Real-time data intelligent association calculation method applied to project management system
Technical Field
The invention relates to the technical field of real-time data computing methods, in particular to a real-time data intelligent association computing method applied to a project management system.
Background
The real-time data in the project management system reflects the operation condition of the whole project, the operation of the real-time data in the project management system ensures the authenticity and integrity of the whole project, the existing data calculation method of the project management system causes incomplete management quality, single function and untimely data association, and therefore users cannot technically and effectively obtain the latest data and obtain an analysis report.
Disclosure of Invention
The invention aims to solve the technical problems and provides a real-time data intelligent association calculation method applied to a project management system aiming at the technical defects.
In order to solve the technical problems, the technical scheme adopted by the invention is as follows: the method comprises the following steps:
s1, the project process personnel enter the basic information of the acquired project into the project management system through the data entry equipment, such as: the project management system comprises project names, project types, starting dates, supervision units, construction units, related view data and the like, wherein basic information input by the engineering projects is displayed in a list form;
s2, decomposing the acquired project into a plurality of different sub-projects, presetting supervision work flow, acceptance criteria, supervision work methods and measures for each sub-project, and acquiring files required in each sub-project to archive to form a project record table;
s2, when the supervision engineer performs supervision work in each sub-project, judging whether the actually acquired information and the preset information are in a safety range, if the actually acquired information and the preset information exceed the safety range, early warning the sub-project, correcting the sub-project after the reason is analyzed by a supervisor, and updating an engineering record table;
s3, establishing a database for the project management system, and storing all the work flows and the project record tables of the project management system in the database;
s4, establishing a step length index table in the database, wherein the step length index table is associated with the data in the database;
and S5, establishing a quick search algorithm to quickly search the step index table and find out the associated data.
Further optimizing the technical scheme, the database is also provided with an authority module, and the function authority configuration is realized according to different registered roles of the user account.
According to the technical scheme, the database is further optimized to be provided with a reminding module, and when data information in the database is updated, new data can be fed back to different user accounts in time to remind the users.
Further optimizing the technical scheme, the database also has an analysis module for periodically integrating the data of the information in the database, and then forming a data report to be fed back to different user accounts for reminding.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention is further described in detail with reference to the following embodiments. It should be understood that the description is intended to be exemplary only, and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
The method comprises the following steps:
s1, the project process personnel enter the basic information of the acquired project into the project management system through the data entry equipment, such as: the project management system comprises project names, project types, starting dates, supervision units, construction units, related view data and the like, wherein basic information input by the engineering projects is displayed in a list form;
s2, decomposing the acquired project into a plurality of different sub-projects, presetting supervision work flow, acceptance criteria, supervision work methods and measures for each sub-project, and acquiring files required in each sub-project to archive to form a project record table;
s2, when the supervision engineer performs supervision work in each sub-project, judging whether the actually acquired information and the preset information are in a safety range, if the actually acquired information and the preset information exceed the safety range, early warning the sub-project, correcting the sub-project after the reason is analyzed by a supervisor, and updating an engineering record table;
s3, establishing a database for the project management system, and storing all the work flows and the project record tables of the project management system in the database;
s4, establishing a step length index table in the database, wherein the step length index table is associated with the data in the database;
and S5, establishing a quick search algorithm to quickly search the step index table and find out the associated data.
All basic information of the acquired project is input in advance, then the basic information is decomposed into detailed sub-projects, supervision personnel are assisted through a preset work flow and specifications, the data are stored to form a basic data source, then a step index table is combined, the associated data can be quickly searched and obtained, a data report can be formed regularly, and analysis by the user is facilitated.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.