CN113702859B - Power supply testing device - Google Patents
Power supply testing device Download PDFInfo
- Publication number
- CN113702859B CN113702859B CN202110876893.6A CN202110876893A CN113702859B CN 113702859 B CN113702859 B CN 113702859B CN 202110876893 A CN202110876893 A CN 202110876893A CN 113702859 B CN113702859 B CN 113702859B
- Authority
- CN
- China
- Prior art keywords
- power supply
- tested
- test
- switching circuit
- switch switching
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R31/00—Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
- G01R31/40—Testing power supplies
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/02—General constructional details
- G01R1/04—Housings; Supporting members; Arrangements of terminals
- G01R1/0408—Test fixtures or contact fields; Connectors or connecting adaptors; Test clips; Test sockets
- G01R1/0416—Connectors, terminals
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01R—MEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
- G01R1/00—Details of instruments or arrangements of the types included in groups G01R5/00 - G01R13/00 and G01R31/00
- G01R1/30—Structural combination of electric measuring instruments with basic electronic circuits, e.g. with amplifier
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
本申请公开了一种电源测试装置,包括:各个检测设备;与待测电源的各个测试引脚连接,并与各个检测设备均连接的测试装置;与测试装置以及各个检测设备均连接的控制器,用于按照预设的自动化电源测试流程控制测试装置的状态切换,以自动调整各个检测设备所连接的待测电源的测试引脚;通过在执行自动化电源测试流程时接收的各个检测设备发送的检测数据,得到待测电源的测试结果。应用本申请的方案,可以自动完成待测电源的测试,并且测试过程中不需要重新接线,有效地提高了电源测试效率。
The present application discloses a power supply test device, comprising: various detection devices; a test device connected to each test pin of the power supply to be tested and connected to each detection device; a controller connected to the test device and each detection device, used to control the state switching of the test device according to a preset automatic power supply test process to automatically adjust the test pin of the power supply to be tested connected to each detection device; and obtain the test result of the power supply to be tested by receiving the detection data sent by each detection device when executing the automatic power supply test process. By applying the scheme of the present application, the test of the power supply to be tested can be automatically completed, and no rewiring is required during the test process, which effectively improves the power supply test efficiency.
Description
技术领域Technical Field
本发明涉及测试技术领域,特别是涉及一种电源测试装置。The invention relates to the field of testing technology, and in particular to a power supply testing device.
背景技术Background technique
随着互联网的高速发展,人们越来越离不开网络,网络数据流量剧增,因此人们对高性能服务器的依赖越来越重,服务器的数量也在不断增长,开发服务器的周期在不断缩短。服务器中的电源芯片的测试是服务器测试的重要环节,提高测试效率十分必要。With the rapid development of the Internet, people are becoming more and more dependent on the network, and network data traffic has increased dramatically. Therefore, people are increasingly dependent on high-performance servers. The number of servers is also increasing, and the server development cycle is constantly shortening. The test of the power chip in the server is an important part of the server test, and it is very necessary to improve the test efficiency.
目前采用的是人工测试,需要工作人员寻找测试点,焊接上飞线,焊接负载线,连接示波器、电子负载、万用表等检测设备。并且,由于测试项目不同,所需要的测试信号不同,因此,在进行测试项目的切换时,经常需要重新焊线并与检测设备重新连接,导致测试效率很低。Currently, manual testing is used, which requires workers to find test points, weld flying wires, weld load wires, and connect oscilloscopes, electronic loads, multimeters and other testing equipment. In addition, since different test items require different test signals, when switching test items, it is often necessary to re-weld wires and reconnect with the testing equipment, resulting in low test efficiency.
综上所述,如何有效地提高电源测试效率,是目前本领域技术人员急需解决的技术问题。In summary, how to effectively improve the power supply test efficiency is a technical problem that those skilled in the art urgently need to solve.
发明内容Summary of the invention
本发明的目的是提供一种电源测试装置,以有效地提高电源测试效率。The object of the present invention is to provide a power supply testing device to effectively improve the power supply testing efficiency.
为解决上述技术问题,本发明提供如下技术方案:In order to solve the above technical problems, the present invention provides the following technical solutions:
一种电源测试装置,包括:A power supply testing device, comprising:
各个检测设备;Various testing equipment;
与待测电源的各个测试引脚连接,并与各个所述检测设备均连接的测试装置;A test device connected to each test pin of the power supply to be tested and connected to each of the detection devices;
与所述测试装置以及各个所述检测设备均连接的控制器,用于按照预设的自动化电源测试流程控制所述测试装置的状态切换,以自动调整各个检测设备所连接的所述待测电源的测试引脚;通过在执行所述自动化电源测试流程时接收的各个所述检测设备发送的检测数据,得到所述待测电源的测试结果。A controller connected to the test device and each of the detection devices is used to control the state switching of the test device according to a preset automatic power supply test process to automatically adjust the test pins of the power supply to be tested connected to each of the detection devices; and obtain the test result of the power supply to be tested by receiving the detection data sent by each of the detection devices when executing the automatic power supply test process.
优选的,所述检测设备包括:Preferably, the detection device comprises:
正极端通过所述测试装置与所述待测电源的电压输入引脚连接,负极端接地的第一示波器;正极端与所述测试装置中的第一开关切换电路的第一端连接,负极端接地的第二示波器;正极端通过所述测试装置与所述待测电源的所述电压输出引脚连接,负极端接地的第三示波器;正极端通过所述测试装置与所述待测电源的使能端引脚连接,负极端接地的第四示波器;通过所述测试装置与所述待测电源的所述电压输出引脚连接的电子负载;A first oscilloscope whose positive terminal is connected to the voltage input pin of the power supply to be tested through the test device and whose negative terminal is grounded; a second oscilloscope whose positive terminal is connected to the first end of the first switch switching circuit in the test device and whose negative terminal is grounded; a third oscilloscope whose positive terminal is connected to the voltage output pin of the power supply to be tested through the test device and whose negative terminal is grounded; a fourth oscilloscope whose positive terminal is connected to the enable pin of the power supply to be tested through the test device and whose negative terminal is grounded; an electronic load connected to the voltage output pin of the power supply to be tested through the test device;
所述测试装置包括所述第一开关切换电路,且所述第一开关切换电路的第二端和第三端分别与所述待测电源的PG引脚和Phase引脚连接;The testing device comprises the first switch switching circuit, and the second end and the third end of the first switch switching circuit are respectively connected to the PG pin and the Phase pin of the power supply to be tested;
所述控制器具体用于:按照所述自动化电源测试流程进行所述待测电源的上电时序测试和抖动测试;The controller is specifically used to: perform a power-on timing test and a jitter test on the power supply to be tested according to the automatic power supply test process;
在进行所述上电时序测试时,控制所述第一开关切换电路为默认状态,以使得所述第一开关切换电路的第一端与所述第一开关切换电路的第二端导通,以接收到所述第二示波器检测到的所述待测电源的PG信号,并且接收所述第三示波器检测到的所述待测电源的输出电压信号Vout,所述第一示波器检测到的所述待测电源的输入电压信号Vin,以及所述第四示波器检测到的所述待测电源的使能信号EN,以得到上电时序测试结果;When performing the power-on timing test, the first switch switching circuit is controlled to be in a default state so that the first end of the first switch switching circuit is turned on with the second end of the first switch switching circuit, so as to receive the PG signal of the power supply to be tested detected by the second oscilloscope, and receive the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope, and the enable signal EN of the power supply to be tested detected by the fourth oscilloscope, so as to obtain the power-on timing test result;
在进行所述抖动测试时,控制所述第一开关切换电路为非默认状态,以使得所述第一开关切换电路的第一端与所述第一开关切换电路的第三端导通,以接收到所述第二示波器检测到的所述待测电源的Phase信号,以得到抖动测试结果。When performing the jitter test, the first switch switching circuit is controlled to a non-default state so that the first end of the first switch switching circuit and the third end of the first switch switching circuit are turned on to receive the Phase signal of the power supply to be tested detected by the second oscilloscope to obtain the jitter test result.
优选的,所述控制器还用于:Preferably, the controller is also used for:
按照所述自动化电源测试流程进行所述待测电源的纹波测试,电压上冲测试,电压下冲测试;Performing a ripple test, a voltage overshoot test, and a voltage undershoot test on the power supply to be tested according to the automated power supply test process;
在进行所述纹波测试时,接收所述第三示波器检测到的所述待测电源的输出电压信号Vout,以得到纹波测试结果;When performing the ripple test, receiving the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope to obtain a ripple test result;
在进行所述电压上冲测试时,接收所述第三示波器检测到的所述待测电源的输出电压信号Vout,以得到电压上冲测试结果;When performing the voltage overshoot test, receiving the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope to obtain a voltage overshoot test result;
在进行所述电压下冲测试时,接收所述第三示波器检测到的所述待测电源的输出电压信号Vout,以得到电压下冲测试结果。When performing the voltage undershoot test, the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope is received to obtain a voltage undershoot test result.
优选的,所述控制器还用于:Preferably, the controller is also used for:
按照所述自动化电源测试流程进行所述待测电源的涌浪电压测试;Performing a surge voltage test on the power supply to be tested according to the automated power supply test process;
在进行所述涌浪电压测试时,接收所述第三示波器检测到的所述待测电源的输出电压信号Vout,以得到涌浪电压测试结果。When performing the surge voltage test, the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope is received to obtain a surge voltage test result.
优选的,还包括:通过所述测试装置与所述待测电源的电压输出引脚连接的第一万用表;Preferably, it further comprises: a first multimeter connected to the voltage output pin of the power supply to be tested through the testing device;
所述控制器还用于:The controller is also used for:
按照所述自动化电源测试流程进行所述待测电源的静态电压测试,并且在进行所述静态电压测试时,接收所述第一万用表检测到的所述待测电源的输出电压信号Vout,以得到静态电压测试结果。The static voltage test of the power supply to be tested is performed according to the automatic power supply test process, and when performing the static voltage test, the output voltage signal Vout of the power supply to be tested detected by the first multimeter is received to obtain a static voltage test result.
优选的,还包括:Preferably, it also includes:
与所述测试装置中的第二开关切换电路的第三端连接的第一直流供电源;通过所述测试装置与所述待测电源的电压输入引脚连接的第二万用表;A first DC power supply connected to a third terminal of a second switch circuit in the test device; a second multimeter connected to a voltage input pin of the power supply to be tested through the test device;
所述测试装置中还包括第一电阻,所述第二开关切换电路,第三开关切换电路以及第四开关切换电路;所述第一电阻的第一端和第二端分别与所述待测电源的所述电压输出引脚和所述电子负载的输入端连接;所述第二开关切换电路的第一端和第二端分别与所述待测电源的电压输入引脚和所述待测电源的主板供电引脚连接;所述第三开关切换电路的第一端,第二端,以及第三端分别与所述第四示波器的正极端,所述待测电源的使能端引脚,以及所述第一电阻的第一端连接;所述第四开关切换电路的第一端和第三端分别与所述第四示波器的负极端和所述第一电阻的第二端连接,所述第四开关切换电路的第二端接地;The test device also includes a first resistor, a second switch switching circuit, a third switch switching circuit and a fourth switch switching circuit; the first end and the second end of the first resistor are respectively connected to the voltage output pin of the power supply to be tested and the input end of the electronic load; the first end and the second end of the second switch switching circuit are respectively connected to the voltage input pin of the power supply to be tested and the mainboard power supply pin of the power supply to be tested; the first end, the second end, and the third end of the third switch switching circuit are respectively connected to the positive terminal of the fourth oscilloscope, the enable terminal pin of the power supply to be tested, and the first end of the first resistor; the first end and the third end of the fourth switch switching circuit are respectively connected to the negative terminal of the fourth oscilloscope and the second end of the first resistor, and the second end of the fourth switch switching circuit is grounded;
所述控制器还用于:按照所述自动化电源测试流程进行所述待测电源的效率测试;The controller is also used to: perform efficiency test of the power supply to be tested according to the automatic power supply test process;
在进行所述效率测试时,接收所述第二万用表检测到的所述待测电源的输入电压信号Vin和所述第一万用表检测到的所述待测电源的输出电压信号Vout;When performing the efficiency test, receiving an input voltage signal Vin of the power supply to be tested detected by the second multimeter and an output voltage signal Vout of the power supply to be tested detected by the first multimeter;
控制所述第二开关切换电路为非默认状态,以使得所述第二开关切换电路的第一端与所述第二开关切换电路的第三端导通,以使所述第一直流供电源向所述待测电源供电,并确定出所述第一直流供电源的供电电流值;Controlling the second switch switching circuit to a non-default state so that the first end of the second switch switching circuit and the third end of the second switch switching circuit are conductive, so that the first DC power supply supplies power to the power supply to be tested, and determining a supply current value of the first DC power supply;
控制所述第三开关切换电路和所述第四开关切换电路均为非默认状态,以使得所述第三开关切换电路的第一端与所述第三开关切换电路的第三端导通,所述第四开关切换电路的第一端与所述第四开关切换电路的第三端导通,以接收所述第四示波器检测到的所述第一电阻的端电压信号;Controlling the third switch switching circuit and the fourth switch switching circuit to be in a non-default state, so that the first end of the third switch switching circuit is connected to the third end of the third switch switching circuit, and the first end of the fourth switch switching circuit is connected to the third end of the fourth switch switching circuit, so as to receive the terminal voltage signal of the first resistor detected by the fourth oscilloscope;
根据所述第二万用表检测到的所述待测电源的输入电压信号Vin,所述第一万用表检测到的所述待测电源的输出电压信号Vout,所述第一直流供电源的供电电流值以及所述第一电阻的端电压信号,确定出所述待测电源的效率值,作为效率测试结果。Based on the input voltage signal Vin of the power supply to be tested detected by the second multimeter, the output voltage signal Vout of the power supply to be tested detected by the first multimeter, the supply current value of the first DC power supply and the terminal voltage signal of the first resistor, the efficiency value of the power supply to be tested is determined as the efficiency test result.
优选的,所述控制器还用于:按照所述自动化电源测试流程进行所述待测电源的过流保护测试和短路保护测试;Preferably, the controller is further used to: perform an overcurrent protection test and a short-circuit protection test of the power supply to be tested according to the automatic power supply test process;
在进行所述过流保护测试时,通过控制所述电子负载使得所述待测电源触发过流保护,接收所述第一示波器检测到的所述待测电源的输入电压信号Vin和所述第三示波器检测到的所述待测电源的输出电压信号Vout,控制所述第一开关切换电路为默认状态以接收到所述第二示波器检测到的所述待测电源的PG信号,以得到过流保护测试结果;When performing the overcurrent protection test, the electronic load is controlled so that the power supply to be tested triggers the overcurrent protection, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope and the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope are received, and the first switch switching circuit is controlled to be in a default state to receive the PG signal of the power supply to be tested detected by the second oscilloscope, so as to obtain the overcurrent protection test result;
在进行所述短路保护测试时,控制所述电子负载短路,接收所述第一示波器检测到的所述待测电源的输入电压信号Vin和所述第三示波器检测到的所述待测电源的输出电压信号Vout,控制所述第一开关切换电路为默认状态以接收到所述第二示波器检测到的所述待测电源的PG信号;控制所述第三开关切换电路和所述第四开关切换电路均为非默认状态,以确定出流经所述第一电阻的电流值,并确定出短路保护测试结果。When performing the short-circuit protection test, the electronic load is controlled to be short-circuited, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope and the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope are received, and the first switch switching circuit is controlled to be in a default state to receive the PG signal of the power supply to be tested detected by the second oscilloscope; the third switch switching circuit and the fourth switch switching circuit are controlled to be in a non-default state to determine the current value flowing through the first resistor and determine the short-circuit protection test result.
优选的,还包括:Preferably, it also includes:
通过所述测试装置与所述待测电源的第一频率分析引脚和第二频率分析引脚连接的频率响应分析仪;A frequency response analyzer connected through the test device to the first frequency analysis pin and the second frequency analysis pin of the power supply to be tested;
所述控制器还用于:按照所述自动化电源测试流程进行所述待测电源的频率响应测试;The controller is also used to: perform a frequency response test of the power supply to be tested according to the automatic power supply test process;
在进行所述频率响应测试时,接收频率响应分析仪的输出信号并得到频率响应测试结果。When performing the frequency response test, an output signal of a frequency response analyzer is received and a frequency response test result is obtained.
优选的,所述待测电源的各个测试引脚均集成在预设的连接器中。Preferably, each test pin of the power supply to be tested is integrated in a preset connector.
优选的,所述控制器为上位机中的控制器。Preferably, the controller is a controller in a host computer.
应用本发明实施例所提供的技术方案,专门设置了用于与各个检测设备以及待测电源的各个测试引脚连接的测试装置,使得本申请的方案在进行测试项目的切换时,不需要将测试装置与待测电源的各个测试引脚重新连接,也不需要将测试装置与各个检测设备重新连接,只需要通过控制器便可以实现连接方式的调整。具体的,控制器与测试装置以及各个检测设备均连接,可以按照预设的自动化电源测试流程控制测试装置的状态切换,从而自动调整各个检测设备所连接的待测电源的测试引脚。并且,控制器通过在执行自动化电源测试流程时接收的各个检测设备发送的检测数据,可以得到待测电源的测试结果,也就是说,利用控制器以及测试装置,可以无需进行连线的切换,并且自动完成了待测电源的测试,得到待测电源的测试结果,有效地提高了电源测试效率。The technical solution provided by the embodiment of the present invention is applied, and a test device for connecting with each test pin of each detection device and the power supply to be tested is specially set, so that when the solution of the present application switches the test items, it is not necessary to reconnect the test device with each test pin of the power supply to be tested, nor is it necessary to reconnect the test device with each detection device, and the adjustment of the connection mode can be realized only through the controller. Specifically, the controller is connected with the test device and each detection device, and the state switching of the test device can be controlled according to the preset automatic power supply test process, so as to automatically adjust the test pin of the power supply to be tested connected by each detection device. In addition, the controller can obtain the test result of the power supply to be tested by the detection data sent by each detection device received when executing the automatic power supply test process, that is, by using the controller and the test device, it is possible to switch the connection without the need to, and automatically complete the test of the power supply to be tested, obtain the test result of the power supply to be tested, and effectively improve the power supply test efficiency.
附图说明BRIEF DESCRIPTION OF THE DRAWINGS
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings required for use in the embodiments or the description of the prior art will be briefly introduced below. Obviously, the drawings described below are only some embodiments of the present invention. For ordinary technicians in this field, other drawings can be obtained based on these drawings without paying creative work.
图1为本发明中一种电源测试装置的结构示意图;FIG1 is a schematic diagram of the structure of a power supply testing device in the present invention;
图2为本发明中另一种电源测试装置的结构示意图;FIG2 is a schematic diagram of the structure of another power supply testing device in the present invention;
图3为本发明中又一种电源测试装置的结构示意图。FIG3 is a schematic diagram of the structure of another power supply testing device in the present invention.
具体实施方式Detailed ways
本发明的核心是提供一种电源测试装置,可以自动完成待测电源的测试,并且测试过程中不需要重新接线,有效地提高了电源测试效率。The core of the present invention is to provide a power supply testing device, which can automatically complete the test of the power supply to be tested, and does not need to reconnect the wires during the test, thereby effectively improving the power supply testing efficiency.
为了使本技术领域的人员更好地理解本发明方案,下面结合附图和具体实施方式对本发明作进一步的详细说明。显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。In order to enable those skilled in the art to better understand the scheme of the present invention, the present invention is further described in detail below in conjunction with the accompanying drawings and specific implementation methods. Obviously, the described embodiments are only part of the embodiments of the present invention, rather than all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by ordinary technicians in this field without making creative work are within the scope of protection of the present invention.
请参考图1,图1为本发明中一种电源测试装置的结构示意图,该电源测试装置可以包括:Please refer to FIG. 1 , which is a schematic diagram of the structure of a power supply testing device in the present invention. The power supply testing device may include:
各个检测设备10;Various testing devices 10;
与待测电源的各个测试引脚连接,并与各个检测设备10均连接的测试装置20;A test device 20 connected to each test pin of the power supply to be tested and connected to each detection device 10;
与测试装置20以及各个检测设备10均连接的控制器30,用于按照预设的自动化电源测试流程控制测试装置20的状态切换,以自动调整各个检测设备10所连接的待测电源的测试引脚;通过在执行自动化电源测试流程时接收的各个检测设备10发送的检测数据,得到待测电源的测试结果。The controller 30 connected to the test device 20 and each detection device 10 is used to control the state switching of the test device 20 according to a preset automatic power supply test process to automatically adjust the test pins of the power supply to be tested connected to each detection device 10; and obtain the test result of the power supply to be tested by receiving the detection data sent by each detection device 10 when executing the automatic power supply test process.
检测设备10的具体数量以及类型可以根据需要进行设定和调整,会受到待测电源所需要测试的具体项目内容的影响,在实际应用中通常需要使用多个检测设备10。The specific number and type of the detection devices 10 can be set and adjusted as needed, and will be affected by the specific items that need to be tested for the power supply to be tested. In practical applications, it is usually necessary to use multiple detection devices 10.
测试装置20与待测电源的各个测试引脚连接,并与各个检测设备10均连接,因此,各个检测设备10可以通过测试装置20与待测电源进行连接,而具体连接到的引脚,则会受到测试装置20状态的影响,因此,在进行待测电源的不同项目的测试时,本申请的方案不需要如传统方案中重新插拔检测设备10,而是通过控制器30对测试装置20进行状态切换即可。即本申请的控制器30可以按照预设的自动化电源测试流程控制测试装置20的状态切换,以自动调整各个检测设备10所连接的待测电源的测试引脚。The test device 20 is connected to each test pin of the power supply to be tested, and is connected to each detection device 10. Therefore, each detection device 10 can be connected to the power supply to be tested through the test device 20, and the specific pins to be connected will be affected by the state of the test device 20. Therefore, when testing different items of the power supply to be tested, the solution of the present application does not need to re-plug the detection device 10 as in the traditional solution, but can switch the state of the test device 20 through the controller 30. That is, the controller 30 of the present application can control the state switching of the test device 20 according to the preset automatic power supply test process to automatically adjust the test pins of the power supply to be tested connected to each detection device 10.
并且,在执行自动化电源测试流程时,本申请可以由控制器30接收各个检测设备10发送的检测数据,从而控制器30可以自动得到待测电源的测试结果,进一步的提高了本申请方案的电源测试效率。Furthermore, when executing the automated power supply test process, the controller 30 of the present application can receive the test data sent by each detection device 10, so that the controller 30 can automatically obtain the test result of the power supply to be tested, further improving the power supply test efficiency of the present application solution.
自动化电源测试流程的具体内容可以根据需要进行设定和调整,例如部分场合中可以包含针对待测电源的完整的各项测试,又如部分场合中根据需要只包含一部分测试项目。The specific content of the automated power supply test process can be set and adjusted as needed. For example, in some cases, a complete set of tests for the power supply to be tested may be included, while in other cases, only a portion of the test items may be included as needed.
在本发明的一种具体实施方式中,可参阅图2,检测设备10可以包括:In a specific embodiment of the present invention, referring to FIG. 2 , the detection device 10 may include:
正极端通过测试装置20与待测电源的电压输入引脚连接,负极端接地的第一示波器CH1;正极端与测试装置20中的第一开关切换电路21的第一端连接,负极端接地的第二示波器CH2;正极端通过测试装置20与待测电源的电压输出引脚连接,负极端接地的第三示波器CH3;正极端通过测试装置20与待测电源的使能端引脚连接,负极端接地的第四示波器CH4;通过测试装置20与待测电源的电压输出引脚连接的电子负载Z1;A first oscilloscope CH1 whose positive terminal is connected to the voltage input pin of the power supply to be tested through the test device 20 and whose negative terminal is grounded; a second oscilloscope CH2 whose positive terminal is connected to the first end of the first switch switching circuit 21 in the test device 20 and whose negative terminal is grounded; a third oscilloscope CH3 whose positive terminal is connected to the voltage output pin of the power supply to be tested through the test device 20 and whose negative terminal is grounded; a fourth oscilloscope CH4 whose positive terminal is connected to the enable pin of the power supply to be tested through the test device 20 and whose negative terminal is grounded; an electronic load Z1 connected to the voltage output pin of the power supply to be tested through the test device 20;
测试装置20包括第一开关切换电路21,且第一开关切换电路21的第二端和第三端分别与待测电源的PG引脚和Phase引脚连接;The test device 20 includes a first switch switching circuit 21, and the second end and the third end of the first switch switching circuit 21 are respectively connected to the PG pin and the Phase pin of the power supply to be tested;
控制器30具体用于:按照自动化电源测试流程进行待测电源的上电时序测试和抖动测试;The controller 30 is specifically used to: perform a power-on timing test and a jitter test on the power supply to be tested according to an automated power supply test process;
在进行上电时序测试时,控制第一开关切换电路21为默认状态,以使得第一开关切换电路21的第一端与第一开关切换电路21的第二端导通,以接收到第二示波器CH2检测到的待测电源的PG信号,并且接收第三示波器CH3检测到的待测电源的输出电压信号Vout,第一示波器CH1检测到的待测电源的输入电压信号Vin,以及第四示波器CH4检测到的待测电源的使能信号EN,以得到上电时序测试结果;When performing a power-on timing test, the first switch switching circuit 21 is controlled to be in a default state so that the first end of the first switch switching circuit 21 is connected to the second end of the first switch switching circuit 21, so as to receive the PG signal of the power supply to be tested detected by the second oscilloscope CH2, and receive the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope CH1, and the enable signal EN of the power supply to be tested detected by the fourth oscilloscope CH4, so as to obtain a power-on timing test result;
在进行抖动测试时,控制第一开关切换电路21为非默认状态,以使得第一开关切换电路21的第一端与第一开关切换电路21的第三端导通,以接收到第二示波器CH2检测到的待测电源的Phase信号,以得到抖动测试结果。When performing a jitter test, the first switch switching circuit 21 is controlled to a non-default state so that the first end of the first switch switching circuit 21 and the third end of the first switch switching circuit 21 are turned on to receive the Phase signal of the power supply to be tested detected by the second oscilloscope CH2 to obtain the jitter test result.
该种实施方式中的电源测试装置20,可以自动完成待测电源的上电时序测试以及抖动测试。The power supply testing device 20 in this embodiment can automatically complete the power-on timing test and jitter test of the power supply to be tested.
在进行上电时序测试时,即SEQUENCE测试,由于控制器30会控制第一开关切换电路21为默认状态,因此使得第一开关切换电路21的第一端与第一开关切换电路21的第二端导通,即控制器30可以接收到第二示波器CH2检测到的待测电源的PG(Power Good,电源正常)信号。除了PG信号之外,在进行上电时序测试时,还需要第三示波器CH3检测到的待测电源的输出电压信号Vout,第一示波器CH1检测到的待测电源的输入电压信号Vin,以及第四示波器CH4检测到的待测电源的使能信号EN,通过这4个信号,便可以得到上电时序测试结果。When performing a power-on sequence test, i.e., a SEQUENCE test, since the controller 30 controls the first switch switching circuit 21 to be in a default state, the first end of the first switch switching circuit 21 is connected to the second end of the first switch switching circuit 21, i.e., the controller 30 can receive the PG (Power Good) signal of the power supply to be tested detected by the second oscilloscope CH2. In addition to the PG signal, when performing a power-on sequence test, the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope CH1, and the enable signal EN of the power supply to be tested detected by the fourth oscilloscope CH4 are also required. Through these four signals, the power-on sequence test result can be obtained.
本申请的图3中,为各个开关切换电路进行了引脚的标号,例如图3中的第一开关切换电路21的1,2,3分别表示第一开关切换电路21的第一端,第二端以及第三端。此外,本申请的图2和图3中并未示出控制器30。In FIG. 3 of the present application, pins of each switch switching circuit are numbered, for example, 1, 2, and 3 of the first switch switching circuit 21 in FIG. 3 respectively represent the first terminal, the second terminal, and the third terminal of the first switch switching circuit 21. In addition, the controller 30 is not shown in FIG. 2 and FIG. 3 of the present application.
而在进行抖动测试时,即Jitter测试,由于控制器30会控制第一开关切换电路21为非默认状态,因此使得第一开关切换电路21的第一端与第一开关切换电路21的第三端导通,也就使得第二示波器CH2检测的是待测电源的Phase信号,通过Phase信号可以得到抖动测试结果。Phase信号指的是待测电源的SW端的信号。When performing a jitter test, i.e., a Jitter test, the controller 30 controls the first switch switching circuit 21 to a non-default state, so that the first end of the first switch switching circuit 21 and the third end of the first switch switching circuit 21 are connected, so that the second oscilloscope CH2 detects the Phase signal of the power supply to be tested, and the jitter test result can be obtained through the Phase signal. The Phase signal refers to the signal at the SW end of the power supply to be tested.
此外,本申请的图2中,仅示出了第一示波器CH1至第四示波器CH4的正极端,未示出第一示波器CH1至第四示波器CH4的负极端,在未特殊说明的情况下,第一示波器CH1至第四示波器CH4的负极端均是默认接地。同样的,电子负载Z1的第一端,即输入端通过测试装置20与待测电源的电压输出引脚连接,电子负载Z1的第二端接地。In addition, in FIG. 2 of the present application, only the positive terminals of the first oscilloscope CH1 to the fourth oscilloscope CH4 are shown, and the negative terminals of the first oscilloscope CH1 to the fourth oscilloscope CH4 are not shown. Unless otherwise specified, the negative terminals of the first oscilloscope CH1 to the fourth oscilloscope CH4 are all grounded by default. Similarly, the first terminal, i.e., the input terminal, of the electronic load Z1 is connected to the voltage output pin of the power supply to be tested through the test device 20, and the second terminal of the electronic load Z1 is grounded.
在实际应用中,上电时序测试通常是自动化电源测试流程的第一个测试项目。In practical applications, power-on timing test is usually the first test item in the automated power supply test process.
进一步的,在本发明的一种具体实施方式中,控制器30还可以用于:Furthermore, in a specific embodiment of the present invention, the controller 30 may also be used for:
按照自动化电源测试流程进行待测电源的纹波测试,电压上冲测试,电压下冲测试;Perform ripple test, voltage overshoot test and voltage undershoot test of the power supply to be tested according to the automated power supply test process;
在进行纹波测试时,接收第三示波器CH3检测到的待测电源的输出电压信号Vout,以得到纹波测试结果;When performing a ripple test, an output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 is received to obtain a ripple test result;
在进行电压上冲测试时,接收第三示波器CH3检测到的待测电源的输出电压信号Vout,以得到电压上冲测试结果;When performing a voltage overshoot test, an output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 is received to obtain a voltage overshoot test result;
在进行电压下冲测试时,接收第三示波器CH3检测到的待测电源的输出电压信号Vout,以得到电压下冲测试结果。When performing the voltage undershoot test, the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 is received to obtain the voltage undershoot test result.
该种实施方式中,自动化电源测试流程中还包括纹波测试,即Ripple测试,电压上冲测试,即Overshoot测试,电压下冲测试,即Undershoot测试。这3项的测试,都可以根据第三示波器CH3检测到的待测电源的输出电压信号Vout得出测试结果。In this implementation, the automated power supply test process also includes a ripple test, a voltage overshoot test, and a voltage undershoot test. The test results of these three tests can be obtained based on the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3.
在本发明的一种具体实施方式中,还可以包括:通过测试装置20与待测电源的电压输出引脚连接的第一万用表11;In a specific embodiment of the present invention, it may also include: a first multimeter 11 connected to the voltage output pin of the power supply to be tested through the testing device 20;
控制器30还用于:The controller 30 is also used to:
按照自动化电源测试流程进行待测电源的静态电压测试,并且在进行静态电压测试时,接收第一万用表11检测到的待测电源的输出电压信号Vout,以得到静态电压测试结果。The static voltage test of the power supply to be tested is performed according to the automatic power supply test process, and when the static voltage test is performed, the output voltage signal Vout of the power supply to be tested detected by the first multimeter 11 is received to obtain the static voltage test result.
该种实施方案中,考虑到示波器适用于需要波形的检测,而进行静态电压测试,即Static测试时,需要确定出稳定的待测电源的输出电压值,因此,可参阅图3,该种实施方式中设置了通过测试装置20与待测电源的电压输出引脚连接的第一万用表11,利用第一万用表11来检测出待测电源的稳定的输出电压,控制器30根据该数值便可以得到静态电压测试结果。In this implementation scheme, considering that the oscilloscope is suitable for detecting waveforms, when performing a static voltage test, i.e., a Static test, it is necessary to determine a stable output voltage value of the power supply to be tested. Therefore, referring to FIG. 3 , in this implementation scheme, a first multimeter 11 connected to the voltage output pin of the power supply to be tested through a test device 20 is provided. The first multimeter 11 is used to detect the stable output voltage of the power supply to be tested, and the controller 30 can obtain the static voltage test result based on the value.
在本发明的一种具体实施方式中,控制器30还可以用于:In a specific embodiment of the present invention, the controller 30 may also be used to:
按照自动化电源测试流程进行待测电源的涌浪电压测试;Perform surge voltage test on the power supply to be tested according to the automated power supply test process;
在进行涌浪电压测试时,接收第三示波器CH3检测到的待测电源的输出电压信号Vout,以得到涌浪电压测试结果。When performing the surge voltage test, the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 is received to obtain the surge voltage test result.
涌浪电压测试即Transient测试,通过第三示波器CH3检测到的待测电源的输出电压信号Vout,可以得到涌浪电压测试结果。The surge voltage test is also called transient test. The surge voltage test result can be obtained by detecting the output voltage signal Vout of the power supply to be tested by the third oscilloscope CH3.
在本发明的一种具体实施方式中,还可以包括:In a specific embodiment of the present invention, it may also include:
与测试装置20中的第二开关切换电路22的第三端连接的第一直流供电源DC1;通过测试装置20与待测电源的电压输入引脚连接的第二万用表12;A first DC power supply DC1 connected to a third terminal of a second switch circuit 22 in the test device 20; a second multimeter 12 connected to a voltage input pin of a power supply to be tested through the test device 20;
测试装置20中还包括第一电阻R1,第二开关切换电路22,第三开关切换电路23以及第四开关切换电路24;第一电阻R1的第一端和第二端分别与待测电源的电压输出引脚和电子负载Z1的输入端连接;第二开关切换电路22的第一端和第二端分别与待测电源的电压输入引脚和待测电源的主板供电引脚连接;第三开关切换电路23的第一端,第二端,以及第三端分别与第四示波器CH4的正极端,待测电源的使能端引脚,以及第一电阻R1的第一端连接;第四开关切换电路24的第一端和第三端分别与第四示波器CH4的负极端和第一电阻R1的第二端连接,第四开关切换电路24的第二端接地;The test device 20 also includes a first resistor R1, a second switch switching circuit 22, a third switch switching circuit 23 and a fourth switch switching circuit 24; the first end and the second end of the first resistor R1 are respectively connected to the voltage output pin of the power supply to be tested and the input end of the electronic load Z1; the first end and the second end of the second switch switching circuit 22 are respectively connected to the voltage input pin of the power supply to be tested and the mainboard power supply pin of the power supply to be tested; the first end, the second end, and the third end of the third switch switching circuit 23 are respectively connected to the positive terminal of the fourth oscilloscope CH4, the enable terminal pin of the power supply to be tested, and the first end of the first resistor R1; the first end and the third end of the fourth switch switching circuit 24 are respectively connected to the negative terminal of the fourth oscilloscope CH4 and the second end of the first resistor R1, and the second end of the fourth switch switching circuit 24 is grounded;
控制器30还用于:按照自动化电源测试流程进行待测电源的效率测试;The controller 30 is also used to: perform efficiency test of the power supply to be tested according to the automated power supply test process;
在进行效率测试时,接收第二万用表12检测到的待测电源的输入电压信号Vin和第一万用表11检测到的待测电源的输出电压信号Vout;When performing the efficiency test, receiving the input voltage signal Vin of the power supply to be tested detected by the second multimeter 12 and the output voltage signal Vout of the power supply to be tested detected by the first multimeter 11;
控制第二开关切换电路22为非默认状态,以使得第二开关切换电路22的第一端与第二开关切换电路22的第三端导通,以使第一直流供电源DC1向待测电源供电,并确定出第一直流供电源DC1的供电电流值;Control the second switch switching circuit 22 to a non-default state so that the first end of the second switch switching circuit 22 and the third end of the second switch switching circuit 22 are conductive, so that the first DC power supply DC1 supplies power to the power supply to be tested, and determine the supply current value of the first DC power supply DC1;
控制第三开关切换电路23和第四开关切换电路24均为非默认状态,以使得第三开关切换电路23的第一端与第三开关切换电路23的第三端导通,第四开关切换电路24的第一端与第四开关切换电路24的第三端导通,以接收第四示波器CH4检测到的第一电阻R1的端电压信号;Control the third switch switching circuit 23 and the fourth switch switching circuit 24 to be in a non-default state, so that the first end of the third switch switching circuit 23 is connected to the third end of the third switch switching circuit 23, and the first end of the fourth switch switching circuit 24 is connected to the third end of the fourth switch switching circuit 24, so as to receive the terminal voltage signal of the first resistor R1 detected by the fourth oscilloscope CH4;
根据第二万用表12检测到的待测电源的输入电压信号Vin,第一万用表11检测到的待测电源的输出电压信号Vout,第一直流供电源DC1的供电电流值以及第一电阻R1的端电压信号,确定出待测电源的效率值,作为效率测试结果。According to the input voltage signal Vin of the power supply to be tested detected by the second multimeter 12, the output voltage signal Vout of the power supply to be tested detected by the first multimeter 11, the supply current value of the first DC power supply DC1 and the terminal voltage signal of the first resistor R1, the efficiency value of the power supply to be tested is determined as the efficiency test result.
前述实施方式是针对电压的测试项目,该种实施方式中,为了确定出待测电源的效率值,即进行Efficiency测试,需要得到流经电子负载Z1的电流值,传统方案中,通常会更换为电流探棒来实现检测,而本申请的方案中,控制器30会控制第三开关切换电路23和第四开关切换电路均为非默认状态,此时,第三开关切换电路23的第一端与第三开关切换电路23的第三端导通,第四开关切换电路24的第一端与第四开关切换电路24的第三端导通,这样便使得第四示波器CH4检测到的是第一电阻R1的端电压信号,再结合已知的第一电阻R1的电阻值,便可以确定出流经电子负载Z1的电流值,也即待测电源的输出电流值。The aforementioned implementation is a test item for voltage. In this implementation, in order to determine the efficiency value of the power supply to be tested, that is, to perform an Efficiency test, it is necessary to obtain the current value flowing through the electronic load Z1. In traditional solutions, a current probe is usually used to achieve detection. In the solution of the present application, the controller 30 controls the third switch switching circuit 23 and the fourth switch switching circuit to be in a non-default state. At this time, the first end of the third switch switching circuit 23 is connected to the third end of the third switch switching circuit 23, and the first end of the fourth switch switching circuit 24 is connected to the third end of the fourth switch switching circuit 24. In this way, the fourth oscilloscope CH4 detects the terminal voltage signal of the first resistor R1. Combined with the known resistance value of the first resistor R1, the current value flowing through the electronic load Z1, that is, the output current value of the power supply to be tested, can be determined.
除了待测电源的输出电流值之外,为了确定出待测电源的效率值,该种实施方式中还需要通过第二万用表12检测到待测电源的输入电压信号Vin,通过第一万用表11检测到的待测电源的输出电压信号Vout,而第一直流供电源DC1的供电电流值可以直接从第一直流供电源DC1读取。In addition to the output current value of the power supply to be tested, in order to determine the efficiency value of the power supply to be tested, this implementation also needs to detect the input voltage signal Vin of the power supply to be tested by the second multimeter 12, and the output voltage signal Vout of the power supply to be tested detected by the first multimeter 11, and the supply current value of the first DC power supply DC1 can be directly read from the first DC power supply DC1.
第一直流供电源DC1即为DC Source,本申请的控制器30通过控制第二开关切换电路22为非默认状态,以使得第二开关切换电路22的第一端与第二开关切换电路22的第三端导通,也就使得第一直流供电源DC1可以向待测电源供电,控制器30可以直接读取出第一直流供电源DC1的供电电流值,也就是待测电源的输入电流值。The first DC power supply DC1 is DC Source. The controller 30 of the present application controls the second switch switching circuit 22 to a non-default state so that the first end of the second switch switching circuit 22 and the third end of the second switch switching circuit 22 are conductive, so that the first DC power supply DC1 can supply power to the power supply to be tested. The controller 30 can directly read the supply current value of the first DC power supply DC1, that is, the input current value of the power supply to be tested.
此外需要说明的是,第二开关切换电路22的第一端和第二端分别与待测电源的电压输入引脚和待测电源的主板供电引脚连接,也就是说,第二开关切换电路22在默认状态下,待测电源接收的是主板的供电。在绝大部分测试项目中,待测电源都是需要接收主板的供电。In addition, it should be noted that the first end and the second end of the second switch switching circuit 22 are respectively connected to the voltage input pin of the power supply to be tested and the mainboard power supply pin of the power supply to be tested, that is, in the default state of the second switch switching circuit 22, the power supply to be tested receives the power supply from the mainboard. In most test items, the power supply to be tested needs to receive the power supply from the mainboard.
在本发明的一种具体实施方式中,控制器30还可以用于:按照自动化电源测试流程进行待测电源的过流保护测试和短路保护测试;In a specific embodiment of the present invention, the controller 30 may also be used to: perform an overcurrent protection test and a short circuit protection test of the power supply to be tested according to an automated power supply test process;
在进行过流保护测试时,通过控制电子负载Z1使得待测电源触发过流保护,接收第一示波器CH1检测到的待测电源的输入电压信号Vin和第三示波器CH3检测到的待测电源的输出电压信号Vout,控制第一开关切换电路21为默认状态以接收到第二示波器CH2检测到的待测电源的PG信号,以得到过流保护测试结果;When performing an overcurrent protection test, the electronic load Z1 is controlled to trigger the overcurrent protection of the power supply to be tested, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope CH1 and the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 are received, and the first switch switching circuit 21 is controlled to be in a default state to receive the PG signal of the power supply to be tested detected by the second oscilloscope CH2, so as to obtain the overcurrent protection test result;
在进行短路保护测试时,控制电子负载Z1短路,接收第一示波器CH1检测到的待测电源的输入电压信号Vin和第三示波器CH3检测到的待测电源的输出电压信号Vout,控制第一开关切换电路21为默认状态以接收到第二示波器CH2检测到的待测电源的PG信号;控制第三开关切换电路23和第四开关切换电路24均为非默认状态,以确定出流经第一电阻R1的电流值,并确定出短路保护测试结果。When performing a short-circuit protection test, the electronic load Z1 is controlled to be short-circuited, the input voltage signal Vin of the power supply to be tested detected by the first oscilloscope CH1 and the output voltage signal Vout of the power supply to be tested detected by the third oscilloscope CH3 are received, and the first switch switching circuit 21 is controlled to be in a default state to receive the PG signal of the power supply to be tested detected by the second oscilloscope CH2; the third switch switching circuit 23 and the fourth switch switching circuit 24 are both controlled to be in a non-default state to determine the current value flowing through the first resistor R1, and determine the short-circuit protection test result.
该种实施方式中,控制器30还可以按照自动化电源测试流程进行待测电源的过流保护测试,即OCP(Over Current Protection,过流保护)测试,以及短路保护测试,即SCP(Short Circuit Protection,短路保护)测试。In this implementation, the controller 30 can also perform an overcurrent protection test, namely an OCP (Over Current Protection) test, and a short circuit protection test, namely an SCP (Short Circuit Protection) test, of the power supply to be tested according to the automated power supply test process.
电子负载Z1具有过流以及短路功能,控制器30可以进行控制,进而可以进行得到过流保护测试结果以及短路保护测试结果。The electronic load Z1 has overcurrent and short-circuit functions, and the controller 30 can control it, thereby obtaining overcurrent protection test results and short-circuit protection test results.
在前文的实施方式中,对待测电源的各个不同的测试项进行了解释说明,在具体实施时,可以根据需要选择具体需要的测试项以及测试顺序。In the above implementations, various test items of the power supply to be tested are explained. In specific implementations, specific test items and test sequences can be selected as needed.
在本发明的一种具体实施方式中,还可以包括:In a specific embodiment of the present invention, it may also include:
通过测试装置20与待测电源的第一频率分析引脚和第二频率分析引脚连接的频率响应分析仪;A frequency response analyzer connected to the first frequency analysis pin and the second frequency analysis pin of the power supply to be tested through the test device 20;
控制器30还用于:按照自动化电源测试流程进行待测电源的频率响应测试;The controller 30 is also used to: perform a frequency response test of the power supply to be tested according to an automated power supply test process;
在进行频率响应测试时,接收频率响应分析仪的输出信号并得到频率响应测试结果。When performing a frequency response test, the output signal of the frequency response analyzer is received and a frequency response test result is obtained.
该种实施方式中,利用频率响应分析仪测量波特图,从而可以实现频率响应测试。In this implementation, a frequency response analyzer is used to measure the Bode plot, thereby realizing a frequency response test.
此外,在本申请的图3的是实施方式中,测试装置20中只需要设置4个开关切换电路,结构简单,成本较低,便于实施。In addition, in the implementation of FIG. 3 of the present application, only four switch switching circuits need to be provided in the test device 20, which has a simple structure, low cost, and is easy to implement.
在实际应用中,待测电源的各个测试引脚可以均集成在预设的连接器上,从而方便与测试装置20进行连接。在实际应用中,待测电源的各个测试引脚可以均集成在预设的连接器的母头中,测试装置20可以为测试卡,通过连接器公头与连接器母头连接。In practical applications, each test pin of the power supply to be tested can be integrated on a preset connector, so as to facilitate connection with the test device 20. In practical applications, each test pin of the power supply to be tested can be integrated in the female head of the preset connector, and the test device 20 can be a test card, which is connected to the female head of the connector through the male head of the connector.
控制器30可以选取为上位机中的控制器30,例如使用用户的笔记本电脑实现本申请的控制器30的功能,通过GPIB接口与测试装置20连接,工作人员在电脑上操作便可以实现待测电源的自动测试。The controller 30 can be selected as the controller 30 in the host computer, for example, the user's laptop computer can be used to implement the functions of the controller 30 of the present application, which is connected to the test device 20 through a GPIB interface. The staff can operate on the computer to realize automatic testing of the power supply to be tested.
应用本发明实施例所提供的技术方案,专门设置了用于与各个检测设备10以及待测电源的各个测试引脚连接的测试装置20,使得本申请的方案在进行测试项目的切换时,不需要将测试装置20与待测电源的各个测试引脚重新连接,也不需要将测试装置20与各个检测设备10重新连接,只需要通过控制器30便可以实现连接方式的调整。具体的,控制器30与测试装置20以及各个检测设备10均连接,可以按照预设的自动化电源测试流程控制测试装置20的状态切换,从而自动调整各个检测设备10所连接的待测电源的测试引脚。并且,控制器30通过在执行自动化电源测试流程时接收的各个检测设备10发送的检测数据,可以得到待测电源的测试结果,也就是说,利用控制器30以及测试装置20,可以无需进行连线的切换,并且自动完成了待测电源的测试,得到待测电源的测试结果,有效地提高了电源测试效率。By applying the technical solution provided by the embodiment of the present invention, a test device 20 is specially provided for connecting with each test pin of each detection device 10 and the power supply to be tested, so that when the solution of the present application switches the test items, it is not necessary to reconnect the test device 20 with each test pin of the power supply to be tested, nor is it necessary to reconnect the test device 20 with each detection device 10, and the connection mode can be adjusted only through the controller 30. Specifically, the controller 30 is connected with the test device 20 and each detection device 10, and the state switching of the test device 20 can be controlled according to the preset automatic power supply test process, so as to automatically adjust the test pin of the power supply to be tested connected to each detection device 10. In addition, the controller 30 can obtain the test result of the power supply to be tested by receiving the detection data sent by each detection device 10 when executing the automatic power supply test process, that is, by using the controller 30 and the test device 20, there is no need to switch the connection, and the test of the power supply to be tested is automatically completed, and the test result of the power supply to be tested is obtained, which effectively improves the power supply test efficiency.
还需要说明的是,在本文中,诸如第一和第二等之类的关系术语仅仅用来将一个实体或者操作与另一个实体或操作区分开来,而不一定要求或者暗示这些实体或操作之间存在任何这种实际的关系或者顺序。而且,术语“包括”、“包含”或者其任何其他变体意在涵盖非排他性的包含,从而使得包括一系列要素的过程、方法、物品或者设备不仅包括那些要素,而且还包括没有明确列出的其他要素,或者是还包括为这种过程、方法、物品或者设备所固有的要素。在没有更多限制的情况下,由语句“包括一个……”限定的要素,并不排除在包括所述要素的过程、方法、物品或者设备中还存在另外的相同要素。It should also be noted that, in this article, relational terms such as first and second, etc. are only used to distinguish one entity or operation from another entity or operation, and do not necessarily require or imply any such actual relationship or order between these entities or operations. Moreover, the terms "include", "comprise" or any other variants thereof are intended to cover non-exclusive inclusion, so that a process, method, article or device including a series of elements includes not only those elements, but also other elements not explicitly listed, or also includes elements inherent to such process, method, article or device. In the absence of further restrictions, the elements defined by the statement "comprise a ..." do not exclude the presence of other identical elements in the process, method, article or device including the elements.
专业人员还可以进一步意识到,结合本文中所公开的实施例描述的各示例的单元及算法步骤,能够以电子硬件、计算机软件或者二者的结合来实现,为了清楚地说明硬件和软件的可互换性,在上述说明中已经按照功能一般性地描述了各示例的组成及步骤。这些功能究竟以硬件还是软件方式来执行,取决于技术方案的特定应用和设计约束条件。专业技术人员可以对每个特定的应用来使用不同方法来实现所描述的功能,但是这种实现不应认为超出本发明的范围。Professionals may further appreciate that the units and algorithm steps of each example described in conjunction with the embodiments disclosed herein can be implemented in electronic hardware, computer software, or a combination of the two. In order to clearly illustrate the interchangeability of hardware and software, the composition and steps of each example have been generally described in the above description according to function. Whether these functions are performed in hardware or software depends on the specific application and design constraints of the technical solution. Professionals and technicians may use different methods to implement the described functions for each specific application, but such implementation should not be considered to be beyond the scope of the present invention.
本文中应用了具体个例对本发明的原理及实施方式进行了阐述,以上实施例的说明只是用于帮助理解本发明的技术方案及其核心思想。应当指出,对于本技术领域的普通技术人员来说,在不脱离本发明原理的前提下,还可以对本发明进行若干改进和修饰,这些改进和修饰也落入本发明权利要求的保护范围内。The principles and implementation methods of the present invention are described in this article using specific examples. The description of the above embodiments is only used to help understand the technical solution and core ideas of the present invention. It should be pointed out that for ordinary technicians in this technical field, without departing from the principles of the present invention, the present invention can also be improved and modified, and these improvements and modifications also fall within the scope of protection of the claims of the present invention.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110876893.6A CN113702859B (en) | 2021-07-31 | 2021-07-31 | Power supply testing device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202110876893.6A CN113702859B (en) | 2021-07-31 | 2021-07-31 | Power supply testing device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN113702859A CN113702859A (en) | 2021-11-26 |
CN113702859B true CN113702859B (en) | 2024-05-24 |
Family
ID=78651163
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202110876893.6A Active CN113702859B (en) | 2021-07-31 | 2021-07-31 | Power supply testing device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN113702859B (en) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201698013U (en) * | 2010-02-01 | 2011-01-05 | 鸿富锦精密工业(深圳)有限公司 | DC Power Test Set |
CN102998630A (en) * | 2012-12-07 | 2013-03-27 | 江苏嘉钰新能源技术有限公司 | Automatic testing device and method of power module |
CN203178453U (en) * | 2013-04-17 | 2013-09-04 | 北京星原丰泰电子技术股份有限公司 | Automatic test system for switch power supply module |
CN103792498A (en) * | 2014-02-14 | 2014-05-14 | 浪潮电子信息产业股份有限公司 | Automatic power supply testing method |
CN105242218A (en) * | 2015-09-24 | 2016-01-13 | 浪潮电子信息产业股份有限公司 | A DC power supply full coverage automatic test system |
CN105676147A (en) * | 2016-01-26 | 2016-06-15 | 合肥华耀电子工业有限公司 | Radar power supply automatic test method |
CN205920205U (en) * | 2016-07-07 | 2017-02-01 | 中国电子科技集团公司第五十研究所 | Communication product power consumption source plate tester |
CN106680736A (en) * | 2017-02-28 | 2017-05-17 | 郑州云海信息技术有限公司 | System of automatically testing Jitter in switching mode power supply |
CN107202965A (en) * | 2017-07-26 | 2017-09-26 | 深圳市共进电子股份有限公司 | A kind of method and apparatus for testing power supply signal integrality |
CN109116266A (en) * | 2018-09-05 | 2019-01-01 | 郑州云海信息技术有限公司 | The test method of power module |
CN111487554A (en) * | 2020-03-17 | 2020-08-04 | 北京交通大学 | Automatic testing system and method for direct current-to-direct current power supply module |
CN111983499A (en) * | 2020-08-09 | 2020-11-24 | 苏州浪潮智能科技有限公司 | Testing method and system of switching power supply |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8589110B2 (en) * | 2009-03-03 | 2013-11-19 | Synergistic Technologies Solutions, Inc. | System and method for programmable automatic testing of power supplied |
-
2021
- 2021-07-31 CN CN202110876893.6A patent/CN113702859B/en active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN201698013U (en) * | 2010-02-01 | 2011-01-05 | 鸿富锦精密工业(深圳)有限公司 | DC Power Test Set |
CN102998630A (en) * | 2012-12-07 | 2013-03-27 | 江苏嘉钰新能源技术有限公司 | Automatic testing device and method of power module |
CN203178453U (en) * | 2013-04-17 | 2013-09-04 | 北京星原丰泰电子技术股份有限公司 | Automatic test system for switch power supply module |
CN103792498A (en) * | 2014-02-14 | 2014-05-14 | 浪潮电子信息产业股份有限公司 | Automatic power supply testing method |
CN105242218A (en) * | 2015-09-24 | 2016-01-13 | 浪潮电子信息产业股份有限公司 | A DC power supply full coverage automatic test system |
CN105676147A (en) * | 2016-01-26 | 2016-06-15 | 合肥华耀电子工业有限公司 | Radar power supply automatic test method |
CN205920205U (en) * | 2016-07-07 | 2017-02-01 | 中国电子科技集团公司第五十研究所 | Communication product power consumption source plate tester |
CN106680736A (en) * | 2017-02-28 | 2017-05-17 | 郑州云海信息技术有限公司 | System of automatically testing Jitter in switching mode power supply |
CN107202965A (en) * | 2017-07-26 | 2017-09-26 | 深圳市共进电子股份有限公司 | A kind of method and apparatus for testing power supply signal integrality |
CN109116266A (en) * | 2018-09-05 | 2019-01-01 | 郑州云海信息技术有限公司 | The test method of power module |
CN111487554A (en) * | 2020-03-17 | 2020-08-04 | 北京交通大学 | Automatic testing system and method for direct current-to-direct current power supply module |
CN111983499A (en) * | 2020-08-09 | 2020-11-24 | 苏州浪潮智能科技有限公司 | Testing method and system of switching power supply |
Non-Patent Citations (1)
Title |
---|
基于GPIB接口的通信电源模块自动测试系统;周哓晶 等;通信电源技术;第23卷(第5期);第58-61页 * |
Also Published As
Publication number | Publication date |
---|---|
CN113702859A (en) | 2021-11-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11360139B2 (en) | Method for testing a power module | |
CN113495208B (en) | Device, system and method for testing power supply circuit of packaged circuit board | |
JP3262819B2 (en) | Impedance measuring device having contact determination circuit and contact determination method thereof | |
CN102466751B (en) | A kind of current measuring device | |
JP6272379B2 (en) | Cable inspection device and cable inspection system | |
CN115308564A (en) | A test circuit and test device | |
CN201392362Y (en) | A current measuring device | |
CN113702859B (en) | Power supply testing device | |
CN215678646U (en) | Test system of PWM circuit | |
CN212391534U (en) | Current detection circuit | |
CN219871718U (en) | Power supply test system | |
CN111123073B (en) | Quick self-checking device of hardware board card | |
CN109738791B (en) | Device and method for testing short-circuit protection before power-on of VR chip | |
CN216526812U (en) | Integrated circuit function and parameter detection circuit board | |
CN117310450A (en) | Power management chip test system | |
CN116973619A (en) | Test method, system and device for simulating surge current of efuse chip | |
JP4259692B2 (en) | Circuit board inspection equipment | |
CN209895333U (en) | Server hard disk backplane power test device | |
CN212364537U (en) | Test system for testing power supply IC efficiency | |
CN116545393A (en) | Precise output amplifying circuit, load detection circuit and device using circuit | |
CN109298986B (en) | Undershoot testing method and device for server board | |
US6617841B2 (en) | Method and apparatus for characterization of electronic circuitry | |
CN114791559A (en) | Method and system for testing power management chip and related components | |
CN211375012U (en) | A test equipment and server for input current | |
CN211718485U (en) | Auxiliary circuit and test system convenient for overvoltage protection and undervoltage turn-off test |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP03 | Change of name, title or address |
Address after: Building 9, No.1, guanpu Road, Guoxiang street, Wuzhong Economic Development Zone, Wuzhong District, Suzhou City, Jiangsu Province Patentee after: Suzhou Yuannao Intelligent Technology Co.,Ltd. Country or region after: China Address before: Building 9, No.1, guanpu Road, Guoxiang street, Wuzhong Economic Development Zone, Wuzhong District, Suzhou City, Jiangsu Province Patentee before: SUZHOU LANGCHAO INTELLIGENT TECHNOLOGY Co.,Ltd. Country or region before: China |