CN1485509A - Steel reinforced concrete building construction method - Google Patents

Steel reinforced concrete building construction method Download PDF

Info

Publication number
CN1485509A
CN1485509A CNA021442614A CN02144261A CN1485509A CN 1485509 A CN1485509 A CN 1485509A CN A021442614 A CNA021442614 A CN A021442614A CN 02144261 A CN02144261 A CN 02144261A CN 1485509 A CN1485509 A CN 1485509A
Authority
CN
China
Prior art keywords
steel
reinforced concrete
construction
column
construction method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CNA021442614A
Other languages
Chinese (zh)
Inventor
刘志鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNA021442614A priority Critical patent/CN1485509A/en
Publication of CN1485509A publication Critical patent/CN1485509A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

A steel reinforced concrete building construction method, it makes the existing steel reinforced concrete construction method, the component and the existing construction method, with regard to its main component column, beam, steel carrier plate, wall body do the accurate stock preparation and its joint, assemble and pack the processing, the purpose is to allocate the conceptual adjustment through the construction material, simplify and unify the functional characteristic of the main component, make its stock preparation easy, the material is accurate, consider the question on the construction quality of Chinese people at the same time, on joint strength requirement and assembly characteristic, through the simpler and more convenient way to realize, make systematic assembly on the job site, go on through a set of accurate operation procedure, in order to improve construction convenience and construction safety, reduce the influence of the climate factor on the time limit of a project, simplify the construction worker's establishment and reduce its job conflict, and then provide the building construction that is faster, economic, environmental protection and performance is good, can be widely applied to the main body structure of the buildings with middle and low floors.

Description

The steel reinforced concrete building structure method
Technical field
The present invention relates to a kind of steel reinforced concrete building structure method, especially relate to a kind of with existing steel reinforced concrete building method, the member of being formed and existing form of construction work, doing the allotment of structure material and joint, assembling and the filling of simplifying handles, by the accurate operation procedure of a cover, constitute the building method of building, the main-body structure of low floor building in can be widely used in.
Background technology
The position, Taiwan is in the frequent area of earthquake of Eurasia plate and Philippine Sea plate, the shock resistance of fabric structure is of crucial importance, after going through 921 violent earthquakes, reinforced concrete construction, traditional timber construction, RC strengthen that brick is made or brick such as makes at building, all be subjected to serious destruction, and even the lives and properties national economic development of society is caused threat significantly; In addition, the subtropical climate humidity in Taiwan is rainy, adds factors such as typhoon and earthquake be frequent, have a strong impact on the construction speed of construction work, also testing the characteristic of steel concrete material, as problems such as infiltration, voids and pits, heat insulation differences, and the steel reinforced concrete structure that generally use in present Taiwan, then, make that the materials of reinforcing bar are big, the cost height because concrete deadweight is overweight, joint is handled complicated, receipts limit difficulty, so weak effect is low floor building in being difficult to spread to.The good speciality of the compound formation of steel reinforced concrete does not fully play and uses at this.
Along with the progress of plant equipment and building materials, the existing sizable space of the development of steel reinforced concrete structure, the steel reinforced concrete building method of general prior art has following state and bottleneck:
1, concrete adopts the heavy concrete, and as sandstone, weight is big;
2, frame type post and beam structure, section is big, and from great, consumptive material is many;
3, post beam splice, because moment of flexure, torsion are big, stress is concentrated, so that strength of joint requires is high and complicated, easy care construction quality not;
4, main body reinforcing bar section is big, the rigidity height, and with respect to the wall body that is connected, the poor rigidity distance is big, inaccurate coordination, the junction is easy to generate breakage;
5, floor uses the steel board to be arranged at the girder steel top usually, connect by WELDING STUDS again, and the construction trouble, the cost height is destroyed by the earthquake horizontal force easily;
6, large-scale beam column accounts for the part plane space, and forces down the floor clear height, and is also comparatively difficult on moulding is handled, weak effect;
7, required machinery and tool maximizes installation cost height, processed complex, cost height;
Constructional difficulties when 8, concrete is filled wall.
9, get the raw materials ready and construct and be difficult to systematization, prefabricated.
10, the water power pipeline is difficult for construction, and influences the duration arrangement.
11, therefore only apply to the simple office of factory building or moulding at present mostly.
In summary, the steel reinforced concrete building method of described prior art on reality is used, obviously exists inconvenience and defective, so be necessary to be improved.
Summary of the invention
The object of the invention is to provide a kind of steel reinforced concrete building structure method, to improve construction convenience and working security, reduce the influence of climatic factor to the duration, and simplify the construction trade establishment and reduce its operation conflict, and then provide a kind of quicker, economy, environmental protection and well behaved architectural construction, low floor building in can be widely used in.
To achieve these goals, the invention provides a kind of steel reinforced concrete building structure method, its step comprises:
(1) Construction Plan, the figure that gets the raw materials ready, storage;
(2) get the raw materials ready, processing, prefabricated: reinforcing bar processing, post and column beam joint pad, the upper flange otch of beam, lower wing plate otch; The steel board cuts; Body of wall and stair are prefabricated;
(3) detection of dispatching from the factory;
(4) finish on Xian Chang beam basis;
(5) material is banked up before the lifting;
(6) lifting: a, assemble central area post beam on the ground, and do temporary fixed by bolt; B, the central area column-beam frame is assembled in basis top; C, from central area to periphery assembling one, second floor sheet-pile beam; D, lay one, second floor slab board; E, carry out the post bit correction to periphery from central area; F, one, two layer of external and internal wall of storing, stair; G, continue to assemble more plate-girder, steel board, body of wall, stair and the roof steel board of upper floor;
(7) construction outside scaffold;
(8) the construction roof hides the rain canvas temporarily;
(9) whole skeleton is proofreaied and correct;
(10) it is affixed to carry out beam column;
(11) body of wall, stair installation, diagonal brace reinforcement, pipeline construction: construction external and internal wall, stair are installed; Construction diagonal brace reinforcement object; Carry out pipeline construction;
(12) carry out the not aluminium zinc net installation of pre-erection of body of wall;
(13) fill preceding detection;
(14) light weight concrete construction is built in filling;
(15) structure is finished;
(16) construction roof membrane, roofing tile and door and window, the outer decoration materials of external wall waterproof powder light, subsequent jobs such as interior decoration.
Described steel reinforced concrete architectural composition, wherein, the post of described step (2) is square through post type, this post general three floors during less than the 5m span i iron be 100 * 100 * 6 * 8mm, i iron is 125 * 125 * 6.5 * 9mm when reaching the 5m span, and described beam is an i beam, the consistent size of its size and post, it is consistent that the height of column beam joint pad setting and form are all simplified, and do temporary fixed by bolt.
Described steel reinforced concrete architectural composition, wherein, the upper flange otch of the beam of described step (2) is arranged on 1/4th places of beam, and it is of a size of 450 * 20mm.
Described steel reinforced concrete architectural composition, wherein, the lower wing plate otch of the beam of described step (2) is arranged on 1/4th places of beam.
Described steel reinforced concrete architectural composition, wherein, the body of wall of described step (2) is assembled into and the wide the same wide steel wall of post by aluminium zinc steel plate and aluminium zinc net.
Described steel reinforced concrete architectural composition, wherein, the post position configuration on the plane of described step (6) c reaches more than two times of general conventional post position, and combines with body of wall as far as possible.
Described steel reinforced concrete architectural composition, wherein, the beam of described step (6) c when big span by the reinforcement of stiffener mode.
Described steel reinforced concrete architectural composition, wherein, steel board, body of wall and the stair of described step (6) g are for to put with stratification.
Described steel reinforced concrete architectural composition, wherein, the diagonal brace reinforcement object of described step (11) is constructed by easy angle bar.
Described steel reinforced concrete architectural composition, wherein, the light weight concrete construction of described step (14) is that polyethylene kind light weight concrete construction disposable whole is built.
Brief Description Of Drawings
Below in conjunction with accompanying drawing,, will make technical scheme of the present invention and other beneficial effects apparent by detailed description to preferred embodiment of the present invention.
In the accompanying drawing,
Fig. 1 is the flow chart of the inventive method;
Fig. 2 A is the lateral view of post of the present invention;
Fig. 2 B is the sectional schematic diagram of post of the present invention;
Fig. 3 A is the vertical view of the otch of the upper flange of beam of the present invention;
Fig. 3 B is the enlarged diagram of the otch of the upper flange of beam of the present invention;
Fig. 3 C is the upward view of the otch of the lower wing plate of beam of the present invention;
Fig. 4 A is a body of wall assembling position schematic diagram of the present invention;
Fig. 4 B is the elevation of body of wall of the present invention;
Fig. 4 C is the lateral view of body of wall of the present invention;
Fig. 5 assembles the floor map of central area post beam for the present invention;
Fig. 6 assembles the lateral view of central area column-beam frame for the present invention;
Fig. 7 is for the present invention assembles one, the lateral view of second floor post beam;
Fig. 8 is the lateral view of lay one of the present invention, second floor steel board;
Fig. 8 A lays the elevation of steel board for beam of the present invention;
Fig. 8 B lays the lateral view of steel board for beam of the present invention;
Fig. 9 is for the present invention puts one, the lateral view of second floor external and internal wall, stair;
Figure 10 for the present invention construct upper strata beam, steel board, put body of wall, stair, roof steel board, outside scaffold, roof and hide rain canvas, the affixed lateral view of post beam temporarily;
Figure 11 is the construct lateral view of diagonal brace reinforcement, pipeline construction, body of wall, stair construction of the present invention;
Figure 12 is the present invention's elevation that aluminium zinc net that the not prefabricated part of body of wall engages installs of constructing.
The specific embodiment
Hereinafter, will describe the present invention in detail.
The invention provides a kind of steel reinforced concrete building structure method, as shown in Figure 1, its step comprises:
(1) Construction Plan, the figure that gets the raw materials ready, storage: the demand statistics of main member post 1, beam 2, steel board 3, body of wall 9;
(2) get the raw materials ready, processing, prefabricated: reinforcing bar processing, post 1 and column beam joint pad 8, upper flange 4 otch 5 of beam 2, lower wing plate 6, otch 7; Post 1, shown in Fig. 2 A and Fig. 2 B, it is square through post type, general three floors during less than the 5m span i iron be 100 * 100 * 6 * 8mm, i iron is 125 * 125 * 6.5 * 9mm when reaching the 5m span, is about 1/3rd of stock size, can increase the interior space, because its little rigidity of conducting oneself with dignity is low, can reduce rigidity difference again with body of wall 9; Beam 2, it is an i beam, the consistent size of its size and post 1, prepare and storage work to simplify material, as shown in Figure 3A, be able to lay in the built-in beam 2 for making steel board 3, otch 5 is done in the little place of upper flange 4 moments of flexure at beam 2, shown in Fig. 3 B, the otch 5 of 450 * 20mm is done at its 1/4th places at beam 2, to strengthen the horizontal resistance of structure material; Shown in Fig. 3 C, be convenient to install for making the water power pipeline, do otch 7 at 1/4th places of the lower wing plate 6 of beam 2 and handle, by running through the water power pipeline is set; It is consistent that the height that column beam joint pad 8 is provided with and form are all simplified, and do temporary fixedly by bolt, makes things convenient for the preparation of material.Steel board 3 cuts: it does the steel board 3 of accurate cutting in factory, to improve component quality and engineering efficient; Body of wall 9 and stair 11 are prefabricated: shown in Fig. 4 A, Fig. 4 B, Fig. 4 C, it is a prefabrication body of wall 9, and this body of wall 9 is assembled into and the wide the same wide steel wall of post by aluminium zinc steel plate and aluminium zinc net, to improve component quality and engineering efficient;
(3) detection of dispatching from the factory: main member post 1, beam 2, steel board 3, body of wall 9 are done strict quality control;
(4) finish on Xian Chang beam basis: Foundation Design is finished;
(5) material is banked up before the lifting: all are got the raw materials ready and transport the building site to, are configured in periphery;
(6) lifting: a, assemble post 1 beam 2 of central area 10 on the ground, and temporary fixed: so that assembling fast, as shown in Figure 5 by bolt; Because column beam joint pad 8 absolute altitude unanimities make joint handle and simplify; Post 1 beam 2 frameworks of b, assembling central area 10 are in the top, basis, as shown in Figure 6; C, from post 1 beam 2 of central area 10 to periphery assembling one, two floors: do temporary fixed as shown in Figure 7, post position configuration in the plane reaches more than two times of general prior art post position, and combine with body of wall 9 as far as possible, beam 2 when big span only by the reinforcement of stiffener mode; D, lay one, second floor slab board 3: do as shown in Figure 8 temporary fixed, the mode of setting up of steel board 3 and beam 2, shown in Fig. 8 A and Fig. 8 B, steel board 3 is entrenched in Joints in the beam 2, increases the horizontal anti-seismic of building; E, carry out the post bit correction to periphery: proofread and correct by crane to periphery from central area 10, reduce tolerance, undertaken affixed by bolt again from central area 10; F, one, two layer of external and internal wall 9 of storing, stair 11, as shown in Figure 9; G, more upper floor plate-girder 2, steel board 3, body of wall 9, stair 11 and roof steel board 3 continue to construct: as shown in figure 10, with main member by quick Web beam 2 posts 1 of easy temporary fixed mode; The steel board of putting with stratification 3 when reducing construction safety problem and the influence of climatic factor; Landed cost and heavy mechanical equipment expense that body of wall of putting with stratification 9 and stair 11 can reduce personnel;
(7) construction outside scaffold 12: as shown in figure 10, in arranged outside scaffold 12 safety measures;
(8) the construction roof hides rain canvas 13 temporarily: as shown in figure 10, and the rainproof measure of construction above roof steel board 3;
(9) whole skeleton is proofreaied and correct: proofread and correct by crane to periphery from central area 10, reduce tolerance;
(10) carry out beam column affixed 14: as shown in figure 10, beam 2 posts 1 that correction is finished weld;
(11) body of wall 9, stair 11 installations, diagonal brace 15 reinforcement, pipeline 16 constructions: construction external and internal wall 9, stair 11 are installed, as shown in figure 11; Construction diagonal brace 15 reinforcement objects:, conveniently obtain material by construct diagonal brace 15 objects of rigidity of easy angle bar; Carry out pipeline 16 construction: water power pipeline 16 run through setting;
(12) carry out not aluminium zinc net 17 installations of prefabricated part of body of wall 9, as shown in figure 12;
(13) fill preceding the detection;
(14) light weight concrete construction is built in filling: the light weight concrete construction of carrying polyethylene kind with pump, the weight of this light weight concrete construction is little, lateral pressure is low and the good fluidity characteristic, make filling effect good, but disposable whole is built, save man-hour and template and expend, and steel board 3 surpasses the horizontal pipeline of being installed 16 with the floor packed height in the beam 2;
(15) structure is finished;
(16) construction roof membrane, roofing tile and door and window, the outer decoration materials of external wall waterproof powder light, subsequent jobs such as interior decoration.
A kind of steel reinforced concrete building structure method of the present invention has characteristics described as follows:
1, described beam column is from heavy and light, and material economy can be saved resource 2/3rds natural resources, has the feature of environmental protection;
2, described post beam splice is handled with pad, bolt and diagonal brace, uses the general building materials in market, only does easy processing and handles, and has popularization;
3, described agent structure can be got the raw materials ready more than 70% in advance, shortens the duration of site construction, has competitiveness;
4, described main member can carry out the management of accurate Construction Plan and outgoing in factory process, has systematicness;
5, the size of described post, beam, steel board, wall body construction is unified, to constitute the most economical structure material and the maximum interior space, has benefit;
6, the meteorotropic situation of described assembling process significantly reduces, and has stability;
7, described engineering construction technology is simplified, and can be participated in by existing unit in charge of construction in locality or workman, has commercial expansion;
8, described steel board is embedded in the beam, has horizontal anti-seismic;
9, described assembling process is put steel board and body of wall with stratification, has safety;
10, described assembling process cooperates the steel board to proofread and correct to periphery from central area, has accuracy;
11, described filling material has light weight by the light weight concrete construction formed by integrally casting;
12, described post section is little, and rigidity is little, and the configuration of post position is many, and combines with body of wall, has harmony;
13, described lower flange of girder plate otch is simplified the water power construction, has simplicity;
14, therefore can be extended in low floor building.
Be understandable that; for the person of ordinary skill of the art; can make other various corresponding changes and distortion according to technical scheme of the present invention and technical conceive, and all these changes and distortion all should belong to the protection domain of accompanying Claim of the present invention.

Claims (10)

1、一种钢骨混凝土建筑构造方法,其步骤包括:1. A steel-reinforced concrete building construction method, the steps comprising: (1)施工计划、备料图、仓储;(1) Construction plans, material preparation drawings, and warehousing; (2)备料、加工、预制:钢骨加工,柱及梁柱接头垫片,梁的上翼板切口、下翼板切口;(2) Material preparation, processing, and prefabrication: steel frame processing, gaskets for column and beam-column joints, cutouts for upper and lower flanges of beams; 钢承板裁切;Steel deck cutting; 墙体及楼梯预制;Prefabrication of walls and stairs; (3)出厂检测;(3) factory inspection; (4)现场的梁基础完成;(4) The beam foundation on site is completed; (5)吊装前物料堆置;(5) Material stacking before hoisting; (6)吊装:(6) Hoisting: a、在地面上组装中央区柱梁,并通过螺栓做临时固定;a. Assemble the column beams in the central area on the ground and fix them temporarily with bolts; b、将中央区柱梁框架组装在基础上方;b. Assemble the column-beam frame in the central area above the foundation; c、从中央区向周边组装一、二楼板柱梁;c. Assemble the first and second floor slab-column beams from the central area to the periphery; d、铺放一、二楼板钢承板;d. Lay the first and second floor steel bearing plates; e、从中央区向周边进行柱位校正;e. Correct the column position from the central area to the periphery; f、置放一、二层内外墙体、楼梯;f. Place the inner and outer walls and stairs on the first and second floors; g、继续组装更上层楼的板梁、钢承板、墙体、楼梯及屋顶钢承板;g. Continue to assemble the slab beams, steel bearing plates, walls, stairs and roof steel bearing plates of the upper floor; (7)施工外侧脚手架;(7) Construction outside scaffolding; (8)施工屋顶临时遮雨帆布;(8) Temporary rain-shielding canvas on the construction roof; (9)整体骨架校正;(9) Overall skeleton correction; (10)进行梁柱固接;(10) Beam-column connection; (11)墙体、楼梯安装、斜撑补强、管路施工:(11) Wall, staircase installation, diagonal brace reinforcement, pipeline construction: 施工内外墙体、楼梯安装;Construction of interior and exterior walls, stair installation; 施工斜撑补强对象;Reinforcement objects of construction diagonal braces; 进行管路施工;carry out pipeline construction; (12)进行墙体未预制部份的铝锌网安装;(12) Install the aluminum-zinc mesh on the unprefabricated part of the wall; (13)填充前的检测;(13) Detection before filling; (14)填充浇筑轻质混凝土;(14) Filling and pouring lightweight concrete; (15)结构体完成;(15) The structure is completed; (16)施工屋顶防水层、屋瓦及门窗,外墙防水粉光外饰材,内装修等后续作业。(16) Construction of roof waterproof layer, roof tiles, doors and windows, exterior wall waterproof powder finish materials, interior decoration and other follow-up operations. 2、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(2)的柱为正方形通柱型,该柱在一般三层楼小于5m跨距时工字钢为100×100×6×8mm,达到5m跨距时工字钢为125×125×6.5×9mm,所述的梁为工字梁,其尺寸与柱的尺寸一致,梁柱接头垫片设置的高度与形式均简化一致,并通过螺栓做临时固定。2. The steel-reinforced concrete building construction method according to claim 1, characterized in that the column in the step (2) is a square through-column type, and when the span of the column is generally less than 5m in a three-story building, the I-beam is 100×100×6×8mm, when the span reaches 5m, the I-beam is 125×125×6.5×9mm, the beam is an I-beam, its size is consistent with that of the column, and the height of the beam-column joint gasket is set It is simplified and consistent with the form, and is temporarily fixed by bolts. 3、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(2)的梁的上翼板切口设置在梁的四分之一处,其尺寸为450×20mm。3. The steel-reinforced concrete building construction method according to claim 1, characterized in that the upper flange cutout of the beam in the step (2) is set at a quarter of the beam, and its size is 450×20mm. 4、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(2)的梁的下翼板切口设置在梁的四分之一处。4. The steel-reinforced concrete building construction method according to claim 1, characterized in that, the cutout of the lower flange of the beam in the step (2) is set at a quarter of the beam. 5、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(2)的墙体通过铝锌钢板和铝锌网组装成与柱宽一样宽的钢墙。5. The steel-reinforced concrete building construction method according to claim 1, characterized in that, the wall body in the step (2) is assembled into a steel wall with the same width as the column width by using aluminum-zinc steel plates and aluminum-zinc mesh. 6、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(6)c的平面上的柱位配置达到一般传统柱位的二倍以上,并尽量与墙体结合。6. The steel-reinforced concrete building construction method according to claim 1, characterized in that the configuration of columns on the plane of step (6)c is more than twice that of conventional columns, and is combined with the wall as much as possible . 7、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(6)c的梁在较大跨距时通过加劲板方式补强。7. The steel-reinforced concrete building construction method according to claim 1, characterized in that the beam in step (6)c is reinforced by a stiffening plate when the span is relatively large. 8、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(6)g的钢承板、墙体与楼梯为随层置放。8. The steel-reinforced concrete building construction method according to claim 1, characterized in that the steel bearing plates, walls and stairs in the step (6)g are placed along the floors. 9、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(11)的斜撑补强对象通过简便的角铁来施工。9. The steel-reinforced concrete building construction method according to claim 1, characterized in that the diagonal bracing reinforcement object in the step (11) is constructed by simple angle irons. 10、根据权利要求1所述的钢骨混凝土建筑构造方式,其特征在于,所述步骤(14)的轻质混凝土为聚乙烯类轻质混凝土一次性整栋浇筑。10. The steel-reinforced concrete building construction method according to claim 1, characterized in that the lightweight concrete in the step (14) is polyethylene-based lightweight concrete poured as a whole at one time.
CNA021442614A 2002-09-27 2002-09-27 Steel reinforced concrete building construction method Pending CN1485509A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNA021442614A CN1485509A (en) 2002-09-27 2002-09-27 Steel reinforced concrete building construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNA021442614A CN1485509A (en) 2002-09-27 2002-09-27 Steel reinforced concrete building construction method

Publications (1)

Publication Number Publication Date
CN1485509A true CN1485509A (en) 2004-03-31

Family

ID=34148447

Family Applications (1)

Application Number Title Priority Date Filing Date
CNA021442614A Pending CN1485509A (en) 2002-09-27 2002-09-27 Steel reinforced concrete building construction method

Country Status (1)

Country Link
CN (1) CN1485509A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009046572A1 (en) * 2007-10-11 2009-04-16 Chih-Peng Liu Light steel skeleton-concrete construction structure
CN102182309A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Construction method of steel reinforced concrete beam of large metallurgical industry factory building
CN102182320A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Method for mounting steel reinforced concrete steel skeleton of large metallurgical industry factory building
CN105926777A (en) * 2016-05-05 2016-09-07 葛加君 Heavy-load suspended long-span beam plug wing long leg load dividing construction method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2009046572A1 (en) * 2007-10-11 2009-04-16 Chih-Peng Liu Light steel skeleton-concrete construction structure
CN102182309A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Construction method of steel reinforced concrete beam of large metallurgical industry factory building
CN102182320A (en) * 2011-03-22 2011-09-14 中国十九冶集团有限公司 Method for mounting steel reinforced concrete steel skeleton of large metallurgical industry factory building
CN102182309B (en) * 2011-03-22 2012-07-25 中国十九冶集团有限公司 Construction method of steel reinforced concrete beam of large metallurgical industry factory building
CN105926777A (en) * 2016-05-05 2016-09-07 葛加君 Heavy-load suspended long-span beam plug wing long leg load dividing construction method

Similar Documents

Publication Publication Date Title
CN106013811B (en) A kind of installation method of assembled architecture
CN204940928U (en) Packaged type aluminium alloys house
CN105839784B (en) Assembled jacking type construction techniques
CN101769008A (en) Method for constructing quake-proof masonry house by utilizing prefabricated constructional column ring beams
CN1452678A (en) Construction of high-rise buildings with large modular units
CN106703201A (en) Fabricated integrated building and production method thereof
CN112854813A (en) Profile steel tray structure for ancient building translation and underpinning method
CN111441606A (en) Traditional building repairing method
CN106149868A (en) Prefabricated buildings architectural structure system and assembly method thereof
CN205875394U (en) Antidetonation concrete beam column that dry process is connected
CN111119368A (en) Construction method for externally-hung metal rock wool sandwich board of autoclaved sand aerated concrete wallboard
CN1737288A (en) Fixing device and construction method for decorative stone curtain wall outside steel pipe truss high tower
CN114351853A (en) Complex antique attic steel-wood combined structure and construction method thereof
CN106499045A (en) A kind of prefabricated composite construction parapet and construction method
CN108360685A (en) Monoblock type jack-up construction method
CN1485509A (en) Steel reinforced concrete building construction method
CN2846567Y (en) Steel net structure concrete composite building
CN204940537U (en) A kind of packaged type aluminium alloys house
CN201865365U (en) Anti-seismic reinforcing structure for old brickwork buildings
KR20190030885A (en) Construction Method for Model House combining of the concept Korean Houses and Wood Houses
CN203361332U (en) Prefabricated assembly type frame structure
CN217517797U (en) Fully-assembled multi-layer bent frame building
CN111254937A (en) Installation method of fabricated building
CN109736425A (en) A kind of precast concrete coping structure and preparation method thereof
CN111287311A (en) Construction method of cold-formed thin-wall light steel structure building

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication