CN1293346C - Energy-saving central air conditioning system - Google Patents

Energy-saving central air conditioning system Download PDF

Info

Publication number
CN1293346C
CN1293346C CNB2003101174498A CN200310117449A CN1293346C CN 1293346 C CN1293346 C CN 1293346C CN B2003101174498 A CNB2003101174498 A CN B2003101174498A CN 200310117449 A CN200310117449 A CN 200310117449A CN 1293346 C CN1293346 C CN 1293346C
Authority
CN
China
Prior art keywords
air
conditioning
central air
cooling
energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNB2003101174498A
Other languages
Chinese (zh)
Other versions
CN1629556A (en
Inventor
颜鸣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
ZHUHAI FIRST AIR-CONDITIONING WORK Co Ltd
Original Assignee
ZHUHAI FIRST AIR-CONDITIONING WORK Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by ZHUHAI FIRST AIR-CONDITIONING WORK Co Ltd filed Critical ZHUHAI FIRST AIR-CONDITIONING WORK Co Ltd
Priority to CNB2003101174498A priority Critical patent/CN1293346C/en
Publication of CN1629556A publication Critical patent/CN1629556A/en
Application granted granted Critical
Publication of CN1293346C publication Critical patent/CN1293346C/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Air Conditioning Control Device (AREA)

Abstract

本发明涉及一种节能型中央空调系统,包括用于提供空气调节所需要的冷(热)水源的主机、用于把机组冷冻水输送到空气处理设备或末端冷冻水装置、用于对空气进行降温、加热、加湿、除湿以及净化过滤的末端装置和用于对机组、空气处理设备与空调过程进行人工或自动调节与监控的空调控制系统;所述空调控制系统根据大量实时采集的动态变化数据进行处理,得出按需供冷的最佳动态运行指令,将中央空调系统各部件部分负荷连续运行状态,实时调控为“蓄冷运行”或“放冷运行”两种模式之一,所述中央空调主机在蓄冷运行模式下高速运行,在放冷运行模式下停止运行。该系统可广泛用于各类型中央空调系统,达到节省电能、降低消耗的作用,具有明显的社会效益和经济效益。

Figure 200310117449

The invention relates to an energy-saving central air-conditioning system, which includes a main machine for providing cold (hot) water sources required for air conditioning, for transporting unit chilled water to air treatment equipment or terminal chilled water devices, and for air conditioning Terminal devices for cooling, heating, humidification, dehumidification, and purification and filtration, and an air-conditioning control system for manual or automatic adjustment and monitoring of the unit, air-handling equipment, and air-conditioning process; the air-conditioning control system is based on a large number of dynamic changes collected in real time Through processing, the best dynamic operation command for on-demand cooling can be obtained, and the partial load continuous operation state of each component of the central air-conditioning system can be adjusted in real time to one of the two modes of "cooling storage operation" or "cooling operation". The main unit of the air conditioner runs at high speed in the cool-storage mode, and stops running in the cool-down mode. The system can be widely used in various types of central air-conditioning systems to save electric energy and reduce consumption, and has obvious social and economic benefits.

Figure 200310117449

Description

节能型中央空调系统Energy-saving central air-conditioning system

技术领域technical field

本发明涉及一种中央空调系统,尤其是涉及一种可节约能源的中央空调系统。The invention relates to a central air-conditioning system, in particular to an energy-saving central air-conditioning system.

背景技术Background technique

随着社会经济的快速发展,使用中央空调系统的酒店、写字楼、大型场馆等场所越来越广泛。由于中央空调系统在设计上,多以峰值气候条件和负荷容量为依据进行计算、选型。而系统实际运行中,随着季节、时间和使用空间散热量的变化,全年绝大多数时间实际负荷远远低于设计值。以酒店为例:空调负荷一般包括:①建筑围护结构传热量(含太阳辐射热);②照明、冰箱、热水壶等电器散热量;③人体散热量;④新风负荷和动力设备散热量等。建筑传热量和新风负荷是随室外气象参数而变化;酒店人流量也是一个很大的变量。由于大堂、会议厅、餐厅、歌舞厅和客房等不同功能空间的使用时间、使用率不同。诸多因素形成空调负荷随时间不断变化。With the rapid development of social economy, hotels, office buildings, large venues and other places using central air-conditioning systems are becoming more and more widespread. Since the design of the central air-conditioning system is mostly calculated and selected based on peak climate conditions and load capacity. In the actual operation of the system, with the change of season, time and the heat dissipation of the used space, the actual load is far lower than the design value most of the time throughout the year. Take hotels as an example: air-conditioning load generally includes: ① building envelope heat transfer (including solar radiation heat); ② lighting, refrigerators, kettles and other electrical appliances heat dissipation; ③ human body heat dissipation; ④ fresh air load and power equipment heat dissipation . Building heat transfer and fresh air load vary with outdoor meteorological parameters; hotel traffic is also a big variable. Due to the use time and utilization rate of different functional spaces such as lobby, conference hall, restaurant, dance hall and guest room are different. Many factors cause the air-conditioning load to change over time.

某酒店日负荷曲线图如图6所示:The daily load curve of a hotel is shown in Figure 6:

从曲线图可见,酒店空调在部分负荷下运转时间频率较多,且低负荷分布不均匀,在过渡季节或夏季时均有可能出现。因此几乎所有中央空调系统,都长期处于部分负荷状况下工作。如果仅靠空调系统设备已具有的负荷调节方式节能,其节电量与耗电量相比效果甚微。It can be seen from the graph that hotel air conditioners operate more frequently under partial load, and the distribution of low load is uneven, which may occur in transitional seasons or summer. Therefore, almost all central air-conditioning systems work under partial load conditions for a long time. If only relying on the load adjustment method that the air conditioning system equipment already has to save energy, the effect of saving electricity is very small compared with electricity consumption.

目前中央空调系统设备运行,普遍由人工操作。由于人工调节的不精确性、不及时性和不稳定性,造成中央空调系统能耗增加。且人工成本加大。At present, the operation of central air-conditioning system equipment is generally operated manually. Due to the inaccuracy, untimelyness and instability of manual adjustment, the energy consumption of the central air-conditioning system increases. And the labor cost increases.

目前,中央空调节能方式有:制冷剂、水泵变频、余热回收和蓄冷等四种。At present, there are four energy-saving methods for central air-conditioning: refrigerant, water pump frequency conversion, waste heat recovery and cold storage.

①制冷剂:通过更换冷水机组制冷剂方式节省耗电量。据称所有冷水机组使用某种制冷剂后均有节能效果,但该制冷剂价格昂贵。  同时,冷水机组的生产厂对其产品使用的制冷剂都有明确规定,不建议随便更换新品种的制冷剂。①Refrigerant: Save electricity consumption by replacing the refrigerant of the chiller. All chillers are said to save energy by using a certain refrigerant, but the refrigerant is expensive. At the same time, the manufacturers of chillers have clear regulations on the refrigerants used in their products, and it is not recommended to replace them with new types of refrigerants.

②水泵变频:根据变流量装置空调末端冷冻水量需要量减少,通过调低水泵电机工作频率,降低运行电流达到减少能耗目的。它受频率调节范围所限。循环水量减小到一定程度,不仅影响主机制冷效率,甚至造成保护停机。②Frequency conversion of water pump: According to the reduction of chilled water demand at the end of the air conditioner of the variable flow device, the purpose of reducing energy consumption is achieved by reducing the operating frequency of the water pump motor and reducing the operating current. It is limited by the frequency adjustment range. If the amount of circulating water is reduced to a certain extent, it will not only affect the cooling efficiency of the main engine, but even cause a protection shutdown.

③余热回收:利用制冷剂冷凝高温,经换热器回收热量,加热用水,节省加热冷水能源,此适用于需要供热水的场合,而不适用较低排气温度的冷水机组。③Waste heat recovery: Use refrigerant to condense high temperature, recover heat through heat exchanger, heat water, save energy for heating cold water, this is suitable for occasions that require hot water supply, not suitable for chillers with lower exhaust temperature.

④冰蓄冷技术:冰蓄冷是通过建造蓄冰池来实现冰球相变吸收和释放冷量。该方式需增加结构投资和使用专门机组。适用于新建、且有峰、谷电价政策的地区(实为耗能降费方案)。④ Ice storage technology: Ice storage is to realize the phase change of ice balls to absorb and release cold energy by building ice storage pools. This method needs to increase structural investment and use special units. Applicable to newly built areas with peak and valley electricity price policies (actually an energy consumption reduction plan).

可见目前应用较多的制冷剂、水泵变频、余热回收节能技术,均只是针对中央空调装置的某个局部进行改造。但是即使采用了全热交换、水泵变频、余热回收等方式,中央空调装置在使用过程中,中央空调的冷水机组常常处于部分负荷状态连续运行,而冷却水泵和冷却水塔仍然按机组满负荷时需要的高能耗运行状态连续运行。分析可知,空调冷水机组(或压缩机)制冷量通常负荷较高(例如70~90%)时能效比COP(COP-制冷量与耗电量之比值)值最高,在低于70~90%负荷时,COP值下降,空调装置能效比在低负荷时大幅度降低,导致在同等制冷量下,较低负荷时耗电量比高负荷时高得多,因此,能耗高、浪费大的情况仍没有解决。It can be seen that the currently widely used refrigerant, water pump frequency conversion, and waste heat recovery energy-saving technologies are all only modified for a certain part of the central air-conditioning device. However, even if full heat exchange, water pump frequency conversion, waste heat recovery and other methods are adopted, during the use of the central air conditioner, the chiller of the central air conditioner often operates continuously at part load, while the cooling water pump and cooling tower still operate according to the full load of the unit. Continuous operation in the high energy consumption operating state. The analysis shows that the energy efficiency ratio COP (COP-cooling capacity to power consumption ratio) value is the highest when the cooling capacity of air-conditioning chillers (or compressors) is usually high (for example, 70-90%), and is lower than 70-90%. When the load is on, the COP value drops, and the energy efficiency ratio of the air conditioner is greatly reduced at low load. As a result, under the same cooling capacity, the power consumption at low load is much higher than that at high load. Therefore, high energy consumption and large waste The situation is still not resolved.

发明内容Contents of the invention

本发明的目的在于提供一种节能型中央空调系统,解决了部分负荷时引起能耗高、浪费大的问题。The purpose of the present invention is to provide an energy-saving central air-conditioning system, which solves the problems of high energy consumption and large waste caused by partial load.

本发明的目的是这样实现的,一种节能型中央空调系统,包括用于提供空气调节所需要的冷或热水源的主机、用于把机组冷冻水输送到空气处理设备或末端冷冻水装置、用于对空气进行降温、加热、加湿、除湿以及净化过滤的末端装置和用于对机组、空气处理设备与空调过程进行人工或自动调节与监控的空调控制系统;其特征在于:所述空调控制系统根据大量实时采集的动态变化数据进行处理,得出按需供冷的最佳动态运行指令,将中央空调系统各部件部分负荷连续运行状态,实时调控为“蓄冷运行”或“放冷运行”两种模式之一,所述中央空调主机在蓄冷运行模式下高速运行,在放冷运行模式下停止运行。The object of the present invention is achieved in this way. An energy-saving central air-conditioning system includes a host for providing cold or hot water sources needed for air conditioning, for delivering the chilled water of the unit to the air handling equipment or the terminal chilled water device, A terminal device for cooling, heating, humidifying, dehumidifying, and purifying and filtering the air, and an air-conditioning control system for manually or automatically adjusting and monitoring the unit, air treatment equipment, and air-conditioning process; it is characterized in that: the air-conditioning control The system processes a large amount of dynamic change data collected in real time, and obtains the best dynamic operation command for on-demand cooling, and adjusts the continuous operation state of each component of the central air conditioning system to "cooling storage operation" or "cooling operation" in real time. One of the two modes, the central air-conditioning host runs at high speed in the cold storage mode, and stops running in the cooling mode.

实施本发明的一种节能型中央空调系统,基于先进的数字化多点分布式空气温度数据采集、由计算机实施的处理、运算、控制程序,动态调节冷冻供、回水温度,使冷水机组、冷却水泵和冷却水塔处于高效、满负荷运行或间歇停机状态工作的智能节电控制系统。该系统能有效提高空调制冷系统的综合能效比,克服了现有节电方式的不足。该系统可广泛用于各类型中央空调系统,达到节省电能、降低消耗的作用,具有明显的社会效益和经济效益。An energy-saving central air-conditioning system implementing the present invention is based on advanced digital multi-point distributed air temperature data collection, processing, calculation, and control programs implemented by computers, and dynamically adjusts the temperature of refrigeration supply and return water, so that chillers, cooling An intelligent energy-saving control system for water pumps and cooling towers in high-efficiency, full-load operation or intermittent shutdown. The system can effectively improve the comprehensive energy efficiency ratio of the air-conditioning and refrigeration system, and overcome the shortcomings of the existing power-saving methods. The system can be widely used in various types of central air-conditioning systems to save electric energy and reduce consumption, and has obvious social and economic benefits.

附图说明Description of drawings

图1是本发明节能型中央空调系统实施例一的系统连接示意图;Fig. 1 is the system connection schematic diagram of Embodiment 1 of the energy-saving central air-conditioning system of the present invention;

图2是图1所示的节能型中央空调控制系统原理框图;Fig. 2 is a functional block diagram of the energy-saving central air-conditioning control system shown in Fig. 1;

图3是图1所示的节能型中央空调控制系统的流程图;Fig. 3 is the flowchart of the energy-saving central air-conditioning control system shown in Fig. 1;

图4a、4b是图1所示的节能型中央空调控制系统的电路图;Fig. 4a, 4b are the circuit diagrams of the energy-saving central air-conditioning control system shown in Fig. 1;

图5为实施例二的运行模式图。Fig. 5 is a diagram of the operation mode of the second embodiment.

具体实施方式Detailed ways

实施例一:Embodiment one:

如图1所示,一种中央空调系统,包括主机、冷冻水装置、末端装置和空调控制系统组成,若主机采用水冷冷或热水机组,还包括冷却水装置。所述主机功能是提供空气调节所需要的冷或热水源,其组成可以是冷水机组、溴化锂吸收式制冷机组等制冷设备。所述冷却水装置作用为把机组热量输送到冷却塔,并将热量散发到空气中,其组成包括冷却水泵、冷却水塔、管道等,所述冷却水塔中设置有风扇、水冷式冷凝器等装置;所述冷冻水装置,其功能是把机组冷冻水输送到空气处理设备或末端,为一种水力管路装置,包括冷冻泵、管道,还可以包括蓄冷罐、集水器、分水器等。所述末端装置,其功能是对空气进行降温、加热、加湿、除湿以及净化过滤,组成形式可以是风机盘管、风柜、组合式空调机组、新风机组等,每种末端设备主要由换热器、风机、过滤网及机壳等组成,制冷时,来自外部的冷水进入换热器与室内循环空气进行热交换,使空气温度降低,达到空气调节的目的;制热时,来自外部的热水进入换热器与室内循环空气进行热交换,使空气温度升高,达到空气调节的目的。进入换热器的冷或热水源自空调主机;为达到所需的空气品质,如恒温、恒湿、高洁净度等要求,末端设备中将增加相应的装置和控制设备。空调控制系统其功能是在空调系统运行中,对机组、空气处理设备与空调过程进行人工或自动调节与监控,常规控制系统包括传感元件、执行与调节机构。本实用新型所述的中央空调系统可以通过计算机进行管理和监控。As shown in Figure 1, a central air-conditioning system consists of a main unit, a chilled water device, a terminal unit, and an air-conditioning control system. If the main unit uses a water-cooled or hot water unit, it also includes a cooling water unit. The function of the main unit is to provide cold or hot water source required by air conditioning, and its composition can be refrigeration equipment such as chiller unit and lithium bromide absorption refrigeration unit. The function of the cooling water device is to transport the heat of the unit to the cooling tower and dissipate the heat into the air. It consists of a cooling water pump, a cooling water tower, pipelines, etc., and the cooling water tower is equipped with devices such as fans and water-cooled condensers. The chilled water device, whose function is to transport the chilled water of the unit to the air treatment equipment or the terminal, is a hydraulic pipeline device, including a chilled pump, a pipeline, and can also include a cold storage tank, a water collector, a water separator, etc. . The function of the terminal device is to cool down, heat, humidify, dehumidify, and purify and filter the air. When cooling, the cold water from the outside enters the heat exchanger to exchange heat with the indoor circulating air, which reduces the air temperature and achieves the purpose of air conditioning; when heating, the heat from the outside The water enters the heat exchanger to exchange heat with the indoor circulating air to increase the air temperature and achieve the purpose of air conditioning. The cold or hot water entering the heat exchanger comes from the main unit of the air conditioner; in order to achieve the required air quality, such as constant temperature, constant humidity, high cleanliness, etc., corresponding devices and control equipment will be added to the terminal equipment. The function of the air conditioning control system is to manually or automatically adjust and monitor the unit, air handling equipment and air conditioning process during the operation of the air conditioning system. The conventional control system includes sensing elements, execution and adjustment mechanisms. The central air-conditioning system described in the utility model can be managed and monitored by a computer.

本实用新型所述中央空调系统的制冷原理为,制冷压缩机将低温低压的制冷剂蒸气压缩成高温高压蒸气后,排入水冷式冷凝器;冷却水将冷凝器的高温高压蒸气冷却成高压常温液体,冷却水在冷凝器中吸收热量后,由冷却水泵将冷却水循环送至冷却塔,在冷却塔与空气进行热交换,被空气冷却;冷凝器中的高压常温制冷剂液体经膨胀阀节流后降压进入蒸发器中沸腾蒸发,吸收由冷冻水从用户端带回的热量,成为低温低压的蒸汽,这些低温低压的制冷剂蒸气再回到压缩机,重复上述过程,达到连续制冷不断地向空调区域提供循环冷水的目的。简而言之,三个循环:制冷剂循环系统、冷却水循环系统、冷冻水循环系统。The refrigeration principle of the central air-conditioning system described in the utility model is that the refrigeration compressor compresses the low-temperature and low-pressure refrigerant vapor into high-temperature and high-pressure steam, and then discharges it into the water-cooled condenser; the cooling water cools the high-temperature and high-pressure steam of the condenser into high-pressure and normal temperature After the cooling water absorbs heat in the condenser, the cooling water is circulated by the cooling water pump to the cooling tower, where it exchanges heat with the air and is cooled by the air; the high-pressure and normal-temperature refrigerant liquid in the condenser is throttled by the expansion valve After decompression, it enters the evaporator to boil and evaporate, absorbing the heat brought back from the user end by the chilled water, and becomes low-temperature and low-pressure steam. These low-temperature and low-pressure refrigerant vapors return to the compressor, and repeat the above process to achieve continuous cooling. The purpose of providing circulating cold water to the air-conditioned area. In short, three cycles: refrigerant cycle system, cooling water cycle system, chilled water cycle system.

本实用新型所述的中央空调系统,由计算机根据大量实时采集的不同季节气侯引起温度升降、室内人流量等因素造成负荷动态变化数据进行的处理,得出按需供冷的最佳动态运行指令,将冷水机组、冷却水泵和冷却水塔实时调控为“蓄冷运行和放冷运行”崭新工况模式,利用计算机程序系统,控制中央空调设备在高能效比状况下运行。中央空调系统蓄冷运行时,冷水机组、冷却水泵和冷却水塔均以高速档运行,因此,在此状态下,空调系统保持高COP值;放冷运行时,除冷冻水泵变频运行外,冷水机组、冷却水泵和冷却水塔等均停止工作,用蓄积在空调循环冷动水装置中的冷量继续为装置供冷,整个空调系统亦处于一种节能的工作状态。The central air-conditioning system described in the utility model is processed by the computer according to a large number of real-time collected data of dynamic load changes caused by factors such as temperature rise and fall caused by different seasons and climates, indoor flow of people and other factors, and the best dynamic operation of on-demand cooling is obtained. According to the instructions, the chillers, cooling water pumps and cooling water towers are adjusted in real time to a new working mode of "cooling storage operation and cooling operation", and the computer program system is used to control the operation of central air-conditioning equipment under high energy efficiency ratio conditions. When the central air-conditioning system is in cold storage operation, the chillers, cooling water pumps and cooling water towers all operate at high speeds, so in this state, the air-conditioning system maintains a high COP value; The cooling water pump and the cooling water tower stop working, and the cold energy accumulated in the air-conditioning circulating cold water device continues to provide cooling for the device, and the entire air-conditioning system is also in an energy-saving working state.

由于空调系统COP值在70~90%时最高,所以当主机保持在较高负荷下运转,而中央空调系统却处于低负荷需求状态时,除一部分满足空调空间冷量需要外,富余部分制冷量采用蓄冷方式。此时,将低负荷时主机运行工况,改变为蓄冷和放冷两个运行阶段,使主机在蓄冷阶段高效运行,将富余冷量储蓄起来;在放冷阶段主机停止制冷,用所储冷量为装置供冷。Since the COP value of the air-conditioning system is the highest when it is 70-90%, when the main engine keeps running under a relatively high load, but the central air-conditioning system is in a low-load demand state, except for a part that meets the cooling capacity of the air-conditioning space, the surplus part of the cooling capacity Adopt cold storage method. At this time, the operating condition of the main engine at low load is changed to two operating stages of cold storage and cooling, so that the main engine can run efficiently in the cold storage stage and save the surplus cooling capacity; in the cooling stage, the main engine stops cooling and uses the stored cold The amount provides cooling for the device.

由于空调冷冻水装置中含有数十乃至数百吨水,水是比热容较大的物质之一,1吨水温度降低1度即需要0.33冷吨冷量。当在7~8度温差条件下,冷冻水装置储蓄冷量可达数百冷吨之多,加上管道、末端设备表冷器蓄冷能力,相当于冷水机组在90%负荷下运转40分钟至1小时的制冷量。建筑物中所有物品,除围护结构传热面和人体表面以外,其它内墙面以及物体表面均具有蓄冷能力。围护结构的绝热能力,使室外热量传到室内的时间为1.65h,它的蓄冷能量除维持房间温度稳定外,也为冷冻水大温差运行提供了稳定的保障。Since the chilled water device of the air conditioner contains dozens or even hundreds of tons of water, water is one of the substances with a large specific heat capacity, and the temperature of 1 ton of water is lowered by 1 degree, which requires 0.33 tons of cooling capacity. Under the condition of a temperature difference of 7-8 degrees, the cold storage capacity of the chilled water device can reach as much as hundreds of cold tons, plus the cold storage capacity of the pipeline and the surface cooler of the terminal equipment, which is equivalent to the chiller running at 90% load for 40 minutes to 1 hour of cooling capacity. All items in the building, except the heat transfer surface of the enclosure structure and the surface of the human body, other inner walls and object surfaces have cold storage capacity. The thermal insulation capacity of the enclosure structure makes it take 1.65 hours for the outdoor heat to be transmitted to the indoor. Its cold storage energy not only maintains the stability of the room temperature, but also provides a stable guarantee for the large temperature difference operation of the chilled water.

为了避免空调冷冻水温度低于设定值,本实用新型所述的中央空调系统还增加了蓄能设备,例如为储冷罐,根据空调系统大小的不同,确定储冷罐的容积和数量。当中央空调系统处于高负荷工作状态下时,储冷罐不工作;随着空调系统主机不停地高负荷运转,满足空调空间所需的制冷量后,空调系统即处于部分负荷需求状态,富余部分制冷量即蓄存在空调冷冻水装置中;当空调冷冻水温达到设定值时,空调冷冻水装置关闭;储冷罐开始工作,空调系统主机仍高负荷运转,产生的冷量即储存在储冷罐中,直至储冷罐中蓄冷介质的温度开始下降,当达到设定值后,空调系统主机等装置停止运行;空调系统进入放冷运行阶段,由空调冷冻水装置为空调区域提供冷量;空调冷冻水装置水温逐渐升高,当高于设定值时,空调系统主机等装置仍为停止运行的状态,由储冷罐为空调区域提供冷量;直至储冷罐温度也高于设定值后,空调系统主机等装置才开始运行,空调系统进入蓄冷运行阶段。空调系统进入放冷运行阶段时,整套装置是非常节能的,而且,此阶段每次往往可持续时间超过1小时。In order to prevent the air-conditioning chilled water temperature from being lower than the set value, the central air-conditioning system described in the utility model also adds energy storage equipment, such as a cold storage tank, and the volume and quantity of the cold storage tank are determined according to the size of the air-conditioning system. When the central air-conditioning system is in a high-load working state, the cold storage tank does not work; as the main engine of the air-conditioning system continues to operate at a high load and meets the cooling capacity required by the air-conditioned space, the air-conditioning system is in a state of partial load demand, and the surplus Part of the cooling capacity is stored in the chilled water device of the air conditioner; when the chilled water temperature of the air conditioner reaches the set value, the chilled water device of the air conditioner is turned off; In the cold tank, until the temperature of the cold storage medium in the cold storage tank begins to drop, when it reaches the set value, the main unit of the air conditioning system and other devices stop running; the air conditioning system enters the cooling operation stage, and the air conditioning chilled water device provides cooling capacity for the air conditioning area ; The water temperature of the air-conditioning chilled water device gradually rises. When it is higher than the set value, the main unit of the air-conditioning system and other devices are still in the state of stopping operation, and the cold storage tank provides cooling capacity for the air-conditioning area; until the temperature of the cold storage tank is also higher than the set value After setting the value, the air-conditioning system host and other devices start to run, and the air-conditioning system enters the cold storage operation stage. When the air conditioning system enters the stage of cooling operation, the whole device is very energy-saving, and this stage often lasts for more than 1 hour each time.

本实用新型所述中央空调系统的控制系统是一种新型的中央空调节电智能控制系统。它可以专为新的楼宇中央空调系统设计,也可以根据用户现有中央空调系统选用设备和运行工况特点“量身定做”。该装置可根据对室内、外温度、人流量和其它散热因素的在线监测数据,自动处理采集数据、计算负荷量,自动调控冷水机组、冷却水泵、冷却水塔等设备的运行状态。避免人为不能及时、准确操控装置所造成的能源浪费。同时,合理调节冷冻水出水初温,控制冷水机组在高效率工况下运行。The control system of the central air-conditioning system described in the utility model is a novel central air-conditioning power-saving intelligent control system. It can be specially designed for the central air-conditioning system of a new building, or it can be "tailor-made" according to the selection of equipment and operating conditions of the user's existing central air-conditioning system. The device can automatically process and collect data, calculate the load, and automatically adjust the operating status of chillers, cooling water pumps, cooling water towers and other equipment based on online monitoring data of indoor and outdoor temperatures, human flow and other heat dissipation factors. Avoid the waste of energy caused by man-made inability to timely and accurately control the device. At the same time, rationally adjust the initial temperature of the chilled water outlet, and control the operation of the chiller under high-efficiency conditions.

控制系统基本原理核心是控制空调系统在部分负荷时,将冷水机组低负荷、低效率的运行状态,调整为制冷系统在高负荷、高效率状态下运行。将其运行状态分为蓄冷和放冷两个运行阶段。The core of the basic principle of the control system is to control the air-conditioning system at partial load, and adjust the low-load and low-efficiency operation of the chiller to the high-load and high-efficiency operation of the refrigeration system. Its operating state is divided into two operating stages of cold storage and cooling.

如图2所示,本发明所述的中央空调控制系统(以下简称节电系统)原理作如下描述:节电系统主要由中央运算处理系统、数据采集系统、联动控制系统、流量调节系统、自动计量系统和远程监控管理系统等六大系统组成。As shown in Figure 2, the principle of the central air-conditioning control system (hereinafter referred to as the power-saving system) of the present invention is described as follows: the power-saving system mainly It is composed of six major systems including metering system and remote monitoring management system.

上述六大系统的组成、联系和功能如下:The composition, connection and functions of the above six major systems are as follows:

(一)中央运算处理系统:(1) Central computing processing system:

“中央运算处理系统”由CPU、扩展模块、模拟量输出模块、触摸式控制面板、电源开关、不间断电源、中间继电器、软件、计算机等组成,是中央空调节电系统的控制指挥中心,可对中央空调节电系统实施集中监控、集中管理、集中控制。"Central operation processing system" is composed of CPU, expansion module, analog output module, touch control panel, power switch, uninterruptible power supply, intermediate relay, software, computer, etc. It is the control command center of the central air-conditioning power-saving system. Implement centralized monitoring, centralized management, and centralized control of the central air-conditioning power saving system.

通过“中央运算处理系统”输入中央空调节电系统的运行参数及运行程序;一是将“数据采集系统”采集的温度、压力、压差、流量、电流、电压、频率、功率等模拟量信号转换为数字信号,与输入的运行参数进行存贮、运算、比较、处理,并将处理后的数据转换为模拟量信号,输出运行指令;二是将“数据采集系统”采集的各设备运行状态的数字信号,与输入的运行参数进行存贮、运算、比较、处理,输出运行指令。The operating parameters and operating procedures of the central air-conditioning power saving system are input through the "central computing processing system"; first, the analog signals such as temperature, pressure, pressure difference, flow rate, current, voltage, frequency, and power collected by the "data acquisition system" It is converted into a digital signal, stored, calculated, compared, and processed with the input operating parameters, and the processed data is converted into an analog signal, and the operating command is output; the second is to collect the operating status of each device collected by the "data acquisition system" The digital signal is stored, calculated, compared and processed with the input operation parameters, and the operation command is output.

“中央运算处理系统”发出的指令通过“流量调节系统”变成具体的动作,自动调节空调风柜末端设备回水管上的流量、冷冻水泵变频、冷冻水系统压差旁通流量和蓄冷罐的运作等;“中央运算处理系统”发出的指令通过“联动控制系统”  使冷水机组、冷却水塔和冷水机组、冷却水塔上安装的电动阀门联动,操控冷水机组、冷冻水泵、冷却水泵、冷却水塔联动和相互切换,以及开关机顺序。“中央运算处理系统”按设定的切换、启停时间,发出系统常规模式和节能模式运行指令,通过“自动计量系统”  进行存贮、统计和处理,准确计算出节电改造后的节电量和节电率。”中央运算处理系统”发出的指令通过“远程监控管理系统”进行异地查询,可掌握用户的中央空调系统运行状态和使用情况。同时,可对修改中央空调节电系统的运行参数及运行程序进行维护优化和升级,使中央空调节电系统在更合理的状态下运行。The instructions issued by the "central processing system" are turned into specific actions through the "flow adjustment system", which automatically adjusts the flow rate on the return pipe of the air-conditioner terminal equipment, the frequency conversion of the chilled water pump, the bypass flow rate of the chilled water system pressure difference and the temperature of the cold storage tank. Operation, etc.; the instructions issued by the "central computing processing system" make the chiller, cooling water tower and the electric valve installed on the chiller and cooling water tower linkage through the "linkage control system", and control the linkage of chiller, chilled water pump, cooling water pump and cooling water tower And switch each other, and the sequence of switching on and off. The "central processing system" sends out operating instructions for the system's regular mode and energy-saving mode according to the set switching and start-stop time, and stores, counts and processes through the "automatic metering system", and accurately calculates the energy saving after power-saving transformation and power saving rate. The instructions issued by the "central computing processing system" can be inquired in different places through the "remote monitoring and management system", and the user's central air-conditioning system operating status and usage can be grasped. At the same time, the operating parameters and operating procedures of the central air-conditioning power saving system can be modified to maintain, optimize and upgrade, so that the central air-conditioning power saving system can operate in a more reasonable state.

(二)数据采集系统:(2) Data acquisition system:

“数据采集系统”由温度传感器、变送器、压力传感器、压差传感器、流量计、电流表、电压表、频率表、功率表、压差开关、压力开关、辅助触点、屏蔽控制线等部分组成,是中央空调节电系统的感觉机构,它的功能是将被控对象的参量和现场信号进行检测、并变换为统一的数字信号,并将数字信号传输到“中央运算处理系统”进行运算处理。"Data acquisition system" consists of temperature sensors, transmitters, pressure sensors, differential pressure sensors, flow meters, ammeters, voltmeters, frequency meters, power meters, differential pressure switches, pressure switches, auxiliary contacts, shielded control lines, etc. The composition is the sensory mechanism of the central air-conditioning power-saving system. Its function is to detect the parameters of the controlled object and field signals, and convert them into unified digital signals, and transmit the digital signals to the "central processing system" for calculation. deal with.

1.安装在冷冻水系统供、回水总管上的温度传感器、压力传感器和压差传感器,用来检测冷冻水系统的冷冻水供、回水温度和供、回水压力及压差,并将采集到的模拟量信号传输到“中央运算处理系统”。1. The temperature sensor, pressure sensor and differential pressure sensor installed on the water supply and return pipes of the chilled water system are used to detect the temperature of the chilled water supply and return water of the chilled water system, the pressure of the supply and return water, and the pressure difference. The collected analog signals are transmitted to the "central computing processing system".

2.安装在室内各空调区域的温度传感器,用来检测空调区域的空气温度,并将采集到的模拟信号传输到“中央运算处理系统。2. The temperature sensors installed in each air-conditioning area in the room are used to detect the air temperature in the air-conditioning area, and transmit the collected analog signals to the "central computing processing system.

3.安装在冷却水系统供水总管上的温度传感器,用来检测冷却水系统的供水温度,并将采集到的模拟量信号传输到“中央运算处理系统”。3. The temperature sensor installed on the main water supply pipe of the cooling water system is used to detect the water supply temperature of the cooling water system, and transmit the collected analog signal to the "central computing processing system".

4.安装在室外的温度传感器,用来检测室外空气的温度,并将采集到的模拟量信号传输到“中央运算处理系统”。4. The temperature sensor installed outdoors is used to detect the temperature of the outdoor air, and transmits the collected analog signal to the "central processing system".

5.安装在冷冻水系统供水总管上的流量计,用来计量冷冻水系统的冷冻水流量,并将采集到的模拟量信号传输到“中央运算处理系统”。5. The flow meter installed on the main water supply pipe of the chilled water system is used to measure the chilled water flow of the chilled water system, and transmit the collected analog signal to the "central processing system".

6.连接空调设备控制电柜、箱的辅助触点,用来监测空调设备的运行状态,并将采集到的数字信号传输到中央运算处理系统。6. Connect the auxiliary contacts of the air-conditioning equipment control cabinets and boxes to monitor the operating status of the air-conditioning equipment and transmit the collected digital signals to the central processing system.

(三)流量调节系统:(3) Flow regulation system:

“流量调节系统”由电动调节阀门、24V变压器、变频器、压差旁通阀、蓄冷罐、控制电缆等部分组成,是中央空调节电系统的执行机构。“流量调节系统”的功能是把“中央运算处理系统”发来的指令变成具体的动作,达到自动调节、自动操作的目的。The "flow regulation system" is composed of electric regulating valves, 24V transformers, frequency converters, differential pressure bypass valves, cold storage tanks, control cables, etc., and is the executive body of the central air conditioning power saving system. The function of the "flow adjustment system" is to turn the instructions sent by the "central computing processing system" into specific actions to achieve the purpose of automatic adjustment and automatic operation.

1.安装在空调风柜末端设备回水管上的流量调节阀,根据“中央运算处理系统”发来的模拟量信号指令,自动调节流过空调末端设备的冷冻水流量,达到控制空调区域的空气温度的目的。1. The flow regulating valve installed on the return pipe of the terminal equipment of the air conditioner can automatically adjust the flow of chilled water flowing through the terminal equipment of the air conditioner according to the analog signal command sent by the "central processing system", so as to control the air in the air conditioner area. temperature purpose.

2.变频器根据“中央运算处理系统”发来的模拟量信号指令,自动变频调节冷冻水泵转速、调节冷冻水的流量,使冷冻水系统供、回水压力差处于设定压力差值上、下限之间。2. The frequency converter automatically adjusts the speed of the chilled water pump and the flow of chilled water according to the analog signal command sent by the "central processing system", so that the pressure difference between the supply and return water of the chilled water system is at the set pressure difference. between lower limits.

3.安装压差旁通阀的冷冻水系统,根据“中央运算处理系统”发来的模拟量信号指令,自动调节压差旁通阀的开度,使冷冻水系统供、回水压力差处于设定压力差值上、下限之间。3. The chilled water system installed with a differential pressure bypass valve automatically adjusts the opening of the differential pressure bypass valve according to the analog signal command sent by the "central processing system", so that the pressure difference between the supply and return water of the chilled water system is at Set between the upper and lower limits of the pressure difference.

4.安装蓄冷罐的冷冻水系统,根据“中央运算处理系统”发来的模拟量信号指令,自动调节蓄冷罐上的电动调节阀门,使蓄冷罐自动完成蓄冷、待释、释冷、待蓄的循环过程。4. Install the chilled water system of the cold storage tank, and automatically adjust the electric regulating valve on the cold storage tank according to the analog signal command sent by the "central computing processing system", so that the cold storage tank can automatically complete cold storage, waiting for release, releasing cold, and waiting for storage cycle process.

(四)联动控制系统:(4) Linkage control system:

“联动控制系统”由电动阀门、电动阀门控制器、辅助触点、控制电缆等组成,是中央空调节电系统的联动机构。联动控制系统的功能一是使冷水机组、冷却水塔和冷水机组、冷却水塔上安装的电动阀门联动,不让冷冻水和冷却水从不运行的冷水机组旁通;不让冷却水从不运行的冷却水塔旁通,保证其它冷水机组的冷冻水和冷却水流量;保证其它冷却水塔的冷却水流量。二是使冷水机组、冷冻水泵、冷却水泵、冷却水塔联动和相互切换,程序和顺序开关机。并将冷水机组、冷冻水泵、冷却水泵、冷却水塔、电动阀门开关的数字信号传输到中央运算处理系统。The "linkage control system" is composed of electric valves, electric valve controllers, auxiliary contacts, control cables, etc., and is the linkage mechanism of the central air-conditioning power-saving system. The function of the linkage control system is to make the chiller, the cooling water tower and the electric valve installed on the chiller and the cooling water tower linkage, so as not to bypass the chiller with chilled water and cooling water; to prevent the chiller with never running cooling water The cooling water tower is bypassed to ensure the chilled water and cooling water flow of other chillers; to ensure the cooling water flow of other cooling water towers. The second is to make chillers, chilled water pumps, cooling water pumps, and cooling water towers interlock and switch between each other, and the programs and sequences are turned on and off. And transmit the digital signals of the chiller, the chilled water pump, the cooling water pump, the cooling water tower, and the electric valve switch to the central processing system.

(五)自动计量系统:(5) Automatic metering system:

“自动计量系统”由多功能电量表综合电力监控仪、计算机、打印机、互感器和控制电缆等组成,是中央空调节电系统中的设备用电计量装置。自动计量系统的功能是对冷水机组、冷冻水泵、冷却水泵、冷却水塔等空调设备电机的用电量进行测量、记录、储存、显示,通过计量节电改造前和节电改造后设备运行的用电量,可以准确计算出节电改造后的节电量和节电量率。The "automatic metering system" is composed of a multi-functional electricity meter, a comprehensive power monitor, a computer, a printer, a transformer, and a control cable. The function of the automatic metering system is to measure, record, store, and display the power consumption of the motors of air-conditioning equipment such as chillers, chilled water pumps, cooling water pumps, and cooling water towers. It can accurately calculate the power saving and power saving rate after the power saving transformation.

(六)远程监控管理系统:(6) Remote monitoring and management system:

“远程监控管理系统”由网络控制器、软件、网络计算机、打印机等组成,是中央空调节电系统的遥控装置。通过网络计算机进行异地查询,可掌握用户的中央空调系统运行状态和使用情况,同时,可以维护、优化中央空调节电系统的运行参数及运行程序,使中央空调节电系统在更合理的状态下运行。"Remote monitoring and management system" is composed of network controller, software, network computer, printer, etc., and is the remote control device of the central air-conditioning power-saving system. Through remote query via network computer, the user’s central air-conditioning system’s operating status and usage can be grasped. At the same time, the operating parameters and operating procedures of the central air-conditioning power-saving system can be maintained and optimized, so that the central air-conditioning power-conserving system can operate in a more reasonable state. run.

本系统采用可编程控制技术,通过数据采集系统,将采集到的模拟量参数转换为输入数字量,传送中央运算处理器处理运算。与设计参数比较运算,然后再将数字命令转化成控制模拟量输出。精确地控制冷水机组、冷却水泵、冷却水塔、空调机和冷冻变频水泵等设备的运行,达到对中央空调系统的智能节能控制。The system adopts programmable control technology, and through the data acquisition system, the collected analog parameters are converted into input digital quantities, and then transmitted to the central processing processor for processing. Comparing the operation with the design parameters, and then converting the digital command into a control analog output. Precisely control the operation of chillers, cooling water pumps, cooling water towers, air conditioners and refrigerated frequency conversion water pumps to achieve intelligent energy-saving control of the central air-conditioning system.

如图3所示,本发明所述中央空调控制系统的流程作如下描述:As shown in Figure 3, the flow process of the central air-conditioning control system of the present invention is described as follows:

一、数据采集系统采集如下数据信息:1. The data acquisition system collects the following data information:

①冷冻水供水流量:① Chilled water supply flow:

安装在冷冻水系统供水总管上的流量计,用来计量冷冻水系统的冷冻水流量,通过屏蔽线传输到节电装置(空调控制系统);The flow meter installed on the main water supply pipe of the chilled water system is used to measure the chilled water flow of the chilled water system and transmit it to the power saving device (air conditioning control system) through the shielded wire;

②冷冻水供水温度:② Chilled water supply temperature:

对于单台冷水机组运行,安装在冷冻水系统供水总管上的温度传感器,用来检测冷冻水系统的冷冻水供水温度,将冷冻水供水温度变化的信号通过屏蔽线传输到节电装置;For the operation of a single chiller, the temperature sensor installed on the water supply main pipe of the chilled water system is used to detect the chilled water supply temperature of the chilled water system, and transmit the signal of the chilled water supply temperature change to the power saving device through the shielded wire;

③冷冻水回水温度③ Chilled water return temperature

对于单台冷水机组运行,安装在冷冻水系统回水总管上的温度传感器,检测冷冻水系统的冷冻水回水温度,将温度变化的信号通过屏蔽线传输到节电装置;For the operation of a single chiller, the temperature sensor installed on the return water main pipe of the chilled water system detects the chilled water return temperature of the chilled water system, and transmits the signal of temperature change to the power saving device through the shielded wire;

④冷冻水系统供、回水压力差④Pressure difference between supply and return water of chilled water system

安装在冷冻水系统供、回水总管上的压力传感器,检测冷冻水系统供、回水的压力,将压力变化的信号通过屏蔽线传输到节电装置以确定压力差;The pressure sensor installed on the water supply and return main pipe of the chilled water system detects the pressure of the chilled water system supply and return water, and transmits the signal of pressure change to the power saving device through the shielded wire to determine the pressure difference;

⑤室内各空调区域温度⑤The temperature of each air-conditioning area in the room

安装在室内各空调区域的温度传感器,检测空调区域的空气温度,并将温度变化的信号通过屏蔽线传输到节电装置;The temperature sensor installed in each air-conditioning area in the room detects the air temperature in the air-conditioning area, and transmits the signal of temperature change to the power-saving device through the shielded wire;

⑥冷却水供水温度、室外温度⑥Cooling water supply temperature, outdoor temperature

安装在冷却水系统供水总管上的温度传感器,监测冷却水系统的供水温度;安装在室外的温度传感器,检测室外空气的温度,将冷却水系统供水温度和室外空气温度的信号通过屏蔽线传输到节电装置;The temperature sensor installed on the main water supply pipe of the cooling water system monitors the water supply temperature of the cooling water system; the temperature sensor installed outside detects the temperature of the outdoor air, and transmits the signals of the water supply temperature of the cooling water system and the outdoor air temperature to the power saving device;

⑦室、内外的温度⑦ Indoor and outdoor temperature

安装在室、内外的温度传感器,检测室内、外空气的温度,将室内、外空气温度的信号通过屏蔽线传输到节电装置。The temperature sensor installed indoors and outdoors detects the temperature of the indoor and outdoor air, and transmits the signal of the indoor and outdoor air temperature to the power-saving device through the shielded wire.

二、实时冷量输出:简称节电装置内中央运算处理器对冷冻水流量和冷冻供、回水温度差进行运算(冷量=流量×温度差),计算出空调系统的实时冷量输出,是节电系统设计的重要参数。2. Real-time cooling capacity output: referred to as the central operation processor in the power-saving device to calculate the chilled water flow rate and the temperature difference between the chilled supply and return water (cooling capacity = flow × temperature difference), and calculate the real-time cooling capacity output of the air conditioning system. It is an important parameter for power-saving system design.

三、空调系统运行:3. Operation of the air conditioning system:

①冷水机组停机控制:由节电装置输出指令,确定冷水机组是否停机;当冷冻水的供水温度高于设定温度值时,冷水机组继续运行;当冷冻水的供水温度低于设定温度值时,冷水机组停机;① Chiller shutdown control: The power-saving device outputs commands to determine whether the chiller is shut down; when the chilled water supply temperature is higher than the set temperature value, the chiller unit continues to run; when the chilled water supply temperature is lower than the set temperature value , the chiller shuts down;

②冷水机组开机控制:由节电装置输出指令,确定冷水机组是否需要启动;当冷冻水回水温度高于设定温度值时,或空调区域的空气温度高于设定温度值时冷水机组启动;当冷冻水回水温度低于设定温度值,且空调区域的空气温度不高于设定温度值时,冷水机组不启动,冷却水泵不运行;② Chiller start-up control: The power-saving device outputs commands to determine whether the chiller needs to be started; when the chilled water return temperature is higher than the set temperature value, or the air temperature in the air-conditioning area is higher than the set temperature value, the chiller is started ;When the chilled water return temperature is lower than the set temperature value and the air temperature in the air-conditioning area is not higher than the set temperature value, the chiller will not start and the cooling water pump will not run;

③冷冻水系统变频控制:由节电装置输出指令,通过变频器调节冷冻水泵的转速,控制冷冻水流量,当冷冻水系统供、回水压力差高于设定压力差值上限时,变频器变频降低冷冻水泵转速,减少冷冻水的流量;当冷冻水系统供、回水压力差处于设定压力差值上、下限之间时,冷冻水泵转速不变,冷冻水的流量不变;当冷冻水系统供、回水压力差低于设定压力差值下限时,变频器变频增加冷冻水泵转速,增加冷冻水的流量;③Frequency conversion control of the chilled water system: The power-saving device outputs instructions, adjusts the speed of the chilled water pump through the frequency converter, and controls the flow of chilled water. When the pressure difference between the supply and return water of the chilled water system is higher than the upper limit of the set pressure difference, the frequency converter Frequency conversion reduces the speed of the chilled water pump to reduce the flow of chilled water; when the pressure difference between the supply and return water of the chilled water system is between the upper and lower limits of the set pressure difference, the speed of the chilled water pump remains unchanged and the flow of chilled water remains unchanged; When the pressure difference between the supply and return water of the water system is lower than the lower limit of the set pressure difference, the frequency converter will increase the speed of the chilled water pump and increase the flow of chilled water;

④蓄冷罐控制:由节电装置输出指令,通过蓄冷罐储存或释放富余冷量,当冷冻水系统供、回水压力差高于设定压力差值时,蓄冷罐上的电动阀门打开,让冷冻水旁通流过蓄冷罐,将冷水机组高负荷运行制冷而空调末端设备部份负荷运行,释放不完的富余冷量储存在蓄冷罐内;当冷冻水供、回水压力差低于设定压力差值时,蓄冷罐上的电动阀门关闭,以保证空调末端设备冷冻水流量;当冷冻水系统供水的温度高于设定的释冷温度值时,蓄冷罐上的电动阀门打开,向冷冻水系统释冷;④ Cold storage tank control: The power-saving device outputs instructions to store or release excess cooling capacity through the cold storage tank. When the pressure difference between the supply and return water of the chilled water system is higher than the set pressure difference, the electric valve on the cold storage tank is opened to allow Chilled water bypasses the cold storage tank to cool the water chiller at high load while the air conditioner terminal equipment operates at partial load, and store the excess cooling capacity in the cold storage tank; when the pressure difference between the chilled water supply and return water is lower than the set When the pressure difference is fixed, the electric valve on the cold storage tank is closed to ensure the chilled water flow of the terminal equipment of the air conditioner; Cooling of the chilled water system;

⑤冷冻水系统压差旁通控制:由节电装置输出指令,通过压差旁通阀的开启度,控制冷冻水流量;当冷冻水系统供、回水压力差高于设定压力差值时,压差旁通阀打开旁通部分冷冻水;当冷冻水系统供、回水压力差低于设定压力差值时,压差旁通阀维持原来开度;⑤Pressure differential bypass control of the chilled water system: The energy-saving device outputs commands to control the chilled water flow through the opening of the differential pressure bypass valve; when the pressure difference between the supply and return water of the chilled water system is higher than the set pressure difference , the differential pressure bypass valve opens to bypass part of the chilled water; when the pressure difference between the supply and return water of the chilled water system is lower than the set pressure difference, the differential pressure bypass valve maintains the original opening;

⑥空调末端设备控制:由节电装置输出指令,通过调节空调末端设备的冷冻水流量,控制空调区域的空气温度;当空调区域的空气温度低于设定温度值时,安装在空调末端设备回水管上的流量调节阀关小,减少流过空调末端设备的冷冻水流量,达到控制空调区域的空气温度的目的;当空调区域的空气温度高于设定温度值时,安装在空调末端设备回水管上的流量调节阀开大,增加流过空调末端设备的冷冻水流量,达到控制空调区域的空气温度的目的;如果空调区域的空气温度仍然高于设定温度值时,证明冷冻水系统的冷冻水温度偏高,冷水机组将启动(优先于冷冻水系统回水温度的检测),以确保空调区域的空气温度精度;⑥Control of air-conditioning terminal equipment: the power-saving device outputs instructions to control the air temperature in the air-conditioning area by adjusting the chilled water flow of the air-conditioning terminal equipment; when the air temperature in the air-conditioning area is lower than the set temperature value, the The flow regulating valve on the water pipe is closed to reduce the flow of chilled water flowing through the air-conditioning terminal equipment to achieve the purpose of controlling the air temperature in the air-conditioning area; when the air temperature in the air-conditioning area is higher than the set temperature value, it will The flow regulating valve on the water pipe is opened to increase the flow of chilled water flowing through the air-conditioning terminal equipment to achieve the purpose of controlling the air temperature in the air-conditioning area; if the air temperature in the air-conditioning area is still higher than the set temperature value, it proves that the chilled water system is faulty. If the chilled water temperature is too high, the chiller will start (prioritizing the detection of the return water temperature of the chilled water system) to ensure the accuracy of the air temperature in the air-conditioned area;

⑦冷却水塔控制:由节电装置输出指令,确定冷却水塔风扇是否需要停止运行;当冷冻水系统供水的温度和室外空气温度高于设定温度值时,冷却水塔风扇继续运行;当冷冻水系统供水的温度和室外空气温度低于设定温度值时,冷却水塔风扇停止运行;⑦Cooling water tower control: The power-saving device outputs instructions to determine whether the cooling water tower fan needs to stop running; when the temperature of the water supplied by the chilled water system and the outdoor air temperature are higher than the set temperature value, the cooling water tower fan continues to run; when the chilled water system When the temperature of the water supply and the outdoor air temperature are lower than the set temperature value, the cooling tower fan stops running;

⑧冷冻水泵控制:由节电装置输出指令,开机时冷冻水泵常规运行,关机后根据供回水压差、回水温度和末端回风温度综合变频调节水泵转速;⑧ Chilled water pump control: The power-saving device outputs instructions, the chilled water pump runs normally when the machine is turned on, and the speed of the water pump is adjusted by comprehensive frequency conversion according to the pressure difference between the supply and return water, the return water temperature and the end return air temperature after the machine is turned off;

⑨冷冻水回水温度的控制:安装在室内、外的温度传感器,用来检测室外的空气温度,将室内、外的空气温度变化的信号,通过屏蔽线传输到节电装置,作为节电装置内中央运算处理器的重要运算依据,由节电装置输出指令,设置冷冻水的回水温度。⑨Control of chilled water return temperature: temperature sensors installed indoors and outdoors are used to detect the outdoor air temperature, and the signals of indoor and outdoor air temperature changes are transmitted to the power-saving device through shielded wires as power-saving devices The important calculation basis of the internal central processing processor is to output instructions from the power saving device to set the return water temperature of the chilled water.

如图4a、4b所示,为本发明空调控制系统的电路图:As shown in Fig. 4a, 4b, it is the circuit diagram of the air conditioning control system of the present invention:

1为模拟量输出模块,型号规格为EM232,参数为148g 2W 24V DCAQ2×12Bit,性能为:2模拟量输出点,功能是将该点的数字信息转换为标准电流、电压信号输出到执行设备(阀门、变频器),调整其工作状态。模块底部“M”、“L+”处分别并联接入来自CPU 226XM底部“M”、“L+”处的电源,接地标识处需并联接地。模块顶部有两组输出,每组分别可选择电流(Ix和公共M)或电压(Vx和公共M)输出。公共M接到执行设备(阀门、变频器)信号输入点的负极,Ix或Vx接正极。1 is the analog output module, the model specification is EM232, the parameter is 148g 2W 24V DCAQ2×12Bit, the performance is: 2 analog output points, the function is to convert the digital information of the points into standard current and voltage signals and output them to the execution equipment ( Valve, frequency converter), adjust its working status. The "M" and "L+" at the bottom of the module are respectively connected in parallel to the power from the "M" and "L+" at the bottom of the CPU 226XM, and the grounding mark needs to be connected in parallel to the ground. There are two sets of outputs on the top of the module, and each set can select current (Ix and common M) or voltage (Vx and common M) output. The public M is connected to the negative pole of the signal input point of the executive device (valve, frequency converter), and Ix or Vx is connected to the positive pole.

2为模拟量模块,型号规格为EM231,参数为183g 2W 24V DCAI4×12Bit,性能为:4模拟量输入点,功能是将该点的电流或电压信号转换为数字信息供CPU 226XM读取,电流或电压信号来自外部的各种传感器。模块底部“M”、“L+”处分别并联接入来自CPU 226XM底部“M”、“L+”处的电源,接地标识处需并联接地。模块顶部有四组输入,单个模块只能选择全部是电流或者电压信号输入,在这里我们全部采用电流输入(信号类型由底部开关决定),以A组为例:将从“L+”处来的24V直流电源正输出到外部传感器的正极,再将来自传感器负极的信号并联接入模块的“A+”和“RA”点,“A-”点接“M”。2 is the analog module, the model specification is EM231, the parameter is 183g 2W 24V DCAI4×12Bit, the performance is: 4 analog input points, the function is to convert the current or voltage signal of the point into digital information for CPU 226XM to read, the current Or the voltage signal comes from various external sensors. The "M" and "L+" at the bottom of the module are respectively connected in parallel to the power from the "M" and "L+" at the bottom of the CPU 226XM, and the grounding mark needs to be connected in parallel to the ground. There are four sets of inputs on the top of the module. A single module can only choose to use current or voltage signal inputs. Here we all use current inputs (the signal type is determined by the bottom switch). Take group A as an example: the input from "L+" The 24V DC power supply is positively output to the positive pole of the external sensor, and then the signal from the negative pole of the sensor is connected in parallel to the "A+" and "RA" points of the module, and the "A-" point is connected to "M".

3为模扩展模块,型号规格为EM223,参数为360g 6W DC/RLY,性能为:16输入漏型/源型(IEC Typel漏型),16路数字输出继电器、干触点,功能是根据“CPU”指令控制外部空调设备启、停,以及接收这些设备的运行、故障信号返回给“CPU”  模块底部为输入部分,“M”、“L+”处分别并联接入来自CPU 226XM底部“M”、“L+”处的电源。“xM”接来自直流电源的负极,直流电源正极通过220V中间继电器的常开触点返回到“.x”。模块顶部为输出部分,“xL”接来自直流电源的正极,接通时由“.x”输出到24V中间继电器的线圈。3 is the modulus expansion module, the model specification is EM223, the parameter is 360g 6W DC/RLY, the performance is: 16 input sink type/source type (IEC Typel sink type), 16 digital output relays, dry contacts, the function is according to " "CPU" commands control the start and stop of external air-conditioning equipment, and receive the operation and fault signals of these equipment and return them to the "CPU". , The power supply at "L+". "xM" is connected to the negative pole of the DC power supply, and the positive pole of the DC power supply returns to ".x" through the normally open contact of the 220V intermediate relay. The top of the module is the output part, "xL" is connected to the positive pole of the DC power supply, and ".x" is output to the coil of the 24V intermediate relay when it is turned on.

4为中央处理器,型号规格为CPU226XM,参数为550g 11W AC/DC/RLY继电器输出,性能为:24路数字量输入,16路数字量输出,功能有运算、存储、时钟、通讯、电源、同EM223相同的输入、输出等。模块顶部“LAC”、“N”分别接单相交流的“火”和“零”,接地标识处需并联接地,底部的“M”、“L”为直流24V输出。其它点位的功能连接与EM 223相同。4 is the central processing unit, the model specification is CPU226XM, the parameter is 550g 11W AC/DC/RLY relay output, the performance is: 24 digital inputs, 16 digital outputs, the functions include calculation, storage, clock, communication, power supply, Same input and output as EM223. The "LAC" and "N" on the top of the module are respectively connected to the "fire" and "zero" of single-phase AC, and the grounding marks need to be connected to the ground in parallel, and the "M" and "L" at the bottom are DC 24V output. The functional connections of other points are the same as EM 223.

5为485连接线,用于传输数据信号;5 is a 485 connection line for transmitting data signals;

6为熔断隔离器,型号规格为RT18-32X,参数为5A;6 is a fuse isolator, the model specification is RT18-32X, and the parameter is 5A;

7为高分段小型断路器,型号规格为DZ47-60,参数为220V/5A 50HZ;7 is a high-section miniature circuit breaker, the model specification is DZ47-60, and the parameter is 220V/5A 50HZ;

8为小型中功率电磁继电器,型号规格为JZX-22F,参数为220VAC,功能功能是将来自外部空调设备的220V“通”、“断”信号转为24V直流“通”、“断”信号传回给“CPU 226XM”和“EM 223”。线圈处分别接“零”和来自外部空调设备的“火”,常开点的一端接直流电源的正极输出,另一端同模块的输入部分“.x”连接。8 is a small medium-power electromagnetic relay, the model specification is JZX-22F, and the parameter is 220VAC. The function is to convert the 220V "on" and "off" signals from the external air-conditioning equipment Return "CPU 226XM" and "EM 223". The coils are respectively connected to "zero" and "fire" from the external air-conditioning equipment, one end of the normally open point is connected to the positive output of the DC power supply, and the other end is connected to the input part ".x" of the module.

9为小型中功率电磁继电器,型号规格为JZX-22F,参数为24VDC,功能功能是将来自“CPU 226XM”和“EM223”的24V输出信号转为220V传到外部空调设备。线圈处分别接直流电源的负极输出和模块的“.x”输出部分,常开点的一端接“火”,另一端接往外部空调设备。9 is a small medium-power electromagnetic relay, the model specification is JZX-22F, and the parameter is 24VDC. Its function is to convert the 24V output signal from "CPU 226XM" and "EM223" to 220V and transmit it to the external air conditioning equipment. The coil is respectively connected to the negative output of the DC power supply and the ".x" output part of the module. One end of the normally open point is connected to "fire", and the other end is connected to the external air conditioning equipment.

10为RVV1×1.0电线。10 is the RVV1×1.0 wire.

采用本发明所述中央空调系统与采用变频节能方式的中央空调系统比较对照效果如下表:Adopt the central air-conditioning system of the present invention and adopt the central air-conditioning system of the frequency conversion energy-saving way to compare and control the effect as follows:

Figure C20031011744900151
Figure C20031011744900151

  影响 Influence   启停次数 Number of starts and stops     3∽4h/次 3∽4h/time     同改造前 Same as before the transformation     设备允许范围内   Within the allowable range of the equipment 喘振Surge 正常时不会normally not 会导致will cause 不会Won't

依据中央空调蓄冷式智能节电系统标准,本公司组织了对“福州金源国际大饭店”的采用本发明所述中央空调系统的运行进行了检测,检测结果如下:According to the standard of central air-conditioning cool-storage intelligent energy-saving system, the company organized a test on the operation of the central air-conditioning system described in the present invention in "Fuzhou Jinyuan International Hotel", and the test results are as follows:

建筑面积:81400M2                 装机冷量:2400RTConstruction area: 81400M2 Installed cooling capacity: 2400RT

单机组制冷量:600RT               机组数量:4台Cooling capacity of single unit: 600RT Quantity of units: 4

单位面积冷量:148W/M2             冷冻水泵功率:75KWCooling capacity per unit area: 148W/M2 Chilled water pump power: 75KW

满载系统能效比:COP值>4          冷却水泵功率:90KWEnergy efficiency ratio of full load system: COP value > 4 Cooling water pump power: 90KW

月节电量>60000KW/hr              系统节电率:20.23%Monthly power saving > 60000KW/hr System power saving rate: 20.23%

由上表及上例可知,采用本发明所述中央空调系统,节能效果是非常好的,总体节能率可达20%左右。同时,本发明既可用于新工程设计,还可以用于对原有中央空调系统的改造,适用性非常广。It can be known from the above table and the above example that the central air-conditioning system of the present invention has a very good energy-saving effect, and the overall energy-saving rate can reach about 20%. At the same time, the present invention can be used not only for new engineering design, but also for the transformation of the original central air-conditioning system, and has very wide applicability.

实施例二:Embodiment two:

本实施例与实施例一不同之处在于,主机采用多台冷水机组。The difference between this embodiment and the first embodiment lies in that the main engine adopts multiple chillers.

如图5所示,实施例二的运行模式为:As shown in Figure 5, the operating mode of the second embodiment is:

当空调系统负荷增加时,空调主机的运行顺序为:When the load of the air-conditioning system increases, the operating sequence of the air-conditioning host is as follows:

第一步:一台机蓄冷运行;The first step: one machine runs with cold storage;

第二步:一台机高负载运行;Step 2: One machine runs under high load;

第三步:二台机蓄冷运行;The third step: two machines cold storage operation;

第四步:二台机高负载运行;Step 4: The two machines run under high load;

第五步:三台机蓄冷运行;Step 5: Three machines run in cold storage;

第六步:三台机高负载运行……Step 6: The three machines are running under high load...

当空调装置负荷减少时,空调主机的运行顺序为:When the load of the air conditioner decreases, the operating sequence of the air conditioner is as follows:

第一步:三台机高负载运行;Step 1: The three machines run under high load;

第二步:三台机蓄冷运行;Step 2: The three machines are running in cold storage;

第三步:二台机高负载运行;Step 3: The two machines run under high load;

第四步:二台机蓄冷运行;Step 4: The two machines run in cold storage;

第五步:一台机高负载运行;Step 5: One machine runs under high load;

第六步:一台机蓄冷运行。Step 6: One machine runs with cold storage.

联动系统根据指令控制主机、泵、冷却塔、流量调节装置的工作状态。高负载运行时,主机在工作状态较高负载工况下连续运转;蓄冷运行:主机循环在蓄冷和放冷两个阶段。The linkage system controls the working status of the main engine, pump, cooling tower and flow regulating device according to the instructions. During high-load operation, the main engine runs continuously under higher load conditions; cold storage operation: the main engine cycle is in two stages of cold storage and cooling.

本实施例中央空调控制系统的流程作如下:The flow process of the central air-conditioning control system of the present embodiment is as follows:

1、冷冻水供水温度监测及冷水机组停机台数控制,对于多台冷水机组并联运行,安装在冷冻水系统供水总管上的温度传感器,检测冷冻水系统的供水温度,将冷冻水系统供水温度变化的信号通过屏蔽线传输到节电装置,由节电装置输出指令,确定冷水机组停止运行台数。当冷冻水系统的供水温度高于设定温度值时,冷水机组继续运行;当冷冻水系统的供水温度持续不降低,冷水机组增加一台运行;当冷冻水系统供水的温度低于设定温度值,且空调区域的空气温度不高于设定温度值时,冷水机组停止一台运行。1. Chilled water supply temperature monitoring and chiller shutdown number control. For multiple chillers running in parallel, the temperature sensor installed on the water supply main pipe of the chilled water system detects the water supply temperature of the chilled water system, and the temperature of the chilled water system changes. The signal is transmitted to the power-saving device through the shielded wire, and the power-saving device outputs instructions to determine the number of chillers to stop running. When the water supply temperature of the chilled water system is higher than the set temperature value, the chiller will continue to run; when the water supply temperature of the chilled water system does not drop continuously, one more chiller will run; when the water supply temperature of the chilled water system is lower than the set temperature value, and the air temperature in the air-conditioned area is not higher than the set temperature value, one chiller will stop running.

2、冷冻水回水温度监测及冷水机组开机台数控制,对于多台冷水机组并联运行,安装在冷冻水系统回水总管上的温度传感器,检测冷冻水系统的回水温度,将冷冻水系统回水温度变化的信号通过屏蔽线传输到节电装置,由节电装置输出指令,确定冷水机组开机运行台数。当冷冻水系统回水的温度高于设定温度值时,冷水机组增加一台运行。2. Chilled water return temperature monitoring and chiller number control. For multiple chillers running in parallel, the temperature sensor installed on the return water main pipe of the chilled water system detects the return water temperature of the chilled water system and returns the chilled water system to The signal of water temperature change is transmitted to the power-saving device through the shielded wire, and the power-saving device outputs instructions to determine the number of chillers to start and run. When the temperature of the return water of the chilled water system is higher than the set temperature value, an additional chiller will run.

3、当多台冷水机组并联运行时,在每台冷水机组的冷冻、冷却水系统供水管上均安装电动阀门,当冷水机组需要开启时,先开启该台冷水机组冷冻、冷却水系统供水管上的电动阀门;当冷水机组停机后,关闭该台冷水机组冷冻、冷却水系统供水管上的电动阀门,不让冷冻、冷却水从该台冷水机组旁通,保证其它冷水机组的冷冻、冷却水流量。3. When multiple chillers are running in parallel, electric valves are installed on the water supply pipes of the freezing and cooling water systems of each chiller. When the chillers need to be turned on, first open the water supply pipes of the freezing and cooling water systems of the chiller When the chiller is shut down, close the electric valve on the water supply pipe of the freezing and cooling water system of the chiller to prevent the freezing and cooling water from bypassing the chiller to ensure the freezing and cooling of other chillers water flow.

4、冷却水塔的运行数量与冷水机组和冷却水泵的运行数量是对应的。当多台冷却水塔并联运行时,在每台冷却水塔的进水管上均安装电动阀门,当冷却水塔需要投入运行时,开启对应的冷却水泵,开启该台冷却水塔进水管上的电动阀门,开启冷却水塔风扇,再开启冷水机组;当冷却水塔不需要运行时,先关闭冷水机组,关闭冷却水塔风扇,关闭该台冷却水塔进水管上的电动阀门,再关闭冷却水泵。4. The operating quantity of the cooling water tower corresponds to the operating quantity of the chiller unit and the cooling water pump. When multiple cooling water towers are running in parallel, an electric valve is installed on the water inlet pipe of each cooling water tower. When the cooling water tower needs to be put into operation, turn on the corresponding cooling water pump, open the electric valve on the water inlet pipe of the cooling water tower, Turn off the cooling tower fan, and then turn on the chiller; when the cooling tower does not need to run, first turn off the chiller, turn off the cooling tower fan, turn off the electric valve on the water inlet pipe of the cooling tower, and then turn off the cooling water pump.

Claims (17)

1、一种节能型中央空调系统,包括用于提供空气调节所需要的冷或热水源的主机、用于把机组冷冻水输送到空气处理设备或末端冷冻水装置、用于对空气进行降温、加热、加湿、除湿以及净化过滤的末端装置和用于对机组、空气处理设备与空调过程进行人工或自动调节与监控的空调控制系统;其特征在于:所述空调控制系统根据大量实时采集的动态变化数据进行处理,得出按需供冷的最佳动态运行指令,将中央空调系统各部件部分负荷连续运行状态,实时调控为“蓄冷运行”或“放冷运行”两种模式之一,所述中央空调主机在蓄冷运行模式下高效运行,在放冷运行模式下停止运行。1. An energy-saving central air-conditioning system, including a host for providing cold or hot water sources required for air conditioning, for transporting unit chilled water to air treatment equipment or terminal chilled water devices, for cooling air, Terminal devices for heating, humidification, dehumidification, and purification and filtration, and an air-conditioning control system for manual or automatic adjustment and monitoring of the unit, air handling equipment, and air-conditioning process; it is characterized in that the air-conditioning control system is based on a large number of dynamic The changing data is processed to obtain the best dynamic operation command for on-demand cooling, and the partial load continuous operation status of each component of the central air-conditioning system is adjusted in real time to one of the two modes of "cooling operation" or "cooling operation". The main engine of the central air conditioner described above operates efficiently in the cold storage operation mode, and stops operation in the cooling operation mode. 2、根据权利要求1所述的节能型中央空调系统,其特征在于:还包括用于把机组热量散发到空气中的冷却水装置,所述冷却水装置包括冷却水泵、冷却水塔、管道,所述冷却水塔中设置有风扇、水冷式冷凝器。2. The energy-saving central air-conditioning system according to claim 1, characterized in that it also includes a cooling water device for dissipating the heat of the unit into the air, and the cooling water device includes a cooling water pump, a cooling water tower, and pipelines. The cooling water tower is provided with a fan and a water-cooled condenser. 3、根据权利要求1或2所述的节能型中央空调系统,其特征在于:所述中央空调系统蓄冷运行时,冷水机组、冷却水泵和冷却水塔均以高效运行。3. The energy-saving central air-conditioning system according to claim 1 or 2, characterized in that: when the central air-conditioning system is in cold storage operation, the water chiller, the cooling water pump and the cooling water tower all operate at high efficiency. 4、根据权利要求1或2所述的节能型中央空调系统,其特征在于:所述中央空调系统放冷运行时,除冷冻水泵变频运行外,冷水机组、冷却水泵和冷却水塔均停止工作,空调系统用蓄积在空调循环冷冻水装置中的冷量继续供冷。4. The energy-saving central air-conditioning system according to claim 1 or 2, characterized in that: when the central air-conditioning system is running in the cold state, except for the chilled water pump running with frequency conversion, the chiller unit, cooling water pump and cooling water tower all stop working, The air-conditioning system continues to provide cooling with the cold energy stored in the air-conditioning circulating chilled water device. 5、根据权利要求4所述的节能型中央空调系统,其特征在于:所述冷冻水泵为变频水泵。5. The energy-saving central air-conditioning system according to claim 4, wherein the chilled water pump is a variable frequency water pump. 6、根据权利要求1或5所述的节能型中央空调系统,其特征在于:所述的中央空调系统包括蓄能设备。6. The energy-saving central air-conditioning system according to claim 1 or 5, characterized in that: said central air-conditioning system includes energy storage equipment. 7、根据权利要求6所述的节能型中央空调系统,其特征在于:所述蓄能设备为储冷罐,根据空调系统大小的不同,确定储冷罐的容积和数量。7. The energy-saving central air-conditioning system according to claim 6, wherein the energy storage device is a cold storage tank, and the volume and number of the cold storage tanks are determined according to the size of the air-conditioning system. 8、根据权利要求7所述的节能型中央空调系统,其特征在于:所述中央空调系统蓄冷运行初始,节能型中央空调系统高负荷工作,储冷罐不工作;空调系统处于部分负荷需求状态,富余部分制冷量即蓄存在空调冷冻水装置中;当空调冷冻水温达到设定值时,空调冷冻水装置关闭;储冷罐开通工作,空调系统主机仍高负荷运转,产生的冷量即储存在储冷罐中;储冷罐中蓄冷介质的温度开始下降,当达到设定值后,空调系统主机停止运行;空调系统进入放冷运行阶段,由空调冷冻水装置为空调区域提供冷量;空调冷冻水装置水温逐渐升高,当高于设定值时,由储冷罐为空调区域提供冷量;直至储冷罐温度也高于设定值后,空调系统主机才开始运行,空调系统进入蓄冷运行阶段。8. The energy-saving central air-conditioning system according to claim 7, characterized in that: when the central air-conditioning system starts cold storage operation, the energy-saving central air-conditioning system works under high load, and the cold storage tank does not work; the air-conditioning system is in a partial load demand state , the excess cooling capacity is stored in the chilled water device of the air conditioner; when the chilled water temperature of the air conditioner reaches the set value, the chilled water device of the air conditioner is turned off; In the cold storage tank; the temperature of the cold storage medium in the cold storage tank begins to drop. When it reaches the set value, the main engine of the air conditioning system stops running; the air conditioning system enters the cooling operation stage, and the air conditioning chilled water device provides cooling capacity for the air conditioning area; The water temperature of the air-conditioning chilled water device rises gradually. When it is higher than the set value, the cold storage tank will provide cooling capacity for the air-conditioning area; Enter the cold storage operation stage. 9、根据权利要求1或2所述的节能型中央空调系统,其特征在于:控制系统主要由中央运算处理系统、数据采集系统、联动控制系统、流量调节系统、自动计量系统和远程监控管理系统组成。9. The energy-saving central air-conditioning system according to claim 1 or 2, characterized in that the control system mainly consists of a central processing system, a data acquisition system, a linkage control system, a flow regulation system, an automatic metering system, and a remote monitoring and management system composition. 10、根据权利要求9所述的节能型中央空调系统,其特征在于:10. The energy-saving central air-conditioning system according to claim 9, characterized in that: 作为控制指挥中心的中央运算处理系统由CPU、扩展模块、模拟量输出模块、触摸式控制面板、电源开关、不间断电源、中间继电器、软件、计算机组成,对中央空调节电系统实施集中监控、集中管理、集中控制。As the control and command center, the central processing system is composed of CPU, expansion module, analog output module, touch control panel, power switch, uninterruptible power supply, intermediate relay, software, and computer. It implements centralized monitoring, Centralized management and centralized control. 11、根据权利要求9所述的节能型中央空调系统,其特征在于:11. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述作为中央空调控制系统的感觉机构的数据采集系统由温度传感器、变送器、压力传感器、压差传感器、流量计、电流表、电压表、频率表、功率表、压差开关、压力开关、辅助触点、屏蔽控制线组成,所述数据采集系统将被控对象的参量和现场信号进行检测、并变换为统一的数字信号,并将数字信号传输到“中央运算处理系统”进行运算处理。The data acquisition system as the sensory mechanism of the central air-conditioning control system consists of a temperature sensor, a transmitter, a pressure sensor, a differential pressure sensor, a flow meter, an ammeter, a voltmeter, a frequency meter, a power meter, a differential pressure switch, a pressure switch, The data acquisition system is composed of auxiliary contacts and shielded control lines. The data acquisition system detects the parameters of the controlled object and field signals, and converts them into unified digital signals, and transmits the digital signals to the "central processing system" for calculation and processing. 12、根据权利要求9所述的节能型中央空调系统,其特征在于:12. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述作为中央空调控制系统的执行机构的流量调节系统由电动调节阀门、24V变压器、变频器、压差旁通阀、蓄冷罐、控制电缆组成,所述流量调节系统把所述中央运算处理系统发来的指令变成具体的动作,自动调节、自动操作中央空调系统。The flow regulating system as the executive mechanism of the central air-conditioning control system is composed of an electric regulating valve, a 24V transformer, a frequency converter, a differential pressure bypass valve, a cold storage tank, and a control cable. The instructions sent are turned into specific actions, and the central air-conditioning system is automatically adjusted and operated automatically. 13、根据权利要求9所述的节能型中央空调系统,其特征在于:13. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述作为中央空调控制系统的联动机构联动控制系统由电动阀门、电动阀门控制器、辅助触点、控制电缆组成,所述联动控制系统使冷水机组、冷却水塔和冷水机组、冷却水塔上安装的电动阀门联动,不让冷冻水和冷却水从不运行的冷水机组旁通;不让冷却水从不运行的冷却水塔旁通,保证其它冷水机组的冷冻水和冷却水流量;保证其它冷却水塔的冷却水流量;所述联动控制系统还使冷水机组、冷冻水泵、冷却水泵、冷却水塔联动和相互切换,程序和顺序开关机;并将冷水机组、冷冻水泵、冷却水泵、冷却水塔、电动阀门开关的数字信号传输到中央运算处理系统。The linkage control system of the linkage mechanism as the central air-conditioning control system is composed of electric valves, electric valve controllers, auxiliary contacts, and control cables. The electric valve is linked to prevent the chilled water and cooling water from bypassing the non-operating chiller; to prevent the cooling water from bypassing the cooling tower that is not operating, to ensure the chilled water and cooling water flow of other chillers; to ensure the flow of other cooling towers Cooling water flow; the linkage control system also enables the chiller, chilled water pump, cooling water pump, and cooling water tower to be linked and switched each other, and the program and sequence are turned on and off; and the chiller, chilled water pump, cooling water pump, cooling water tower, and electric valve switch The digital signal is transmitted to the central processing system. 14、根据权利要求9所述的节能型中央空调系统,其特征在于:14. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述作为中央空调控制系统中的设备用电计量装置的自动计量系统由多功能电量表综合电力监控仪、计算机、打印机、互感器和控制电缆组成,所述自动计量系统的功能是对冷水机组、冷冻水泵、冷却水泵、冷却水塔的电机的用电量进行测量、记录、储存、显示,通过计量节电改造前和节电改造后设备运行的用电量,可以准确计算出节电改造后的节电量和节电量率。The automatic metering system as the equipment power metering device in the central air-conditioning control system is composed of a multi-functional electricity meter integrated power monitor, a computer, a printer, a transformer and a control cable, and the function of the automatic metering system is to control the water chiller. , Chilled water pumps, cooling water pumps, and motors of cooling water towers are measured, recorded, stored, and displayed. power saving and power saving rate. 15、根据权利要求9所述的节能型中央空调系统,其特征在于:15. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述作为中央空调控制系统的遥控装置远程监控管理系统由网络控制器、软件、网络计算机、打印机组成,通过网络计算机进行异地查询,可掌握用户的中央空调系统运行状态和使用情况,同时,可以维护、优化中央空调节电系统的运行参数及运行程序,使中央空调节电系统在更合理的状态下运行。The remote monitoring and management system of the remote control device as the central air-conditioning control system is composed of network controllers, software, network computers, and printers. Through the network computer for remote query, the user's central air-conditioning system operating status and usage can be grasped. At the same time, it can Maintain and optimize the operating parameters and operating procedures of the central air-conditioning power-saving system, so that the central air-conditioning power-saving system can operate in a more reasonable state. 16、根据权利要求9所述的节能型中央空调系统,其特征在于:16. The energy-saving central air-conditioning system according to claim 9, characterized in that: 所述控制系统采用可编程控制技术,通过数据采集系统,将采集到的模拟量参数转换为输入数字量,传送中央运算处理器处理运算;与设计参数比较运算,然后再将数字命令转化成控制模拟量输出;精确地控制冷水机组、冷却水泵、冷却水塔、空调机和冷冻变频水泵设备的运行,达到对中央空调系统的智能节能控制。The control system adopts programmable control technology, and through the data acquisition system, the collected analog parameters are converted into input digital quantities, which are transmitted to the central processing processor for processing; compared with the design parameters, the digital commands are then converted into control Analog output; accurately control the operation of chillers, cooling water pumps, cooling water towers, air conditioners and refrigerated frequency conversion water pump equipment to achieve intelligent energy-saving control of the central air-conditioning system. 17、根据权利要求1所述的节能型中央空调系统,其特征在于:所述主机采用多台冷水机组。17. The energy-saving central air-conditioning system according to claim 1, characterized in that: the host adopts multiple chillers.
CNB2003101174498A 2003-12-19 2003-12-19 Energy-saving central air conditioning system Expired - Fee Related CN1293346C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNB2003101174498A CN1293346C (en) 2003-12-19 2003-12-19 Energy-saving central air conditioning system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNB2003101174498A CN1293346C (en) 2003-12-19 2003-12-19 Energy-saving central air conditioning system

Publications (2)

Publication Number Publication Date
CN1629556A CN1629556A (en) 2005-06-22
CN1293346C true CN1293346C (en) 2007-01-03

Family

ID=34843586

Family Applications (1)

Application Number Title Priority Date Filing Date
CNB2003101174498A Expired - Fee Related CN1293346C (en) 2003-12-19 2003-12-19 Energy-saving central air conditioning system

Country Status (1)

Country Link
CN (1) CN1293346C (en)

Families Citing this family (66)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN100445655C (en) * 2007-01-23 2008-12-24 贵州汇通华城楼宇科技有限公司 Heating ventilating and air conditioning hydraulic dynamic regulation method and device based on energy distribution equilibrium
JP4936961B2 (en) * 2007-04-04 2012-05-23 株式会社東芝 Air conditioning system controller
CN101561173B (en) * 2009-05-15 2010-09-08 魏占海 Electricity-saving system of circulating pump in central air conditioner
US9441846B2 (en) 2009-05-21 2016-09-13 Lennox Industries Inc. HVAC unit, a method of generating a network address for a HVAC unit and a HVAC controller therefor
CN102022799B (en) * 2009-09-19 2014-03-26 袁恒杰 Energy-saving control method for central air conditioner system
CA2716313C (en) * 2010-01-27 2018-08-21 Lennox Industries Inc. Wiring connector housing
CN102538152A (en) * 2010-12-08 2012-07-04 无锡华润上华科技有限公司 Water system for air conditioner
CN102168877B (en) * 2011-03-01 2013-06-12 深圳达实智能股份有限公司 Load prediction based group control method and device for central air-conditioning system
CN102147146B (en) * 2011-04-22 2013-05-15 湖北卓立集控智能技术有限公司 Digital integrated intelligent control system of central air conditioner
CN102305447B (en) * 2011-09-15 2013-12-18 上海腾邦环境科技有限公司 Cooling-down humidity-control system
CN102589097A (en) * 2012-03-31 2012-07-18 杨建宁 Unit type energy-saving control device and control method for heating, ventilating and air conditioning refrigeration station
CN104089328B (en) 2013-04-01 2018-10-12 开利公司 Air-conditioning system and the method that air-conditioning system is controlled
CN103307711B (en) * 2013-06-07 2016-08-24 昆山市远视商用空调工程有限公司 Air-conditioner control system and control method
CN104110782B (en) * 2013-11-30 2016-08-03 深圳市爱绿地能源环境科技有限公司 A kind of water cold storage energy-saving management system of central air conditioner
CN103727608A (en) * 2013-12-17 2014-04-16 上海建坤信息技术有限责任公司 Indoor air PM2.5 (fine particulate matter) control system and control method thereof
CN104006490A (en) * 2014-04-30 2014-08-27 浪潮电子信息产业股份有限公司 Novel energy-saving control system based on 51 single-chip microcomputer
CN103968508B (en) * 2014-05-28 2016-11-09 国家电网公司 A kind of efficiency towards central air conditioner main machine system optimized operation controls terminal and control method
CN104279724A (en) * 2014-08-25 2015-01-14 广西申能达智能技术有限公司 Heat pump control method and heat pump control system of energy-saving air conditioner
CN104266316A (en) * 2014-10-24 2015-01-07 中国扬子集团滁州扬子空调器有限公司 Heat recovery control circuit for air conditioner
CN106765985B (en) * 2014-11-19 2019-05-03 北京百度网讯科技有限公司 Energy-saving control method and device for end of air conditioner in data center computer room
CN104534617B (en) * 2014-12-08 2017-04-26 北京方胜有成科技股份有限公司 Cold source centralized digital control method based on energy consumption monitoring
CN104819548A (en) * 2015-05-15 2015-08-05 章荣兵 Air-conditioning cold storage control system and central air-conditioning system
CN104896678A (en) * 2015-06-19 2015-09-09 郑州轻工业学院 Intelligent control system of water chilling unit
WO2017011949A1 (en) * 2015-07-18 2017-01-26 吴鹏 Water pump control method and system for central air conditioner
CN105042780A (en) * 2015-07-23 2015-11-11 魏强 Central-air-conditioner control system
CN105240993B (en) * 2015-09-11 2018-06-19 董锐 Become more meticulous energy-saving control system and its implementation of a kind of central air-conditioning
CN106765860B (en) * 2015-11-25 2019-10-08 中广核工程有限公司 A kind of control system and method for nuclear power station central air-conditioning
CN105588289A (en) * 2016-02-28 2016-05-18 广州市设计院 Temperature control device controlling opening degree limit of water valve according to return air temperature for air processor
CN105783190B (en) * 2016-03-31 2018-11-06 北京博锐尚格节能技术股份有限公司 A kind of cold device controller
CN107345703A (en) * 2016-05-05 2017-11-14 谢必华 A kind of big data energy-saving air central
CN106403175B (en) * 2016-09-12 2019-03-26 珠海格力电器股份有限公司 Control method of water chilling unit and water chilling unit
CN106679020B (en) * 2016-12-12 2022-05-20 珠海格力电器股份有限公司 Air conditioning system and control method thereof
CN106642594B (en) * 2017-01-06 2019-04-02 深圳华兴科创节能技术有限公司 One kind being used for data center's air conditioner energy conservation control system and its method
CN108917041A (en) * 2017-04-14 2018-11-30 广东精冷源设备工程有限公司 A kind of central air conditioner system
CN107202398B (en) * 2017-05-16 2019-07-26 珠海格力电器股份有限公司 Central air-conditioning water system control method and device and readable storage medium
CN107228464A (en) * 2017-07-28 2017-10-03 广船国际有限公司 A kind of marine air-conditioning system and its control method
CN108050719B (en) * 2017-12-12 2023-05-12 广东海悟科技有限公司 Natural cooling system for calculating capacity of refrigerant pump based on temperature difference and control method thereof
CN108120191B (en) * 2017-12-18 2020-06-19 新智能源系统控制有限责任公司 Advanced control system and method for cooling unit for realizing demand side response
CN108089629B (en) * 2017-12-18 2020-03-10 新智能源系统控制有限责任公司 Cooling unit control system and method for realizing demand side response
CN108089628B (en) * 2017-12-18 2020-11-03 新智能源系统控制有限责任公司 Intelligent control system and method for cooling unit capable of realizing demand side response
CN108131763A (en) * 2017-12-30 2018-06-08 广东申菱环境系统股份有限公司 A kind of modularization evaporation cooling integrates cold and heat source system and its control method
CN108266872A (en) * 2018-02-05 2018-07-10 苏州木山云智能科技有限公司 A kind of intelligent constant-temperature regulating system
CN109114776B (en) * 2018-07-18 2019-11-22 宁波高新区安立特电气科技有限公司 A kind of central air-conditioning servo water pump circulating energy-saving control system
CN109059154A (en) * 2018-08-07 2018-12-21 王凯旋 A kind of Commercial Complex shares cold source with for cold accumulation system and its control method
CN109028405A (en) * 2018-08-07 2018-12-18 王凯旋 A kind of air-conditioning system and its control method for hotel's class building
CN109253511A (en) * 2018-08-10 2019-01-22 珠海格力电器股份有限公司 Centralized cold source type air conditioning system and refrigerating unit start and stop control method
CN110513833A (en) * 2019-09-18 2019-11-29 西华大学 Building HVAC control system and usage method
CN111047732B (en) * 2019-12-16 2022-04-12 青岛海信网络科技股份有限公司 Equipment abnormity diagnosis method and device based on energy consumption model and data interaction
CN111207487A (en) * 2020-01-09 2020-05-29 青岛捷能易道能效科技有限公司 Cold station energy efficiency control system
CN111678222B (en) * 2020-05-09 2022-05-17 中金汇融(昆山)信息科技有限公司 Novel data center refrigeration control device
CN111678249B (en) * 2020-06-19 2021-07-30 广东美的暖通设备有限公司 Operation control method for air conditioning equipment, air conditioning equipment and storage medium
CN114383302B (en) * 2020-10-19 2023-09-05 浙江盾安人工环境股份有限公司 Water system control method, system, device and computer equipment
CN115451533A (en) * 2021-06-09 2022-12-09 珠海奥斯迈机电工程顾问有限公司 System and method for calculating and analyzing energy efficiency of centralized air-conditioning refrigeration machine room system
CN113989984A (en) * 2021-12-02 2022-01-28 四川虹美智能科技有限公司 Intelligent beer cabinet
CN114279013A (en) * 2021-12-24 2022-04-05 珠海格力电器股份有限公司 Air conditioning system, air conditioning equipment and control method thereof
CN114459133B (en) * 2022-01-10 2024-07-05 广东建设职业技术学院 Energy-saving control method and energy-saving control system for central air conditioning system
CN114777237B (en) * 2022-05-05 2024-05-28 美的集团武汉制冷设备有限公司 Air conditioner control method, air conditioner and computer readable storage medium
CN115013952B (en) * 2022-05-30 2025-04-18 上海美控智慧建筑有限公司 A control method and device for air conditioning system
CN115046295B (en) * 2022-05-30 2025-05-30 上海美控智慧建筑有限公司 A control method and device for air conditioning system
CN115218458B (en) * 2022-07-22 2025-07-18 青岛海尔空调器有限总公司 Variable frequency air conditioner and control method thereof
CN115235051B (en) * 2022-07-27 2023-03-14 广州市铭汉科技股份有限公司 Double-control cooling water control system
CN116878109A (en) * 2023-08-16 2023-10-13 天津海河乳品有限公司 Intelligent control method for partition of refrigerating system
CN117647043B (en) * 2024-01-30 2024-04-09 广州贝龙环保产业科技股份有限公司 Cloud control system for ice storage system
CN120008171A (en) * 2025-02-07 2025-05-16 山东建筑大学 An energy-saving optimization control system for a central air-conditioning system
CN120273763B (en) * 2025-06-06 2025-09-30 中煤天津设计工程有限责任公司 Centralized refrigeration cooling system and method for underground ventilation air methane heat rejection area
CN120557762B (en) * 2025-07-31 2025-10-10 西安新港分布式能源有限公司 Dual-mode cold accumulation air conditioning system based on dynamic cooperative regulation and control of people flow

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01281348A (en) * 1988-04-30 1989-11-13 Shinryo Corp Cooling system with secondary-side heat accumulation tank
JP2000121128A (en) * 1998-10-12 2000-04-28 Osaka Energy Service Kk Method of operating heat accumulating system for air conditioning, and its operation device
JP2002221371A (en) * 2001-01-24 2002-08-09 Tokyo Gas Co Ltd air conditioner

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH01281348A (en) * 1988-04-30 1989-11-13 Shinryo Corp Cooling system with secondary-side heat accumulation tank
JP2000121128A (en) * 1998-10-12 2000-04-28 Osaka Energy Service Kk Method of operating heat accumulating system for air conditioning, and its operation device
JP2002221371A (en) * 2001-01-24 2002-08-09 Tokyo Gas Co Ltd air conditioner

Also Published As

Publication number Publication date
CN1629556A (en) 2005-06-22

Similar Documents

Publication Publication Date Title
CN1293346C (en) Energy-saving central air conditioning system
CN202371920U (en) Combined closed naturally cooling energy saving device for double condensers of air conditioning system in data machine room
CN201589376U (en) Central air-conditioning variable water volume and variable air volume whole group-control energy saving system
CN108834366B (en) Air conditioning system of data machine room
CN101968651B (en) Building energy-saving monitoring system based on wireless mode
CN203837109U (en) Integrated and combined type machine room air conditioner unit
CN104197446A (en) Dynamic double-cold-source pre-cooling energy-saving air conditioning system
CN103499137A (en) Method, device and system for controlling refrigeration of computer room
CN1916519A (en) System of adjusting quantity of cold, and adjustment method for central cooling in region
CN109765951B (en) Electrical cabinet temperature and humidity regulation method, system and medium based on heterogeneous data analysis
CN214536620U (en) Network architecture of air-conditioning and air-water coordination energy-saving control device of subway station
CN216143883U (en) Energy-saving double-circulation air conditioner with multiple working conditions and cold source utilization
CN2706704Y (en) Energy-saving central air conditioning device
CN108521213A (en) Cooling system and cooling method for a converter valve
CN114992731B (en) System for realizing building refrigeration by only utilizing geothermal energy and air energy and control method
CN102538105A (en) Air-source water-solution heat pump type refrigerating and heating system of air-conditioner and control method thereof
CN117232065A (en) Energy-saving equipment and optimal control method for air-cooled heat pump air conditioner
CN202032705U (en) Novel intelligent ground source heat pump control system
CN202598725U (en) Dual-system integrated computer room energy-saving air conditioner
CN202885131U (en) Intelligent precise energy-saving equipment of central air conditioner
CN103673230A (en) Data center complex water-cooling system operation control device and method
CN210130052U (en) An energy-saving retrofit module and retrofitted computer room air conditioning system
CN103743010B (en) Wind power generation is air conditioning unit with what evaporation cooling combined
CN202675480U (en) Chilled water type double-acting energy-saving air conditioner for machine room
CN201615559U (en) Integral energy-saving and environment-friendly base station air conditioner

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070103

Termination date: 20131219