的测量控制命令中的上报条件时,上报至RNC;(1.2) The Node B reports to the RNC the uplink receiving broadband power RTWP and/or transmitting carrier power TCP value of the corresponding cell when the reporting condition in the measurement control command sent by the RNC is met;
(1.3)RNC对Node B上报的结果进行存贮,以供需要时使用。(1.3) RNC stores the results reported by Node B for use when needed.
在上述步骤(2)中,无线网络控制器RNC在有用户设备UE接入发起连接请求(RRCConnection Request)时,查询当前存贮的该小区的负荷状况以及与该小区的异频同覆盖小区的负荷,对于负荷状况的判决可以有如下几种方法:In the above-mentioned step (2), the radio network controller RNC inquires about the load status of the currently stored sub-district and the coverage sub-district with different frequencies and the same coverage of the sub-district when there is a user equipment UE access to initiate a connection request (RRCConnection Request). There are several ways to judge the load status as follows:
(2.1)在上行方向受限为主的系统中,可以仅选择采用上行方向接收到的接收宽带功率RTWP,作为各小区之间负荷比较的参考;(2.1) In a system where the uplink direction is limited, only the received wideband power RTWP received in the uplink direction can be selected as a reference for load comparison between cells;
(2.2)在下行方向受限为主的系统中,可以仅选择采用下行方向发射载波功率TCP值,作为各小区之间负荷比较的参考;(2.2) In a system where the downlink direction is mainly limited, you can only choose to use the TCP value of the transmit carrier power in the downlink direction as a reference for load comparison between cells;
(2.3)在上、下行方向需要综合考虑的系统中,可以同时采用上行方向接收到的接收宽带功率RTWP和下行方向发射载波功率TCP值,作为各小区之间负荷比较的参考。(2.3) In systems where the uplink and downlink directions need to be considered comprehensively, the received broadband power RTWP received in the uplink direction and the transmit carrier power TCP value in the downlink direction can be used simultaneously as a reference for load comparison between cells.
在上述步骤(3)中,RNC根据步骤(2)中所作出的决定,在相应的信息在相应的RRC连接建立(RRC Connection Setup)消息中带给UE,可能包括如下内容:A.该小区频率信息;B.该小区的扰码信息;C.无线链路资源信息。In the above step (3), according to the decision made in step (2), the RNC will bring the corresponding information to the UE in the corresponding RRC Connection Setup (RRC Connection Setup) message, which may include the following content: A. The cell Frequency information; B. Scrambling code information of the cell; C. Radio link resource information.
在本发明的技术方案中,还可以考虑在本小区负荷在一定门限之下时,不管异频同覆盖小区的负荷状况如何,都不将当前接入的UE均衡至异频同覆盖小区。在UE初始接入时,先判断当前小区的负荷是否低于一个预先设置的门限值,如果是,则可以不进行后续判决,直接将当前小区作为目标小区;如果否,RNC根据预先设定的门限参数以及UE当前接入的小区负荷和同站址同覆盖异频小区的负荷,决定UE是否有必要均衡至异频小区。In the technical solution of the present invention, it can also be considered that when the load of the current cell is below a certain threshold, regardless of the load status of the different-frequency and same-coverage cell, the currently accessed UE will not be balanced to the different-frequency and same-coverage cell. When the UE initially accesses, it first judges whether the load of the current cell is lower than a preset threshold value, if yes, it does not need to make subsequent judgments, and directly uses the current cell as the target cell; if not, the RNC The threshold parameter of the UE and the load of the cell currently accessed by the UE and the load of the same-site and same-coverage different-frequency cell determine whether the UE needs to be balanced to a different-frequency cell.
本发明所述的方法简单、逻辑合理、效率高,能够很好地保证WCDMA系统在UE初始接入时,并尽早使UE在负荷较低的小区中接受服务,使多个同覆盖异载频小区的负荷较好地实现均衡,从而实现整个系统容量的最大化,方便后续UE的顺利接入。另外,本发明所述方法还可以从两个方面避免可能出现的频繁均衡处理。一方面是通过设定一个门限,在此门限之下,不管异频同覆盖小区的负荷状况如何,都不必作均衡处理,认为此时在相对较高负荷的小区还能够有较好的能力接纳新的用户;另一方面,在两小区作负荷比较的时候,可以设定一个迟滞门限,在两小区的负荷超出该迟滞门限时才真正作负荷均衡的处理,从而最大限度地维护当前接入UE的服务质量。The method described in the present invention is simple, logical and efficient, and can well ensure that when the UE initially accesses the WCDMA system, the UE can receive services in a cell with a lower load as soon as possible, so that multiple carriers with the same coverage and different carrier frequencies The load of the cell is better balanced, so as to maximize the capacity of the entire system and facilitate the smooth access of subsequent UEs. In addition, the method of the present invention can also avoid possible frequent equalization processing from two aspects. On the one hand, by setting a threshold, under this threshold, regardless of the load status of the different-frequency and same-coverage cells, there is no need to perform equalization processing. new users; on the other hand, when comparing the loads of the two cells, a hysteresis threshold can be set, and only when the loads of the two cells exceed the hysteresis threshold can the real load balancing process be performed, so as to maintain the current access to the maximum extent. UE's quality of service.
附图说明Description of drawings
图1是本发明的一种实施例初始接入时频间负荷均衡的总流程图;Fig. 1 is a general flowchart of initial access time-frequency load balancing in an embodiment of the present invention;
图2是初始接入时频间负荷均衡时RNC与Node B的消息流程图。Fig. 2 is a flow chart of messages between RNC and Node B during inter-frequency load balancing at the time of initial access.
图3是初始接入时频间负荷均衡时RNC与UE间的消息流程图。Fig. 3 is a flow chart of messages between RNC and UE during inter-frequency load balancing during initial access.
图4是本发明的另一种实施例初始接入时频间负荷均衡的总流程图。Fig. 4 is a general flow chart of load balancing between frequency and frequency during initial access according to another embodiment of the present invention.
具体实施方式Detailed ways
在3GPPTS25.331规范中,规定了在WCDMA系统中Node B的公共测量报告上报可以选择两种方式:周期上报和事件触发上报。本方法主要针对周期上报方式进行描述,但在事件触发上报方式下同样适用。In the 3GPPTS25.331 specification, it is stipulated that in the WCDMA system, the public measurement report of the Node B can be reported in two ways: periodic reporting and event-triggered reporting. This method is mainly described for the periodic reporting method, but it is also applicable in the event-triggered reporting method.
本发明充分利用WCDMA系统中NodeB上报的测量结果,在RNC中,根据上报的当前小区负荷情况及其异频同覆盖小区的负荷,综合决定当前接入的UE是否有必要均衡至其他异载频同覆盖小区。The present invention makes full use of the measurement results reported by the NodeB in the WCDMA system. In the RNC, according to the reported current cell load situation and the load of the different-frequency and same-coverage cells, it is comprehensively determined whether the currently accessed UE needs to be balanced to other different carrier frequencies. Same coverage area.
下面结合附图对技术方案的实施作进一步的详细描述:Below in conjunction with accompanying drawing, the implementation of technical scheme is described in further detail:
在WCDMA系统中应用本发明所述方法,在测量控制命令中,对于公共测量采用的是周期上报方案,对于事件触发上报方式也有重要参考意义。When the method of the present invention is applied in the WCDMA system, in the measurement control command, the periodic reporting scheme is adopted for public measurement, and it also has important reference significance for the event-triggered reporting method.
本发明所述方法核心思想的流程如图1所示,从图1可以看出:The flow process of method core idea of the present invention is as shown in Figure 1, as can be seen from Figure 1:
步骤101,RNC向NodeB发送公共测量控制命令(Common Measurement InitiationRequest),要求NodeB周期测量并上报RTWP和/或TCP的测量值;在发送测量控制命令中,还包括周期上报的间隙(Report Periodicity)、过滤系数(Measurement Filter Coefficient)等;Step 101, the RNC sends a common measurement control command (Common Measurement InitiationRequest) to the NodeB, requiring the NodeB to periodically measure and report the measured value of the RTWP and/or TCP; in sending the measurement control command, the gap (Report Periodicity), Filter coefficient (Measurement Filter Coefficient), etc.;
步骤102,NodeB接收RNC发来的专用测量控制命令,并根据要求进行测量,在上报条件满足时上报测量结果;Step 102, the NodeB receives the dedicated measurement control command sent by the RNC, and performs measurement according to the requirements, and reports the measurement result when the reporting condition is met;
步骤103,RNC收到上报结果后,存储NodeB上报的与各小区有关的RTWP和/或TCP值;RTWP是直接反映小区的上行干扰的情况的一个量,而TCP是直接反映小区下行发射功率的一个量,在小区规划确定的条件下,两个测量量分别能够代表着一个小区的上下行的负荷情况;Step 103, after the RNC receives the reported result, store the RTWP and/or TCP value related to each cell reported by the NodeB; RTWP is a quantity that directly reflects the uplink interference of the cell, and TCP directly reflects the downlink transmit power of the cell One quantity, under the conditions determined by the cell planning, the two measurement quantities can respectively represent the uplink and downlink load of a cell;
步骤104,在UE发起RRC连接请求时,比较当前小区与异频同覆盖小区的负荷情况(见步骤105),选择负荷较轻的小区作为目标小区,若当前小区负荷较低,则选择当前小区作为目标小区(见步骤106),否则选择负荷较低的异频小区作为目标小区(见步骤107);Step 104, when the UE initiates an RRC connection request, compare the load conditions of the current cell and the different frequency and same coverage cell (see step 105), select a cell with a lighter load as the target cell, and if the load of the current cell is low, select the current cell As the target cell (seeing step 106), otherwise select a lower inter-frequency cell as the target cell (seeing step 107);
步骤108,对于RRC连接建立在专用信道的情况,在目标小区的Node B建立相应的无线链路后,可以将链路的信息连同频率信息等放于RRC连接建立消息(RRC Connection Setup)中发送至UE;Step 108, for the RRC connection is set up in the situation of the dedicated channel, after the Node B of the target cell establishes the corresponding wireless link, the information of the link can be sent in the RRC connection establishment message (RRC Connection Setup) together with the frequency information etc. to UE;
步骤109,UE返回RRC连接建立完成消息(RRC Connection Setup Complete),后续过程同正常的处理过程,即进行初始直传等过程。In step 109, the UE returns an RRC Connection Setup Complete message (RRC Connection Setup Complete), and the subsequent process is the same as the normal processing process, that is, initial direct transmission and other processes are performed.
图2是在处理过程中RNC与NodeB的消息流程。对应图1中的(101)和(102):Figure 2 is the message flow between RNC and NodeB during the processing. Corresponding to (101) and (102) in Figure 1:
RNC向各Node B发送公共测量命令(Common Measurement Initiation Request)(步骤201),命令中带有测量量、上报方式、过滤系数等一些重要的信息;Node B在检查认为自己的能力能够胜任测量时,向RNC返回公共测量初始响应(Common Measurement InitiationResponse)(步骤202),并开始进行测量,在测量的同时Node B发现达到上报条件时,NodeB在达到上报条件时,向RNC发送公共测量报告(Common Measurement Report)(步骤203),对于周期上报方式,每隔一段时间就向RNC上报一次测量结果(步骤204)。RNC sends a common measurement order (Common Measurement Initiation Request) to each Node B (step 201), which contains some important information such as measurement amount, reporting method, filtering coefficient, etc.; , return public measurement initial response (Common Measurement InitiationResponse) (step 202) (step 202) to RNC, and start to measure, when measuring while Node B finds and reaches reporting condition, NodeB sends common measurement report (Common Measurement Report) to RNC when reaching reporting condition Measurement Report) (step 203), for periodic report mode, just report a measurement result (step 204) to RNC every once in a while.
图3是在处理过程中与UE相关的专用消息流程。对应图1中的步骤(104)、(108)、(109):Fig. 3 is a flow of dedicated messages related to UE during processing. Corresponding to steps (104), (108), (109) in Fig. 1:
UE发起RRC连接请求(RRC Connection Request)(步骤301),RNC在收到此连接请求之后,进行判决,然后决定建立无线链路的目标小区,并向目标小区的Node B发送无线链路建立请求(Radio Link Setup Request)(步骤302),在Node B返回正确的无线链路建立响应(Radio Link Setup Response)(步骤303)之后,向UE发送RRC连接建立消息(RRC ConnectionSetup)(步骤304),在消息中填上与目标小区和所建链路相关的一些信息,UE在完成空中的同步之后,向RNC返回RRC连接建立完成消息(RRC Connection Setup Complete)(步骤305),然后进入正常的直传过程。The UE initiates an RRC connection request (RRC Connection Request) (step 301), and the RNC, after receiving the connection request, makes a judgment, then decides to establish the target cell of the radio link, and sends a radio link establishment request to the Node B of the target cell (Radio Link Setup Request) (step 302), after Node B returns correct radio link setup response (Radio Link Setup Response) (step 303), send RRC connection setup message (RRC ConnectionSetup) (step 304) to UE, Fill in some information related to the target cell and the established link in the message, and after completing the synchronization in the air, the UE returns the RRC connection to the RNC to establish a complete message (RRC Connection Setup Complete) (step 305), and then enters the normal direct transfer process.
为了避免过多的频繁均衡动作发生,在图4所示的另一种实施方案中,在图1所示的实施方案的基础上增加了步骤(110),即优先判断当前小区的负荷是否低于一个预先设置的门限值,如果是,则可以不进行后续判决,直接将当前小区作为目标小区。同时在步骤(105)中可以增加一个迟滞性的判决条件,即要求异频小区的负荷比当前小区低一定的门限之下,才将异频小区作为目标小区,这样可以更有效降低由于频率发生改变而导致的连接失败的可能。In order to avoid too many frequent equalization actions, in another embodiment shown in Figure 4, a step (110) is added on the basis of the embodiment shown in Figure 1, that is, it is preferentially judged whether the load of the current cell is low If it is a preset threshold value, then the current cell can be directly used as the target cell without making subsequent judgments. At the same time, in step (105), a hysteresis decision condition can be added, that is, the load of the different-frequency cell is required to be lower than the current cell by a certain threshold, and the different-frequency cell is used as the target cell, which can more effectively reduce the frequency due to frequency occurrence. Changes may cause connection failures.
Claims (5)
- Load balance control method between the frequency when 1, initially inserting in the broadband CDMA system comprises the steps:(1) radio network controller obtains the reception broadband power and the emission carrier power value of reflection load condition from Node B;(2) when subscriber equipment initially inserts, radio network controller is according to the cell load of predefined threshold parameter and the current access of subscriber equipment with the load of site with the covering alien-frequency district, and whether the decision subscriber equipment is necessary balanced to alien-frequency district;(3) if decision with this subscriber equipment equilibrium to alien-frequency district, then alien-frequency district is as Target cell, sets up in the message in the connection that sends to this subscriber equipment, sends the information of corresponding alien-frequency district; If determine unbalancedly to alien-frequency district, then current area sends the information of this sub-district as Target cell;(4) subscriber equipment returns to set up in Target cell and finishes message.
- Load balance control method between the frequency when 2, initially inserting in the described broadband CDMA system of claim 1 is characterized in that described step (1) comprises the steps:(1.1) radio network controller sends at sub-district public-measurement control command to Node B, require to measure and receive broadband power and/or launch the carrier power value, and set the condition report, for the periodic report mode, the cycle that the needs setting reports etc., for reporting events, the thresholding that the needs setting reports, triggered time etc.;(1.2) Node B is to the up reception broadband power of respective cell and/or emission carrier power value, during report condition in reaching the measurement control order that radio network controller sends, reports to radio network controller;(1.3) radio network controller stores the result that Node B reports, and uses during for needs.
- Load balance control method between the frequency when 3, initially inserting in the described broadband CDMA system of claim 1, it is characterized in that: in the described step (2), radio network controller is when having subscriber equipment to insert, inquire about current storage this sub-district load condition and with the alien frequencies of this sub-district load with coverage cell, for the judgement of load condition following several method can be arranged:(2.1) be limited as in the main system at up direction, can only select the reception broadband power that adopts up direction to receive, as duty ratio reference between each sub-district;(2.2) be limited as in the main system at down direction, can only select to adopt down direction emission carrier power value, as duty ratio reference between each sub-district;(2.3) in the system that the uplink and downlink direction need be taken all factors into consideration, the reception broadband power and the down direction emission carrier power value that can adopt up direction to receive simultaneously are as duty ratio reference between each sub-district.
- Load balance control method between the frequency when 4, initially inserting in the described broadband CDMA system of claim 1 is characterized in that in described step (3), radio network controller comprises: this cell frequency information of A. to the information that Target cell sends; B. the scrambling code information of this sub-district; C. air-link resources information.
- Load balance control method between the frequency when 5, initially inserting in the described broadband CDMA system of the arbitrary at the most claim of claim 1, it is characterized in that: when subscriber equipment initially inserts, earlier judge whether the load of current area is lower than a threshold value that sets in advance, if, then can not carry out follow-up judgement, directly with current area as Target cell; If not, radio network controller is according to the cell load of predefined threshold parameter and the current access of subscriber equipment with the load of site with the covering alien-frequency district, and whether the decision subscriber equipment is necessary balanced to alien-frequency district.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB031404553A CN100544510C (en) | 2003-09-07 | 2003-09-07 | Inter-frequency load balancing control method during initial access in wideband code division multiple access system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB031404553A CN100544510C (en) | 2003-09-07 | 2003-09-07 | Inter-frequency load balancing control method during initial access in wideband code division multiple access system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1592165A true CN1592165A (en) | 2005-03-09 |
| CN100544510C CN100544510C (en) | 2009-09-23 |
Family
ID=34597365
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB031404553A Expired - Fee Related CN100544510C (en) | 2003-09-07 | 2003-09-07 | Inter-frequency load balancing control method during initial access in wideband code division multiple access system |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100544510C (en) |
Cited By (13)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100442937C (en) * | 2006-05-25 | 2008-12-10 | 华为技术有限公司 | Admission Judgment and Congestion Judgment Methods |
| WO2009089782A1 (en) * | 2008-01-08 | 2009-07-23 | Huawei Technologies Co., Ltd. | A method for handling the radio link, a communication method and device after the radio link failing |
| CN101064634B (en) * | 2006-04-30 | 2011-08-10 | 华为技术有限公司 | Frequency band reconfiguration system and method |
| CN102281573A (en) * | 2010-06-11 | 2011-12-14 | 电信科学技术研究院 | Time slot priority determination method and wireless network controller thereof |
| CN102612144A (en) * | 2006-02-23 | 2012-07-25 | 鼎桥通信技术有限公司 | HSDPA (high speed downlink packet access) resource management method in multicarrier TD-SCDMA (time division-synchronous code division multiple access) system |
| CN102695208A (en) * | 2011-03-22 | 2012-09-26 | 中兴通讯股份有限公司 | Business equalization distribution method and apparatus |
| CN103249094A (en) * | 2012-02-06 | 2013-08-14 | 中兴通讯股份有限公司 | Load balancing method and system |
| US8971905B2 (en) | 2010-06-30 | 2015-03-03 | Huawei Technologies Co., Ltd | Method, device, and system for performing assignment for a call |
| WO2016198011A1 (en) * | 2015-12-10 | 2016-12-15 | 中兴通讯股份有限公司 | Method and device for implementing load sharing |
| CN106341853A (en) * | 2015-07-10 | 2017-01-18 | 中兴通讯股份有限公司 | Switching realizing method and device and base station |
| CN109729534A (en) * | 2017-10-27 | 2019-05-07 | 普天信息技术有限公司 | Method and device for generating same-coverage and different-frequency cells |
| WO2020125508A1 (en) * | 2018-12-21 | 2020-06-25 | 中兴通讯股份有限公司 | Load balancing method, apparatus and device, and storage medium |
| CN113196863A (en) * | 2018-10-25 | 2021-07-30 | 瑞典爱立信有限公司 | Method and node for performing handover at recovery |
Family Cites Families (3)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2000278741A (en) * | 1999-03-19 | 2000-10-06 | Hitachi Ltd | Control method of cell radius |
| CN1145294C (en) * | 2001-01-12 | 2004-04-07 | 华为技术有限公司 | A Detection Method of Forward Link Load in CDMA Communication System |
| CN1134921C (en) * | 2001-03-14 | 2004-01-14 | 华为技术有限公司 | Method for Allocating Traffic Channel Frequency in Code Division Multiple Access Mobile Communication System |
-
2003
- 2003-09-07 CN CNB031404553A patent/CN100544510C/en not_active Expired - Fee Related
Cited By (17)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN102612144A (en) * | 2006-02-23 | 2012-07-25 | 鼎桥通信技术有限公司 | HSDPA (high speed downlink packet access) resource management method in multicarrier TD-SCDMA (time division-synchronous code division multiple access) system |
| CN101064634B (en) * | 2006-04-30 | 2011-08-10 | 华为技术有限公司 | Frequency band reconfiguration system and method |
| CN100442937C (en) * | 2006-05-25 | 2008-12-10 | 华为技术有限公司 | Admission Judgment and Congestion Judgment Methods |
| WO2009089782A1 (en) * | 2008-01-08 | 2009-07-23 | Huawei Technologies Co., Ltd. | A method for handling the radio link, a communication method and device after the radio link failing |
| CN102281573B (en) * | 2010-06-11 | 2014-12-17 | 电信科学技术研究院 | Time slot priority determination method and wireless network controller thereof |
| WO2011153955A1 (en) * | 2010-06-11 | 2011-12-15 | 电信科学技术研究院 | Method for determining time slot priority and radio network controller |
| CN102281573A (en) * | 2010-06-11 | 2011-12-14 | 电信科学技术研究院 | Time slot priority determination method and wireless network controller thereof |
| US8971905B2 (en) | 2010-06-30 | 2015-03-03 | Huawei Technologies Co., Ltd | Method, device, and system for performing assignment for a call |
| CN102695208A (en) * | 2011-03-22 | 2012-09-26 | 中兴通讯股份有限公司 | Business equalization distribution method and apparatus |
| CN102695208B (en) * | 2011-03-22 | 2015-01-28 | 中兴通讯股份有限公司 | Business equalization distribution method and apparatus |
| CN103249094A (en) * | 2012-02-06 | 2013-08-14 | 中兴通讯股份有限公司 | Load balancing method and system |
| CN103249094B (en) * | 2012-02-06 | 2016-12-14 | 中兴通讯股份有限公司 | A kind of load equalization method and system |
| CN106341853A (en) * | 2015-07-10 | 2017-01-18 | 中兴通讯股份有限公司 | Switching realizing method and device and base station |
| WO2016198011A1 (en) * | 2015-12-10 | 2016-12-15 | 中兴通讯股份有限公司 | Method and device for implementing load sharing |
| CN109729534A (en) * | 2017-10-27 | 2019-05-07 | 普天信息技术有限公司 | Method and device for generating same-coverage and different-frequency cells |
| CN113196863A (en) * | 2018-10-25 | 2021-07-30 | 瑞典爱立信有限公司 | Method and node for performing handover at recovery |
| WO2020125508A1 (en) * | 2018-12-21 | 2020-06-25 | 中兴通讯股份有限公司 | Load balancing method, apparatus and device, and storage medium |
Also Published As
| Publication number | Publication date |
|---|---|
| CN100544510C (en) | 2009-09-23 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US7209517B2 (en) | Method and apparatus for estimating a maximum rate of data and for estimating power required for transmission of data at a rate of data in a communication system | |
| JP5335817B2 (en) | Carrier management in wireless communication devices assigned multiple carrier sets by a wireless communication network | |
| CN1500317B (en) | Method for controlling reverse transmission in mobile communication system | |
| US8422435B2 (en) | Enhancing coverage for high speed downlink packet access (HSDPA) channel | |
| US8385217B2 (en) | Method for configuring channel and carrier resources for multi-carrier high speed downlink packet access | |
| US20080137537A1 (en) | Method for optimal packet scheduling for wireless and mobile communications networks | |
| CN1299441C (en) | A method for controlling inter-frequency load balancing in WCDMA system | |
| CN1726734A (en) | Wireless Communication Rate Shaping | |
| EP2168262A2 (en) | Method and apparatus for performing measurement on neighboring cells in a mobile communication system | |
| AU2007309844A1 (en) | Method and apparatus for allocating radio resource using random access procedure in a mobile communication system | |
| CN1301474A (en) | Method and system for soft handoff control based on access network capacity | |
| CN100544510C (en) | Inter-frequency load balancing control method during initial access in wideband code division multiple access system | |
| CN100373833C (en) | A Load Balancing Method in Wideband Code Division Multiple Access System | |
| CN1291012A (en) | Method and equipment for stopping pulse train transmission in radio system | |
| CN1165066C (en) | Method of selecting the best link for auxiliary channel allocation during handover of spread spectrum communication system | |
| CN1275400C (en) | Velocity regulating method of speech sound self adaptive multivelocity | |
| CN1578523A (en) | Antenna adjustment method, system and network element | |
| CN1913386A (en) | Method for regulating pilot channel transmitting power | |
| CN1758804A (en) | Method of sector loading balance in time-division group network system | |
| WO2006118491A1 (en) | Method and arrangement for allocating power in a communication network | |
| CN1679256A (en) | Method for transmission power control of multicast signal | |
| Pérez-Romero et al. | A generalized framework for multi-RAT scenarios characterisation | |
| EP2181515A1 (en) | Code assignment in hs-scch less operation mode | |
| CN1722861A (en) | A self-adapting method for transmission link | |
| Jeong et al. | Congestion control schemes for reverse link data transmission in multimedia CDMA systems |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20090923 Termination date: 20150907 |
|
| EXPY | Termination of patent right or utility model |