CN1564495A - Load balancing method in system of broad band CDMA - Google Patents
Load balancing method in system of broad band CDMA Download PDFInfo
- Publication number
- CN1564495A CN1564495A CN 200410029830 CN200410029830A CN1564495A CN 1564495 A CN1564495 A CN 1564495A CN 200410029830 CN200410029830 CN 200410029830 CN 200410029830 A CN200410029830 A CN 200410029830A CN 1564495 A CN1564495 A CN 1564495A
- Authority
- CN
- China
- Prior art keywords
- load
- cell
- target cell
- network controller
- radio network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Landscapes
- Mobile Radio Communication Systems (AREA)
Abstract
本发明公开了一种宽带码分多址系统中的负荷均衡方法,包括以下步骤:RNC从各同覆盖异频小区的基站获取反映各小区负荷状况的测量值;在接收到CN对UE的无线接入承载建立消息后,比较当前小区和其同覆盖异频小区的负荷,根据设定的负荷均衡切换条件为UE选定目标小区;在目标小区进行接纳动作后,向UE发送无线承载建立命令,携带目标小区的信息和资源信息;UE侧完成无线承载建立动作后,在目标小区中返回无线承载建立完成消息。本发明方法能够很好地保证WCDMA系统在UE业务建立时,较早地将部分UE切至负荷较低的同覆盖小区中接受服务,实现负荷均衡和系统容量的最大化,也能方便后续UE的顺利接入。
The invention discloses a load balancing method in a wideband code division multiple access system, comprising the following steps: RNC obtains measurement values reflecting the load status of each cell from base stations of the same coverage and different frequency cells; After accessing the bearer setup message, compare the load of the current cell with the same coverage and different frequency cells, and select the target cell for the UE according to the set load balancing handover conditions; after the target cell accepts the action, send the radio bearer setup command to the UE , carrying the information and resource information of the target cell; after the UE completes the radio bearer establishment action, it returns a radio bearer establishment complete message in the target cell. The method of the present invention can well ensure that when the UE service is established in the WCDMA system, some UEs will be switched to receive services in the same coverage cell with a lower load earlier, so as to realize load balancing and system capacity maximization, and also facilitate subsequent UEs smooth access.
Description
技术领域technical field
本发明涉及宽带码分多址(Wideband Code Division Multiple Access,以下简称WCDMA)系统中的一种负荷均衡方法,特别是对同覆盖异频小区的频间负荷均衡方法。The invention relates to a load balancing method in a Wideband Code Division Multiple Access (WCDMA for short) system, in particular to an inter-frequency load balancing method for cells with the same coverage and different frequencies.
背景技术Background technique
随着移动通讯系统的广泛应用和快速发展,移动系统中的很多关键技术也日趋完善,在实现用户正常通信的同时也必须要考虑如何获得最好的性能,使得系统和用户设备都能获得令人满意的效果,从系统的角度而言,希望尽可能接入更多的用户。With the wide application and rapid development of mobile communication systems, many key technologies in the mobile system are becoming more and more perfect. While realizing the normal communication of users, it is also necessary to consider how to obtain the best performance so that both the system and user equipment can obtain the order. People are satisfied with the effect. From the perspective of the system, it is hoped to connect as many users as possible.
WCDMA系统与其他系统(如GSM系统和CDMA系统)相比有许多特殊之处,软容量、支持变速率业务是其一大特征。在WCDMA系统中,用户设备(User Equipment,以下简称UE)在移动的过程中,所处的无线环境是时刻在变化着的,在UE远离基站或无线环境变坏的时候,如果仍然保持原来的速率传输,为了保证其服务质量QoS(Quality of Service),在闭环功率控制的作用下,基站必然会以更大的功率发送信号,系统的容量也会随之发生变化。如果能够通过适当措施使UE在合适的小区接收服务,对于系统来说,一方面可以使系统容量得到充分地利用,保证后续UE的顺利接入,另一方面对于用户来说,也可以得到相对较好的服务质量。Compared with other systems (such as GSM system and CDMA system), the WCDMA system has many special features. Soft capacity and support for variable rate services are its major features. In the WCDMA system, the wireless environment in which the user equipment (User Equipment, hereinafter referred to as UE) is moving is constantly changing. When the UE is far away from the base station or the wireless environment deteriorates, if the original Rate transmission, in order to ensure its quality of service QoS (Quality of Service), under the action of closed-loop power control, the base station will inevitably send signals with higher power, and the capacity of the system will also change accordingly. If appropriate measures can be taken to enable the UE to receive services in a suitable cell, for the system, on the one hand, the system capacity can be fully utilized to ensure the smooth access of subsequent UEs, and on the other hand, relatively Good quality of service.
对于采用同覆盖的异频小区的区域,多个同覆盖异载频小区的容量之和构成了该区域所能达到的总容量,如何进行频间负荷的均衡,实现多载频地区容量的最大化,是值得研究的一个课题。For an area that uses different frequency cells with the same coverage, the sum of the capacities of multiple cells with the same coverage and different carrier frequencies constitutes the total capacity that can be achieved in this area. How to balance the load between frequencies to achieve the maximum capacity in multi-carrier frequency areas is a topic worthy of study.
现有技术规范中没有针对WCDMA系统负荷均衡的具体实现方法。在专利申请号为00127302.7的中国专利申请中,公开了“一种移动通信系统中负载平衡预处理的方法”,该方法在移动通信系统中,通过测量相邻各小区的负荷情况,修改系统信息参数,即控制用户选择小区的参数,达到引导用户在负荷相对较低的小区中接入。但是,该专利申请进行负荷均衡的技术方案只能用于同频小区的处理,针对的是尚未接入系统的潜在用户,没有说明对同覆盖异频小区的情况具体如何处理,也没有针对已经接入系统的用户的处理方法。There is no specific implementation method for WCDMA system load balancing in the existing technical specifications. In the Chinese patent application with the patent application number 00127302.7, "a method for load balancing preprocessing in a mobile communication system" is disclosed. In the mobile communication system, the method modifies the system information by measuring the load conditions of adjacent cells Parameters, that is, parameters that control the user to select a cell, so as to guide the user to access in a cell with a relatively low load. However, the technical solution for load balancing in this patent application can only be used for the processing of same-frequency cells, and it is aimed at potential users who have not yet accessed the system. How to handle users who access the system.
发明内容Contents of the invention
本发明要解决的技术问题是提供一种宽带码分多址系统中的负荷均衡方法,在业务建立时,可以基于各同覆盖异频小区的负荷进行频间负荷的均衡。The technical problem to be solved by the present invention is to provide a load balancing method in a broadband code division multiple access system, which can perform inter-frequency load balancing based on the loads of different-frequency cells with the same coverage when establishing services.
为了解决上述技术问题,本发明提供了一种宽带码分多址系统中的负荷均衡方法,包括以下步骤:In order to solve the above technical problems, the invention provides a load balancing method in a wideband code division multiple access system, comprising the following steps:
(a)无线网络控制器从各同覆盖异频小区的基站获取反映各小区负荷状况的测量值;(a) The radio network controller obtains the measurement value reflecting the load status of each cell from the base stations of the same coverage and different frequency cells;
(b)无线网络控制器接收到核心网对用户设备的无线接入承载建立消息后,比较当前小区和其同覆盖异频小区的负荷,结合设定的负荷均衡切换条件,为所述用户设备选定目标小区;(b) After the radio network controller receives the radio access bearer establishment message of the core network for the user equipment, it compares the loads of the current cell and its same-coverage and different-frequency cell, and combines the set load balancing handover conditions for the user equipment Select the target area;
(c)在所述目标小区进行接纳动作,完成后向所述用户设备发送无线承载建立命令,携带目标小区的信息和分配资源的信息;(c) Perform an admission action in the target cell, and send a radio bearer establishment command to the user equipment after completion, carrying information about the target cell and resource allocation information;
(d)所述用户设备侧的无线承载建立动作完成后,在目标小区中返回无线承载建立完成消息。(d) After the radio bearer establishment action on the user equipment side is completed, a radio bearer establishment complete message is returned in the target cell.
上述方法可具有以下特点:所述步骤(a)进一步可包括以下步骤:The above-mentioned method may have the following characteristics: said step (a) may further include the following steps:
所述无线网络控制器向各同覆盖异频小区的基站发送小区公共测量控制命令,包含设定的测量量和与上报方式相关的参数;The radio network controller sends a cell common measurement control command to the base stations of the same coverage and different frequency cells, including the set measurement amount and parameters related to the reporting method;
所述基站接收到所述公共测量控制命令后,根据要求进行测量,在满足上报条件时,向所述无线网络控制器上报测量结果;After receiving the public measurement control command, the base station performs measurement according to requirements, and reports the measurement result to the radio network controller when the reporting condition is met;
所述无线网络控制器存储基站上报的测量结果,供需要时使用。The radio network controller stores the measurement results reported by the base stations for use when needed.
上述方法可具有以下特点:所述测量值为接收总宽带功率,或者为发射载波功率,或者为接收总宽带功率和发射载波功率。The above method may have the following characteristics: the measured value is the total received broadband power, or the transmitted carrier power, or the received total broadband power and the transmitted carrier power.
上述方法可具有以下特点:所述基站向无线网络控制器上报测量值的方式为周期上报方式或者事件触发上报方式。The above method may have the following characteristics: the manner in which the base station reports the measurement value to the radio network controller is a periodic reporting manner or an event-triggered reporting manner.
上述方法可具有以下特点:所述步骤(b)中,无线网络控制器根据小区负荷选择目标小区的过程进一步包括以下步骤:The above method may have the following characteristics: in the step (b), the process of the radio network controller selecting the target cell according to the load of the cell further includes the following steps:
(b1)无线网络控制器查询所述各个同覆盖异频小区的负荷情况,判断是否存在负荷低于当前小区负荷的同覆盖异频小区,如果存在,执行下一步,否则,执行步骤(b3);(b1) The radio network controller inquires about the load situation of each same-coverage and different-frequency cell, and judges whether there is a same-coverage and different-frequency cell whose load is lower than that of the current cell. If it exists, perform the next step, otherwise, perform step (b3) ;
(b2)将负荷较低的同覆盖异频小区作为建立业务的目标小区,执行步骤(c);(b2) taking the same-coverage inter-frequency cell with lower load as the target cell for establishing the service, and performing step (c);
(b3)将当前小区作为建立业务的目标小区,执行步骤(c)。(b3) Take the current cell as the target cell for establishing the service, and execute step (c).
为了避免可能出现的频繁均衡处理,有效降低由于发生频间硬切换而导致的掉话的可能,上述无线网络控制器根据小区负荷选择目标小区的过程中,所述步骤(b1)之前可进一步包括步骤:判断当前小区负荷是否低于预设的门限值,如果是,执行步骤(b3),否则执行步骤(b1)。In order to avoid frequent equalization processing that may occur and effectively reduce the possibility of call drop due to inter-frequency hard handover, in the process of selecting the target cell according to the load of the cell, the above-mentioned radio network controller may further include before the step (b1) Step: judging whether the current cell load is lower than a preset threshold value, if yes, execute step (b3), otherwise execute step (b1).
为了避免可能出现的频繁均衡处理,最大限度地维护当前已接入用户设备的服务质量,上述方法中,所述步骤(b1)后可进一步包括步骤:判断当前小区负荷超出其同覆盖异频小区负荷的差值是否达到预设的迟滞门限,如果是,执行步骤(b2),否则执行步骤(b3)。In order to avoid frequent equalization processing that may occur, and maintain the service quality of the currently accessed user equipment to the greatest extent, in the above method, after the step (b1), it may further include the step of: judging that the current cell load exceeds its same coverage and different frequency cell Whether the load difference reaches the preset hysteresis threshold, if yes, execute step (b2), otherwise execute step (b3).
上述方法可具有以下特点:在进行小区间负荷的比较时,只进行接收总宽带功率或者发射载波功率的比较,或者对接收总宽带功率和发射载波功率进行综合比较。The above method may have the following characteristics: when comparing the loads between cells, only the total received broadband power or the transmitted carrier power is compared, or the total received wideband power and the transmitted carrier power are compared comprehensively.
上述方法可具有以下特点:所述步骤(c)中,无线网络控制器在目标小区进行接纳时包含以下动作,给所述用户设备分配资源,完成与所述基站间无线链路的建立或重配置准备,确定将要进行建立或重配置的时间点;所述目标小区的信息包含目标小区的频率信息和扰码信息。The above method may have the following characteristics: in the step (c), the radio network controller includes the following actions when the target cell accepts: allocate resources to the user equipment, and complete the establishment or re-establishment of the radio link with the base station The configuration preparation is to determine the time point for establishment or reconfiguration; the information of the target cell includes frequency information and scrambling code information of the target cell.
上述方法可具有以下特点:所述步骤(d)之后还包括步骤:无线网络控制器收到所述无线承载建立完成消息后,向核心网反馈一个无线接入承载建立响应消息,然后进入正常的通信过程。The above method may have the following characteristics: after the step (d), it also includes a step: after the radio network controller receives the radio bearer establishment completion message, it feeds back a radio access bearer establishment response message to the core network, and then enters the normal communication process.
由上可知,本发明方法简单、逻辑合理、效率高,能够很好地保证WCDMA系统在UE业务建立时,较早地将部分UE切至负荷较低的同覆盖小区中接受服务,使多个同覆盖异频小区的负荷较好地实现负荷的均衡,从而实现整个系统容量的最大化,也能方便后续UE的顺利接入。It can be seen from the above that the method of the present invention is simple, logical and efficient, and can well ensure that when the UE service is established in the WCDMA system, some UEs will be switched to receive services in the same coverage cell with a lower load earlier, so that multiple The load of the same-coverage and different-frequency cells can better achieve load balance, so as to maximize the capacity of the entire system and facilitate the smooth access of subsequent UEs.
另外,本发明方法还可以从两个方面避免可能出现的频繁均衡处理。一方面是在当前小区负荷低于一个设定门限时,不管其同覆盖异频小区的负荷状况如何,都不必作均衡处理,认为此时的当前小区还有较好的能力接纳新的用户;另一方面,在对两小区作负荷比较的时候,通过设定一个迟滞门限,只在当前小区与其同覆盖异频小区的负荷差值超出该迟滞门限时,才作负荷均衡处理,从而最大限度地维护当前已接入UE的服务质量。In addition, the method of the present invention can also avoid possible frequent equalization processing from two aspects. On the one hand, when the current cell load is lower than a set threshold, regardless of the load status of the same-coverage and different-frequency cells, there is no need to perform equalization processing. It is believed that the current cell at this time still has a better ability to accept new users; On the other hand, when comparing the loads of the two cells, by setting a hysteresis threshold, only when the load difference between the current cell and the same-coverage inter-frequency cell exceeds the hysteresis threshold, the load balancing process is performed, thereby maximizing Maintain the service quality of the currently connected UE in a timely manner.
附图说明Description of drawings
图1是本发明实施例负荷均衡控制方法的主流程图;Fig. 1 is the main flowchart of the load balancing control method of the embodiment of the present invention;
图2是本发明实施例RNC与Node B之间公共测量的流程图;Fig. 2 is the flowchart of common measurement between RNC and Node B of the embodiment of the present invention;
图3是本发明实施例公共测量时的消息流程图;Fig. 3 is a message flow diagram during public measurement according to an embodiment of the present invention;
图4是本发明实施例RNC选择目标小区过程的流程图;Fig. 4 is the flow chart of the RNC selection target cell process of the embodiment of the present invention;
图5是本发明实施例业务建立时的消息流程图。Fig. 5 is a flow chart of messages when a service is established according to an embodiment of the present invention.
具体实施方式Detailed ways
下面结合附图对本发明的实施例作进一步的详细描述。Embodiments of the present invention will be further described in detail below in conjunction with the accompanying drawings.
本发明应用于由核心网(CN)、陆地无线接入网(UTRAN)和用户设备(UE)组成的WCDMA系统,UTRAN包括许多通过Iu接口连接到CN的无线网络子系统集(RNS),一个RNS包括一个无线网络控制器(RNC)和一个或多个基站(Node B)。Node B包括一个或多个小区,通过Iub接口连接到RNC上。各RNS中的RNC之间也可以通过Iur接口交互信息。The present invention is applied to a WCDMA system composed of a core network (CN), a terrestrial radio access network (UTRAN) and a user equipment (UE). The UTRAN includes many radio network subsystem sets (RNS) connected to the CN through the Iu interface. A RNS includes a radio network controller (RNC) and one or more base stations (Node B). Node B includes one or more cells, connected to RNC through Iub interface. RNCs in each RNS can also exchange information through the Iur interface.
本实施例负荷均衡控制方法的主流程如图1所示,包括以下步骤:The main flow of the load balancing control method in this embodiment is shown in Figure 1, including the following steps:
步骤100,RNC从各同覆盖异频小区的Node B处定时获取反映小区负荷状况的接收总宽带功率(RTWP)和发射载波功率(TCP)值;
步骤110,RNC接收到来自核心网(CN)的对单个UE的无线接入承载建立消息后,比较当前小区和其同覆盖异频小区的负荷,结合预设的负荷均衡切换条件,为UE选定目标小区;
步骤120,在目标小区进行接纳等动作,然后向该UE发送无线承载建立命令,在该命令消息中带上与目标小区相关的信息和资源信息;
步骤130,UE侧完成无线承载建立动作后,在目标小区中返回无线承载建立完成消息。
步骤100中,RTWP是直接反映小区上行干扰情况的一个量,而TCP是直接反映小区下行发射功率的一个量,在小区规划确定的条件下,两个测量量分别能够代表着一个小区的上、下行的负荷情况。在3GPP TS 25.331规范中,WCDMA系统中Node B的公共测量报告上报可以选择周期上报或者事件触发上报方式,本实施例采用周期上报方式。In
图2所示是RNC与Node B间的公共测量的具体流程,包括以下步骤:Shown in Fig. 2 is the specific flow of public measurement between RNC and Node B, comprising the following steps:
步骤200,RNC向Node B发送小区公共测量控制命令,要求Node B周期测量并上报RTWP和TCP的测量值,除测量量外,在发送的测量控制命令中还包括周期上报的间隙、过滤系数等信息;In step 200, the RNC sends a cell public measurement control command to the Node B, requiring the Node B to periodically measure and report the measured values of RTWP and TCP. In addition to the measured value, the transmitted measurement control command also includes the periodic reporting gap, filter coefficient, etc. information;
步骤210,Node B接收RNC发来的公共测量控制命令,根据要求进行测量,定时向RNC上报测量结果,即各同覆盖异频小区的RTWP和TCP测量值;Step 210, the Node B receives the public measurement control command sent by the RNC, performs measurement according to the requirements, and regularly reports the measurement results to the RNC, that is, the RTWP and TCP measurement values of the same coverage of different frequency cells;
步骤220,RNC存储Node B上报的测量结果,以供需要时使用。Step 220, the RNC stores the measurement results reported by the Node B for use when needed.
图3示出了对应于上述公共测量流程的RNC与Node B间的消息流程:Fig. 3 shows the message flow corresponding to the above-mentioned public measurement flow between RNC and Node B:
步骤300,RNC向Node B发送公共测量发起请求(Common MeasurementInitiation Request);Step 300, RNC sends a common measurement initiation request (Common MeasurementInitiation Request) to Node B;
步骤310,Node B在检查认为自己的能力能够胜任测量时,向RNC返回公共测量初始响应(Common Measurement Initiation Response),并开始进行测量;Step 310, Node B returns a Common Measurement Initiation Response (Common Measurement Initiation Response) to the RNC when the Node B checks that it is capable of performing the measurement, and starts to measure;
步骤320,Node B在达到上报条件时,向RNC发送公共测量报告(Common Measurement Report);Step 320, Node B sends a public measurement report (Common Measurement Report) to RNC when reaching the reporting condition;
步骤330,对于周期上报方式,Node B每隔一段时间向RNC上报一次测量结果。Step 330, for the periodic reporting mode, the Node B reports the measurement results to the RNC at intervals.
Node B的公共测量报告也可以采用事件触发上报方式,对于事件上报而言,RNC向各Node B发送的公共测量命令中除测量量外,还需要设定上报的门限、触发时间等参数,Node B在设定的事件满足时,向RNC上报测量结果。The public measurement report of Node B can also adopt the event-triggered reporting method. For event reporting, in addition to the measurement quantity, the public measurement command sent by RNC to each Node B also needs to set the reporting threshold, trigger time and other parameters. Node When the set event is met, B reports the measurement result to the RNC.
当有UE接入,业务建立时的具体流程如图4所示,包括以下步骤:When there is UE access, the specific process of service establishment is shown in Figure 4, including the following steps:
步骤400,RNC收到来自CN的无线接入承载建立消息(RAB AssignmentRequest)时,触发频间均衡的判决动作;Step 400, when the RNC receives a radio access bearer establishment message (RAB AssignmentRequest) from the CN, it triggers a judgment action for inter-frequency equalization;
步骤410,RNC比较各同覆盖异频小区的负荷情况,判断当前小区负荷是否低于预设的门限值,如果是,执行步骤440,否则执行下一步;Step 410, the RNC compares the load situation of the different frequency cells with the same coverage, and judges whether the current cell load is lower than the preset threshold value, if yes, execute step 440, otherwise execute the next step;
步骤420,判断是否存在负荷低于当前小区的同覆盖异频小区,如果是,执行下一步,否则,执行步骤440;Step 420, judging whether there is a same-coverage and different-frequency cell with a load lower than the current cell, if yes, perform the next step, otherwise, perform step 440;
步骤430,将负荷较低的同覆盖异频小区作为建立业务的目标小区,执行步骤450;Step 430, taking the same-coverage and different-frequency cell with a lower load as the target cell for establishing the service, and performing step 450;
步骤440,将当前小区作为建立业务的目标小区;Step 440, taking the current cell as the target cell for establishing the service;
步骤450,RNC在目标小区进行接纳等动作,完成后向该UE发送无线承载建立命令;Step 450, the RNC performs actions such as acceptance in the target cell, and sends a radio bearer establishment command to the UE after completion;
步骤460,UE侧完成无线承载建立动作后,在目标小区中返回无线承载建立完成消息。Step 460, after the UE completes the radio bearer establishment action, it returns a radio bearer establishment complete message in the target cell.
上述流程在步骤410先判断当前小区的负荷是否低于一个预先设置的门限值,如果是,则认为该小区的负荷处于一个较低的水平,直接将当前小区作为业务建立的目标小区,不必进行频间负荷均衡的判断。这样可以有效降低由于发生频间硬切换而导致的掉话的可能。Above-mentioned process first judges whether the load of current sub-district is lower than a preset threshold value in step 410, if yes, then consider that the load of this sub-district is at a lower level, directly use current sub-district as the target sub-district of service establishment, need not The determination of inter-frequency load balancing is performed. This can effectively reduce the possibility of call drop caused by inter-frequency hard handover.
上述步骤420中,进行负荷状况判决时,本实施例是对上、下行方向进行综合考虑,同时将上行方向的RTWP值和下行方向的TCP值作为各小区之间负荷比较的参考。负荷大小的判决规则可能有多种,一个简单的例子是在两个测量值都大时才认为该小区的负荷较大,两个测量值都小时才认为该小区的负荷较小。In the above step 420, when judging the load status, this embodiment comprehensively considers the uplink and downlink directions, and simultaneously uses the RTWP value in the uplink direction and the TCP value in the downlink direction as a reference for load comparison among cells. There may be multiple judgment rules for the load size. A simple example is that the load of the cell is considered to be large when the two measured values are large, and the load of the cell is considered to be small when the two measured values are small.
在上行方向或者下行方向受限为主的系统中,也可以仅选择上行方向的RTWP值或者下行方向的TCP值作为各小区之间负荷比较的参考。相应的,在这两种情况下,RNC向Node B发送的公共测量控制命令中的测量量可以仅包括RTWP或者TCP。In a system where the uplink direction or the downlink direction is limited, only the RTWP value in the uplink direction or the TCP value in the downlink direction may be selected as a reference for load comparison among cells. Correspondingly, in these two cases, the measurement quantity in the public measurement control command sent by the RNC to the Node B may only include RTWP or TCP.
进一步地,在对两小区作负荷比较时,还可以设定一个迟滞门限,在当前小区负荷超出其同覆盖异频小区负荷的差值达到该迟滞门限时,才执行步骤430的切换处理,否则仍执行步骤440,从而最大限度地维护当前已接入UE的服务质量。Further, when comparing the loads of the two cells, a hysteresis threshold can also be set, and when the difference between the load of the current cell exceeds the load of the inter-frequency cell with the same coverage and reaches the hysteresis threshold, the handover process in step 430 is executed; otherwise Step 440 is still performed, so as to maintain the service quality of the currently accessed UE to the greatest extent.
步骤450中,RNC在目标小区进行接纳等动作时,需要给相应的UE分配合适的资源,完成与基站间无线链路的建立或重配置准备,确定将要进行建立或重配置的时间点等;在无线接入网(RAN)侧完成所有的准备工作后,由RNC向UE发送无线承载建立消息,在该命令消息中带上目标小区的相关信息(频率信息、扰码信息)和所分配的资源信息,如果目标小区为同覆盖异频小区,则该无线承载建立消息实质上是一个频间硬切换命令消息。In step 450, when the RNC performs actions such as admission in the target cell, it needs to allocate appropriate resources to the corresponding UE, complete the establishment or reconfiguration preparation of the radio link with the base station, and determine the time point for establishment or reconfiguration, etc.; After completing all preparations on the radio access network (RAN) side, the RNC sends a radio bearer establishment message to the UE, and the command message carries the relevant information of the target cell (frequency information, scrambling code information) and the assigned For resource information, if the target cell is a same-coverage and different-frequency cell, the radio bearer setup message is essentially an inter-frequency hard handover command message.
步骤460中,RNC接收到UE从目标小区中返回的无线承载建立完成消息,表示UE侧的无线承载建立动作已经顺利完成。RNC还可向CN反馈一个无线接入承载建立的响应消息,然后进入正常的通信过程。In step 460, the RNC receives the radio bearer establishment complete message returned by the UE from the target cell, indicating that the radio bearer establishment action on the UE side has been successfully completed. The RNC can also feed back a response message of establishing a radio access bearer to the CN, and then enter into a normal communication process.
图5示出了本实施例业务建立时UE、RNC、CN之间的消息流程:Figure 5 shows the message flow between UE, RNC and CN when the service is established in this embodiment:
步骤500,RNC收到来自核心网的无线接入承载建立请求消息(RABAssignment Request);
步骤510,根据Node B测量上报的各同覆盖异频小区的负荷信息,进行是否作频间切换的均衡判决,确定目标小区,并完成接纳等动作;
步骤520,向UE发送无线承载建立消息(Radio Bearer Setup);
步骤530,UE侧的无线承载建立动作完成后,向RNC返回无线承载建立完成消息(Radio Bearer Setup Complete);
步骤540,RNC随即向CN反馈一个无线接入承载建立响应消息(RABAssignment Response),然后进入正常的通信过程。In
另外,如果在当前小区中由于码资源等原因不能接纳时,也可以尝试在其同覆盖异频小区中作接纳,并将可以接纳的小区作为目标小区。In addition, if the current cell cannot be admitted due to reasons such as code resources, it can also try to be admitted in its same-coverage inter-frequency cell, and use the cell that can be admitted as the target cell.
综上所述,本发明充分利用WCDMA系统中Node B上报的测量结果,在RNC中,根据当前小区及其同覆盖异频小区的负荷测量值,即各小区接收总宽带功率和/或发射载波功率的情况,决定正在建立业务的UE是否需要均衡至其他同覆盖异频小区。本发明方法简单、逻辑合理、效率高,能够很好地保证WCDMA系统在UE业务建立时,较早地将部分UE切至负荷较低的同覆盖小区中接受服务,使多个同覆盖异频小区的负荷较好地实现负荷均衡,从而实现整个系统容量的最大化,也能方便后续UE的顺利接入。In summary, the present invention makes full use of the measurement results reported by the Node B in the WCDMA system. In the RNC, according to the load measurement values of the current cell and its same coverage and different frequency cells, that is, each cell receives the total broadband power and/or transmits the carrier In the case of power, it is determined whether the UE that is establishing a service needs to be balanced to other same-coverage and different-frequency cells. The method of the present invention is simple, logical and high in efficiency, and can well ensure that when the UE service is established in the WCDMA system, some UEs will be switched to receive services in the same-coverage cells with lower loads earlier, so that multiple same-coverage and different-frequency The load of the cell can better achieve load balancing, so as to maximize the capacity of the entire system, and also facilitate the smooth access of subsequent UEs.
Claims (10)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2004100298303A CN100373833C (en) | 2004-03-29 | 2004-03-29 | A Load Balancing Method in Wideband Code Division Multiple Access System |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CNB2004100298303A CN100373833C (en) | 2004-03-29 | 2004-03-29 | A Load Balancing Method in Wideband Code Division Multiple Access System |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN1564495A true CN1564495A (en) | 2005-01-12 |
| CN100373833C CN100373833C (en) | 2008-03-05 |
Family
ID=34481012
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CNB2004100298303A Expired - Fee Related CN100373833C (en) | 2004-03-29 | 2004-03-29 | A Load Balancing Method in Wideband Code Division Multiple Access System |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN100373833C (en) |
Cited By (21)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100369516C (en) * | 2005-01-21 | 2008-02-13 | 中兴通讯股份有限公司 | A Capacity Test Method for Fixed Beam Smart Antenna Base Station System |
| WO2008080337A1 (en) * | 2006-12-28 | 2008-07-10 | Huawei Technologies Co., Ltd. | A method, system and apparatus for implementing load balancing |
| WO2008095437A1 (en) * | 2007-02-08 | 2008-08-14 | Huawei Technologies Co., Ltd. | Method, system, network and terminal for transmitting data between the terminal and the network |
| CN100426925C (en) * | 2005-05-16 | 2008-10-15 | 中兴通讯股份有限公司 | Transition method from CELL_DCH state to CELL_FACH state in broadband CDMA system |
| CN101978716A (en) * | 2008-03-21 | 2011-02-16 | 日本电气株式会社 | Method for optimizing a user equipment pdn (packet data network) connection |
| WO2011020230A1 (en) * | 2009-08-17 | 2011-02-24 | 上海贝尔股份有限公司 | Method and device for radio admission control |
| CN102088728A (en) * | 2011-01-20 | 2011-06-08 | 大唐移动通信设备有限公司 | Method, system and device for reporting cell load information and selecting target cell |
| CN101272602B (en) * | 2007-03-21 | 2012-05-23 | 华为技术有限公司 | Method, system and device for switching between networks |
| CN101480088B (en) * | 2006-06-29 | 2012-06-13 | 卢森特技术有限公司 | A Method for Dynamically Filling Neighbor List in Wireless Communication System |
| CN102547897A (en) * | 2012-01-16 | 2012-07-04 | 中国联合网络通信集团有限公司 | Cell switching method and access network equipment |
| CN102612144A (en) * | 2006-02-23 | 2012-07-25 | 鼎桥通信技术有限公司 | HSDPA (high speed downlink packet access) resource management method in multicarrier TD-SCDMA (time division-synchronous code division multiple access) system |
| WO2012174824A1 (en) * | 2011-06-22 | 2012-12-27 | 中兴通讯股份有限公司 | Synchronization method, access method and devices for load information of same coverage cells |
| CN102905316A (en) * | 2012-09-28 | 2013-01-30 | 大唐移动通信设备有限公司 | Method and device for dynamically balancing carrier load |
| CN101521921B (en) * | 2008-02-29 | 2013-02-27 | 中兴通讯股份有限公司 | Base station switch method |
| CN103139839A (en) * | 2011-12-02 | 2013-06-05 | 中兴通讯股份有限公司 | Method and system of mobility load balance |
| US8958812B2 (en) | 2008-09-24 | 2015-02-17 | Huawei Technologies Co., Ltd. | Cell load balancing method and devices thereof |
| US8971905B2 (en) | 2010-06-30 | 2015-03-03 | Huawei Technologies Co., Ltd | Method, device, and system for performing assignment for a call |
| CN106341853A (en) * | 2015-07-10 | 2017-01-18 | 中兴通讯股份有限公司 | Switching realizing method and device and base station |
| WO2017185880A1 (en) * | 2016-04-26 | 2017-11-02 | 中兴通讯股份有限公司 | Cell switching method and device |
| CN107801214A (en) * | 2016-09-07 | 2018-03-13 | 上海中兴软件有限责任公司 | A kind of traffic put-on method and device for balanced load |
| CN111356179A (en) * | 2018-12-21 | 2020-06-30 | 中兴通讯股份有限公司 | Load balancing method, device, equipment and storage medium |
-
2004
- 2004-03-29 CN CNB2004100298303A patent/CN100373833C/en not_active Expired - Fee Related
Cited By (30)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN100369516C (en) * | 2005-01-21 | 2008-02-13 | 中兴通讯股份有限公司 | A Capacity Test Method for Fixed Beam Smart Antenna Base Station System |
| CN100426925C (en) * | 2005-05-16 | 2008-10-15 | 中兴通讯股份有限公司 | Transition method from CELL_DCH state to CELL_FACH state in broadband CDMA system |
| CN102612144A (en) * | 2006-02-23 | 2012-07-25 | 鼎桥通信技术有限公司 | HSDPA (high speed downlink packet access) resource management method in multicarrier TD-SCDMA (time division-synchronous code division multiple access) system |
| CN101480088B (en) * | 2006-06-29 | 2012-06-13 | 卢森特技术有限公司 | A Method for Dynamically Filling Neighbor List in Wireless Communication System |
| CN101212402B (en) * | 2006-12-28 | 2010-08-25 | 华为技术有限公司 | A method and system for realizing load balancing |
| WO2008080337A1 (en) * | 2006-12-28 | 2008-07-10 | Huawei Technologies Co., Ltd. | A method, system and apparatus for implementing load balancing |
| WO2008095437A1 (en) * | 2007-02-08 | 2008-08-14 | Huawei Technologies Co., Ltd. | Method, system, network and terminal for transmitting data between the terminal and the network |
| CN101272602B (en) * | 2007-03-21 | 2012-05-23 | 华为技术有限公司 | Method, system and device for switching between networks |
| CN101521921B (en) * | 2008-02-29 | 2013-02-27 | 中兴通讯股份有限公司 | Base station switch method |
| CN101978716A (en) * | 2008-03-21 | 2011-02-16 | 日本电气株式会社 | Method for optimizing a user equipment pdn (packet data network) connection |
| CN101978716B (en) * | 2008-03-21 | 2015-09-09 | 联想创新有限公司(香港) | Method for optimizing a user equipment PDN (packet data network) connection |
| US8594016B2 (en) | 2008-03-21 | 2013-11-26 | Nec Corporation | Method for optimizing a user equipment PDN (packet data network) connection |
| US8958812B2 (en) | 2008-09-24 | 2015-02-17 | Huawei Technologies Co., Ltd. | Cell load balancing method and devices thereof |
| WO2011020230A1 (en) * | 2009-08-17 | 2011-02-24 | 上海贝尔股份有限公司 | Method and device for radio admission control |
| CN102474797B (en) * | 2009-08-17 | 2014-01-22 | 上海贝尔股份有限公司 | Method and device for radio admission control |
| US8971905B2 (en) | 2010-06-30 | 2015-03-03 | Huawei Technologies Co., Ltd | Method, device, and system for performing assignment for a call |
| CN102088728B (en) * | 2011-01-20 | 2013-10-02 | 大唐移动通信设备有限公司 | Method, system and device for reporting cell load information and selecting target cell |
| CN102088728A (en) * | 2011-01-20 | 2011-06-08 | 大唐移动通信设备有限公司 | Method, system and device for reporting cell load information and selecting target cell |
| WO2012174824A1 (en) * | 2011-06-22 | 2012-12-27 | 中兴通讯股份有限公司 | Synchronization method, access method and devices for load information of same coverage cells |
| WO2013078841A1 (en) * | 2011-12-02 | 2013-06-06 | 中兴通讯股份有限公司 | Mobility load balancing method and system |
| CN103139839A (en) * | 2011-12-02 | 2013-06-05 | 中兴通讯股份有限公司 | Method and system of mobility load balance |
| CN102547897A (en) * | 2012-01-16 | 2012-07-04 | 中国联合网络通信集团有限公司 | Cell switching method and access network equipment |
| CN102905316B (en) * | 2012-09-28 | 2015-03-11 | 大唐移动通信设备有限公司 | Method and device for dynamically balancing carrier load |
| CN102905316A (en) * | 2012-09-28 | 2013-01-30 | 大唐移动通信设备有限公司 | Method and device for dynamically balancing carrier load |
| CN106341853A (en) * | 2015-07-10 | 2017-01-18 | 中兴通讯股份有限公司 | Switching realizing method and device and base station |
| WO2017185880A1 (en) * | 2016-04-26 | 2017-11-02 | 中兴通讯股份有限公司 | Cell switching method and device |
| CN107318124A (en) * | 2016-04-26 | 2017-11-03 | 中兴通讯股份有限公司 | A kind of cell switching method and device |
| CN107801214A (en) * | 2016-09-07 | 2018-03-13 | 上海中兴软件有限责任公司 | A kind of traffic put-on method and device for balanced load |
| CN111356179A (en) * | 2018-12-21 | 2020-06-30 | 中兴通讯股份有限公司 | Load balancing method, device, equipment and storage medium |
| CN111356179B (en) * | 2018-12-21 | 2023-10-17 | 中兴通讯股份有限公司 | A load balancing method, device, equipment and storage medium |
Also Published As
| Publication number | Publication date |
|---|---|
| CN100373833C (en) | 2008-03-05 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN1564495A (en) | Load balancing method in system of broad band CDMA | |
| CN102349325B (en) | Load sharing method, device and system thereof | |
| CN1270578C (en) | Method for providing more broadcasting businesses by carrier to interfrence ratio in layered region structure | |
| EP2800414B1 (en) | Load balancing method and related device | |
| CN1270576C (en) | Method to control the packet switching traffic in digital cellular communication systems | |
| CN105554818B (en) | A kind of load equalization method and device | |
| CN1112075C (en) | Method and device for managing and allocating radio transmission channels in mobile radio telephone systems | |
| RU2540264C2 (en) | Method and apparatus for providing differentiated service for user equipment | |
| JP4767572B2 (en) | Centralized cell homing and load balancing in base station controllers | |
| CN1714589A (en) | Service priorities in multi-cell network | |
| EP1953971A1 (en) | A channel for multicarrier high speed downlink packet access and a method for allocating the carrier resource | |
| CN1832621A (en) | Handover Control Method in Multi-Frequency Point System | |
| CN1589582A (en) | Method for determining a monitored set of cells associated with an active set of cells | |
| CN1681348A (en) | Method for controlling non-realtime service data transmission of mobile terminal | |
| CN1599471A (en) | Realization method and device for controlling load balance in communication system | |
| CN1299441C (en) | A method for controlling inter-frequency load balancing in WCDMA system | |
| CN110461011A (en) | A load information processing method based on intent-driven balanced communication | |
| CN101087472B (en) | Method for user equipment to reselect a cell | |
| CN100544510C (en) | Inter-frequency load balancing control method during initial access in wideband code division multiple access system | |
| WO2013097789A1 (en) | Method, device and system for determining carrier according to service of quality | |
| CN102572945A (en) | Selection method for switching object cell and system thereof | |
| CN101064634A (en) | Frequency band reconfiguration system and method | |
| CN1738476A (en) | channel switching method | |
| CN1571574A (en) | A wireless communication system access control method | |
| CN101076181A (en) | Method for selecting access frequency point N frequency-point domain in TD-SCDMA system |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| C06 | Publication | ||
| PB01 | Publication | ||
| C10 | Entry into substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| C14 | Grant of patent or utility model | ||
| GR01 | Patent grant | ||
| CF01 | Termination of patent right due to non-payment of annual fee | ||
| CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20080305 Termination date: 20210329 |