CN112541692B - Scientific data management plan generation method and device - Google Patents
Scientific data management plan generation method and device Download PDFInfo
- Publication number
- CN112541692B CN112541692B CN202011518755.2A CN202011518755A CN112541692B CN 112541692 B CN112541692 B CN 112541692B CN 202011518755 A CN202011518755 A CN 202011518755A CN 112541692 B CN112541692 B CN 112541692B
- Authority
- CN
- China
- Prior art keywords
- plan
- data
- template
- planning
- scientific
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06315—Needs-based resource requirements planning or analysis
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/30—Information retrieval; Database structures therefor; File system structures therefor of unstructured textual data
- G06F16/36—Creation of semantic tools, e.g. ontology or thesauri
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F40/00—Handling natural language data
- G06F40/10—Text processing
- G06F40/166—Editing, e.g. inserting or deleting
- G06F40/186—Templates
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P90/00—Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
- Y02P90/30—Computing systems specially adapted for manufacturing
Landscapes
- Engineering & Computer Science (AREA)
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Physics & Mathematics (AREA)
- General Engineering & Computer Science (AREA)
- Economics (AREA)
- Computational Linguistics (AREA)
- Entrepreneurship & Innovation (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Artificial Intelligence (AREA)
- Operations Research (AREA)
- General Business, Economics & Management (AREA)
- Marketing (AREA)
- Game Theory and Decision Science (AREA)
- Health & Medical Sciences (AREA)
- Quality & Reliability (AREA)
- Audiology, Speech & Language Pathology (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Development Economics (AREA)
- Data Mining & Analysis (AREA)
- Databases & Information Systems (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域technical field
本发明涉及数据处理技术领域,特别是涉及一种科学数据管理计划生成方法及装置。The invention relates to the technical field of data processing, in particular to a method and device for generating a scientific data management plan.
背景技术Background technique
科学数据成为重要的战略性基础资源,科学数据管理的规范化和有效性越来越受到关注。科学数据管理计划是科学研究过程中对整个科学数据管理工作的重要指导性文档,在科学研究和科研项目管理过程中能够有效帮助科研工作者系统规划数据采集、描述、存储、分析、利用、交汇、共享等工作以及安排好人员角色、合作内容、质量控制和时效成本,规范科学数据管理流程的同时提高科研效率和促进成果转化与共享。Scientific data has become an important strategic basic resource, and the standardization and effectiveness of scientific data management have attracted more and more attention. The scientific data management plan is an important guiding document for the entire scientific data management work in the process of scientific research. It can effectively help scientific researchers systematically plan data collection, description, storage, analysis, utilization, and convergence in the process of scientific research and scientific research project management. , sharing and other work, as well as arrange personnel roles, cooperation content, quality control and timeliness costs, standardize the scientific data management process while improving scientific research efficiency and promoting the transformation and sharing of results.
现有的科学数据管理计划工具(如,DMPonline)以问答方式为主,数据存储缺乏语义化定义,不能满足不同领域科学研究和项目等数据管理差异化的需求,使得对数据的管理效率低,不利于建立有效、个性化的数据管理系统。Existing scientific data management planning tools (such as DMPonline) are mainly based on question-and-answer methods, and data storage lacks semantic definition, which cannot meet the differentiated needs of data management in different fields of scientific research and projects, making data management inefficient. It is not conducive to establishing an effective and personalized data management system.
发明内容Contents of the invention
针对于上述问题,本发明提供一种科学数据管理计划生成方法及装置,实现了提升数据的管理效率,建立有效和个性化的科学数据管理计划。In view of the above problems, the present invention provides a method and device for generating a scientific data management plan, which realizes the improvement of data management efficiency and the establishment of an effective and personalized scientific data management plan.
为了实现上述目的,本发明提供了如下技术方案:In order to achieve the above object, the present invention provides the following technical solutions:
一种应用于科学数据管理的数据处理方法,包括:A data processing method applied to scientific data management, comprising:
获取科学数据管理计划的需求信息;Obtain information on the needs of a scientific data management plan;
通过预构建的语义知识模型,获取与所述需求信息对应的场景的计划模板;Obtain a planning template of a scenario corresponding to the demand information through a pre-built semantic knowledge model;
若接收到对所述计划模板的确认指令,生成所述计划模块的数据项,所述数据项包括计划问题项、计划评估项、计划管理项、计划保存项和计划预览项中的一种或多种;If a confirmation instruction for the plan template is received, generate data items of the plan module, where the data items include one of plan question items, plan evaluation items, plan management items, plan save items, and plan preview items, or various;
依据获取到的与所述数据项相匹配的反馈知识,对所述计划模板进行处理,得到目标计划模板;Processing the plan template according to the obtained feedback knowledge matching the data item to obtain the target plan template;
若接收到对所述计划模块的删除指令,获取目标计划模块,所述目标计划模板包括通过语义知识模型获取的计划模板或者接收到的自定义计划模板;If a deletion instruction for the plan module is received, the target plan module is obtained, and the target plan template includes a plan template obtained through a semantic knowledge model or a received custom plan template;
依据所述目标计划模板生成科学数据管理计划,以使通过所述科学数据管理计划对科学数据进行管理。A scientific data management plan is generated according to the target plan template, so that the scientific data can be managed through the scientific data management plan.
可选地,所述方法还包括:Optionally, the method also includes:
构建语义知识模型,包括:Build a semantic knowledge model, including:
建立计划、计划步骤和问答体系的元素的基本架构;Establish the basic structure of the elements of the plan, plan steps, and question-and-answer system;
确定数据管理的关联对象,所述关联对象包括人员、项目、数据集、数据安全、数据工具、数据仓储、数据许可和元数据中的一种或多种;Determine the associated objects of data management, which include one or more of personnel, projects, datasets, data security, data tools, data warehouses, data permissions, and metadata;
建立所述基本架构中的元素与所述关联对象的语义关系;Establishing the semantic relationship between the elements in the basic architecture and the associated objects;
基于所述语义关系,生成语义知识模型。Based on the semantic relationship, a semantic knowledge model is generated.
可选地,所述方法还包括:Optionally, the method also includes:
接收自定义计划模板;Receive custom plan templates;
依据所述语义知识模型,对所述自定义计划模板进行概念和关系扩展,获得所述自定义计划模板的关联数据。According to the semantic knowledge model, the concept and relationship of the self-defined plan template are extended to obtain associated data of the self-defined plan template.
可选地,当所述数据项包括计划问题项,所述方法还包括:Optionally, when the data items include planning problem items, the method further includes:
生成所述计划问题项的组件,使得通过所述组件接收针对所述计划问题项的问题描述信息和回答方式信息;Generating components of the planned question items, so that the question description information and answering information for the planned question items are received through the components;
其中,所述组件包括第一类型组件和第二类型组件,所述第一类型组件为针对计划问题的形式组件,所述第二类型组件为针对计划问题数据的组件。Wherein, the components include first-type components and second-type components, the first-type components are formal components for planning problems, and the second-type components are data components for planning problems.
可选地,所述方法还包括:Optionally, the method also includes:
响应于多个接收者接收到所述目标计划模板,获取各个接收者针对所述目标计划模板的编辑信息;Responsive to multiple receivers receiving the target plan template, acquiring editing information of each recipient for the target plan template;
按照所述编辑信息对应的时间戳,生成所述目标计划模板的版本信息,使得通过所述版本信息获得与所述版本信息相匹配的目标计划模块的编辑信息。According to the time stamp corresponding to the editing information, the version information of the target planning template is generated, so that the editing information of the target planning module matching the version information is obtained through the version information.
可选地,所述方法还包括:Optionally, the method also includes:
基于所述目标计划模板的数据接口,获取需求数据库的目标数据;Acquiring target data of the demand database based on the data interface of the target plan template;
利用所述科学数据管理计划对所述目标数据进行管理,获得科学管理数据。Using the scientific data management plan to manage the target data to obtain scientific management data.
可选地,所述方法还包括:Optionally, the method also includes:
接收对于计划数据的设定指令,所述计划数据为依据目标计划模板生成的数据;receiving a setting instruction for plan data, the plan data is data generated according to the target plan template;
确定与所述设定指令相匹配的计划数据的数据格式,所述数据格式包括数据输出格式和数据展示格式;Determine the data format of the planning data matching the setting instruction, the data format includes a data output format and a data display format;
依据所述数据格式对所述计划数据进行发布。Publish the planning data according to the data format.
可选地,所述方法还包括:Optionally, the method also includes:
接收针对所述目标计划模板的评估信息;receiving evaluation information for the target plan template;
依据所述评估信息,对所述语义知识模型中的计划模板进行修正。According to the evaluation information, the planning template in the semantic knowledge model is corrected.
一种科学数据管理计划生成装置,包括:A scientific data management plan generating device, comprising:
第一获取单元,用于获取科学数据管理计划的需求信息;The first acquisition unit is used to acquire the demand information of the scientific data management plan;
第二获取单元,用于通过预构建的语义知识模型,获取与所述需求信息对应的场景的计划模板;The second acquiring unit is used to acquire the planning template of the scene corresponding to the demand information through the pre-built semantic knowledge model;
第一生成单元,用于若接收到对所述计划模板的确认指令,生成所述计划模块的数据项,所述数据项包括计划问题项、计划评估项、计划管理项、计划保存项和计划预览项中的一种或多种;A first generation unit, configured to generate data items of the planning module if a confirmation instruction for the plan template is received, the data items include plan question items, plan evaluation items, plan management items, plan preservation items, and plans One or more of the preview items;
处理单元,用于依据获取到的与所述数据项相匹配的反馈知识,对所述计划模板进行处理,得到目标计划模板;A processing unit, configured to process the plan template according to the acquired feedback knowledge matching the data item, to obtain a target plan template;
第三获取单元,用于若接收到对所述计划模块的删除指令,获取目标计划模块,所述目标计划模板包括通过语义知识模型获取的计划模板或者接收到的自定义计划模板;The third obtaining unit is configured to obtain a target plan module if a deletion instruction for the plan module is received, and the target plan template includes a plan template obtained through a semantic knowledge model or a received custom plan template;
第二生成单元,用于依据所述目标计划模板生成科学数据管理计划,以使通过所述科学数据管理计划对科学数据进行管理。The second generating unit is configured to generate a scientific data management plan according to the target plan template, so that the scientific data can be managed through the scientific data management plan.
一种电子设备,包括:An electronic device comprising:
存储器,用于存储程序;memory for storing programs;
处理器,用于执行所述程序,所述程序具体用于实现如上任意一项所述的科学数据管理计划生成方法。A processor, configured to execute the program, and the program is specifically used to implement the method for generating a scientific data management plan as described in any one of the above.
相较于现有技术,本发明提供了一种科学数据管理计划生成方法及装置,获取科学数据管理计划的需求信息;通过预构建的语义知识模型,获取与所述需求信息对应的场景的计划模板;若接收到对所述计划模板的确认指令,生成所述计划模块的数据项;依据获取到的与所述数据项相匹配的反馈知识,对所述计划模板进行处理,得到目标计划模板;若接收到对所述计划模块的删除指令,获取目标计划模块,所述目标计划模板包括通过语义知识模型获取的计划模板或者接收到的自定义计划模板;依据所述目标计划模块生成科学数据管理计划,以使通过所述科学数据管理计划对科学数据进行管理。本发明基于语义知识模型和模板库实现了模板的选取和自定义,提升数据的管理效率,建立有效和个性化的科学数据管理计划。Compared with the prior art, the present invention provides a method and device for generating a scientific data management plan to obtain the demand information of the scientific data management plan; through the pre-built semantic knowledge model, the plan of the scene corresponding to the demand information is obtained Template; if a confirmation instruction for the plan template is received, generate the data item of the plan module; process the plan template according to the obtained feedback knowledge matching the data item to obtain the target plan template ; If a deletion instruction to the planning module is received, the target planning module is obtained, and the target planning template includes a planning template obtained through a semantic knowledge model or a received custom planning template; generating scientific data according to the target planning module A management plan such that scientific data is managed by said scientific data management plan. The invention realizes the selection and customization of templates based on the semantic knowledge model and the template library, improves the management efficiency of data, and establishes an effective and personalized scientific data management plan.
附图说明Description of drawings
为了更清楚地说明本发明实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本发明的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the technical solutions in the embodiments of the present invention or the prior art, the following will briefly introduce the drawings that need to be used in the description of the embodiments or the prior art. Obviously, the accompanying drawings in the following description are only It is an embodiment of the present invention, and those skilled in the art can also obtain other drawings according to the provided drawings without creative work.
图1为本发明实施例提供的一种科学数据管理计划生成方法的流程示意图;FIG. 1 is a schematic flowchart of a method for generating a scientific data management plan provided by an embodiment of the present invention;
图2为本发明实施例提供的一种科学数据管理计划制定工具的架构图;Fig. 2 is a structure diagram of a scientific data management plan formulation tool provided by an embodiment of the present invention;
图3为本发明实施例一种科学数据管理计划工具的应用领域的示意图;Fig. 3 is a schematic diagram of the application field of a scientific data management plan tool according to an embodiment of the present invention;
图4为本发明实施例提供的一种基于语义知识模型的数据处理流程示意图;FIG. 4 is a schematic diagram of a data processing flow based on a semantic knowledge model provided by an embodiment of the present invention;
图5本发明实施例提供的一种科学数据管理计划生成装置的结构示意图。FIG. 5 is a schematic structural diagram of an apparatus for generating a scientific data management plan provided by an embodiment of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
本发明的说明书和权利要求书及上述附图中的术语“第一”和“第二”等是用于区别不同的对象,而不是用于描述特定的顺序。此外术语“包括”和“具有”以及他们任何变形,意图在于覆盖不排他的包含。例如包含了一系列步骤或单元的过程、方法、系统、产品或设备没有设定于已列出的步骤或单元,而是可包括没有列出的步骤或单元。The terms "first" and "second" in the specification and claims of the present invention and the above drawings are used to distinguish different objects, rather than to describe a specific order. Furthermore, the terms "comprising" and "having", and any variations thereof, are intended to cover a non-exclusive inclusion. For example, a process, method, system, product or apparatus comprising a series of steps or units is not defined by listed steps or units, but may include unlisted steps or units.
在本发明实施例中提供了一种科学数据管理计划生成方法,参见图1,该方法可以包括以下步骤:A method for generating a scientific data management plan is provided in an embodiment of the present invention. Referring to FIG. 1, the method may include the following steps:
S101、获取科学数据管理计划的需求信息。S101. Acquiring demand information of a scientific data management plan.
科学数据管理计划的需求信息是指由科学数据管理计划基本信息组成的,即包括科学数据管理技术的目的、需求以及针对数据等等信息。The demand information of the scientific data management plan refers to the basic information of the scientific data management plan, including the purpose, demand and data-oriented information of the scientific data management technology.
S102、通过预构建的语义知识模型,获取与所述需求信息对应的场景的计划模板。S102. Obtain a planning template of a scenario corresponding to the demand information through a pre-built semantic knowledge model.
构建科学管理计划语义知识模型支持计划模本智能化制定和数据语义存储。在本发明实施例中还提供了一种构建语义知识模型的方法,包括:建立计划、计划步骤和问答体系的元素的基本架构;确定数据管理的关联对象,所述关联对象包括人员、项目、数据集、数据安全、数据工具、数据仓储、数据许可和元数据中的一种或多种;建立所述基本架构中的元素与所述关联对象的语义关系;基于所述语义关系,生成语义知识模型。Construct a scientific management plan semantic knowledge model to support the intelligent formulation of plan models and data semantic storage. In an embodiment of the present invention, a method for constructing a semantic knowledge model is also provided, including: establishing a basic framework of plans, planning steps, and elements of a question-and-answer system; determining associated objects for data management, and the associated objects include personnel, projects, One or more of datasets, data security, data tools, data warehousing, data permissions, and metadata; establish semantic relationships between elements in the basic architecture and associated objects; generate semantics based on the semantic relationships knowledge model.
具体的,语义知识模型可以包括多种计划模本,即基于语义知识模型可以得到多个模板,对应于不同的应用场景可以选择不同的计划模板。应用场景可以包括科研项目管理场景、科研项目数据管理场景、科学研究数据管理场景。Specifically, the semantic knowledge model may include multiple plan templates, that is, multiple templates may be obtained based on the semantic knowledge model, and different plan templates may be selected corresponding to different application scenarios. Application scenarios may include scientific research project management scenarios, scientific research project data management scenarios, and scientific research data management scenarios.
S103、若接收到对所述计划模板的确认指令,生成所述计划模块的数据项。S103. If a confirmation instruction for the plan template is received, generate a data item of the plan module.
所述数据项包括计划问题项、计划评估项、计划管理项、计划保存项和计划预览项中的一种或多种。The data items include one or more of plan question items, plan evaluation items, plan management items, plan save items and plan preview items.
S104、依据获取到的与所述数据项相匹配的反馈知识,对所述计划模板进行处理,得到目标计划模板。S104. According to the acquired feedback knowledge matching the data item, process the plan template to obtain a target plan template.
S105、若接收到对所述计划模块的删除指令,获取目标计划模块。S105. Acquire a target planning module if a deletion instruction for the planning module is received.
所述目标计划模板包括通过语义知识模型获取的计划模板或者接收到的自定义计划模板。The target plan template includes a plan template acquired through a semantic knowledge model or a received custom plan template.
S106、依据所述目标计划模板生成科学数据管理计划,以使通过所述科学数据管理计划对科学数据进行管理。S106. Generate a scientific data management plan according to the target plan template, so that the scientific data can be managed through the scientific data management plan.
然后会基于语义知识模型生成推荐的计划模板,由用户是否确认是否可以采用该推荐的计划模板,若会生成对应的计划模板的数据项,以使得能够基于该数据项进行信息的进一步完善,得到完整的计划。若用户不接收推荐的计划模板,则可以选择创建新的计划模板,即用户可以自定义生成计划模板,此时接收到的是用户对原来推荐的计划模板的删除指令,然后可以基于语义知识模型重新生成推荐模板,也可以接收用户自定义的计划模板,从而最终确定目标计划模板,然后依据目标计划模板生成科学数据管理计划,该科学数据管理计划可以包括对科学数据进行管理过程的条件、实施方式和处理流程等等,从而可以对科学数据实现计划管理,进一步可以得到科学管理数据,进行数据发布和共享,也可以将数据导出和发送。Then, a recommended planning template will be generated based on the semantic knowledge model, and the user will confirm whether the recommended planning template can be adopted. If the data item of the corresponding planning template will be generated, the information can be further improved based on the data item, and the obtained complete plan. If the user does not receive the recommended plan template, he can choose to create a new plan template, that is, the user can customize the generated plan template. At this time, what is received is the user's delete instruction for the originally recommended plan template, and then can be based on the semantic knowledge model Regenerate the recommended template, or receive a user-defined plan template, so as to finally determine the target plan template, and then generate a scientific data management plan based on the target plan template. The scientific data management plan can include the conditions and implementation of the scientific data management process Methods and processing procedures, etc., so that scientific data can be planned and managed, and scientific management data can be obtained, data released and shared, and data can also be exported and sent.
在本发明实施例中,可以面向不同科研应用场景和需求的灵活数据管理计划进行制定。对应的,可以将本发明实施例的应用于科学数据管理的数据处理方法封装成科学数据管理计划工具,来面向中国科研项目管理、科研项目数据管理和科学研究数据管理三个应用场景,提供有效的科学数据管理计划定制方法和路径。包括:In the embodiment of the present invention, flexible data management plans for different scientific research application scenarios and requirements can be formulated. Correspondingly, the data processing method applied to scientific data management in the embodiment of the present invention can be packaged into a scientific data management planning tool to provide effective The scientific data management program customizes the approach and path. include:
面向科研项目管理,支持项目资金管理者制定和发布项目数据管理计划和汇交方案模板,帮助项目管理人员明晰经费资助项目的启动到结题验收过程的科学数据全生命周期管理工作和产出计划安排。For scientific research project management, support project fund managers to formulate and publish project data management plans and submission plan templates, and help project managers to clarify the scientific data lifecycle management and output plans from the start of the funded project to the completion and acceptance of the project arrange.
面向科研项目数据管理,提供多种科技项目数据管理计划模板,支持项目承担人员撰写从项目启动到结题验收过程的科学数据管理全生命周期的工作规划,帮助项目承担者制定计划和规范项目数据管理流程,提高项目申报、科学研究数据管理的效率。For data management of scientific research projects, it provides a variety of data management plan templates for scientific and technological projects, supports project undertakers to write work plans for the entire life cycle of scientific data management from project initiation to completion and acceptance, and helps project undertakers formulate plans and standardize project data Management process, improving the efficiency of project declaration and scientific research data management.
面向科学研究数据管理,支持不同领域科研用户开展科研工作过程的科学数据管理全生命周期工作规划,结合不同学科特点制定个性化数据管理计划,提供多类型模板及问题组件和开放共享的数据管理计划,帮助科研用户复用计划模板和学习数据管理计划撰写经验。提供协作撰写和计划动态更新功能,支持研究团队合作制定计划和进行版本更新,有效提高科研效率。Oriented to scientific research data management, support scientific research users in different fields to carry out scientific data management life cycle work planning in the process of scientific research, formulate personalized data management plans in combination with the characteristics of different disciplines, provide multi-type templates and problem components, and open and shared data management plans , to help scientific research users reuse plan templates and learn data management plan writing experience. Provide collaborative writing and plan dynamic update functions, support research teams to work together to formulate plans and update versions, and effectively improve scientific research efficiency.
在本发明实施例中还提供了一种构建语义知识模型的方法,包括:In an embodiment of the present invention, a method for constructing a semantic knowledge model is also provided, including:
建立计划、计划步骤和问答体系的元素的基本架构;Establish the basic structure of the elements of the plan, plan steps, and question-and-answer system;
确定数据管理的关联对象,所述关联对象包括人员、项目、数据集、数据安全、数据工具、数据仓储、数据许可和元数据中的一种或多种;Determine the associated objects of data management, which include one or more of personnel, projects, datasets, data security, data tools, data warehouses, data permissions, and metadata;
建立所述基本架构中的元素与所述关联对象的语义关系;Establishing the semantic relationship between the elements in the basic architecture and the associated objects;
基于所述语义关系,生成语义知识模型。Based on the semantic relationship, a semantic knowledge model is generated.
具体的,构建科学数据管理计划本体作为语义知识模型,模型以科研管理计划为中心,建立计划、计划步骤、问题和回答的基本架构,同时,围绕科学数据管理生命周期特点和关联,增加科学管理相关对象,包括人员、项目、数据集、伦理道德、数据安全、数据工具、数据仓储、数据许可、成本、元数据等,建立计划、步骤、问题和这些重要对象间的语义关系,通过语义本体建模建立科学数据管理计划模板的逻辑框架,并有效支撑科学数据管理计划实体数据存储,包括数据管理知识库、问题库、计划库和模板库。该模型的概念和关系均支持扩展,可根据用户自定义的新计划模板进行概念和关系扩展,能够支持描述型问题存储也可以支持选择性、枚举型、跳转型等多类型问题和答案的制定和存储。通过对问题的语义标注和概念与概念、概念与实体之间的关联增强了计划数据的机读语义。Specifically, the scientific data management plan ontology is constructed as a semantic knowledge model. The model centers on the scientific research management plan and establishes the basic structure of plans, plan steps, questions and answers. At the same time, around the characteristics and associations of the scientific data management life cycle, scientific management is added Relevant objects, including personnel, projects, data sets, ethics, data security, data tools, data warehousing, data permissions, costs, metadata, etc., establish plans, steps, problems and semantic relationships among these important objects, through semantic ontology Modeling establishes the logical framework of scientific data management planning templates, and effectively supports scientific data management planning entity data storage, including data management knowledge base, question base, plan base and template base. Both the concept and relationship of the model support expansion, and the concept and relationship can be extended according to the user-defined new plan template. It can support descriptive question storage and can also support multiple types of questions and answers such as selective, enumerative, and jumping. formulation and storage. The machine-readable semantics of planning data is enhanced through the semantic annotation of questions and the association between concepts and concepts, concepts and entities.
在不同需求场景的基础上,工具将科学管理计划模板分为科研项目和兴趣研究两类,并根据科研项目阶段,又分为项目申请阶段的数据管理计划和项目数据验收阶段的数据汇交方案模板,并且预制多类国内外研究资助机构和高效发布的数据计划模板,包括国家重点研发计划专项项目的科学数据汇交计划模板、中国医学科学院科技项目管理计划模板、中国医学科学院科技项目汇交方案模板、DataCurationCenter数据管理计划模板、科技基础专项汇交计划模板等,供用户选择适用。On the basis of different demand scenarios, the tool divides the scientific management plan template into scientific research projects and interest research, and according to the stage of scientific research projects, it is further divided into data management plans in the project application stage and data submission plans in the project data acceptance stage Templates, and prefabricated multiple types of domestic and foreign research funding agencies and data plan templates for efficient release, including scientific data submission plan templates for special projects of national key R&D programs, Chinese Academy of Medical Sciences science and technology project management plan templates, and Chinese Academy of Medical Sciences science and technology project submission templates Scheme templates, DataCurationCenter data management plan templates, science and technology foundation special confluence plan templates, etc., are available for users to choose and apply.
当数据项包括计划问题项时,生成所述计划问题项的组件,使得通过所述组件接收针对所述计划问题项的问题描述信息和回答方式信息;其中,所述组件包括第一类型组件和第二类型组件,所述第一类型组件为针对计划问题的形式组件,所述第二类型组件为针对计划问题数据的组件。When the data item includes a planned question item, generate the components of the planned question item, so that the question description information and answer information for the planned question item are received through the component; wherein the components include the first type of component and A second-type component, the first-type component is a formal component for planning problems, and the second-type component is a data component for planning problems.
同时,也可以支持用户面向不同领域数据管理需要,根据需求自定义科学数据管理计划模板,支持自定义计划模板结构,包括流程设计、步骤模块创建和编辑、问题描述和回答方式创建和编辑、说明和引导语添加。流程设计,支持创建不同步骤模块,为每个模块添加多个问题项。问题项通过组件库中的组件定义,组件库包括基本组件和常用组件。基本组件包括文本框、复选框、单选框、文件浏览等。常用组件是制定计划过程中常用的,基于已有知识库封装组件,如数据标准检索组件、数据仓储检索组件、数据许可检索组件及人员信息填写组件等,便于用户选用。通过组件选择配置计划表单中每个问题的描述和类型,确定问题回答方式,并可以定义每个问题的顺序和设置跳转逻辑。工具能够根据用户定义的模板名称、计划步骤模块、问题描述逐步提供智能推荐。通过对用户输入模板名称和类型、步骤模块名称、问题描述文本和已有计划模板库、问题库中的模板、步骤模块和问题描述进行语义匹配、计算和排序推荐,生成最适合的描述推荐给用户供其选择,智能辅助计划模板创建过程。工具的计划流程执行由计划工作流引擎控制,其负责调用计划流程模板,根据命令操作,执行工作流服务,包括模板服务,流程服务,查询服务,跟踪服务,同时,反馈操作是否成功。At the same time, it can also support users to face data management needs in different fields, customize scientific data management plan templates according to needs, and support custom plan template structures, including process design, creation and editing of step modules, creation and editing of question descriptions and answer methods, and instructions and introductory words added. Process design, supports the creation of different step modules, and adds multiple question items for each module. Problem items are defined by components in the component library, which includes basic components and commonly used components. Basic components include text boxes, check boxes, radio boxes, file browsers, and more. Commonly used components are commonly used in the process of planning. Based on the existing knowledge base package components, such as data standard retrieval components, data warehouse retrieval components, data license retrieval components and personnel information filling components, etc., are convenient for users to choose. Configure the description and type of each question in the planning form through component selection, determine the question answering method, and define the order of each question and set the jump logic. The tool is able to provide intelligent recommendations step by step based on user-defined template names, planning step modules, and problem descriptions. Generate the most suitable description recommendation for Users can choose from it, intelligently assisting the planning template creation process. The planning process execution of the tool is controlled by the planning workflow engine, which is responsible for calling the planning process template, operating according to the command, and executing workflow services, including template service, process service, query service, tracking service, and feedback whether the operation is successful.
在本发明实施例中还可以实现多用户协同科学数据管理的计划制定和动态版本控制。即响应于多个接收者接收到所述目标计划模板,获取各个接收者针对所述目标计划模板的编辑信息;按照所述编辑信息对应的时间戳,生成所述目标计划模板的版本信息,使得通过所述版本信息获得与所述版本信息相匹配的目标计划模块的编辑信息。In the embodiment of the present invention, plan formulation and dynamic version control of multi-user collaborative scientific data management can also be realized. That is, in response to multiple receivers receiving the target plan template, the edit information of each recipient for the target plan template is obtained; according to the timestamp corresponding to the edit information, the version information of the target plan template is generated, so that The editing information of the target planning module matching the version information is obtained through the version information.
具体的,科研数据管理计划通常由科研项目团队创建,需要多人合作完成,并且数据管理计划不是静态文本,而是需要结合科研过程实际情况和需求进行动态性调整的动态文件。因此,科学数据管理计划制定工具支持分布式实时用户(如科技项目团队成员)协同科学数据管理计划创建和编辑功能,提供计划编辑、修改和维护功能。支持科学数据管理计划内容的更新与修订,基于时间戳生成不同计划版本,并记录编辑记录,便于计划内容和操作溯源。Specifically, the scientific research data management plan is usually created by the scientific research project team and requires the cooperation of multiple people to complete, and the data management plan is not a static text, but a dynamic document that needs to be dynamically adjusted according to the actual situation and needs of the scientific research process. Therefore, the scientific data management planning tool supports distributed real-time users (such as scientific and technological project team members) to create and edit scientific data management plans collaboratively, and provides plan editing, modification and maintenance functions. Support the update and revision of scientific data management plan content, generate different plan versions based on time stamps, and record edit records to facilitate traceability of plan content and operations.
在本发明实施例中还可以建立与数据管理系统中其他实体关联和互操作,例如,在需要对其他数据库进行数据访问时,可以基于目标计划模板的数据接口,获取需求数据库的目标数据;利用所述目标数据对所述科学数据进行处理,得到科学管理数据。可以基于目标计划模板实现数据管理计划制定、编辑、审核、管理和发布的多个流程的信息的自动编辑和处理。具体的,数据管理计划制定、编辑、审核、管理和发布等涉及多机构或系统,包括项目管理者、机构管理者、科研工作者、计划制定合作者、数据仓储、硬件环境支撑方等。数据管理计划制定工具嵌入涵盖国内外数据标准、数据仓储、数据许可、数据工具等内容知识库,并在一定程度上嵌入标识符和可控词汇,支持用户检索、选择、制定计划和保障内容的相对程度上的规范性。同时支持发送邮件或提供接口给已有数据仓储和数据管理相关人员,使科学数据管理计划工具能够有效的和其他数据管理生态系统中的相关利益者和系统进行关联和互操作。In the embodiment of the present invention, association and interoperability with other entities in the data management system can also be established. For example, when data access to other databases is required, the target data of the demand database can be obtained based on the data interface of the target plan template; The target data processes the scientific data to obtain scientific management data. Automatic editing and processing of information in multiple processes of data management plan formulation, editing, review, management and release can be realized based on the target plan template. Specifically, the formulation, editing, review, management, and release of data management plans involve multiple institutions or systems, including project managers, institution managers, scientific research workers, plan formulation collaborators, data warehouses, and hardware environment support parties. Data management planning tools are embedded in content knowledge bases covering domestic and foreign data standards, data warehousing, data licensing, data tools, etc., and to a certain extent, identifiers and controllable vocabulary are embedded to support users to search, select, plan and guarantee content. relatively normative. At the same time, it supports sending emails or providing interfaces to existing data warehousing and data management personnel, so that scientific data management planning tools can effectively associate and interoperate with stakeholders and systems in other data management ecosystems.
在本发明实施例中还可以自定义计划数据的数据格式,实现对计划导出的格式、公布的模式进行自定义。对应的,科学数据管理计划定制工具可以执行如下指令:In the embodiment of the present invention, the data format of the plan data can also be customized, so as to realize the customization of the format of plan export and the published mode. Correspondingly, the scientific data management plan customization tool can execute the following instructions:
接收对于计划数据的设定指令,所述计划数据为依据目标计划模板生成的数据;receiving a setting instruction for plan data, the plan data is data generated according to the target plan template;
确定与所述设定指令相匹配的计划数据的数据格式,所述数据格式包括数据输出格式和数据展示格式;Determine the data format of the planning data matching the setting instruction, the data format includes a data output format and a data display format;
依据所述数据格式对所述计划数据进行发布。Publish the planning data according to the data format.
即科学数据管理计划制定工具支持科学数据管理计划模板和计划的导出,支持生成多种格式的科学数据管理计划,包括用户可理解的PDF、Word格式,同时支持机器可读可理解的JSON格式,用于和不同系统进行数据交换和传输。不同人员在科学数据管理过程中承担不同角色和任务,科学数据管理计划完成后用户可灵活选择私有、特定人员或公开共享等多种方式在所需适宜范围进行发布,对不同人员进行权限设置,如编辑和只读权限。That is, the scientific data management plan formulation tool supports the export of scientific data management plan templates and plans, and supports the generation of scientific data management plans in various formats, including user-understandable PDF and Word formats, and supports machine-readable and understandable JSON formats. Used for data exchange and transmission with different systems. Different personnel take on different roles and tasks in the scientific data management process. After the scientific data management plan is completed, users can flexibly choose multiple methods such as private, specific personnel, or public sharing to publish in the required and appropriate range, and set permissions for different personnel. Such as edit and read-only permissions.
对应的,数据管理计划制定工具在执行应用于科学数据管理的数据处理方法时可以实现以下步骤:Correspondingly, the data management planning tool can implement the following steps when implementing the data processing method applied to scientific data management:
接收针对所述目标计划模板的评估信息;receiving evaluation information for the target plan template;
依据所述评估信息,对所述语义知识模型中的计划模板进行修正。According to the evaluation information, the planning template in the semantic knowledge model is corrected.
数据管理计划制定工具对所有计划制定提供数据填写完整性评估,帮助用户了解计划完成情况。并且建立科学数据管理计划评估指标库,针对特定问题模板提供不同的评估方法,面向不同计划目标向用户提供科学数据管理计划的评估,提供评估结果,帮助用户更好的完成计划撰写。The data management plan formulation tool provides completeness assessment of data filling for all plan formulations to help users understand the completion of the plan. It also establishes a scientific data management plan evaluation indicator library, provides different evaluation methods for specific problem templates, provides users with scientific data management plan evaluations for different plan objectives, and provides evaluation results to help users better complete plan writing.
参见图2,其示出了本发明实施例提供的一种科学数据管理计划制定工具的架构图,其包括运行保障体系、安全保障体系和标准规范体系。对应的,可以包括模板库、组件库、问题库、计划库、知识库、用户库、网络、存储、计算和操作系统,可以实现用户信息注册和管理、多科研场景数据管理计划快速入口、数据管理计划创建、数据管理计划评估、多类型数据管理计划文档导出、数据管理计划模板定制、模板创建和选择智能推荐、数据管理计划模板浏览和检索、数据管理计划浏览和检索、数据管理计划发布和共享、数据管理计划信息管理、计划模板信息管理、语义知识模型维护,模板库、问题库和知识库管理,数据管理计划发布权限管理、数据管理计划版本管理、计划模板版本管理、工作流配置和工作流引擎、数据管理计划评估指标计算、用户角色和权限管理。该工具还包括科学数据管理计划工作流引擎和科学数据管理计划语义知识模型。Referring to FIG. 2 , it shows a structure diagram of a scientific data management plan formulation tool provided by an embodiment of the present invention, which includes an operation assurance system, a security assurance system, and a standard specification system. Correspondingly, it can include template library, component library, question library, plan library, knowledge base, user library, network, storage, computing and operating system, which can realize user information registration and management, quick access to data management plans for multiple scientific research scenarios, and data Management plan creation, data management plan evaluation, multi-type data management plan document export, data management plan template customization, template creation and intelligent recommendation for template selection, data management plan template browsing and retrieval, data management plan browsing and retrieval, data management plan publishing and Sharing, data management plan information management, plan template information management, semantic knowledge model maintenance, template library, question library and knowledge base management, data management plan release authority management, data management plan version management, plan template version management, workflow configuration and Workflow engine, data management plan evaluation indicator calculation, user role and permission management. The tool also includes a scientific data management program workflow engine and a scientific data management program semantic knowledge model.
参见图3,其示出了本发明实施例一种科学数据管理计划工具的应用领域的示意图。数据中心管理者可以将收集、审批和管理数据管理计划发送给科学数据管理工具,科学数据管理工具可以将计划审批发送给领域专家,将提供数据存储/计算条件发送给基础设施提供者,将伦理审批发送给伦理审批着,将存储数据发送给数据仓储,将浏览和查询计划发送给公众用户。可以接收来自项目自助者指定和发布的计划模板、计划审批,接收来自数据计划制定者创建、管理、提交和发布数据管理计划,接收在即计划制定合作者合作创建数据管理计划。Referring to FIG. 3 , it shows a schematic diagram of an application field of a scientific data management planning tool according to an embodiment of the present invention. Data center managers can send collection, approval and management data management plans to scientific data management tools, scientific data management tools can send plan approval to domain experts, provide data storage/computing conditions to infrastructure providers, and ethical Approvals are sent to ethics reviewers, stored data is sent to data warehouses, and browsing and query plans are sent to public users. Can receive plan templates and plan approvals specified and released by project self-help personnel, receive data planners to create, manage, submit and release data management plans, and receive immediate plan-making collaborators to jointly create data management plans.
参见图4,其示出了本发明实施例提供的一种基于语义知识模型的数据处理流程示意图,语义知识模型包括知识库、问题库和模板库,通过填写信息和计划模板语义分析、计算得到计划推荐模板进行模板的推荐。即当接收到科学数据管理计划基本信息后,会进行相关计划模板推荐。若用户接受推荐模块,会使用推荐计划模板,从而进行计划问题填写、计划浏览、计划保存、计划管理,然后将计划发送给项目资助方或者数据中心审核。若没有接受推荐模板,则会生成是否创建新模板的提示信息,若没有创建新模板会使用其他已有计划模板,如果是,创建自定义计划模板,然后将自定义计划模板保存至语义知识模型中,并使用自定义计划模板。基于最终确定的自定义计划模板,生成计划。在计划进行发布时,可以选择公开发布或者私有发布,公开发布还可以进一步选定指定人员和权项共享,或者开放共享。也可以对科学数据管理计划导出,可以是word形式,PDF形式,也可以是JSON格式。Referring to FIG. 4, it shows a schematic diagram of a data processing flow based on a semantic knowledge model provided by an embodiment of the present invention. The semantic knowledge model includes a knowledge base, a question base and a template base, which are obtained by filling in information and planning template semantic analysis and calculation. The plan recommends templates to recommend templates. That is, after receiving the basic information of the scientific data management plan, relevant plan templates will be recommended. If the user accepts the recommendation module, the recommendation plan template will be used to fill in the plan questions, browse the plan, save the plan, manage the plan, and then send the plan to the project sponsor or data center for review. If the recommended template is not accepted, a prompt message will be generated whether to create a new template. If no new template is created, other existing plan templates will be used. If so, a custom plan template will be created, and then the custom plan template will be saved to the semantic knowledge model , and use a custom plan template. Generate plans based on finalized custom plan templates. When planning to release, you can choose public release or private release, and public release can further select designated personnel and rights sharing, or open sharing. It can also export the scientific data management plan, which can be in word form, PDF form, or JSON format.
基于本发明实施例提供的数据处理方法可以实现:The data processing method provided based on the embodiment of the present invention can realize:
(1)用户注册和用户信息管理(1) User registration and user information management
工具支持项目资助者/管理者、数据汇交者等多类型用户注册账号。注册填写的用户信息包括机构、姓名、性别等基本信息注册和编辑功能,提供注册信息有效性校验,提供用户信息管理。The tool supports project funders/managers, data submitters and other types of users to register accounts. The user information filled in the registration includes registration and editing functions of basic information such as organization, name, gender, etc., provides verification of the validity of registration information, and provides user information management.
(2)语义知识模型维护和数据存储管理(2) Semantic knowledge model maintenance and data storage management
存储和维护科学数据管理计划的语义知识模型,提供模型编辑、修改和按需扩展。语义知识模型支持模板库、问题库和数据管理相关知识库结构指导和建设,并提供语义关联关系。另一方面,通过模板库和知识库的内容更新、内容分析可用于优化和丰富科学数据管理计划语义知识模型中的概念和概念间的语义关系。Stores and maintains the semantic knowledge models of scientific data management initiatives, providing model editing, modification, and on-demand extensions. The semantic knowledge model supports the structural guidance and construction of the template database, question database and data management-related knowledge base, and provides semantic associations. On the other hand, content updates and content analysis through template libraries and knowledge bases can be used to optimize and enrich concepts and semantic relationships between concepts in the semantic knowledge model of scientific data management programs.
(3)模板库、问题库和知识库管理(3) Template library, question library and knowledge base management
模板库管理支持模板信息存储和管理,包括计划模板编号、模板结构、模板描述等。问题库主要进行模板问题编号、问题描述、问题引导、问题所在模板等信息的存储,并且和模板库关联。知识库重点围绕科学数据管理生命周期中相关实体信息,包括国内外数据标准、数据仓储、数据许可、数据工具等进行收集和存储,用于支持计划模板智能创建和丰富计划服务。预制计划模板中在基础资源和计算资源配置、伦理审批、存储方式、计划提交发布等步骤中嵌入可与基础资源服务商、伦理委员会、国家数据中心、数据仓储、项目资助机构、计划合作创建者等不同方的关联和通信方式,支持机器可读的数据接口。Template library management supports template information storage and management, including plan template number, template structure, template description, etc. The question bank mainly stores information such as template question numbers, question descriptions, question guides, and templates where questions are located, and is associated with the template library. The knowledge base focuses on the collection and storage of relevant entity information in the scientific data management lifecycle, including domestic and foreign data standards, data warehousing, data licensing, and data tools, to support the intelligent creation of plan templates and enrich plan services. The prefabricated plan template is embedded in the steps of basic resource and computing resource configuration, ethical approval, storage method, plan submission and release, etc. It can cooperate with basic resource service providers, ethics committees, national data centers, data warehouses, project funding agencies, and plan co-creators The association and communication methods of different parties support machine-readable data interfaces.
(4)计划和模板信息管理与维护(4) Plan and template information management and maintenance
工具提供用户已制定和使用的计划和模板的完整列表,支持其进行计划和模板的管理和维护,包括计划和模板信息列表浏览、详情查看、计划编辑、计划修改、计划发布、计划导出等功能。记录计划和模板的创建信息、版本信息、更新信息、操作信息和编辑者信息,便于数据溯源。The tool provides a complete list of plans and templates that users have formulated and used, and supports the management and maintenance of plans and templates, including functions such as plan and template information list browsing, detailed viewing, plan editing, plan modification, plan release, and plan export. . Record the creation information, version information, update information, operation information and editor information of plans and templates to facilitate data traceability.
(5)计划模板创建和智能模板推荐(5) Plan template creation and smart template recommendation
模板编辑器支持动态模板创建。编辑器包括计划步骤模块、计划组件库、计划编辑区。计划模板编辑,首先选择模板类型和定义模板名称。可选择已有模板复用模板结构和问题。如需创建新的模板结构,工具支持步骤模块创建,并通过模板库和问题库支持模块和问题创建。每个模块可创建多个问题或描述,通过计划组件库实现每个问题的创建。组件库提供多种组件类型,如文本框、单选、复选等。问题创建,工具通过将用户输入模块名称和问题描述从已有问题库中查找相似问题,通过语义匹配和计算,为模块和问题提供智能推荐,对这一问题的最佳描述。编辑器支持问题排序和跳转等设置。支持模板库中的已有模板进行编辑和修改,形成并保存为新的计划模板。科技项目发布Template editor supports dynamic template creation. The editor includes planning step module, planning component library, and planning editing area. To plan template editing, first select the template type and define the template name. An existing template can be selected to reuse the template structure and questions. To create new template structures, the tool supports step module creation, and supports module and question creation through the template library and question library. Each module can create multiple questions or descriptions, and each question creation is realized through the planning component library. The component library provides various component types, such as text box, radio, check, etc. Question creation, the tool finds similar questions from the existing question database by inputting the module name and question description from the user, and provides intelligent recommendations for modules and questions through semantic matching and calculation, which is the best description of this question. The editor supports settings such as question sorting and jumping. Support existing templates in the template library to be edited and modified to form and save as a new planning template. Technology project release
(6)科学数据管理计划评估(6) Evaluation of scientific data management plan
工具提供计划完整性评估,帮助用户了解计划填写内容的完整程度。同时,根据国际发布的FAIR原则、我国发布的科学数据管理评估标准规范,科技项目提出的科学数据管理计划要求等,制定面向不同需求的计划模板,并根据模板目标需求对其科学数据管理计划填写内容进行评估和打分。建有不同维度的评估框架和指标库,帮助用户更好的完成面向科研项目和科学研究的科学数据管理计划。The tool provides plan completeness assessment to help users understand the completeness of plan filling. At the same time, according to the FAIR principles released internationally, the scientific data management evaluation standards issued by my country, and the scientific data management plan requirements proposed by science and technology projects, etc., formulate plan templates for different needs, and fill in the scientific data management plan according to the template target requirements Content is evaluated and scored. It has evaluation frameworks and indicator libraries of different dimensions to help users better complete scientific data management plans for scientific research projects and scientific research.
(7)应用场景快速入口和计划、模板检索浏览(7) Quick access to application scenarios and retrieval and browsing of plans and templates
面向中国科研项目管理资助、科研项目数据管理和科学研究的三个应用场景,分别提供满足不同需求的计划和模板浏览、检索入口。提供多种检索功能,包括高级检索和基本检索,提供多种计划和模板分类和多维度浏览导航。Facing the three application scenarios of China's scientific research project management funding, scientific research project data management and scientific research, it provides plan and template browsing and retrieval entrances to meet different needs. Provides various search functions, including advanced search and basic search, provides various plans and template classifications and multi-dimensional browsing navigation.
(8)基于引导和智能知识推荐的计划创建与版本更新(8) Plan creation and version update based on guidance and intelligent knowledge recommendation
工具为用户提供计划创建引导,帮助用户选择目标模板和进行计划填写。用户首先填写项目或研究基本信息,工具根据用户填写内容进行语义分析,给予需求相关的计划模板推荐。工具提供基于WEB的多类型科学数据管理计划制定界面,支持用户选择工具中预制或用户共享的已有模板进行计划创建,也支持其选择自定义模板进行计划创建。使用工具预制的计划模板创建的计划,模板中提供更详细的计划步骤和填写内容说明和引导描述,并且提供多种问题回答类型,预制基于数据仓储、数据标准、数据中心、数据许可等知识库封装的组件,可以有效为用户制定计划时推荐和选择,降低用户理解和选择难度,提高计划创建效率。创建后的计划可以进行编辑、修改和发布。计划发布功能支持设定计划共享范围,包括设置计划使用的人员范围和使用权限等。具有编辑权限用户可以合作参与计划编辑和修改。具有只读权限的用户只能阅读计划。工具支持计划内容更新,提供基于时间戳的版本信息管理。The tool provides users with plan creation guidance, helping users select a target template and complete the plan. The user first fills in the basic information of the project or research, and the tool performs semantic analysis based on the content filled in by the user, and recommends a plan template related to the demand. The tool provides a WEB-based multi-type scientific data management plan formulation interface, and supports users to select prefabricated or user-shared existing templates in the tool for plan creation, and also supports users to select custom templates for plan creation. The plan created using the tool’s prefabricated planning template provides more detailed planning steps, content instructions and guide descriptions, and provides a variety of question answering types. The prefabrication is based on knowledge bases such as data warehousing, data standards, data centers, and data licensing. The encapsulated components can effectively recommend and choose for users when making plans, reduce the difficulty of users' understanding and selection, and improve the efficiency of plan creation. Created plans can be edited, modified and published. The plan release function supports setting plan sharing scope, including setting the scope of personnel and usage rights for plan use. Users with editing rights can cooperate in plan editing and modification. Users with read-only permissions can only read plans. The tool supports scheduling content updates and provides timestamp-based version information management.
参见图5,其示出了本发明实施例提供的一种科学数据管理计划生成装置,包括:Referring to Fig. 5, it shows a scientific data management plan generation device provided by an embodiment of the present invention, including:
第一获取单元10,用于获取科学数据管理计划的需求信息;The first obtaining unit 10 is used to obtain the demand information of the scientific data management plan;
第二获取单元20,用于通过预构建的语义知识模型,获取与所述需求信息对应的场景的计划模板;The second acquiring unit 20 is configured to acquire a planning template of a scenario corresponding to the demand information through a pre-built semantic knowledge model;
第一生成单元30,用于若接收到对所述计划模板的确认指令,生成所述计划模块的数据项,所述数据项包括计划问题项、计划评估项、计划管理项、计划保存项和计划预览项中的一种或多种;The first generation unit 30 is configured to generate the data items of the planning module if a confirmation instruction for the plan template is received, the data items include plan question items, plan evaluation items, plan management items, plan preservation items and One or more of the planned preview items;
处理单元40,用于依据获取到的与所述数据项相匹配的反馈知识,对所述计划模板进行处理,得到目标计划模板;A processing unit 40, configured to process the plan template according to the acquired feedback knowledge matching the data item, to obtain a target plan template;
第三获取单元50,用于若接收到对所述计划模块的删除指令,获取目标计划模块,所述目标计划模板包括通过语义知识模型获取的计划模板或者接收到的自定义计划模板;The third obtaining unit 50 is configured to obtain a target plan module if a deletion instruction for the plan module is received, and the target plan template includes a plan template obtained through a semantic knowledge model or a received custom plan template;
第二生成单元60,用于依据所述目标计划模板生成科学数据管理计划,以使通过所述科学数据管理计划对科学数据进行管理。The second generating unit 60 is configured to generate a scientific data management plan according to the target plan template, so that the scientific data can be managed through the scientific data management plan.
在上述实施例的基础上,所述装置还包括:On the basis of the foregoing embodiments, the device also includes:
构建单元,用于构建语义知识模型,所述构建单元具体用于:The construction unit is used to construct the semantic knowledge model, and the construction unit is specifically used for:
建立计划、计划步骤和问答体系的元素的基本架构;Establish the basic structure of the elements of the plan, plan steps, and question-and-answer system;
确定数据管理的关联对象,所述关联对象包括人员、项目、数据集、数据安全、数据工具、数据仓储、数据许可和元数据中的一种或多种;Determine the associated objects of data management, which include one or more of personnel, projects, datasets, data security, data tools, data warehouses, data permissions, and metadata;
建立所述基本架构中的元素与所述关联对象的语义关系;Establishing the semantic relationship between the elements in the basic architecture and the associated objects;
基于所述语义关系,生成语义知识模型。Based on the semantic relationship, a semantic knowledge model is generated.
在上述实施例的基础上,所述装置还包括:On the basis of the foregoing embodiments, the device also includes:
接收单元,用于接收自定义计划模板;Receiving unit for receiving custom plan templates;
扩展单元,用于依据所述语义知识模型,对所述自定义计划模板进行概念和关系扩展,获得所述自定义计划模板的关联数据。An extension unit, configured to extend the concepts and relationships of the custom plan template according to the semantic knowledge model, and obtain associated data of the custom plan template.
可选地,所述装置还包括:Optionally, the device also includes:
组件生成单元,用于生成所述计划问题项的组件,使得通过所述组件接收针对所述计划问题项的问题描述信息和回答方式信息;A component generation unit, configured to generate components of the planned question items, so that the components receive question description information and answer information for the planned question items;
其中,所述组件包括第一类型组件和第二类型组件,所述第一类型组件为针对计划问题的形式组件,所述第二类型组件为针对计划问题数据的组件。Wherein, the components include a first-type component and a second-type component, the first-type component is a formal component for planning problems, and the second-type component is a data component for planning problems.
在上述实施例的基础上,所述装置还包括:On the basis of the foregoing embodiments, the device also includes:
第四获取单元,用于响应于多个接收者接收到所述目标计划模板,获取各个接收者针对所述目标计划模板的编辑信息;A fourth acquiring unit, configured to acquire editing information of each receiver for the target plan template in response to multiple recipients receiving the target plan template;
版本生成单元,用于按照所述编辑信息对应的时间戳,生成所述目标计划模板的版本信息,使得通过所述版本信息获得与所述版本信息相匹配的目标计划模块的编辑信息。The version generation unit is configured to generate version information of the target plan template according to the time stamp corresponding to the edit information, so that the edit information of the target plan module matching the version information is obtained through the version information.
可选地,所述装置还包括管理单元,所述管理单元用于:Optionally, the device further includes a management unit configured to:
基于所述目标计划模板的数据接口,获取需求数据库的目标数据;利用所述科学数据管理计划对所述目标数据进行管理,获得科学管理数据。Based on the data interface of the target plan template, the target data of the demand database is obtained; the target data is managed by using the scientific data management plan to obtain scientific management data.
可选地,所述装置还包括:Optionally, the device also includes:
指令接收单元,用于接收对于计划数据的设定指令,所述计划数据为依据目标计划模板生成的数据;An instruction receiving unit, configured to receive a setting instruction for plan data, the plan data is data generated according to the target plan template;
格式确定单元,用于确定与所述设定指令相匹配的计划数据的数据格式,所述数据格式包括数据输出格式和数据展示格式;a format determination unit, configured to determine the data format of the plan data matching the setting instruction, the data format includes a data output format and a data display format;
发布单元,用于依据所述数据格式对所述计划数据进行发布。An issuing unit, configured to issue the planning data according to the data format.
可选地,所述装置还包括:Optionally, the device also includes:
评估接收单元,用于接收针对所述目标计划模板的评估信息;An evaluation receiving unit, configured to receive evaluation information for the target plan template;
修正单元,用于依据所述评估信息,对所述语义知识模型中的计划模板进行修正。A revising unit, configured to revise the plan template in the semantic knowledge model according to the evaluation information.
基于前述实施例,本申请的实施例提供一种计算机可读存储介质,计算机可读存储介质存储有一个或者多个程序,该一个或者多个程序可被一个或者多个处理器执行,以实现如上任一项的科学数据管理计划生成方法的步骤。Based on the foregoing embodiments, the embodiments of the present application provide a computer-readable storage medium, where one or more programs are stored on the computer-readable storage medium, and the one or more programs can be executed by one or more processors to realize Steps as in any of the above methods for generating a scientific data management plan.
本发明实施例还提供了一种电子设备,包括存储器、处理器以及存储在存储器上并可在处理器上运行的计算机程序,其特征在于,所述处理器执行所述程序时实现的科学数据管理计划生成方法的步骤。An embodiment of the present invention also provides an electronic device, including a memory, a processor, and a computer program stored in the memory and operable on the processor, wherein the scientific data realized when the processor executes the program Steps in the management plan generation method.
需要说明的是,上述处理器或CPU可以为特定用途集成电路(ApplicationSpecific Integrated Circuit,ASIC)、数字信号处理器(Digital Signal Processor,DSP)、数字信号处理装置(Digital Signal Processing Device,DSPD)、可编程逻辑装置(Programmable Logic Device,PLD)、现场可编程门阵列(Field Programmable GateArray,FPGA)、中央处理器(Central Processing Unit,CPU)、控制器、微控制器、微处理器中的至少一种。可以理解地,实现上述处理器功能的电子器件还可以为其它,本申请实施例不作具体限定。It should be noted that the above-mentioned processor or CPU may be an application-specific integrated circuit (Application Specific Integrated Circuit, ASIC), a digital signal processor (Digital Signal Processor, DSP), a digital signal processing device (Digital Signal Processing Device, DSPD), or At least one of programmable logic device (Programmable Logic Device, PLD), field programmable gate array (Field Programmable GateArray, FPGA), central processing unit (Central Processing Unit, CPU), controller, microcontroller, microprocessor . It can be understood that the electronic device implementing the above processor function may also be other, which is not specifically limited in this embodiment of the present application.
需要说明的是,上述计算机存储介质/存储器可以是只读存储器(Read OnlyMemory,ROM)、可编程只读存储器(Programmable Read-Only Memory,PROM)、可擦除可编程只读存储器(Erasable Programmable Read-Only Memory,EPROM)、电可擦除可编程只读存储器(Electrically Erasable Programmable Read-Only Memory,EEPROM)、磁性随机存取存储器(Ferromagnetic Random Access Memory,FRAM)、快闪存储器(Flash Memory)、磁表面存储器、光盘、或只读光盘(Compact Disc Read-Only Memory,CD-ROM)等存储器;也可以是包括上述存储器之一或任意组合的各种终端,如移动电话、计算机、平板设备、个人数字助理等。It should be noted that the above-mentioned computer storage medium/memory can be a read-only memory (Read Only Memory, ROM), a programmable read-only memory (Programmable Read-Only Memory, PROM), an erasable programmable read-only memory (Erasable Programmable Read -Only Memory, EPROM), Electrically Erasable Programmable Read-Only Memory (EEPROM), Magnetic Random Access Memory (Ferromagnetic Random Access Memory, FRAM), Flash Memory (Flash Memory), Memory such as magnetic surface memory, optical disc, or CD-ROM (Compact Disc Read-Only Memory, CD-ROM); it can also be various terminals including one or any combination of the above-mentioned memories, such as mobile phones, computers, tablet devices, Personal digital assistants and more.
在本申请所提供的几个实施例中,应该理解到,所揭露的设备和方法,可以通过其它的方式实现。以上所描述的设备实施例仅仅是示意性的,例如,所述单元的划分,仅仅为一种逻辑功能划分,实际实现时可以有另外的划分方式,如:多个单元或组件可以结合,或可以集成到另一个系统,或一些特征可以忽略,或不执行。另外,所显示或讨论的各组成部分相互之间的耦合、或直接耦合、或通信连接可以是通过一些接口,设备或单元的间接耦合或通信连接,可以是电性的、机械的或其它形式的。In the several embodiments provided in this application, it should be understood that the disclosed devices and methods may be implemented in other ways. The device embodiments described above are only illustrative. For example, the division of the units is only a logical function division. In actual implementation, there may be other division methods, such as: multiple units or components can be combined, or May be integrated into another system, or some features may be ignored, or not implemented. In addition, the coupling, or direct coupling, or communication connection between the components shown or discussed may be through some interfaces, and the indirect coupling or communication connection of devices or units may be electrical, mechanical or other forms of.
上述作为分离部件说明的单元可以是、或也可以不是物理上分开的,作为单元显示的部件可以是、或也可以不是物理单元,即可以位于一个地方,也可以分布到多个网络单元上;可以根据实际的需要选择其中的部分或全部单元来实现本实施例方案的目的。The units described above as separate components may or may not be physically separated, and the components displayed as units may or may not be physical units, that is, they may be located in one place or distributed to multiple network units; Part or all of the units can be selected according to actual needs to achieve the purpose of the solution of this embodiment.
另外,在本申请各实施例中的各功能单元可以全部集成在一个处理模块中,也可以是各单元分别单独作为一个单元,也可以两个或两个以上单元集成在一个单元中;上述集成的单元既可以采用硬件的形式实现,也可以采用硬件加软件功能单元的形式实现。本领域普通技术人员可以理解:实现上述方法实施例的全部或部分步骤可以通过程序指令相关的硬件来完成,前述的程序可以存储于一计算机可读取存储介质中,该程序在执行时,执行包括上述方法实施例的步骤;而前述的存储介质包括:移动存储设备、只读存储器(Read-Only Memory,ROM)、随机存取存储器(Random Access Memory,RAM)、磁碟或者光盘等各种可以存储程序代码的介质。In addition, each functional unit in each embodiment of the present application can be integrated into one processing module, or each unit can be used as a single unit, or two or more units can be integrated into one unit; the above-mentioned integration The unit can be realized in the form of hardware or in the form of hardware plus software functional unit. Those of ordinary skill in the art can understand that all or part of the steps to realize the above method embodiments can be completed by hardware related to program instructions, and the aforementioned program can be stored in a computer-readable storage medium. When the program is executed, the Including the steps of the foregoing method embodiments; and the aforementioned storage medium includes: various A medium on which program code can be stored.
本申请所提供的几个方法实施例中所揭露的方法,在不冲突的情况下可以任意组合,得到新的方法实施例。The methods disclosed in several method embodiments provided in this application can be combined arbitrarily to obtain new method embodiments under the condition of no conflict.
本申请所提供的几个产品实施例中所揭露的特征,在不冲突的情况下可以任意组合,得到新的产品实施例。The features disclosed in several product embodiments provided in this application can be combined arbitrarily without conflict to obtain new product embodiments.
本申请所提供的几个方法或设备实施例中所揭露的特征,在不冲突的情况下可以任意组合,得到新的方法实施例或设备实施例。The features disclosed in several method or device embodiments provided in this application can be combined arbitrarily without conflict to obtain new method embodiments or device embodiments.
以上所述,仅为本申请的具体实施方式,但本申请的保护范围并不局限于此,任何熟悉本技术领域的技术人员在本申请揭露的技术范围内,可轻易想到变化或替换,都应涵盖在本申请的保护范围之内。因此,本申请的保护范围应以所述权利要求的保护范围为准。The above is only a specific implementation of the application, but the scope of protection of the application is not limited thereto. Anyone familiar with the technical field can easily think of changes or substitutions within the technical scope disclosed in the application. Should be covered within the protection scope of this application. Therefore, the protection scope of the present application should be determined by the protection scope of the claims.
Claims (9)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011518755.2A CN112541692B (en) | 2020-12-21 | 2020-12-21 | Scientific data management plan generation method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202011518755.2A CN112541692B (en) | 2020-12-21 | 2020-12-21 | Scientific data management plan generation method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN112541692A CN112541692A (en) | 2021-03-23 |
CN112541692B true CN112541692B (en) | 2023-08-11 |
Family
ID=75019244
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202011518755.2A Active CN112541692B (en) | 2020-12-21 | 2020-12-21 | Scientific data management plan generation method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN112541692B (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113361778A (en) * | 2021-06-08 | 2021-09-07 | 北京同创永益科技发展有限公司 | Information processing method and device applied to business continuity management platform |
CN113626379B (en) * | 2021-08-10 | 2025-02-28 | 中国工商银行股份有限公司 | Research and development data management methods, devices, equipment and media |
CN115171862A (en) * | 2022-07-13 | 2022-10-11 | 刘自帅 | Hospital clinical data arrangement and analysis system |
CN115269667B (en) * | 2022-09-23 | 2023-01-06 | 中招国际招标有限公司 | Recommendation method for building engineering project template |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003060751A1 (en) * | 2001-12-26 | 2003-07-24 | Compassoft, Inc. | System and method for autonomously generating heterogeneous data source interoperability bridges based on semantic modeling derived from self adapting ontology |
JP2018116449A (en) * | 2017-01-18 | 2018-07-26 | 三菱電機株式会社 | Plan generation apparatus, plan generation method, and plan generation program |
CN109977489A (en) * | 2019-03-05 | 2019-07-05 | 日立电梯(上海)有限公司 | Hoistway layout designs planning management automatic method and system |
CN110246016A (en) * | 2019-05-20 | 2019-09-17 | 平安普惠企业管理有限公司 | Approaches to IM, device and computer storage medium |
KR102109044B1 (en) * | 2019-09-17 | 2020-05-11 | 한국과학기술정보연구원 | Research data repository system and control method thereof |
CN111737471A (en) * | 2020-06-28 | 2020-10-02 | 中国农业科学院农业信息研究所 | A method and system for building archives management model based on knowledge graph |
CN111813798A (en) * | 2020-07-10 | 2020-10-23 | 中国医学科学院医学信息研究所 | Mapping method, device, device and storage medium based on R2RML standard |
CN112084294A (en) * | 2020-09-14 | 2020-12-15 | 重庆长安新能源汽车科技有限公司 | Whole vehicle electromagnetic compatibility grading management method based on artificial intelligence |
CN112084761A (en) * | 2020-09-02 | 2020-12-15 | 董萍 | Hydraulic engineering information management method and device |
Family Cites Families (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20080133589A1 (en) * | 2006-12-01 | 2008-06-05 | Sockeye Solutions, Inc. | Management of an operations chain through customizable applications and components |
US20080288269A1 (en) * | 2007-05-18 | 2008-11-20 | Siemens Power Generation, Inc. | Enterprise-wide data standardization structure and method |
US8006223B2 (en) * | 2007-06-13 | 2011-08-23 | International Business Machines Corporation | Method and system for estimating project plans for packaged software applications |
US20110307412A1 (en) * | 2010-06-14 | 2011-12-15 | Jerome Rolia | Reusable capacity planning scenario templates |
US11216765B2 (en) * | 2014-06-27 | 2022-01-04 | o9 Solutions, Inc. | Plan modeling visualization |
US9959268B2 (en) * | 2014-12-01 | 2018-05-01 | Environmental Systems Research Institute, Inc. | Semantic modeling of geographic information in business intelligence |
US20170017618A1 (en) * | 2015-07-14 | 2017-01-19 | GTxcel | Unified publishing platform |
US11132634B2 (en) * | 2016-04-08 | 2021-09-28 | International Business Machines Corporation | Expert system |
US10423685B2 (en) * | 2016-09-09 | 2019-09-24 | Robert Bosch Gmbh | System and method for automatic question generation from knowledge base |
US11074250B2 (en) * | 2017-06-27 | 2021-07-27 | OWOX Limted | Technologies for implementing ontological models for natural language queries |
US11416830B2 (en) * | 2018-09-25 | 2022-08-16 | Salesforce.Com, Inc. | Method and system for automatically creating action plans based on an action plan template |
EP3906468A4 (en) * | 2018-12-31 | 2022-09-21 | Kobai, Inc. | Decision intelligence system and method |
EP3734471A1 (en) * | 2019-04-30 | 2020-11-04 | Tata Consultancy Services Limited | Method and system for utilizing domain knowledge to automatically identify solution to a problem |
-
2020
- 2020-12-21 CN CN202011518755.2A patent/CN112541692B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2003060751A1 (en) * | 2001-12-26 | 2003-07-24 | Compassoft, Inc. | System and method for autonomously generating heterogeneous data source interoperability bridges based on semantic modeling derived from self adapting ontology |
JP2018116449A (en) * | 2017-01-18 | 2018-07-26 | 三菱電機株式会社 | Plan generation apparatus, plan generation method, and plan generation program |
CN109977489A (en) * | 2019-03-05 | 2019-07-05 | 日立电梯(上海)有限公司 | Hoistway layout designs planning management automatic method and system |
CN110246016A (en) * | 2019-05-20 | 2019-09-17 | 平安普惠企业管理有限公司 | Approaches to IM, device and computer storage medium |
KR102109044B1 (en) * | 2019-09-17 | 2020-05-11 | 한국과학기술정보연구원 | Research data repository system and control method thereof |
CN111737471A (en) * | 2020-06-28 | 2020-10-02 | 中国农业科学院农业信息研究所 | A method and system for building archives management model based on knowledge graph |
CN111813798A (en) * | 2020-07-10 | 2020-10-23 | 中国医学科学院医学信息研究所 | Mapping method, device, device and storage medium based on R2RML standard |
CN112084761A (en) * | 2020-09-02 | 2020-12-15 | 董萍 | Hydraulic engineering information management method and device |
CN112084294A (en) * | 2020-09-14 | 2020-12-15 | 重庆长安新能源汽车科技有限公司 | Whole vehicle electromagnetic compatibility grading management method based on artificial intelligence |
Non-Patent Citations (1)
Title |
---|
基于开放数据的领域知识融合方法研究及应用;胡洁琼;《信息科技》(第1期);全文 * |
Also Published As
Publication number | Publication date |
---|---|
CN112541692A (en) | 2021-03-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112541692B (en) | Scientific data management plan generation method and device | |
US20220215123A1 (en) | Specifying characteristics of an output dataset of a data pipeline | |
CN102763126B (en) | For the method and system of the data binding of the structural data solution based on web | |
US8522195B2 (en) | Systems and methods to generate a software framework based on semantic modeling and business rules | |
Brambilla et al. | Designing web applications with WebML and WebRatio | |
Fill | SeMFIS: a flexible engineering platform for semantic annotations of conceptual models | |
CN106445536B (en) | Automatic business design management system | |
US10338894B2 (en) | Generating applications based on data definition language (DDL) query view and application page template | |
CN111897890B (en) | Financial business processing method and device | |
US11687957B2 (en) | Mobile cloud and mobile cloud computing for a user-customized survey or election service system and method | |
CN109597603B (en) | An automatic generation method of requirements document based on document component | |
US7512451B2 (en) | System and method for interactive process management | |
Akatkin et al. | The concept and the roadmap to linked open statistical data in the Russian federation | |
Horsburgh et al. | Assessing the state of research data publication in hydrology: A perspective from the Consortium of Universities for the Advancement of Hydrologic Science, Incorporated | |
Hu et al. | A simulation model design method for cloud-based simulation environment | |
Seng et al. | An intelligent XML-based multidimensional data cube exchange | |
Brunette | Open Data Kit 2: building mobile application frameworks for disconnected data management | |
Chessell et al. | Common information models for an open, analytical, and agile world | |
CN105279122A (en) | XML-based data exchange system | |
Huynh | A Blockchain-Based IoT System for Secure Attendance Management | |
Lee | Critical Junctures of Technological Mediation: Infrastructuring a Tracing System Through Commercial Apps in South Korea | |
Alhaag Abdyssalam | Model-Driven Software Architecture for the Management of Educational Resources Metadata | |
CN119205049A (en) | A performance accounting method, device, computer equipment and storage medium | |
Bhatia | Structured Information Flow (SIF) Framework for Automating End-to-End Information Flow for Large Organizations | |
CN115756444A (en) | Method and system for constructing platform in industrial scene service |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |