[go: up one dir, main page]

CN113919816A - Real-time data intelligent association calculation method applied to project management system - Google Patents

Real-time data intelligent association calculation method applied to project management system Download PDF

Info

Publication number
CN113919816A
CN113919816A CN202111230812.1A CN202111230812A CN113919816A CN 113919816 A CN113919816 A CN 113919816A CN 202111230812 A CN202111230812 A CN 202111230812A CN 113919816 A CN113919816 A CN 113919816A
Authority
CN
China
Prior art keywords
project
data
management system
database
real
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202111230812.1A
Other languages
Chinese (zh)
Inventor
李海天
马利光
廉学菊
姚莲莲
齐明月
姚永亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hebei Jinlin Engineering Project Management Co ltd
Original Assignee
Hebei Jinlin Engineering Project Management Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hebei Jinlin Engineering Project Management Co ltd filed Critical Hebei Jinlin Engineering Project Management Co ltd
Priority to CN202111230812.1A priority Critical patent/CN113919816A/en
Publication of CN113919816A publication Critical patent/CN113919816A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/22Indexing; Data structures therefor; Storage structures
    • G06F16/2282Tablespace storage structures; Management thereof
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/20Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
    • G06F16/24Querying
    • G06F16/245Query processing
    • G06F16/2455Query execution
    • GPHYSICS
    • G06COMPUTING OR CALCULATING; COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0633Workflow analysis

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Physics & Mathematics (AREA)
  • Physics & Mathematics (AREA)
  • Data Mining & Analysis (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Marketing (AREA)
  • General Business, Economics & Management (AREA)
  • Databases & Information Systems (AREA)
  • General Engineering & Computer Science (AREA)
  • Game Theory and Decision Science (AREA)
  • Educational Administration (AREA)
  • Software Systems (AREA)
  • Development Economics (AREA)
  • Computational Linguistics (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

本发明涉及实时数据计算方法技术领域,尤其涉及一种应用于项目管理系统的实时数据智能关联计算方法;采用预先录入所承揽项目的所有基础信息,然后再分解为细致的子项目并通过预设的工作流程及规范来辅助监理人员,并将上述数据进行储存形成基础数据源,然后结合步长索引表,能够快速查找和获取关联数据,还能定期形成数据报表,便于使用人员分析。The invention relates to the technical field of real-time data calculation methods, in particular to a real-time data intelligent correlation calculation method applied to a project management system; all basic information of a contracted project is entered in advance, and then decomposed into detailed sub-items and passed through preset The work flow and specifications are used to assist supervisors, and the above data is stored to form a basic data source, and then combined with the step index table, it can quickly find and obtain related data, and can also regularly form data reports, which is convenient for users to analyze.

Description

Real-time data intelligent association calculation method applied to project management system
Technical Field
The invention relates to the technical field of real-time data computing methods, in particular to a real-time data intelligent association computing method applied to a project management system.
Background
The real-time data in the project management system reflects the operation condition of the whole project, the operation of the real-time data in the project management system ensures the authenticity and integrity of the whole project, the existing data calculation method of the project management system causes incomplete management quality, single function and untimely data association, and therefore users cannot technically and effectively obtain the latest data and obtain an analysis report.
Disclosure of Invention
The invention aims to solve the technical problems and provides a real-time data intelligent association calculation method applied to a project management system aiming at the technical defects.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: the method comprises the following steps:
s1, the project process personnel enter the basic information of the acquired project into the project management system through the data entry equipment, such as: the project management system comprises project names, project types, starting dates, supervision units, construction units, related view data and the like, wherein basic information input by the engineering projects is displayed in a list form;
s2, decomposing the acquired project into a plurality of different sub-projects, presetting supervision work flow, acceptance criteria, supervision work methods and measures for each sub-project, and acquiring files required in each sub-project to archive to form a project record table;
s2, when the supervision engineer performs supervision work in each sub-project, judging whether the actually acquired information and the preset information are in a safety range, if the actually acquired information and the preset information exceed the safety range, early warning the sub-project, correcting the sub-project after the reason is analyzed by a supervisor, and updating an engineering record table;
s3, establishing a database for the project management system, and storing all the work flows and the project record tables of the project management system in the database;
s4, establishing a step length index table in the database, wherein the step length index table is associated with the data in the database;
and S5, establishing a quick search algorithm to quickly search the step index table and find out the associated data.
Further optimizing the technical scheme, the database is also provided with an authority module, and the function authority configuration is realized according to different registered roles of the user account.
According to the technical scheme, the database is further optimized to be provided with a reminding module, and when data information in the database is updated, new data can be fed back to different user accounts in time to remind the users.
Further optimizing the technical scheme, the database also has an analysis module for periodically integrating the data of the information in the database, and then forming a data report to be fed back to different user accounts for reminding.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
The method comprises the following steps:
s1, the project process personnel enter the basic information of the acquired project into the project management system through the data entry equipment, such as: the project management system comprises project names, project types, starting dates, supervision units, construction units, related view data and the like, wherein basic information input by the engineering projects is displayed in a list form;
s2, decomposing the acquired project into a plurality of different sub-projects, presetting supervision work flow, acceptance criteria, supervision work methods and measures for each sub-project, and acquiring files required in each sub-project to archive to form a project record table;
s2, when the supervision engineer performs supervision work in each sub-project, judging whether the actually acquired information and the preset information are in a safety range, if the actually acquired information and the preset information exceed the safety range, early warning the sub-project, correcting the sub-project after the reason is analyzed by a supervisor, and updating an engineering record table;
s3, establishing a database for the project management system, and storing all the work flows and the project record tables of the project management system in the database;
s4, establishing a step length index table in the database, wherein the step length index table is associated with the data in the database;
and S5, establishing a quick search algorithm to quickly search the step index table and find out the associated data.
All basic information of the acquired project is input in advance, then the basic information is decomposed into detailed sub-projects, supervision personnel are assisted through a preset work flow and specifications, the data are stored to form a basic data source, then a step index table is combined, the associated data can be quickly searched and obtained, a data report can be formed regularly, and analysis by the user is facilitated.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.

Claims (4)

1.一种应用于项目管理系统的实时数据智能关联计算方法,其特征在于:包括以下步骤:1. a real-time data intelligent correlation calculation method applied to a project management system, is characterized in that: comprise the following steps: S1、项目流程人员通过数据录入设备将所承揽项目的基础信息录入到项目管理系统中,如:项目名称、项目类型、起始日期、监理单位、建设单位、相关视图资料等,以列表的形式展现工程项目录入的基础信息;S1. The project process personnel enter the basic information of the contracted project into the project management system through data entry equipment, such as: project name, project type, start date, supervision unit, construction unit, relevant view data, etc., in the form of a list Display the basic information entered in the project; S2、将所承揽的项目分解成多个不同的子项目,并对每个子项目预设监理工作流程、验收规范、监理工作方法及措施,并获取每个子项目中所需的文件进行归档形成工程记录表;S2. Decompose the contracted project into a number of different sub-projects, and preset the supervision workflow, acceptance specifications, supervision work methods and measures for each sub-project, and obtain the required documents in each sub-project to archive and form a project recording sheet; S2、监理工程师在每个子项目中开展监理工作时,判断实际获取的信息与预设信息是否处于安全范围,如果超出安全范围,则对该子项目进行预警,并经监理人员分析原因后进行纠正,并更新工程记录表;S2. When supervising engineers carry out supervision work in each sub-project, judge whether the actually obtained information and preset information are within the safe range. If it exceeds the safe range, the sub-project will be given an early warning, and the supervisor will make corrections after analyzing the reasons. , and update the engineering record sheet; S3、为项目管理系统建立数据库,并将项目管理系统的所有的工作流程以及工程记录表存储在数据库中;S3. Establish a database for the project management system, and store all the workflows and engineering records of the project management system in the database; S4、在数据库中建立一个步长索引表,步长索引表与数据库中的数据相关联;S4, establish a step index table in the database, and the step index table is associated with the data in the database; S5、建立快速搜索算法对步长索引表进行快速搜索,查找出关联数据。S5, establishing a fast search algorithm to quickly search the step size index table to find out the associated data. 2.根据权利要求1所述的一种应用于项目管理系统的实时数据智能关联计算方法,其特征在于:数据库还具有权限模块,根据用户账号注册的角色不同,实现功能权限配置。2. A kind of real-time data intelligent associative computing method applied to a project management system according to claim 1, is characterized in that: database also has authority module, according to the different roles of user account registration, realize functional authority configuration. 3.根据权利要求1所述的一种应用于项目管理系统的实时数据智能关联计算方法,其特征在于:数据库还具有提醒模块,当数据库中的数据信息更新时,能够将新的数据及时反馈到不同的用户账号进行提醒。3. a kind of real-time data intelligent associative computing method applied to project management system according to claim 1 is characterized in that: database also has reminding module, when the data information in the database is updated, new data can be fed back in time to a different user account for reminders. 4.根据权利要求1所述的一种应用于项目管理系统的实时数据智能关联计算方法,其特征在于:数据库还具有分析模块,用于对数据库中的信息定期进行数据整合,然后形成数据报表反馈到不同的用户账号进行提醒。4. a kind of real-time data intelligent associative computing method applied to project management system according to claim 1, is characterized in that: database also has analysis module, is used for regularly carrying out data integration to the information in database, then forms data report form Feedback to different user accounts for reminders.
CN202111230812.1A 2021-10-22 2021-10-22 Real-time data intelligent association calculation method applied to project management system Pending CN113919816A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202111230812.1A CN113919816A (en) 2021-10-22 2021-10-22 Real-time data intelligent association calculation method applied to project management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202111230812.1A CN113919816A (en) 2021-10-22 2021-10-22 Real-time data intelligent association calculation method applied to project management system

Publications (1)

Publication Number Publication Date
CN113919816A true CN113919816A (en) 2022-01-11

Family

ID=79242346

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202111230812.1A Pending CN113919816A (en) 2021-10-22 2021-10-22 Real-time data intelligent association calculation method applied to project management system

Country Status (1)

Country Link
CN (1) CN113919816A (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6308164B1 (en) * 1997-04-28 2001-10-23 Jeff Nummelin Distributed project management system and method
US20040249694A1 (en) * 2003-06-06 2004-12-09 Luo Sheng Chi Project management method and system
WO2013181719A1 (en) * 2012-06-08 2013-12-12 Bonh Lockstocker Ltd Project management system
CN103646317A (en) * 2013-12-30 2014-03-19 广西科技大学 Intelligent Real-time data association computing method applied to project management system
CN110322147A (en) * 2019-07-04 2019-10-11 四川元丰建设项目管理有限公司 A kind of Project Supervision approaches to IM and system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6308164B1 (en) * 1997-04-28 2001-10-23 Jeff Nummelin Distributed project management system and method
US20040249694A1 (en) * 2003-06-06 2004-12-09 Luo Sheng Chi Project management method and system
WO2013181719A1 (en) * 2012-06-08 2013-12-12 Bonh Lockstocker Ltd Project management system
CN103646317A (en) * 2013-12-30 2014-03-19 广西科技大学 Intelligent Real-time data association computing method applied to project management system
CN110322147A (en) * 2019-07-04 2019-10-11 四川元丰建设项目管理有限公司 A kind of Project Supervision approaches to IM and system

Similar Documents

Publication Publication Date Title
CN110322147A (en) A kind of Project Supervision approaches to IM and system
CN103605771B (en) Operation method for intelligent assistant decision and maintenance system
CN108090675A (en) A quality management system for vehicle manufacturing
Murè et al. Fuzzy Application Procedure (FAP) for the risk assessment of occupational accidents
CN112541748A (en) Engineering project management system based on BIM technology
CN117591679B (en) Intelligent analysis system and method for carbon footprint of building block type product based on knowledge graph
CN118967202B (en) A multi-source data processing method and system for supplier evaluation
CN113919816A (en) Real-time data intelligent association calculation method applied to project management system
CN115994817A (en) Method and system for realizing target object due diligence based on RPA and low code
CN119360589A (en) Dynamic monitoring system for safety management risks in production safety
CN103389698B (en) Method for controlling production through standards
US20040102873A1 (en) System for maintaining power plant outage data
CN114240211A (en) Intelligent production management system and management method
US20120053813A1 (en) Method and computer program product for maintaining vehicle inspection, registration, and emissions status
CN113052560A (en) System method for solving enterprise safety and sanitation problems
CN117391455B (en) Major hazard source safety control system for iron and steel enterprises
CN111667170B (en) Abnormal processing method, device and storage medium for sewing product working time standard
CN118798659A (en) A method and system for identifying and handling hidden dangers in port safety and environmental protection operations
CN120598571A (en) Customer appeal service quality refined management method
JP6571232B1 (en) Impact investigation system, impact investigation method and impact investigation program
CN119721583A (en) Internal supervision system of the unified tobacco monopoly supervision platform
Chaudhary et al. Comparison of Risk Minimization Strategies in an under Construction Five Star Hotel in Kathmandu Valley, Nepal
Bekeneva Using Accounting Databases for Data Processing within Enterprise Monitoring Systems
Liu Safety management analysis for construction industry: Statistical Process Control (SPC) approach
JP2003162310A (en) Loss cost analytical system for manufacturing process

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20220111

RJ01 Rejection of invention patent application after publication