CN113569936B - 绿电系统的供电控制方法、装置及计算机存储介质 - Google Patents
绿电系统的供电控制方法、装置及计算机存储介质 Download PDFInfo
- Publication number
- CN113569936B CN113569936B CN202110822276.8A CN202110822276A CN113569936B CN 113569936 B CN113569936 B CN 113569936B CN 202110822276 A CN202110822276 A CN 202110822276A CN 113569936 B CN113569936 B CN 113569936B
- Authority
- CN
- China
- Prior art keywords
- power
- green
- park
- electric
- expected
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F18/00—Pattern recognition
- G06F18/20—Analysing
- G06F18/21—Design or setup of recognition systems or techniques; Extraction of features in feature space; Blind source separation
- G06F18/214—Generating training patterns; Bootstrap methods, e.g. bagging or boosting
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F17/00—Digital computing or data processing equipment or methods, specially adapted for specific functions
- G06F17/10—Complex mathematical operations
- G06F17/16—Matrix or vector computation, e.g. matrix-matrix or matrix-vector multiplication, matrix factorization
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N20/00—Machine learning
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/04—Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/003—Load forecast, e.g. methods or systems for forecasting future load demand
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/004—Generation forecast, e.g. methods or systems for forecasting future energy generation
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/28—Arrangements for balancing of the load in a network by storage of energy
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for AC mains or AC distribution networks
- H02J3/38—Arrangements for parallely feeding a single network by two or more generators, converters or transformers
- H02J3/381—Dispersed generators
-
- H02J2101/24—
-
- H02J2103/30—
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
- Y02E10/56—Power conversion systems, e.g. maximum power point trackers
Landscapes
- Engineering & Computer Science (AREA)
- Theoretical Computer Science (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Data Mining & Analysis (AREA)
- Economics (AREA)
- Mathematical Physics (AREA)
- Power Engineering (AREA)
- Strategic Management (AREA)
- Human Resources & Organizations (AREA)
- Software Systems (AREA)
- General Engineering & Computer Science (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Computing Systems (AREA)
- Mathematical Analysis (AREA)
- Mathematical Optimization (AREA)
- Computational Mathematics (AREA)
- Pure & Applied Mathematics (AREA)
- Marketing (AREA)
- Evolutionary Computation (AREA)
- Tourism & Hospitality (AREA)
- General Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Artificial Intelligence (AREA)
- Databases & Information Systems (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Public Health (AREA)
- Algebra (AREA)
- Primary Health Care (AREA)
- Evolutionary Biology (AREA)
- Bioinformatics & Computational Biology (AREA)
- Bioinformatics & Cheminformatics (AREA)
- Medical Informatics (AREA)
- Development Economics (AREA)
- Game Theory and Decision Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
Abstract
Description
Claims (7)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110822276.8A CN113569936B (zh) | 2021-07-20 | 2021-07-20 | 绿电系统的供电控制方法、装置及计算机存储介质 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202110822276.8A CN113569936B (zh) | 2021-07-20 | 2021-07-20 | 绿电系统的供电控制方法、装置及计算机存储介质 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN113569936A CN113569936A (zh) | 2021-10-29 |
| CN113569936B true CN113569936B (zh) | 2024-05-03 |
Family
ID=78165897
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202110822276.8A Active CN113569936B (zh) | 2021-07-20 | 2021-07-20 | 绿电系统的供电控制方法、装置及计算机存储介质 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN113569936B (zh) |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| TWI795296B (zh) * | 2022-05-23 | 2023-03-01 | 潔能氏新能源股份有限公司 | 綠能匹配系統及其方法 |
| CN119204291B (zh) * | 2024-08-23 | 2025-08-15 | 河南省恒安智控技术有限公司 | 一种面向生产企业的碳排放量预测方法及系统 |
Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103647291A (zh) * | 2013-12-24 | 2014-03-19 | 国家电网公司 | 配电网无功补偿的控制方法及装置 |
| CN104269849A (zh) * | 2014-10-17 | 2015-01-07 | 国家电网公司 | 基于建筑光伏微电网的能量管理方法及系统 |
| CN104463701A (zh) * | 2014-12-07 | 2015-03-25 | 国网浙江省电力公司电动汽车服务分公司 | 一种配电系统与电动汽车充电网络的协调规划方法 |
| CN104700158A (zh) * | 2015-02-12 | 2015-06-10 | 国家电网公司 | 一种配电园区的能源管理方法与系统 |
| CN104809327A (zh) * | 2014-09-02 | 2015-07-29 | 长沙理工大学 | 含新能源电力调度矩不确定分布鲁棒优化方法 |
| CN107872067A (zh) * | 2016-09-26 | 2018-04-03 | 财团法人资讯工业策进会 | 充放电控制装置及方法 |
| CN107979093A (zh) * | 2018-01-11 | 2018-05-01 | 重庆市东泰电器实业有限公司 | 电力控制系统及方法 |
| CN108564223A (zh) * | 2018-04-23 | 2018-09-21 | 中国农业大学 | 光伏发电功率预测方法的组合评估方法及装置 |
| CN110942217A (zh) * | 2018-09-21 | 2020-03-31 | 潜能恒信能源技术股份有限公司 | 一种构建零碳绿色能源体系的方法和系统 |
| CN111144654A (zh) * | 2019-12-27 | 2020-05-12 | 深圳供电局有限公司 | 一种基于物联网的园区能源管理配置方法及装置 |
| CN112381410A (zh) * | 2020-11-16 | 2021-02-19 | 国网山东省电力公司莒县供电公司 | 一种基于物联网区块链的电源管理方法及系统 |
-
2021
- 2021-07-20 CN CN202110822276.8A patent/CN113569936B/zh active Active
Patent Citations (11)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN103647291A (zh) * | 2013-12-24 | 2014-03-19 | 国家电网公司 | 配电网无功补偿的控制方法及装置 |
| CN104809327A (zh) * | 2014-09-02 | 2015-07-29 | 长沙理工大学 | 含新能源电力调度矩不确定分布鲁棒优化方法 |
| CN104269849A (zh) * | 2014-10-17 | 2015-01-07 | 国家电网公司 | 基于建筑光伏微电网的能量管理方法及系统 |
| CN104463701A (zh) * | 2014-12-07 | 2015-03-25 | 国网浙江省电力公司电动汽车服务分公司 | 一种配电系统与电动汽车充电网络的协调规划方法 |
| CN104700158A (zh) * | 2015-02-12 | 2015-06-10 | 国家电网公司 | 一种配电园区的能源管理方法与系统 |
| CN107872067A (zh) * | 2016-09-26 | 2018-04-03 | 财团法人资讯工业策进会 | 充放电控制装置及方法 |
| CN107979093A (zh) * | 2018-01-11 | 2018-05-01 | 重庆市东泰电器实业有限公司 | 电力控制系统及方法 |
| CN108564223A (zh) * | 2018-04-23 | 2018-09-21 | 中国农业大学 | 光伏发电功率预测方法的组合评估方法及装置 |
| CN110942217A (zh) * | 2018-09-21 | 2020-03-31 | 潜能恒信能源技术股份有限公司 | 一种构建零碳绿色能源体系的方法和系统 |
| CN111144654A (zh) * | 2019-12-27 | 2020-05-12 | 深圳供电局有限公司 | 一种基于物联网的园区能源管理配置方法及装置 |
| CN112381410A (zh) * | 2020-11-16 | 2021-02-19 | 国网山东省电力公司莒县供电公司 | 一种基于物联网区块链的电源管理方法及系统 |
Also Published As
| Publication number | Publication date |
|---|---|
| CN113569936A (zh) | 2021-10-29 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN113569936B (zh) | 绿电系统的供电控制方法、装置及计算机存储介质 | |
| CN113159540A (zh) | 一种考虑负荷价值的需求侧资源梯级调用方法及装置 | |
| EP4009264A1 (en) | Power prediction device and power prediction method | |
| CN120165393B (zh) | 一种智慧社区新能源网格化管理与分析系统 | |
| CN119090315A (zh) | 一种基于虚拟电厂的多目标动态切换优化调度方法及系统 | |
| Zhao et al. | Optimal planning of distributed generation and energy storage systems in DC distribution networks with application of category-based multi-objective algorithm | |
| CN119298124A (zh) | 基于mpc和多电解槽控制的风氢微电网系统寿命优化方法 | |
| JP2018133035A (ja) | 設備設計支援方法、設備設計支援装置、およびプログラム | |
| CN119362525B (zh) | 微电网多源能量交互中的能量缓存方法及系统 | |
| CN119518991B (zh) | 一种电网调度需求响应系统及方法 | |
| CN119671319B (zh) | 可调节负荷的需求响应能力评估方法、装置和计算机设备 | |
| CN112348235B (zh) | 风光母线负荷自适应预测方法、装置、计算机设备 | |
| CN114243681A (zh) | 电力系统的用电调控方法、装置、设备和存储介质 | |
| CN112311078A (zh) | 一种基于信息融合的太阳能负载调节方法和装置 | |
| CN118659370A (zh) | 一种基于动态仿真的能源系统运行策略优化方法及系统 | |
| CN118801385A (zh) | 一种考虑时序相关性的需求侧资源可调节功率域聚合方法 | |
| CN118137542A (zh) | 光伏储能调度方法、装置、计算机设备和存储介质 | |
| CN117977604A (zh) | 配电网分层协调控制方法、系统、设备及存储介质 | |
| Soofi et al. | Training A Deep Reinforcement Learning Agent for Microgrid Control using PSCAD Environment | |
| CN116526456A (zh) | 基于b/s架构的电能路由器智能化集中控制方法及系统 | |
| CN115130842A (zh) | 风光火一体化基地配置方法及装置 | |
| CN118627740B (zh) | 面向用能设备的低碳优化运行与减碳评估方法 | |
| CN120542880B (zh) | 考虑备用裕度的电厂弹性聚合方法、装置、设备及介质 | |
| CN120235310B (zh) | 一种能源电力规划与智能优化的大模型应用系统 | |
| CN119130034A (zh) | 一种智能供电所工单调度方法、系统及存储介质、电子终端 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| TA01 | Transfer of patent application right |
Effective date of registration: 20221219 Address after: 214-49, Block B, Phase III (South Area) of Huguang Road Independent Innovation Industrial Base, Shushan New Industrial Park, Shushan District, Hefei, Anhui Province, 230031 Applicant after: Hefei Zero Carbon Technology Co.,Ltd. Address before: 230088 No. 1699 Xiyou Road, Hefei High-tech Zone, Anhui Province Applicant before: SUNGROW POWER SUPPLY Co.,Ltd. |
|
| TA01 | Transfer of patent application right | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CP03 | Change of name, title or address |
Address after: Room 214-49, Block B, Phase III (South District), Huguang Road Independent Innovation Industrial Base, Shushan New Industrial Park, Shushan District, Hefei City, Anhui Province, 230088 Patentee after: Hefei Sunshine Zero Carbon Technology Co.,Ltd. Country or region after: China Address before: 214-49, Block B, Phase III (South Area) of Huguang Road Independent Innovation Industrial Base, Shushan New Industrial Park, Shushan District, Hefei, Anhui Province, 230031 Patentee before: Hefei Zero Carbon Technology Co.,Ltd. Country or region before: China |
|
| CP03 | Change of name, title or address |