[go: up one dir, main page]

CN113526819B - Commercial concrete integral septic tank device and using method thereof - Google Patents

Commercial concrete integral septic tank device and using method thereof Download PDF

Info

Publication number
CN113526819B
CN113526819B CN202110921311.1A CN202110921311A CN113526819B CN 113526819 B CN113526819 B CN 113526819B CN 202110921311 A CN202110921311 A CN 202110921311A CN 113526819 B CN113526819 B CN 113526819B
Authority
CN
China
Prior art keywords
septic tank
main body
die
inner mold
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202110921311.1A
Other languages
Chinese (zh)
Other versions
CN113526819A (en
Inventor
曹勇
曹阳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yang Dongdong
Original Assignee
Huaibei Haiju Environmental Protection Equipment Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Huaibei Haiju Environmental Protection Equipment Co ltd filed Critical Huaibei Haiju Environmental Protection Equipment Co ltd
Priority to CN202110921311.1A priority Critical patent/CN113526819B/en
Publication of CN113526819A publication Critical patent/CN113526819A/en
Application granted granted Critical
Publication of CN113526819B publication Critical patent/CN113526819B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • CCHEMISTRY; METALLURGY
    • C02TREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02FTREATMENT OF WATER, WASTE WATER, SEWAGE, OR SLUDGE
    • C02F11/00Treatment of sludge; Devices therefor
    • C02F11/02Biological treatment
    • C02F11/04Anaerobic treatment; Production of methane by such processes

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Chemical & Material Sciences (AREA)
  • Oil, Petroleum & Natural Gas (AREA)
  • Health & Medical Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Molecular Biology (AREA)
  • Hydrology & Water Resources (AREA)
  • Environmental & Geological Engineering (AREA)
  • Water Supply & Treatment (AREA)
  • Organic Chemistry (AREA)
  • Treatment Of Biological Wastes In General (AREA)

Abstract

The invention discloses a commercial concrete integral septic tank device and a using method thereof, wherein a septic tank upper die and a septic tank lower die are provided with a plurality of inner die bags, the inner die bags are provided with inlet and outlet ports, the septic tank lower die is provided with a plurality of mounting holes, supporting structures are arranged in the mounting holes, each supporting structure comprises a main body and a support arm, the main body comprises an upper main body and a lower main body, and the upper main body and the lower main body are in threaded connection; the top surface of the upper main body is rotatably connected with two support arms, the upper main body and the lower main body are both provided with sparse through holes, and the inner mold bag is supported by arranging a support structure, so that the problem that the inner mold bag cannot be poured when being directly placed is solved; the two support arms are rotatably connected to the top surface of the main body, so that when the inner mold bag support is used, the two support arms are spread, the inner mold bag is placed on the two support arms, and the inner mold bag is supported.

Description

一种商砼整体式化粪池装置及其使用方法A commercial concrete integrated septic tank device and its application method

技术领域technical field

本发明属于化粪池技术领域,具体是一种商砼整体式化粪池装置及其使用方法。The invention belongs to the technical field of septic tanks, in particular to a commercial concrete integrated septic tank device and a method for using the same.

背景技术Background technique

化粪池是处理粪便并加以过滤沉淀的设备,固化物进入化粪池后在池底分解,上层的水化物经过管道流走,能够有效防止管道堵塞,给固化物体充足的时间分解。目前常见的化粪池主要包括混凝土化粪池和玻璃钢化粪池,玻璃钢化粪池主要优点在于体积小,一体化成型密封性好,但是其机械强度较低,安装繁琐,混凝土化粪池的优点在于体积大、机械强度高、安装方便,但是化粪池存在内部的腔室,因此通过混凝土浇筑成型的方式制作一体成型的化粪池,会存在难以取出内模的问题,因此需要生产多个半模通过后期的粘接或安装形成一个整体,这样一来,密封性能就大幅度下降,同时制备步骤繁琐,多个半模组装的方式使其机械强度也有所下降。The septic tank is a device for treating feces and filtering and sedimenting. The solidified matter enters the septic tank and decomposes at the bottom of the pool. The hydrated matter in the upper layer flows away through the pipeline, which can effectively prevent the pipeline from being blocked and give the solidified object enough time to decompose. At present, common septic tanks mainly include concrete septic tanks and glass fiber reinforced plastic septic tanks. The main advantages of glass fiber reinforced plastic septic tanks are small size and good sealing performance when integrated, but their mechanical strength is low and installation is cumbersome. The advantages are large volume, high mechanical strength, and easy installation. However, there are internal chambers in the septic tank. Therefore, it is difficult to remove the inner mold when making an integrally formed septic tank by concrete pouring, so it needs to be produced. The two half-molds form a whole through bonding or installation in the later stage. In this way, the sealing performance is greatly reduced, and the preparation steps are cumbersome, and the mechanical strength is also reduced by the way of assembling multiple half-molds.

发明内容Contents of the invention

为了解决上述方案存在的问题,本发明提供了一种商砼整体式化粪池装置及其使用方法。In order to solve the problems in the above solution, the present invention provides a commercial concrete integrated septic tank device and its usage method.

本发明的目的可以通过以下技术方案实现:The purpose of the present invention can be achieved through the following technical solutions:

一种商砼整体式化粪池装置,包括:化粪池上模和化粪池下模,所述化粪池上模和化粪池下模之间设有若干个内模袋,所述内模袋上设有进出口,所述化粪池下模上设有若干个安装孔,所述安装孔内设有支撑结构,所述支撑结构包括主体和支臂,所述主体包括上部主体和下部主体,所述上部主体和下部主体之间螺纹连接;所述上部主体顶面转动连接有两个支臂,所述上部主体和下部主体内均设有疏通孔,所述疏通孔的一端设有止回阀。A commercial concrete integrated septic tank device, comprising: a septic tank upper mold and a septic tank lower mold, several inner mold bags are arranged between the septic tank upper mold and the septic tank lower mold, and the inner mold bags are There are inlets and outlets, and several installation holes are provided on the lower mold of the septic tank, and a support structure is provided in the installation holes, the support structure includes a main body and an arm, and the main body includes an upper main body and a lower main body. The upper body and the lower body are threadedly connected; the top surface of the upper body is rotatably connected with two arms, and both the upper body and the lower body are provided with a dredging hole, and one end of the dredged hole is provided with a check valve .

进一步地,所述化粪池上模和化粪池下模相配合,所述化粪池上模顶部设有灌注槽。Further, the upper mold of the septic tank is matched with the lower mold of the septic tank, and the top of the upper mold of the septic tank is provided with a pouring groove.

进一步地,所述化粪池上模和化粪池下模均为半圆柱形。Further, the upper mold of the septic tank and the lower mold of the septic tank are both semi-cylindrical.

进一步地,所述化粪池上模侧面固定连接有第一密封圈,所述化粪池下模侧面固定连接有第二密封圈,所述第一密封圈上设有若干个第一螺栓孔,所述第二密封圈上设有若干个第二螺栓孔,所述第一螺栓孔与第二螺栓孔相对应。Further, the side of the septic tank upper mold is fixedly connected with a first sealing ring, the side of the septic tank lower mold is fixedly connected with a second sealing ring, and the first sealing ring is provided with several first bolt holes, so The second sealing ring is provided with several second bolt holes, and the first bolt holes correspond to the second bolt holes.

进一步地,所述进出口与灌注槽相对应。Further, the inlet and outlet correspond to the perfusion tank.

进一步地,所述化粪池下模外壁上固定连接有若干组固定块,且每组固定块有两个,每组两个固定块位于安装孔两侧,所述固定块上设有第一限位孔。Further, several groups of fixing blocks are fixedly connected to the outer wall of the lower mold of the septic tank, and each group of fixing blocks has two, and each group of two fixing blocks is located on both sides of the installation hole, and the fixing blocks are provided with a first limit Bit hole.

进一步地,所述下部主体上设有第二限位孔,所述第二限位孔与第一限位孔相对应。Further, the lower body is provided with a second limiting hole corresponding to the first limiting hole.

进一步地,两个支臂之间的夹角为α,且夹角α的最大取值范围为[100°,160°]。Further, the angle between the two support arms is α, and the maximum value range of the angle α is [100°, 160°].

进一步地,止回阀位于靠近支臂的一端。Further, the check valve is located near one end of the support arm.

一种商砼整体式化粪池装置的使用方法,具体方法包括:A method for using a commercial concrete integrated septic tank device, the specific method comprising:

将支撑结构通过安装孔和第一限位孔安装到化粪池下模上,转动上部主体,调整支撑结构长度和钢筋保护层厚度;Install the support structure on the lower mold of the septic tank through the installation hole and the first limit hole, rotate the upper body, and adjust the length of the support structure and the thickness of the steel protection layer;

将钢筋笼安装在化粪池下模上,调整钢筋笼外壁保护层厚度,将支撑结构穿过钢筋笼;Install the reinforcement cage on the lower mold of the septic tank, adjust the thickness of the protective layer on the outer wall of the reinforcement cage, and pass the supporting structure through the reinforcement cage;

摊开支撑结构的两个支臂,将内模袋放置到支臂上,对内模袋进行填充,并在填充过程中调整内模袋的位置,确保内模袋是位于支臂上;Spread the two arms of the support structure, place the inner mold bag on the arm, fill the inner mold bag, and adjust the position of the inner mold bag during the filling process to ensure that the inner mold bag is located on the arm;

完成内模袋填充后,向化粪池下模内浇筑混凝土,进行振捣;After filling the inner mold bag, pour concrete into the lower mold of the septic tank and vibrate it;

将化粪池上模与化粪池下模对齐固定,从灌注槽再次进行浇筑,进行振捣;Align and fix the upper mold of the septic tank with the lower mold of the septic tank, pour again from the pouring tank, and vibrate;

达到拆模条件后,取出内模袋内的填充物,将内模袋从成型的化粪池出口处取出,使用铁棒插入疏通孔,顶开止回阀,将两个支臂之间的混凝土剔除,取出支撑结构;After reaching the mold removal conditions, take out the filler in the inner mold bag, take out the inner mold bag from the outlet of the formed septic tank, use an iron rod to insert the dredging hole, open the check valve, and close the gap between the two arms. Concrete removal, removal of supporting structures;

拆开化粪池上模与化粪池下模,获得化粪池,再将化粪池上的孔使用混凝土进行封堵。The septic tank upper mold and the septic tank lower mold are disassembled to obtain the septic tank, and then the holes on the septic tank are blocked with concrete.

与现有技术相比,本发明的有益效果是:通过设置内模袋,克服了内模体积大,占用面积多,难以移动搬运的缺陷,且在浇筑前期对模具进行拼接的时候方法更简单,通过充气或者填充其他填充物即可将内模安装在钢筋框架内,制作方法更简单,同时脱模过程也更容易,取出填充物,内模袋收缩,将内模袋从灌注槽处取出来,完成一体化浇筑,成型度高,无需后期进行拼接,结构更牢固,同时本发明的材料都可以循环使用,节约材料成本;通过设置支撑结构对内模袋进行支撑,解决直接放置内模袋不能进行浇筑的问题;通过在主体顶面转动连接两个支臂,使得在使用时,将两个支臂摊开,将内模袋放到两个支臂上,完成对内模袋的支撑,当完成浇筑,需要取出支撑结构时,因为在此之前内模袋已经被取出了,因此向外拖动支撑结构,两个支臂将会合拢,最终将支撑结构拿出来,完成一体化浇筑,避免使用混凝土块或者其他物品进行支撑,导致后面拿不出来的问题,进而影响化粪池整体强度的问题;Compared with the prior art, the beneficial effect of the present invention is: by setting the inner mold bag, the defects of large volume, large occupied area, and difficulty in moving and handling of the inner mold are overcome, and the method is simpler when splicing the molds in the early stage of pouring , the inner mold can be installed in the steel frame by inflating or filling other fillers, the production method is simpler, and the demoulding process is also easier. Take out the filler, the inner mold bag shrinks, and take the inner mold bag from the pouring groove out, the integrated pouring is completed, the forming degree is high, there is no need for splicing in the later stage, and the structure is stronger. At the same time, the materials of the present invention can be recycled to save material costs; by setting the support structure to support the inner mold bag, it is solved to directly place the inner mold The problem that the bag cannot be poured; by rotating and connecting the two arms on the top surface of the main body, when in use, the two arms are spread out, and the inner mold bag is placed on the two arms to complete the inner mold bag. Support, when the pouring is completed and the support structure needs to be taken out, because the inner mold bag has been taken out before then, drag the support structure outward, the two arms will close together, and finally the support structure will be taken out to complete the integration For pouring, avoid using concrete blocks or other objects for support, which will cause problems that cannot be taken out later, and then affect the overall strength of the septic tank;

通过在主体内设有疏通孔,在疏通孔的一端设有止回阀,通过止回阀防止混凝土堵塞疏通孔,当支撑结构取出困难时,使用铁棒等物品插入疏通孔,顶开止回阀,将两个支臂之间的混凝土剔除,取出支撑结构,避免因为混凝土的影响,导致支撑结构取出困难的问题;通过上部主体和下部主体之间螺纹连接,转动上部主体就可以调整支撑结构的长度了,进而达到调整钢筋混凝土保护层厚度的目的。A dredging hole is provided in the main body, and a check valve is provided at one end of the dredging hole to prevent the concrete from clogging the dredging hole. When it is difficult to remove the support structure, insert an iron rod into the dredging hole to open the check valve. The valve removes the concrete between the two arms and takes out the support structure, avoiding the difficulty of taking out the support structure due to the influence of concrete; through the threaded connection between the upper body and the lower body, the support structure can be adjusted by rotating the upper body The length, and then achieve the purpose of adjusting the thickness of reinforced concrete cover.

附图说明Description of drawings

为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only These are some embodiments of the present invention. Those skilled in the art can also obtain other drawings based on these drawings without creative work.

图1为本发明整体结构爆炸图;Fig. 1 is an exploded view of the overall structure of the present invention;

图2为本发明化粪池下模结构示意图;Fig. 2 is the structure schematic diagram of septic tank lower mold of the present invention;

图3为本发明化粪池上模结构示意图;Fig. 3 is the structure schematic diagram of upper mold of septic tank of the present invention;

图4为本发明化粪池上模和化粪池下模剖面图;Fig. 4 is the cutaway view of the septic tank upper mold and the septic tank lower mold of the present invention;

图5为本发明实施例一中的支撑结构示意图;Fig. 5 is a schematic diagram of a support structure in Embodiment 1 of the present invention;

图6为本发明实施例二中的支撑结构剖面图;Fig. 6 is a sectional view of the support structure in Embodiment 2 of the present invention;

图7为本发明实施例三中的支撑结构示意图;7 is a schematic diagram of a support structure in Embodiment 3 of the present invention;

图8为本发明实施例三中的支撑结构剖面图。Fig. 8 is a sectional view of the supporting structure in the third embodiment of the present invention.

图中:1、化粪池上模;2、化粪池下模;3、灌注槽;4、第一密封圈;5、第二密封圈;6、第一螺栓孔;7、第二螺栓孔;8、内模袋;9、进出口;10、安装孔;11、固定块;12、第一限位孔;13、支撑结构;14、主体;15、支臂;16、第二限位孔;17、疏通孔;18、止回阀;19、上部主体;20、下部主体。In the figure: 1. Upper mold for septic tank; 2. Lower mold for septic tank; 3. Filling tank; 4. First sealing ring; 5. Second sealing ring; 6. First bolt hole; 7. Second bolt hole; 8. Inner mold bag; 9. Import and export; 10. Mounting hole; 11. Fixed block; 12. First limit hole; 13. Support structure; 14. Main body; 15. Support arm; 16. Second limit hole ; 17, dredge hole; 18, check valve; 19, upper main body; 20, lower main body.

具体实施方式Detailed ways

下面将结合实施例对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其它实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below in conjunction with the embodiments. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

实施例一:如图1-5所示,一种商砼整体式化粪池装置,包括化粪池上模1和化粪池下模2,所述化粪池上模1和化粪池下模2相配合,所述化粪池上模1和化粪池下模2均为半圆柱形,所述化粪池上模1顶部设有灌注槽3,所述化粪池上模1侧面固定连接有第一密封圈4,所述化粪池下模2侧面固定连接有第二密封圈5,所述第一密封圈4上设有若干个第一螺栓孔6,所述第二密封圈5上设有若干个第二螺栓孔7,所述第一螺栓孔6与第二螺栓孔7相对应;Embodiment 1: As shown in Figures 1-5, a commercial concrete integrated septic tank device includes a septic tank upper mold 1 and a septic tank lower mold 2, and the septic tank upper mold 1 and septic tank lower mold 2 are in phase Cooperate, the septic tank upper mold 1 and the septic tank lower mold 2 are both semi-cylindrical, the top of the septic tank upper mold 1 is provided with a perfusion groove 3, and the side of the septic tank upper mold 1 is fixedly connected with a first sealing ring 4. The side of the septic tank lower mold 2 is fixedly connected with a second sealing ring 5, and the first sealing ring 4 is provided with several first bolt holes 6, and the second sealing ring 5 is provided with several first bolt holes. Two bolt holes 7, the first bolt hole 6 corresponds to the second bolt hole 7;

所述化粪池上模1和化粪池下模2之间设有若干个内模袋8,因为实际生产中有的化粪池具有十几米,甚至更长,这就需要根据实际生产需求规划内膜袋的数量,因此内模袋8的数量可以是1个、2个、3个、4个,或者其他数量的内膜袋8;内模袋8可以根据使用情况使用不同类型的袋子,例如:可以使用气袋,进行充气后作为浇筑内模;可以使用填充袋,向袋内注满水或者使用沙子等物品填满,将填满的袋子作为内模;所述内模袋8上设有进出口9,所述进出口9与灌注槽3相对应;Several inner mold bags 8 are arranged between the upper mold 1 of the septic tank and the lower mold 2 of the septic tank, because some septic tanks in actual production have a length of more than ten meters or even longer, which needs to be planned according to the actual production demand. The number of membrane bags, so the number of inner mold bags 8 can be 1, 2, 3, 4, or other numbers of inner membrane bags 8; inner mold bags 8 can use different types of bags according to the usage, such as : air bags can be used to inflate as pouring inner molds; filling bags can be used to fill the bags with water or use sand and other items to fill up, and the filled bags can be used as inner molds; the inner mold bag 8 is provided with There are inlets and outlets 9, and the inlets and outlets 9 correspond to the filling tank 3;

通过设置内模袋8,克服了内模体积大,占用面积多,难以移动搬运的缺陷,且在浇筑前期对模具进行拼接的时候方法更简单,通过充气或者填充其他填充物即可将内模安装在钢筋框架内,制作方法更简单,同时脱模过程也更容易,取出填充物,内模袋8收缩,将内模袋8从灌注槽3处取出来,完成一体化浇筑,成型度高,无需后期进行拼接,结构更牢固,同时本发明的材料都可以循环使用,节约材料成本;By setting the inner mold bag 8, the defects of large volume, large area occupied and difficult to move and transport of the inner mold are overcome, and the method of splicing the mold in the early stage of pouring is simpler, and the inner mold can be assembled by inflating or filling other fillers. Installed in the steel frame, the production method is simpler, and the demoulding process is also easier. Take out the filler, the inner mold bag 8 shrinks, and the inner mold bag 8 is taken out from the pouring groove 3 to complete the integrated pouring with a high degree of molding. , there is no need for splicing in the later stage, the structure is stronger, and the materials of the present invention can be recycled, saving material costs;

所述化粪池下模2上设有若干个安装孔10,所述化粪池下模2外壁上固定连接有若干组固定块11,且每组固定块11有两个,每组两个固定块11位于安装孔10两侧,所述固定块11上设有第一限位孔12;The lower mold 2 of the septic tank is provided with several mounting holes 10, and the outer wall of the lower mold 2 of the septic tank is fixedly connected with several groups of fixing blocks 11, and each group of fixing blocks 11 has two, and each group of two fixing blocks 11 is located on both sides of the mounting hole 10, and the fixing block 11 is provided with a first limiting hole 12;

所述安装孔10内设有支撑结构13,所述支撑结构13包括主体14和支臂15,所述主体14上设有第二限位孔16,所述第二限位孔16与第一限位孔12相对应,所述主体14顶面转动连接有两个支臂15,两个支臂15之间的夹角为α,且夹角α的最大取值范围为[100°,160°];The mounting hole 10 is provided with a supporting structure 13, the supporting structure 13 includes a main body 14 and an arm 15, the main body 14 is provided with a second limiting hole 16, and the second limiting hole 16 is connected to the first Corresponding to the limit hole 12, the top surface of the main body 14 is rotatably connected with two support arms 15, the angle between the two support arms 15 is α, and the maximum value range of the angle α is [100°, 160° °];

通过设置支撑结构13对内模袋8进行支撑,解决直接放置内模袋8不能进行浇筑的问题;通过在主体14顶面转动连接两个支臂15,使得在使用时,将两个支臂15摊开,将内模袋8放到两个支臂15上,完成对内模袋8的支撑,当完成浇筑,需要取出支撑结构13时,因为在此之前内模袋8已经被取出了,因此向外拖动支撑结构13,两个支臂15将会合拢,最终将支撑结构13拿出来,完成一体化浇筑,避免使用混凝土块或者其他物品进行支撑,导致后面拿不出来的问题,进而影响化粪池整体强度的问题。The inner mold bag 8 is supported by setting the support structure 13 to solve the problem that the inner mold bag 8 cannot be poured directly; the two support arms 15 are connected by rotating on the top surface of the main body 14, so that when in use, the two support arms 15 is spread out, and the inner mold bag 8 is placed on the two support arms 15 to complete the support of the inner mold bag 8. When the pouring is completed, the supporting structure 13 needs to be taken out, because the inner mold bag 8 has been taken out before , so drag the support structure 13 outwards, the two arms 15 will be closed, and finally the support structure 13 will be taken out to complete the integrated pouring, avoiding the use of concrete blocks or other objects for support, resulting in the problem that it cannot be taken out later, And then affect the overall strength of the septic tank.

实施例二:如图1-6所示,本实施例与实施例一的区别在于:所述主体14内设有疏通孔17,所述疏通孔17的一端设有止回阀18,且止回阀18位于靠近支臂15的一端,止回阀18只能向外开,不能向疏通孔17内开;Embodiment 2: As shown in Figures 1-6, the difference between this embodiment and Embodiment 1 is that: the main body 14 is provided with a dredging hole 17, and one end of the dredging hole 17 is provided with a check valve 18, and The return valve 18 is located at one end close to the support arm 15, the check valve 18 can only be opened outwards, and cannot be opened in the dredging hole 17;

因为在浇筑混凝土的过程中,会有混凝土流到两个支臂15之间,因此会有部分的支撑结构13取出困难,而通过在主体14内设有疏通孔17,在疏通孔17的一端设有止回阀18,通过止回阀18防止混凝土堵塞疏通孔17,当支撑结构13取出困难时,使用铁棒等物品插入疏通孔17,顶开止回阀18,将两个支臂15之间的混凝土剔除,取出支撑结构13。Because in the process of pouring concrete, there will be concrete flowing between the two support arms 15, so there will be some difficulty in taking out the support structure 13, and by being provided with a dredging hole 17 in the main body 14, at one end of the dredging hole 17 A check valve 18 is provided to prevent the concrete from clogging the dredging hole 17. When the support structure 13 is difficult to take out, insert an iron rod or the like into the dredging hole 17, push the check valve 18 open, and move the two arms 15 The concrete in between is removed, and the support structure 13 is taken out.

实施例三:如图1-4和图7-8所示,本实施例与实施例二的区别在于:所述主体14包括上部主体19和下部主体20,所述上部主体19和下部主体20之间螺纹连接;所述下部主体20上设有第二限位孔16,所述第二限位孔16与第一限位孔12相对应,所述上部主体19顶面转动连接有两个支臂15,两个支臂15之间的夹角为α,且夹角α的最大取值范围为[100°,160°];所述上部主体19和下部主体20内均设有疏通孔17,两个疏通孔17是对齐的;所述疏通孔17的一端设有止回阀18,且止回阀18位于靠近支臂15的一端;Embodiment 3: As shown in Figures 1-4 and 7-8, the difference between this embodiment and Embodiment 2 is that the main body 14 includes an upper main body 19 and a lower main body 20, and the upper main body 19 and the lower main body 20 threaded connection between them; the lower main body 20 is provided with a second limiting hole 16, which corresponds to the first limiting hole 12, and the top surface of the upper main body 19 is rotatably connected with two The support arm 15, the angle between the two support arms 15 is α, and the maximum value range of the angle α is [100°, 160°]; the upper body 19 and the lower body 20 are provided with dredge holes 17, the two dredging holes 17 are aligned; one end of the dredging hole 17 is provided with a check valve 18, and the check valve 18 is located at one end close to the support arm 15;

因为实施例一和实施例二中的支撑结构13均不能调整长度,不能满足不同类型的化粪池浇筑任务,因为不同类型的化粪池的设计混凝土保护层厚度可能并不相同,这就导致实施例一和实施例二中的支撑结构13不能满足不同类型的化粪池浇筑任务;而通过上部主体19和下部主体20之间螺纹连接,转动上部主体19就可以调整支撑结构13的长度了,进而达到调整钢筋混凝土保护层厚度的目的。Because the supporting structure 13 in embodiment one and embodiment two all can not adjust length, can not meet the task of pouring of different types of septic tanks, because the design concrete cover thickness of different types of septic tanks may be different, this just causes The support structure 13 in Embodiment 1 and Embodiment 2 cannot meet the tasks of pouring different types of septic tanks; and through the screw connection between the upper body 19 and the lower body 20, the length of the support structure 13 can be adjusted by rotating the upper body 19 , and then achieve the purpose of adjusting the thickness of the reinforced concrete cover.

一种商砼整体式化粪池装置的使用方法,具体方法包括:A method for using a commercial concrete integrated septic tank device, the specific method comprising:

将支撑结构13通过安装孔10和第一限位孔12安装到化粪池下模2上,转动上部主体19,调整支撑结构13长度和钢筋保护层厚度;调整的是化粪池内壁保护层厚度,外壁的由原先的方法进行调整;Install the support structure 13 on the septic tank lower mold 2 through the installation hole 10 and the first limit hole 12, rotate the upper body 19, adjust the length of the support structure 13 and the thickness of the protective layer of steel bars; the adjustment is the thickness of the protective layer on the inner wall of the septic tank , the outer wall is adjusted by the original method;

将钢筋笼安装在化粪池下模2上,调整钢筋笼外壁保护层厚度,可以使用马凳筋、混凝土块等等;将支撑结构13穿过钢筋笼;Install the reinforcement cage on the septic tank lower mold 2, adjust the thickness of the protective layer on the outer wall of the reinforcement cage, and use horse stool bars, concrete blocks, etc.; pass the support structure 13 through the reinforcement cage;

摊开支撑结构13的两个支臂15,将内模袋8放置到支臂15上,对内模袋8进行填充,并在填充过程中调整内模袋8的位置,确保内模袋8是位于支臂15上;Spread out the two support arms 15 of the support structure 13, place the inner mold bag 8 on the support arms 15, fill the inner mold bag 8, and adjust the position of the inner mold bag 8 during the filling process to ensure that the inner mold bag 8 is located on the support arm 15;

完成内模袋8填充后,向化粪池下模2内浇筑混凝土,并不浇筑满,这是为了避免合模后振捣不便进行的;进行振捣;After completing the filling of the inner mold bag 8, pour concrete into the lower mold 2 of the septic tank, and do not pour it full, this is to avoid the inconvenience of vibrating after mold closing; vibrate;

将化粪池上模1与化粪池下模2对齐固定,从灌注槽3再次进行浇筑,进行振捣;Align and fix the upper mold 1 of the septic tank with the lower mold 2 of the septic tank, pour again from the pouring tank 3, and vibrate;

达到拆模条件后,取出内模袋8内的填充物,将内模袋8从成型的化粪池出口处取出,使用铁棒插入疏通孔17,顶开止回阀18,将两个支臂15之间的混凝土剔除,取出支撑结构13;After the mold removal condition is reached, take out the filler in the inner mold bag 8, take out the inner mold bag 8 from the outlet of the formed septic tank, use an iron rod to insert the dredging hole 17, open the check valve 18, and connect the two branches Concrete removal between the arms 15, taking out the support structure 13;

拆开化粪池上模1与化粪池下模2,获得化粪池,再将化粪池上的孔使用混凝土进行封堵;化粪池上的孔是因为拆除支撑结构13后形成的,按要求使用高一标号的混凝土进行封堵。Disassemble the septic tank upper mold 1 and the septic tank lower mold 2 to obtain the septic tank, and then seal the holes on the septic tank with concrete; the holes on the septic tank are formed after the support structure 13 is removed and used as required Concrete with a higher grade is used for sealing.

本发明的工作原理:将支撑结构13通过安装孔10和第一限位孔12安装到化粪池下模2上,转动上部主体19,调整支撑结构13长度和钢筋保护层厚度;将钢筋笼安装在化粪池下模2上,调整钢筋笼外壁保护层厚度,将支撑结构13穿过钢筋笼;摊开支撑结构13的两个支臂15,将内模袋8放置到支臂15上,对内模袋8进行填充,并在填充过程中调整内模袋8的位置,确保内模袋8是位于支臂15上;完成内模袋8填充后,向化粪池下模2内浇筑混凝土,进行振捣;将化粪池上模1与化粪池下模2对齐固定,从灌注槽3再次进行浇筑,进行振捣;达到拆模条件后,取出内模袋8内的填充物,将内模袋8从成型的化粪池出口处取出,使用铁棒插入疏通孔17,顶开止回阀18,将两个支臂15之间的混凝土剔除,取出支撑结构13;拆开化粪池上模1与化粪池下模2,获得化粪池,再将化粪池上的孔使用混凝土进行封堵。The working principle of the present invention: install the support structure 13 on the septic tank lower mold 2 through the installation hole 10 and the first limit hole 12, rotate the upper body 19, adjust the length of the support structure 13 and the thickness of the steel protection layer; install the steel cage On the lower mold 2 of the septic tank, adjust the thickness of the steel cage outer wall protective layer, and the support structure 13 is passed through the steel cage; spread out the two support arms 15 of the support structure 13, and the inner mold bag 8 is placed on the support arms 15. The inner mold bag 8 is filled, and the position of the inner mold bag 8 is adjusted during the filling process to ensure that the inner mold bag 8 is located on the support arm 15; after the inner mold bag 8 is filled, pour concrete into the septic tank lower mold 2, Vibrate; align and fix the upper mold 1 of the septic tank with the lower mold 2 of the septic tank, pour again from the pouring tank 3, and vibrate; Take out the bag 8 from the outlet of the formed septic tank, use an iron rod to insert the dredging hole 17, open the check valve 18, remove the concrete between the two arms 15, and take out the supporting structure 13; disassemble the upper mold of the septic tank 1 and septic tank lower mold 2 to obtain a septic tank, and then use concrete to block the holes on the septic tank.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“长度”、“宽度”、“厚度”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”、“顺时针”、“逆时针”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的设备或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。In describing the present invention, it should be understood that the terms "center", "longitudinal", "transverse", "length", "width", "thickness", "upper", "lower", "front", " Orientation indicated by rear, left, right, vertical, horizontal, top, bottom, inside, outside, clockwise, counterclockwise, etc. The positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, be constructed and operated in a specific orientation, Therefore, it should not be construed as limiting the invention.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,“多个”的含义是两个或两个以上,除非另有明确具体的限定。In addition, the terms "first" and "second" are used for descriptive purposes only, and cannot be interpreted as indicating or implying relative importance or implicitly specifying the quantity of indicated technical features. Thus, a feature defined as "first" and "second" may explicitly or implicitly include one or more of these features. In the description of the present invention, "plurality" means two or more, unless otherwise specifically defined.

以上内容仅仅是对本发明结构所做的举例和说明,所属本技术领域的技术人员对所描述的具体实施例做各种各样的修改或补充或采用类似的方式替代,只要不偏离发明的结构或者超越本权利要求书所定义的范围,均应属于本发明的保护范围。The above content is only an example and description of the structure of the present invention. Those skilled in the art make various modifications or supplements to the described specific embodiments or replace them in similar ways, as long as they do not deviate from the structure of the invention. Or beyond the scope defined in the claims, all should belong to the protection scope of the present invention.

Claims (8)

1. An integral septic tank device of merchant's concrete, includes: the septic tank upper die (1) and the septic tank lower die (2) are characterized in that a plurality of inner die bags (8) are arranged between the septic tank upper die (1) and the septic tank lower die (2), an inlet and an outlet (9) are formed in each inner die bag (8), a plurality of mounting holes (10) are formed in the septic tank lower die (2), supporting structures (13) are arranged in the mounting holes (10), and the supporting structures (13) are used for supporting the inner die bags (8);
the outer wall of the lower septic tank die (2) is fixedly connected with a plurality of groups of fixing blocks (11), two fixing blocks (11) are arranged in each group, two fixing blocks (11) in each group are positioned at two sides of the mounting hole (10), and the fixing blocks (11) are provided with first limiting holes (12);
the support structure (13) comprises a main body (14) and a support arm (15), the main body (14) comprises an upper main body (19) and a lower main body (20), and the upper main body (19) and the lower main body (20) are in threaded connection; the top surface of the upper main body (19) is rotatably connected with two support arms (15), the upper main body (19) and the lower main body (20) are both internally provided with a dredging hole (17), and one end of the dredging hole (17) is provided with a check valve (18); the lower main body (20) is provided with a second limiting hole (16), and the second limiting hole (16) corresponds to the first limiting hole (12).
2. The integral septic tank device of claim 1, wherein the septic tank upper mold (1) is matched with the septic tank lower mold (2), and the top of the septic tank upper mold (1) is provided with a pouring groove (3).
3. The commercial concrete integrated septic tank device according to claim 1, wherein the septic tank upper mold (1) and the septic tank lower mold (2) are semi-cylindrical.
4. The integral septic tank device of merchant concrete according to claim 1, characterized in that, the septic tank upper die (1) side fixedly connected with first sealing washer (4), the septic tank lower die (2) side fixedly connected with second sealing washer (5), be equipped with a plurality of first bolt hole (6) on first sealing washer (4), be equipped with a plurality of second bolt hole (7) on second sealing washer (5), first bolt hole (6) and second bolt hole (7) are corresponding.
5. The commercial concrete integrated septic tank device in claim 2, wherein said inlet and outlet (9) is corresponding to the pouring basin (3).
6. The integral septic tank device of claim 1, wherein the included angle between the two arms (15) is α, and the maximum value range of the included angle α is [100 °,160 ° ].
7. The concrete integrated septic tank apparatus of claim 1, wherein the check valve (18) is located near one end of the arm (15).
8. A using method of an integral commercial concrete septic tank device is characterized by comprising the following steps:
mounting a support structure (13) on a lower die (2) of the septic tank through a mounting hole (10) and a first limiting hole (12), rotating an upper main body (19), and adjusting the length of the support structure (13) and the thickness of a reinforcing steel bar protective layer;
installing a reinforcement cage on a lower die (2) of the septic tank, adjusting the thickness of a protective layer on the outer wall of the reinforcement cage, and enabling a support structure (13) to penetrate through the reinforcement cage;
spreading out the two support arms (15) of the support structure (13), placing the inner mold bag (8) on the support arms (15), filling the inner mold bag (8), and adjusting the position of the inner mold bag (8) in the filling process to ensure that the inner mold bag (8) is positioned on the support arms (15);
after the inner mold bag (8) is filled, concrete is poured into the lower mold (2) of the septic tank for vibration;
aligning and fixing the upper septic tank mould (1) and the lower septic tank mould (2), pouring again from the pouring groove (3), and vibrating;
after the mold stripping condition is met, the filler in the inner mold bag (8) is taken out, the inner mold bag (8) is taken out from the outlet of the molded septic tank, an iron rod is inserted into the dredging hole (17), the check valve (18) is jacked open, the concrete between the two support arms (15) is removed, and the support structure (13) is taken out;
and (3) disassembling the upper septic tank mould (1) and the lower septic tank mould (2) to obtain the septic tank, and plugging the hole in the septic tank by using concrete.
CN202110921311.1A 2021-08-11 2021-08-11 Commercial concrete integral septic tank device and using method thereof Active CN113526819B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202110921311.1A CN113526819B (en) 2021-08-11 2021-08-11 Commercial concrete integral septic tank device and using method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202110921311.1A CN113526819B (en) 2021-08-11 2021-08-11 Commercial concrete integral septic tank device and using method thereof

Publications (2)

Publication Number Publication Date
CN113526819A CN113526819A (en) 2021-10-22
CN113526819B true CN113526819B (en) 2023-03-21

Family

ID=78090898

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202110921311.1A Active CN113526819B (en) 2021-08-11 2021-08-11 Commercial concrete integral septic tank device and using method thereof

Country Status (1)

Country Link
CN (1) CN113526819B (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205955199U (en) * 2016-08-25 2017-02-15 重庆道同建材有限公司 Combined core mould
CN210012729U (en) * 2019-04-24 2020-02-04 江阴市亿万达塑料制品有限公司 Combined septic tank
CN210190109U (en) * 2019-03-12 2020-03-27 漯河俊展机械设备有限公司 A septic tank mold

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7731149B2 (en) * 2004-08-20 2010-06-08 Del Zotto Products, Inc. Septic tank form
CN102310474A (en) * 2010-06-29 2012-01-11 湖南华廷筑邦建材有限公司 Die for manufacturing filling body
CN109501092A (en) * 2018-12-27 2019-03-22 漯河俊展机械设备有限公司 Septic tank integrated molding mold
CN210419670U (en) * 2019-07-09 2020-04-28 福建省禄源环保科技有限公司 Steel septic tank
CN110919848B (en) * 2019-11-25 2024-11-26 中铁八局集团第七工程有限公司 Suspension mechanism for casting elastic support block and use method thereof
CN111531685A (en) * 2020-04-28 2020-08-14 漯河俊展机械设备有限公司 Integral molding method of septic tank
CN112726808A (en) * 2020-12-22 2021-04-30 淮北海聚环保设备有限公司 Commercial concrete integral septic tank and forming method thereof

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN205955199U (en) * 2016-08-25 2017-02-15 重庆道同建材有限公司 Combined core mould
CN210190109U (en) * 2019-03-12 2020-03-27 漯河俊展机械设备有限公司 A septic tank mold
CN210012729U (en) * 2019-04-24 2020-02-04 江阴市亿万达塑料制品有限公司 Combined septic tank

Also Published As

Publication number Publication date
CN113526819A (en) 2021-10-22

Similar Documents

Publication Publication Date Title
CN113526819B (en) Commercial concrete integral septic tank device and using method thereof
CN207327274U (en) A kind of water channel engineering system
CN105965681A (en) Vertical pouring and fast homogenizing device and method for pipe cores of PCCPs
CN109736852A (en) A kind of tunnel inverted arch one-time casting molding device and method
CN114789502A (en) Pouring mold for reinforced concrete prefabricated column
CN106217584A (en) The device of mechanization clay molding
CN209891745U (en) A Crack Control Structure in Mass Concrete Construction of Basement Engineering
CN219946694U (en) A device for improving the compressive strength of prefabricated blocks
CN109676752B (en) Porous cement pipe and manufacturing process thereof
CN215165842U (en) Steel formwork combination for prefabricated reinforced concrete inspection well
CN216682658U (en) A custom mold for roof pipe protection pier
CN204982567U (en) Unilateral perfusion device in ballastless track self -compaction concrete side
CN220666918U (en) Cast-in-situ plastic formwork for dense rib floor concrete
CN222862866U (en) Simple circular template device
CN111546469A (en) Septic tank half-module integrated forming method
CN214055803U (en) A frame fastening device for making cement pipes
CN206748691U (en) Retaining wall prefabricated-member mould with Quick locking mechanism
CN207327245U (en) A kind of water channel is passed by one's way prefabricated-member mould
CN218699847U (en) A concrete component prefabricated trolley
CN222362774U (en) A segmented pouring device for large-volume concrete wall
CN219634110U (en) Material feeding unit is used in precast beam production
CN109736563A (en) A kind of the rigid-flexibility transition mould and application method of large size template
CN221066705U (en) Prefabricated cement board quick assembly disassembly mould for engineering construction
CN216740740U (en) Concrete placement device is used in hydraulic engineering construction
CN106827191A (en) A kind of piping lane mould

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20250407

Address after: No. 5 Liushu Lane, Gongchang Town, Longxi County, Dingxi City, Gansu Province, China 748100

Patentee after: Yang Dongdong

Country or region after: China

Address before: 235000 Room 101, building 1, No. 9, Longxing Road, Longhu Industrial Park, Huaibei Economic Development Zone, Anhui Province

Patentee before: HUAIBEI HAIJU ENVIRONMENTAL PROTECTION EQUIPMENT CO.,LTD.

Country or region before: China