CN112116712B - An approach to architectural planning using a 2D design interface - Google Patents
An approach to architectural planning using a 2D design interface Download PDFInfo
- Publication number
- CN112116712B CN112116712B CN202010167217.7A CN202010167217A CN112116712B CN 112116712 B CN112116712 B CN 112116712B CN 202010167217 A CN202010167217 A CN 202010167217A CN 112116712 B CN112116712 B CN 112116712B
- Authority
- CN
- China
- Prior art keywords
- line
- dimensional
- longitudinal
- transverse
- building
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06T—IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
- G06T17/00—Three dimensional [3D] modelling, e.g. data description of 3D objects
- G06T17/10—Constructive solid geometry [CSG] using solid primitives, e.g. cylinders, cubes
-
- G—PHYSICS
- G06—COMPUTING OR CALCULATING; COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/20—Information retrieval; Database structures therefor; File system structures therefor of structured data, e.g. relational data
- G06F16/28—Databases characterised by their database models, e.g. relational or object models
- G06F16/284—Relational databases
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Databases & Information Systems (AREA)
- Geometry (AREA)
- General Physics & Mathematics (AREA)
- Computer Graphics (AREA)
- Software Systems (AREA)
- Data Mining & Analysis (AREA)
- General Engineering & Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
Description
技术领域Technical field
本发明涉及一种以2维设计接口进行建筑规划的方法。The invention relates to a method for architectural planning using a 2-dimensional design interface.
背景技术Background technique
目前普遍应用于建筑设计的方法,通常是以建构完整的3D实体模型为目的,但是很多简易的建筑工程并不需要建构复杂的3D实体建筑模型,施工者只需获得必要的信息便足以因应未来实际工程的需求。若采用目前3D实体建筑模型的建筑规划方法,不但将使设计时间冗长外,用以处理3D实体建筑也因硬设备的要求较高,使得设计业者必须所投入较高的硬件成本,这些对仅用于设计简单的建筑工程而言,显极不经济。The method currently commonly used in architectural design is usually aimed at constructing a complete 3D solid model. However, many simple construction projects do not require the construction of complex 3D solid building models. The builders only need to obtain the necessary information to cope with the future. actual engineering needs. If the current architectural planning method of 3D solid building models is used, not only will the design time be lengthy, but also the requirements for hardware equipment for processing 3D solid buildings are higher, so designers must invest higher hardware costs. It is extremely uneconomical for simple construction projects.
另外一般2维设计接口,虽然可以进行建筑规划设计,但是所设计的建筑物因无实际工地的地盘线进行比对参考,因此设计者所设计的建筑往往在实际工地施工时产生问题,例如水沟坡度不足,无法顺利排水、挡土墙高度不足等问题,因此如何提供设计者在2维设计接口准确进行建筑规划,实有改进的必要。In addition, although the general 2D design interface can be used for architectural planning and design, the designed buildings do not have the site lines of the actual construction site for reference. Therefore, the buildings designed by the designer often cause problems during construction on the actual construction site, such as water The slope of the ditch is insufficient, drainage is not smooth, and the height of the retaining wall is insufficient. Therefore, there is a need for improvement in how to provide designers with accurate architectural planning in the 2D design interface.
发明内容Contents of the invention
本发明的目的是提供一种以2维设计接口进行建筑规划的方法,包括:于一2维设计接口中汇入预定建筑位置的2维纵向地盘线及至少一条2维横向地盘线;以该2维纵向地盘线为参考基准,在该2维设计接口中建立至少一2维纵向工作线;于该2维设计接口建立或指定至少一个沿该2维纵向工作线建筑的建筑单元;以及建立由该建筑单元沿其中建立由该建筑单元沿一2维纵向工作线轨迹所需的物料统计表或者于两2维纵向工作线间的区域布满该建筑单元所需的物料统计表。The object of the present invention is to provide a method for architectural planning using a 2D design interface, which includes: importing a 2D longitudinal site line and at least one 2D transverse site line of a predetermined building location into a 2D design interface; Using the 2D longitudinal site line as the reference datum, establish at least one 2D longitudinal work line in the 2D design interface; establish or specify at least one building unit constructed along the 2D longitudinal work line in the 2D design interface; and establish The material statistical table required by the building unit to establish the trajectory of the building unit along a 2-dimensional longitudinal working line or the material statistical table required to fill the area between the two 2-dimensional longitudinal working lines with the building unit.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该建筑单元是指对应于该2维纵向工作线的特定点或特定区段所建立。The present invention discloses a method for architectural planning using a 2D design interface, wherein the building unit refers to a specific point or specific section corresponding to the 2D longitudinal work line.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该建筑单元是指截面图、附有尺寸标示的截面图、图形符号、工程品项代码。The present invention discloses a method for building planning using a 2-dimensional design interface, in which the building unit refers to a cross-sectional view, a cross-sectional view with dimensions, a graphic symbol, and a project item code.
本发明所揭示以2维设计接口进行建筑规划的方法,建立有若干不同的建筑单元,并使各该建筑单元分别对应该2维纵向工作线的不同特定点或特定区段。The method of building planning using a 2-D design interface disclosed in the present invention establishes several different building units, and makes each building unit correspond to different specific points or specific sections of the 2-D longitudinal working line.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该2维纵向地盘线是以多数连续线段所组成,令所建立的2维纵向工作线也区分为对应于该2维纵向地盘线的相等若干连续线段。The present invention discloses a method for building planning using a 2-dimensional design interface, in which the 2-dimensional longitudinal site line is composed of a plurality of continuous line segments, so that the established 2-dimensional longitudinal work line is also divided into corresponding to the 2-dimensional longitudinal site line. A number of equal continuous line segments.
本发明所揭示以2维设计接口进行建筑规划的方法,进一步于该2维设计接口中汇入至少一条2维横向地盘线,令该2维横向地盘线与该2维纵向地盘线在3维空间中是相互交错;其中令该建筑单元的横向面是平行或与该2维横向地盘线位于同一平面。The method of building planning using a 2D design interface disclosed in the present invention further integrates at least one 2D transverse site line into the 2D design interface, so that the 2D transverse site line and the 2D longitudinal site line are aligned in 3D. They are interlaced in space; where the transverse planes of the building units are parallel or on the same plane as the two-dimensional transverse site line.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该2维纵向地盘线与2维横向地盘线的建立,令一3维立体模型定义含有一X、Y、Z坐标,其中Z坐标为高度坐标,于该X、Y平面坐标上标定一区域,且于该X、Y平面沿所标定区域的纵长方向建立一纵向基线,并且于该X、Y平面沿所标定区域的横向建立至少一横向基线,令以该纵向基线切割该3维立体模型后所得的地盘面上缘轮廓为其纵向地盘线,令该纵向地盘线在3维立体模型投影于XY平面的长度与该2维纵向地盘线投影在一2维平面坐标的X轴的长度相等,该纵向地盘线在3维立体模型的Z轴坐标与该2维纵向地盘线投影在其2维平面坐标的Y轴坐标相等;且令以该横向基线切割该3维立体模型后所得的地盘面上缘轮廓为其横向地盘线,令该横向地盘线在3维立体模型投影于XY平面的长度与该2维横向地盘线投影在一2维平面坐标的X轴的长度相等,该横向地盘线在3维立体模型的Z轴坐标与该2维横向地盘线投影在其2维平面坐标的Y轴坐标相等。The invention discloses a method for architectural planning using a 2D design interface, in which the 2D longitudinal site line and the 2D transverse site line are established so that a 3D three-dimensional model definition contains an X, Y, Z coordinate, where the Z coordinate is the height coordinate, an area is calibrated on the X and Y plane coordinates, and a longitudinal baseline is established on the X and Y plane along the longitudinal direction of the calibrated area, and a longitudinal baseline is established on the X and Y plane along the transverse direction of the calibrated area. At least one transverse baseline, so that the upper edge contour of the land surface obtained by cutting the 3D model with the longitudinal baseline is its longitudinal land line, and the length of the longitudinal land line projected on the XY plane of the 3D model is equal to the length of the 2D The length of the longitudinal site line projected on the X-axis of a 2-dimensional plane coordinate is equal, and the Z-axis coordinate of the longitudinal site line on the 3-D model is equal to the Y-axis coordinate of the 2-D longitudinal site line projected on the 2-D plane coordinate; And let the upper edge contour of the land surface obtained by cutting the three-dimensional model with the transverse baseline be its transverse land line, and let the length of the transverse land line projected on the XY plane of the three-dimensional model be equal to the projection of the two-dimensional transverse land line The lengths of the X-axis in a 2-dimensional plane coordinate are equal, and the Z-axis coordinate of the lateral land line in the 3-D model is equal to the Y-axis coordinate of the 2-D lateral land line projected in the 2-D plane coordinate.
本发明所揭示以2维设计接口进行建筑规划的方法,其中于所标定区域呈等距地横向建立多数横向基线,令各该横向基线分别切割该3维立体模型后所得的地盘面上缘轮廓为一横向地盘线,令各该横向地盘线在3维立体模型投影于XY平面的长度与该2维横向地盘线投影在一2维平面坐标的X轴的长度相等,且在3维立体模型的Z轴坐标与该2维横向地盘线投影在其2维平面坐标的Y轴坐标相等,以建立多数2维横向地盘线。The present invention discloses a method for architectural planning using a 2D design interface, in which a plurality of transverse baselines are established equidistantly across the calibrated area, and each transverse baseline cuts the upper edge contour of the land surface obtained by cutting the 3D model. is a transverse site line, so that the length of each transverse site line projected on the XY plane of the 3D model is equal to the length of the 2D transverse site line projected on the X-axis of a 2D plane coordinate, and in the 3D model The Z-axis coordinate is equal to the Y-axis coordinate of the 2D lateral ground line projected onto its 2D planar coordinate to create a plurality of 2D lateral ground lines.
本发明所揭示以2维设计接口进行建筑规划的方法,令依据该2维纵向地盘线与2维横向地盘线,分别建立至少一2维纵向工作线与至少一2维横向工作线,使依2维横向工作线设计或指定的建筑单元,依该2维纵向工作线与2维横向工作线间以积分方式计算取得该物料统计表。The method disclosed in the present invention for architectural planning using a 2-D design interface is to establish at least one 2-D longitudinal work line and at least one 2-D transverse work line based on the 2-D longitudinal site line and the 2-D transverse site line. For the 2-dimensional horizontal work line design or designated building unit, the material statistics table is calculated based on the integral between the 2-dimensional vertical work line and the 2-dimensional horizontal work line.
本发明所揭示以2维设计接口进行建筑规划的方法,进一步设有一互动数据库,用以提供设计者设定对应该建筑单元在建筑时所需要的物料信息,令设计者完成建筑该建筑单元时所需要的物料信息设定后,该互动数据库便纪录该笔信息,并以所设定该建筑单元进行建筑时所需要的物料信息与所对应该2维纵向工作线长度的积所产生的物料信息、或是布满两2维纵向工作线所构成区域所需该建筑单元数的总合的物料信息,或依该2维纵向工作线与2维横向工作线间以积分方式计算取得该物料信息,记录于该物料统计表中。The method of building planning using a 2-dimensional design interface disclosed in the present invention is further provided with an interactive database to provide the designer with the material information needed to set the corresponding building unit during construction, so that the designer can complete the construction of the building unit. After the required material information is set, the interactive database records the information and generates materials based on the product of the set material information required for construction of the building unit and the length of the corresponding 2-dimensional longitudinal working line. information, or the material information of the total number of building units required to cover the area composed of two 2-dimensional longitudinal work lines, or the material is obtained by calculating the integral between the 2-dimensional longitudinal work line and the 2-dimensional horizontal work line Information is recorded in the material statistics table.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该互动数据库,于一显示屏中显示一输入接口,提供用户编辑对应该建筑单元所需的物料信息。The present invention discloses a method for building planning using a 2-dimensional design interface, wherein the interactive database displays an input interface on a display screen to provide users with the ability to edit the material information required for the building unit.
本发明所揭示以2维设计接口进行建筑规划的方法,进一步设有一内建数据库,该内建数据库记录有多数建筑单元及以该建筑单元进行建筑时所需要的物料信息;令设计者依该内建数据库选择某一建筑单元及所对应的2维纵向工作线轨迹或两2维纵向工作线所构成的区域或2维纵向工作线与2维横向工作线所构成的区域后,即以所设定该建筑单元进行建筑时所需要的物料信息与所对应该2维纵向工作线长度的积所产生的物料信息、或是布满两2维纵向工作线所构成区域所需该建筑单元数的总合的物料信息,或依该2维纵向工作线与2维横向工作线间以积分方式计算取得该物料信息,记录于该物料统计表中。The method of building planning using a 2-dimensional design interface disclosed in the present invention is further provided with a built-in database, which records a plurality of building units and the material information required for construction with the building units; allowing the designer to follow the The built-in database selects a certain building unit and the corresponding 2D longitudinal work line trajectory or the area composed of two 2D longitudinal work lines or the area composed of the 2D longitudinal work line and the 2D transverse work line. Set the material information generated by the product of the material information required for construction of the building unit and the length of the corresponding 2-dimensional longitudinal working line, or the number of building units required to cover the area formed by the two 2-dimensional longitudinal working lines. The total material information, or the material information is obtained by integral calculation between the 2-dimensional longitudinal working line and the 2-dimensional horizontal working line, and is recorded in the material statistics table.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该内建数据库可供用户自行新增、修正与查询。The present invention discloses a method for building planning using a 2-dimensional design interface, in which the built-in database can be added, modified and queried by users.
附图说明Description of drawings
图1为本发明的方块流程图。Figure 1 is a block flow diagram of the present invention.
图2为本发明于2维设计接口下,所建立2维纵向地盘线与工作线的示意图。Figure 2 is a schematic diagram of the 2-dimensional longitudinal site line and work line established by the present invention under the 2-dimensional design interface.
图3为图2的3-3方向所建立截面图与俯视图的建筑单元示意图。Figure 3 is a schematic diagram of the building unit in cross-section and top view established in the 3-3 direction of Figure 2.
图4为于工作在线标示建筑单元的设计简图。Figure 4 is a schematic diagram of the design of marking building units on the work line.
图5为本发明于依2维纵向地盘线建立两条工作线的示意图。Figure 5 is a schematic diagram of the present invention establishing two working lines based on the two-dimensional longitudinal site line.
图6为本发明另一实施例的方块流程图。Figure 6 is a block flow diagram of another embodiment of the present invention.
图7为以现有3维设计接口建立2维纵向地盘线的示意图。Figure 7 is a schematic diagram of establishing a 2D longitudinal site line using the existing 3D design interface.
图8为本发明取自一3维立体模型建构2维纵向地盘线与2维横向地盘线的方法示意图。Figure 8 is a schematic diagram of the method of constructing a 2-dimensional longitudinal site line and a 2-dimensional transverse site line from a 3-dimensional model according to the present invention.
图9为本发明以所汇入的2维纵向地盘线与2维横向地盘线为依据,建立2维纵向工作线与2维横向工作线的示意图。Figure 9 is a schematic diagram of the present invention establishing a 2-dimensional longitudinal work line and a 2-dimensional transverse work line based on the merged 2-dimensional longitudinal site line and 2-dimensional transverse site line.
附图标记说明:Explanation of reference symbols:
10 2维纵向地盘线10 2D longitudinal site lines
10’ 地盘线10’ property line
20 20’工作线20 20’ work line
30 建筑单元30 building units
S1’、S2’、S3’、S4’、S5’ 横向基线S1’, S2’, S3’, S4’, S5’ transverse baseline
S1、S2、S3、S4、S5 2维横向基线S1, S2, S3, S4, S5 2-dimensional transverse baseline
S11、S21、S31、S41、S51 2维横向工作线S11, S21, S31, S41, S51 2-dimensional transverse working line
A 区域A area
B 纵向基线B longitudinal baseline
L 长度L length
M 3维立体模型。M 3D model.
具体实施方式Detailed ways
下面通过参考附图描述的实施例是示例性的,仅用于解释本发明,而不能解释为对本发明的限制。The embodiments described below with reference to the drawings are exemplary and are only used to explain the present invention and cannot be construed as limiting the present invention.
请参阅图1所示,本发明有关一种以2维设计接口进行建筑规划的方法,包括:Please refer to Figure 1. The present invention relates to a method for architectural planning using a 2-dimensional design interface, which includes:
(a)于一2维设计接口中汇入预定建筑位置的2维纵向地盘线;(a) Import the 2D longitudinal site lines of the intended building location into a 2D design interface;
(b)以该2维纵向地盘线为参考基准,在该2维设计接口建立至少一2维纵向工作线;(b) Using the 2D longitudinal site line as a reference, establish at least one 2D longitudinal work line in the 2D design interface;
(c)于该2维设计接口建立或指定沿该2维纵向工作线建筑的至少一个建筑单元;以及(c) Create or designate at least one building unit constructed along the 2D longitudinal work line in the 2D design interface; and
(d)建立由该建筑单元沿一2维纵向工作线轨迹所需的物料统计表或者于两2维纵向工作线间的区域布满该建筑单元所需的物料统计表。(d) Establish a material statistical table required by the building unit along a 2-dimensional longitudinal working line or a material statistical table required to fill the building unit in the area between two 2-dimensional longitudinal working lines.
通过本发明所揭示的方法,让使用者可以在2维设计接口的环境下进行简易的建筑规划及设计,由于2维的设计接口对于计算器硬件的要求相对于3维设计接口低,且所占档案储存空间小,因此对于很多施工单位只需要2维设计施工图及施工所需物料统计表而言,本发明便可以符合其需求,而显其经济性。Through the method disclosed in the present invention, users can perform simple architectural planning and design in the environment of a 2D design interface. Since the 2D design interface has lower requirements for computer hardware than the 3D design interface, and the It occupies a small file storage space. Therefore, for many construction units that only need 2-dimensional design construction drawings and statistical tables of materials required for construction, the present invention can meet their needs and show its economy.
本发明所揭示以2维设计接口进行建筑规划的方法,并不以显示最后完整的3维建筑图为必要,而是以提供使用者设计2维设计施工图及最后完成该设计建筑时所需的物料统计信息为主要目的,而有别于现有如AutodeskRevit、Sketchup、3dsmax…等惯用于建筑业的设计软件,用以完成最终3D建筑样貌的目的。The method of architectural planning using a 2D design interface disclosed by the present invention is not necessary to display the final complete 3D architectural drawing, but to provide the user with what is needed to design the 2D design construction drawing and finally complete the designed building. The main purpose is to use material statistical information, which is different from existing design software such as Autodesk Revit, Sketchup, 3dsmax... etc. that are commonly used in the construction industry. It is used to complete the final 3D architectural appearance.
本发明所汇入2维纵向地盘线,可通过现有3D软件取得,例如图7所示,通过该3维立体模型M所定义相互垂直的X、Y及Z轴,其中Z轴为3维立体模型的高度轴,建立者可于该3维立体模型中的X、Y平面,投影对应于3维立体模型M需要进行施工的位置建立一基线B,并建立以该基线B切割该3维立体模型后所得的地盘面上缘轮廓为其纵向地盘线10’,令该基线B在3维立体模型投影于X、Y平面的长度L与该2维纵向地盘线10投影在一2维平面坐标的X轴的长度L相等,如图2所示,该纵向地盘线10’在3维立体模型的Z轴坐标与该2维纵向地盘线10投影在其2维平面坐标的Y轴坐标相等,以取得2维纵向地盘线10,如图2所示。惟上述建立2维纵向地盘线10的方式并非本发明申请的目标,本发明并不自限用以建立2维纵向地盘线的方法。该2维纵向地盘线可由设计者以传统方法自行至施工现场丈量建立或购自专业丈量机构,本发明并不予自限。上述的基线可为直线或曲线,本发明并不予自限。The 2-dimensional longitudinal site lines imported by the present invention can be obtained through existing 3D software. For example, as shown in Figure 7, the mutually perpendicular X, Y and Z axes defined by the 3-dimensional three-dimensional model M, of which the Z-axis is a 3-dimensional For the height axis of the three-dimensional model, the creator can create a baseline B on the X and Y planes in the three-dimensional model, corresponding to the position where the three-dimensional model M needs to be constructed, and establish a baseline B to cut the three-dimensional model. The upper edge contour of the land surface obtained after the three-dimensional model is its longitudinal land line 10', so that the length L of the baseline B projected on the X and Y planes of the three-dimensional model and the two-dimensional longitudinal land line 10 are projected on a two-dimensional plane The length of the , to obtain the 2-dimensional longitudinal site line 10, as shown in Figure 2. However, the above-mentioned method of establishing the two-dimensional longitudinal construction line 10 is not the target of the present invention, and the present invention is not limited to the method used to establish the two-dimensional longitudinal construction line. The two-dimensional longitudinal construction line can be measured and established by the designer at the construction site using traditional methods or purchased from a professional measurement institution. The present invention is not limited thereto. The above-mentioned baseline can be a straight line or a curve, and the present invention is not limited thereto.
如图2所示,本发明所揭示以2维设计接口进行建筑规划的方法,是在一2维设计接口中撷取或汇入2维纵向地盘线10后,便可依该2维纵向地盘线10为参考依据,建立一2维纵向工作线20,以便进行后续的建筑设计及规划例如作为开挖的基地基线或完工后的完工线,即建筑会依据、沿着该2维纵向工作线20进行建筑,因此,应用本发明的设计者,不需要强大的电子计算器设备。As shown in Figure 2, the method of building planning using a 2D design interface disclosed in the present invention is to extract or import a 2D longitudinal site line 10 into a 2D design interface, and then the 2D longitudinal site line can be Line 10 is used as a reference basis to establish a 2-dimensional longitudinal work line 20 for subsequent architectural design and planning, such as the base baseline for excavation or the completion line after completion, that is, the building will be based on and along the 2-dimensional longitudinal work line. 20 to carry out construction, therefore, the designer applying the present invention does not need powerful electronic computing equipment.
如图2、3所示,本发明所揭示2维设计接口进行建筑规划的方法,其中该建筑单元30是指对应于该2维纵向工作线20的特定点或特定区段所建立,该建筑单元30可以是对应于该2维纵向工作线20的特定点或该特定区段的截面图例如沟渠、挡土墙、柏油路面等等的截面图或是用以做为沟渠、挡土墙、堤、扶手、楼梯…等等建筑设计的示意图、符号、图形、工程品项代码,如图4所示,W217*5H表示产品编号,其中W217为挡土墙,5H表示高5尺;或如图3中,该建筑单元30是附有尺寸标示的由图2的3-3剖面线的截面图与该处的俯视图,即用以表示图2中该2维纵向工作线20自a点至b点2维设计施工图。本发明并不自限该建筑单元30的表示方法。As shown in Figures 2 and 3, the present invention discloses a method for architectural planning using a 2-dimensional design interface, in which the building unit 30 refers to a specific point or specific section corresponding to the 2-dimensional longitudinal working line 20. The building The unit 30 may be a specific point corresponding to the 2-dimensional longitudinal working line 20 or a cross-sectional view of the specific section, such as a cross-sectional view of a ditch, a retaining wall, an asphalt road, etc. or used as a ditch, a retaining wall, Embankments, handrails, stairs, etc. schematic diagrams, symbols, graphics, and project item codes of architectural designs, as shown in Figure 4, W217*5H represents the product number, where W217 is the retaining wall, and 5H represents 5 feet high; or as shown in Figure 4. In Fig. 3, the building unit 30 is a cross-sectional view along the 3-3 line in Fig. 2 and a top view thereof with dimensional markings, that is, it is used to represent the two-dimensional longitudinal working line 20 in Fig. 2 from point a to 2D design and construction drawing of point b. The present invention is not limited to the representation method of the building unit 30.
本发明所揭示以2维设计接口进行建筑规划的方法,于该2维设计接口中设计若干不同的建筑单元30,并使各该建筑单元30分别对应该2维纵向工作线20的不同特定点或特定区段。即,所规划的建筑是由不同建筑单元30沿该2维纵向工作线20扫掠所构成。The present invention discloses a method for architectural planning using a 2D design interface. A number of different building units 30 are designed in the 2D design interface, and each building unit 30 corresponds to different specific points of the 2D longitudinal working line 20. or a specific segment. That is, the planned building is composed of different building units 30 swept along the two-dimensional longitudinal working line 20 .
如图2所示,本发明所揭示以2维设计接口进行建筑规划的方法,其中该2维纵向地盘线10是以多数连续线段所组成,令所建立的2维纵向工作线20也区分为对应相等的若干连续线段,并于该2维纵向工作线20的各线段进行一建筑单元30的设计。也即,可提供设计者就不同段的2维纵向工作线20进行不同建筑单元30的设计。As shown in Figure 2, the present invention discloses a method for architectural planning using a 2-dimensional design interface, in which the 2-dimensional longitudinal site line 10 is composed of a plurality of continuous line segments, so that the established 2-dimensional longitudinal work line 20 is also divided into Corresponding to a number of equal continuous line segments, a building unit 30 is designed on each line segment of the two-dimensional longitudinal working line 20 . That is, the designer can be provided to design different building units 30 based on different sections of the 2-dimensional longitudinal working line 20 .
如图9所示,本发明所揭示以2维设计接口进行建筑规划的方法,进一步于该2维设计接口中汇入至少一条2维横向地盘线S1-S5,令该2维横向地盘线S1-S5与该2维纵向地盘线10在3维空间中是相互交错最佳为相互垂直,且其中该建筑单元30的横向面是平行或位于该2维横向地盘线S1-S5同一平面。如是,设计者便可以通过该2维横向地盘线S1-S5,了解所预定建筑区域的横向断面状况,例如路宽、倾斜坡度、所要建筑的横向位置关系,以提供建筑单元30设计的必要信息。As shown in Figure 9, the method of architectural planning using a 2D design interface disclosed in the present invention further integrates at least one 2D transverse site line S1-S5 into the 2D design interface, so that the 2D transverse site line S1 -S5 and the 2-dimensional longitudinal site line 10 are interlaced with each other in the 3-dimensional space and are preferably perpendicular to each other, and the transverse plane of the building unit 30 is parallel or located on the same plane as the 2-dimensional transverse site line S1-S5. If so, the designer can use the two-dimensional lateral site lines S1-S5 to understand the lateral cross-sectional conditions of the scheduled building area, such as road width, slope, and lateral position relationship of the desired building, so as to provide necessary information for the design of the building unit 30 .
本发明所揭示以2维设计接口进行建筑规划的方法,其中该2维纵向地盘线10与2维横向地盘线S1-S5的建立,如图8、9所示,令一3维立体模型M定义含有一X、Y、Z坐标,其中Z坐标为高度坐标,于该X、Y平面坐标上标定一区域A,且于该X、Y平面沿所标定区域A的纵长方向建立一纵向基线B,并且于该X、Y平面沿所标定区域A的横向建立至少一横向基线S1’-S5’,令以该纵向基线B切割该3维立体模型M后所得的地盘面上缘轮廓为其纵向地盘线,令该纵向地盘线在3维立体模型投影于X、Y平面的长度与该2维纵向地盘线10,如图9所示投影在一2维平面坐标的X轴的长度相等,该纵向地盘线在3维立体模型M的Z轴坐标与该2维纵向地盘线10投影在其2维平面坐标的Y轴坐标相等,其中该2维纵向地盘线10依X坐标,分为5段,即X=0、X=20、X=40、X=60及X=80;且令以该横向基线S1’-S5’切割该3维立体模型M后所得的地盘面上缘轮廓为其横向地盘线,令该横向地盘线在3维立体模型投影于XY平面的长度与该2维横向地盘线S1-S5投影在一2维平面坐标的X轴的长度相等,并令各该横向地盘线S1-S5依序对应通过该2维纵向地盘线10在X坐标的分段点,即如图9所示X轴的X=0,X=20、X=40、X=60及X=80各点,即为该2维纵向地盘线10的各分段点分别对应一条2维横向地盘线S1、S2、S3、S4、S5;该横向地盘线在3维立体模型M的Z轴坐标与该2维横向地盘线S1-S5投影在其2维平面坐标的Y轴坐标即高度坐标相等。The present invention discloses a method for architectural planning using a 2D design interface, in which the 2D longitudinal site line 10 and the 2D transverse site lines S1-S5 are established, as shown in Figures 8 and 9. Let a 3D three-dimensional model M The definition contains an X, Y, Z coordinate, where the Z coordinate is the height coordinate, an area A is calibrated on the X, Y plane coordinates, and a longitudinal baseline is established along the longitudinal direction of the calibrated area A on the X, Y plane. B, and establish at least one transverse baseline S1'-S5' on the X and Y planes along the transverse direction of the calibrated area A, so that the upper edge contour of the land surface obtained after cutting the three-dimensional model M with the longitudinal baseline B is: For the longitudinal site line, the length of the longitudinal site line projected on the X and Y planes of the three-dimensional model is equal to the length of the two-dimensional longitudinal site line 10 projected on the X-axis of a two-dimensional plane coordinate as shown in Figure 9, The Z-axis coordinate of the longitudinal site line on the 3D model M is equal to the Y-axis coordinate of the 2D longitudinal site line 10 projected on its 2D plane coordinate, where the 2D longitudinal site line 10 is divided into 5 according to the X coordinate segments, that is, X=0, X=20, X=40, X=60 and For its transverse site line, the length of the transverse site line projected on the XY plane of the 3D model is equal to the length of the 2D transverse site lines S1-S5 projected on the X-axis of a 2D plane coordinate, and each of the transverse site lines is The site lines S1-S5 correspond in sequence to the segment points at the X coordinate that pass through the two-dimensional longitudinal site line 10, that is, X=0, X=20, X=40, X=60 and X on the X-axis as shown in Figure 9 =80 points, that is, each segment point of the 2-dimensional longitudinal site line 10 corresponds to a 2-dimensional transverse site line S1, S2, S3, S4, S5; the transverse site line is on the Z axis of the 3-dimensional model M The coordinates are equal to the Y-axis coordinates, that is, the height coordinates of the two-dimensional plane coordinates projected onto the two-dimensional transverse site lines S1-S5.
本发明所揭示以2维设计接口进行建筑规划的方法,其中于所标定区域A内呈等距地横向建立多数横向基线S1’-S5’,令各该横向基线S1’-S5’切割该3维立体模型M后所得的地盘面上缘轮廓分别为一横向地盘线,令各该横向地盘线在3维立体模型投影于XY平面的长度距离与该2维横向地盘线投影在一2维平面坐标的X轴的长度相等,且在3维立体模型M的Z轴坐标与该2维横向地盘线投影在其2维平面坐标的Y轴坐标相等,以建立多数2维横向地盘线。The invention discloses a method for architectural planning using a 2-dimensional design interface, in which a plurality of transverse baselines S1'-S5' are established equidistantly and laterally in the calibrated area A, so that each of the transverse baselines S1'-S5' cuts the 3 The upper contours of the land surface obtained after constructing the three-dimensional model M are respectively a transverse land line, so that the length distance of each transverse land line projected on the XY plane of the three-dimensional model is the same as the projection of the two-dimensional transverse land line on a two-dimensional plane The lengths of the X-axis of the coordinates are equal, and the Z-axis coordinate of the 3D three-dimensional model M is equal to the Y-axis coordinate of the 2D transverse land line projected on its 2D plane coordinate, so as to establish a plurality of 2D transverse land lines.
如图8所示,本发明在一3维立体模型所标定的区域中,等距地横向建立5条横向基线S1’、S2’、S3’、S4’、S5’,令各该横向基线S1’、S2’、S3’、S4’、S5’切割该3维立体模型后所得的地盘面上缘轮廓分别为一横向地盘线,令各该横向地盘线在3维立体模型投影于XY平面的长度与该2维横向地盘线S1、S2、S3、S4、S5投影在一2维平面坐标的X轴的长度相等,且在3维立体模型的Z轴Z轴垂直于XY平面坐标与该2维横向地盘线S1、S2、S3、S4、S5投影在其2维平面坐标的Y轴坐标相等,以建立5条2维横向地盘线S1、S2、S3、S4、S5,此时,设计者便可以通过各2维横向地盘线S1、S2、S3、S4、S5了解施工现场的地形地貌状态,也可以通过各2维横向地盘线S1、S2、S3、S4、S5进行丈量、设计,并可依据各该2维横向地盘线S1、S2、S3、S4、S5分别建立一2维横向工作线S11、S21、S31、S41、S51。As shown in Figure 8, the present invention establishes five transverse baselines S1', S2', S3', S4', and S5' at equal intervals in the area calibrated by a three-dimensional model, so that each transverse baseline S1 ', S2', S3', S4', and S5', the upper contours of the land surface obtained after cutting the 3D model are respectively a transverse land line, so that each transverse land line is projected on the XY plane of the 3D model. The length is equal to the length of the X-axis projected on a 2-D plane coordinate of the 2-D transverse site lines S1, S2, S3, S4, S5, and the Z-axis of the 3-D model is perpendicular to the XY plane coordinates of the 2-D model. The Y-axis coordinates of the two-dimensional horizontal site lines S1, S2, S3, S4, and S5 projected on their two-dimensional plane coordinates are equal to establish five two-dimensional horizontal site lines S1, S2, S3, S4, and S5. At this time, the designer You can understand the topography and landform status of the construction site through each 2-dimensional transverse site line S1, S2, S3, S4, and S5, and you can also measure and design through each 2-dimensional transverse site line S1, S2, S3, S4, and S5, and A 2-dimensional transverse working line S11, S21, S31, S41, S51 can be established based on each of the two-dimensional transverse construction lines S1, S2, S3, S4, and S5.
如图8所示,本发明所揭以2维设计接口进行建筑规划的方法,于3维立体模型M上所标定的横向基线S1’、S2’、S3’、S4’、S5’,可由系统内定的密度设置,或可以由设计者自行设定;例如设计者可以设定于所标定区域A内需设立N条横向基线,其中N为自然数;或者可以提供设计者于所标定的区域A相对两侧自行标定该横向基线通过的点,以自行取得该3维立体模型M所标定区域A中任两点间的2维横向地盘线。As shown in Figure 8, in the architectural planning method using a 2-dimensional design interface disclosed in the present invention, the transverse baselines S1', S2', S3', S4', and S5' calibrated on the 3-dimensional model M can be determined by the system. The default density setting may be set by the designer; for example, the designer can set N horizontal baselines to be established in the calibrated area A, where N is a natural number; or the designer can be provided with two relative baselines in the calibrated area A. The side self-calibrates the points through which the transverse baseline passes, so as to self-obtain the two-dimensional transverse construction line between any two points in the calibrated area A of the three-dimensional three-dimensional model M.
本发明所揭示以2维设计接口进行建筑规划的方法,由于本发明可以通过单纯的2维设计接口汇入2维纵向地盘线10与2维横向地盘线S1、S2、S3、S4、S5,以提供设计者依据该2维纵向地盘线10与2维横向地盘线S1、S2、S3、S4、S5,分别建立至少一2维纵向工作线20与至少一2维横向工作线S11、S21、S31、S41、S51,使所设计或指定的建筑单元30在该2维纵向工作线与2维横向工作线间以积分方式计算取得所需的物料统计表,例如是在2维纵向工作线与2维横向工作线上方所需刨除的土方体积或需铺设的柏油体积,并建立于物料统计表。The present invention discloses a method for building planning using a 2D design interface. Since the present invention can integrate 2D longitudinal site lines 10 and 2D transverse site lines S1, S2, S3, S4, S5 through a simple 2D design interface, To provide the designer to establish at least one 2-dimensional longitudinal work line 20 and at least one 2-dimensional transverse work line S11, S21, respectively based on the 2-dimensional longitudinal site line 10 and the 2-dimensional transverse site lines S1, S2, S3, S4, S5. S31, S41, and S51 enable the designed or designated building unit 30 to calculate and obtain the required material statistics table in an integral manner between the 2-D longitudinal work line and the 2-D transverse work line, for example, between the 2-D longitudinal work line and the 2-D transverse work line. The volume of earthwork that needs to be removed or the volume of asphalt that needs to be laid above the 2D transverse working line is established in the material statistics table.
本发明所揭示以2维设计接口进行建筑规划的方法,上述的2维纵向工作线20可区分为多数段,令各段分别对应一2维横向工作线S11、S21、S31、S41、S51。The present invention discloses a method for architectural planning using a 2-dimensional design interface. The above-mentioned 2-dimensional longitudinal work line 20 can be divided into a plurality of segments, so that each segment corresponds to a 2-dimensional transverse work line S11, S21, S31, S41, S51 respectively.
上述物料统计表,可包括建筑所需要的物料品项、数量、单价或需移除的或需填入的土方或物料体积等等,本发明并不予自限该物料统计表的格式及内容。The above-mentioned material statistics table may include the material items, quantities, unit prices required for construction, or the volume of earthwork or materials that need to be removed or filled in, etc. The present invention is not limited to the format and content of the material statistics table. .
如图6所示,本发明所揭示以2维设计接口进行建筑规划的方法,进一步设有一互动数据库,用以提供设计者设定对应该建筑单元在建筑时所需要的物料信息。当设计者完成建筑该建筑单元时所需要的物料信息设定后,该互动数据库便纪录该笔信息,并以所设定该建筑单元进行建筑时所需要的物料信息与所对应该2维纵向工作线长度的积;或是布满两2维纵向工作线所构成区域所需该建筑单元数的总合的物料信息,记录于该物料统计表中;或者以该内建数据库中该建筑单元进行建筑时所需要的物料信息在所对应该2维纵向工作线及2维横向工作线间以积分方式计算取得该物料统计信息,并纪录于该物料统计表中。As shown in Figure 6, the method of building planning using a 2-dimensional design interface disclosed in the present invention is further provided with an interactive database to provide the designer with the material information needed to set the corresponding building unit during construction. After the designer completes the setting of the material information required for the construction of the building unit, the interactive database will record the information and use the set material information required for the construction of the building unit and the corresponding 2-dimensional longitudinal direction. The product of the length of the work line; or the material information of the total number of building units required to cover the area formed by the two 2-dimensional longitudinal work lines is recorded in the material statistics table; or the building unit in the built-in database The material information required for construction is calculated by integration between the corresponding 2-dimensional longitudinal work line and the 2-dimensional horizontal work line to obtain the material statistical information, and is recorded in the material statistics table.
本发明以该建筑单元30沿一对应2维纵向工作线20的轨迹进行扫掠建筑为例,本发明所揭示上述互动数据库,可于一显示屏中显示一输入接口,提供用户编辑对应该建筑单元所需物料信息,例如品项、单位、数量、单价…等物料信息,该输入接口可如下所示,标示有底线者为可供设计者输入或修改的字段:The present invention takes the construction unit 30 to sweep the building along a trajectory corresponding to the two-dimensional longitudinal work line 20 as an example. The interactive database disclosed in the present invention can display an input interface on a display screen to provide the user with the ability to edit the corresponding building. The material information required by the unit, such as item, unit, quantity, unit price... and other material information, the input interface can be as shown below, the fields marked with a bottom line are fields that can be input or modified by the designer:
待设计者完成上述对应该建筑单元进行建筑时,每建筑单元所需要的物料信息输入后,本发明便可依据上述的信息与所指定的该2维纵向工作线长度的乘积列出以该建筑单元进行建筑时所需要的物料统计表;例如以上述设计者所输入的信息为例,若该2维纵向工作线的长度为40m时,本发明便可列出下方的物料统计表,以供设计者参考:After the designer completes the above construction of the building unit and inputs the material information required for each building unit, the present invention can list the building based on the product of the above information and the specified length of the two-dimensional longitudinal working line. The material statistics table required when the unit is constructed; for example, taking the information input by the above-mentioned designer as an example, if the length of the 2-dimensional longitudinal working line is 40m, the present invention can list the material statistics table below for Designer reference:
缘此,设计者便可以通过上述物料统计表,快速了解整个建筑所需的各项物料明细及总工程所需的物料成本。For this reason, designers can quickly understand the details of various materials required for the entire building and the material costs required for the total project through the above material statistics table.
如图5所示,本发明所揭示以2维设计接口进行建筑规划的方法,以该2维纵向地盘线10为参考基准,在该2维设计接口中建立两条2维纵向工作线20、20’,并于该两条2维纵向工作线20、20’间建立或设定至少一建筑单元30,如图5中即设定”W217”及”W23”两建筑单元30,用以表示由a-b点间是由”W217”的建筑单元30所构成,b-c点间是由”W23”的建筑单元30所构成,并建立以该两建筑单元30布满于所对应的该两2维纵向工作线20、20’间的区域所需的物料统计表。上述两条2维纵向工作线20、20’其中一条可定义为开挖基线,另一条为建筑完成面线,两条2维纵向工作线20、20’可相互平行或相互不平行。若两条2维纵向工作线20、20’互不平行,位于该两2维纵向工作线20、20’间的建筑单元30高度将随该两2维纵向工作线间20、20’的距离改变,本发明可通过积分或其它数学方式的计算,取得在该两2维纵向工作线20、20’间以该建筑单元30进行建筑时所需要的物料信息。As shown in Figure 5, the method disclosed in the present invention for architectural planning using a 2D design interface takes the 2D longitudinal site line 10 as a reference and establishes two 2D longitudinal work lines 20 and 20 in the 2D design interface. 20', and establish or set at least one building unit 30 between the two 2-dimensional longitudinal working lines 20, 20'. In Figure 5, two building units 30 "W217" and "W23" are set to represent The space between points a-b is composed of the building units 30 of "W217", and the space between points b-c is composed of the building units 30 of "W23", and the two building units 30 are established to cover the corresponding two 2-dimensional longitudinal directions. Material statistics table required for the area between work lines 20 and 20'. One of the above two 2-dimensional longitudinal work lines 20, 20' can be defined as the excavation baseline, and the other is the construction completion line. The two 2-dimensional longitudinal work lines 20, 20' can be parallel to each other or not parallel to each other. If the two 2-dimensional longitudinal work lines 20 and 20' are not parallel to each other, the height of the building unit 30 located between the two 2-dimensional longitudinal work lines 20 and 20' will be determined by the distance between the two 2-dimensional longitudinal work lines 20 and 20'. Alternatively, the present invention can obtain the material information required for construction with the building unit 30 between the two two-dimensional longitudinal working lines 20 and 20' through integral or other mathematical calculations.
如图6所示,本发明所揭示以2维设计接口进行建筑规划的方法,进一步设有一内建数据库,该内建数据库记录有多数建筑单元及以各该建筑单元进行建筑时每建筑单元所需要的物料信息;如是,当设计者依该内建数据库选择某一建筑单元例如是扶手及所对应的2维纵向工作线轨迹或两2维纵向工作线所构成的区域后,本发明即以该内建数据库中该建筑单元进行建筑时所需要的物料信息与对应该2维纵向工作线轨迹长度的积;或是布满两2维纵向工作线间区域的建筑单元总数的总物料信息,纪录于该物料统计表中;或者以该内建数据库中该建筑单元进行建筑时所需要的物料信息在所对应该2维纵向工作线及2维横向工作线间以积分方式计算取得该物料统计信息,并纪录于该物料统计表中;以提供设计者做为设计、规划建筑时的参考。于本实施例中,设计者是应用本发明的内建数据库,并不需要自行建立前述互动数据库中该建筑单元所需要的物料信息,以大幅降低设计、规划建筑的时间与成本,而显本发明的经济性及便利性。上述的内建数据库可供用户自行新增、修正与查询。As shown in Figure 6, the method of building planning using a 2-dimensional design interface disclosed in the present invention is further provided with a built-in database. The built-in database records a plurality of building units and the location of each building unit when building with each building unit. Required material information; in this case, when the designer selects a certain building unit according to the built-in database, such as a handrail and the corresponding 2-dimensional longitudinal working line trajectory or the area composed of two 2-dimensional longitudinal working lines, the present invention will The product of the material information required for construction of the building unit in the built-in database and the track length corresponding to the 2-D longitudinal work line; or the total material information of the total number of building units covering the area between the two 2-D longitudinal work lines, Record it in the material statistics table; or use the material information required for the construction of the building unit in the built-in database to obtain the material statistics by integrating between the corresponding 2-dimensional longitudinal work line and the 2-dimensional horizontal work line. Information is recorded in the material statistics table to provide designers with a reference when designing and planning buildings. In this embodiment, the designer uses the built-in database of the present invention and does not need to create the material information required for the building unit in the interactive database by himself, so as to significantly reduce the time and cost of designing and planning the building, and display the present invention. Economy and convenience of invention. The above-mentioned built-in database can be added, modified and queried by users.
如图9所示,本发明所揭示以2维设计接口进行建筑规划的方法,主要提供设计者在2维平面接口中,通过汇入2维纵向地盘线10或2维横向地盘线作S1-S5为建立至少一2维纵向工作线20或至少一2维横向工作线S11、S21、S31、S41、S51的参考,使设计者不需要经过实地测量,便可以快速地建立该2维纵向工作线20或2维横向工作线S11、S21、S31、S41、S51,并透过简单的建立或选择建筑单元30的信息,便可以完成建筑所需要的所有物料统计表,设计者可以立即获得所有物料品项、数量及价格,大幅降低设计所需时间、人力及成本。As shown in Figure 9, the method for architectural planning using a 2D design interface disclosed in the present invention mainly provides the designer with the 2D plane interface to create S1- by integrating the 2D longitudinal site line 10 or the 2D transverse site line. S5 is a reference for establishing at least one 2-dimensional longitudinal working line 20 or at least one 2-dimensional horizontal working line S11, S21, S31, S41, S51, so that the designer can quickly establish the 2-dimensional longitudinal working line without on-site measurement. Line 20 or 2-dimensional transverse work lines S11, S21, S31, S41, S51, and by simply creating or selecting the information of the building unit 30, all material statistics tables required for the construction can be completed, and the designer can immediately obtain all Material items, quantities and prices, significantly reducing the time, labor and costs required for design.
本发明所揭示以2维设计接口进行建筑规划的方法,其中该2维纵向地盘线或2维横向地盘线,可为dxf、dwg、dwf、dae、dxb…等格式,其原始建立,可由一般建筑规划软件建立,或如同本案发明人所申请并经核准的发明专利申请案号第105100650号、第107140371号中所建构的3维模型中建立,或采构自专业丈量公司,本发明并不自限用以建立2维纵向地盘线、2维横向地盘线的工具与来源。The method disclosed in the present invention uses a 2-dimensional design interface for architectural planning, in which the 2-dimensional longitudinal site line or the 2-dimensional transverse site line can be in a format such as dxf, dwg, dwf, dae, dxb... and the original establishment can be made by a general Architectural planning software is created, or it is created from the 3D model constructed in the approved invention patent application numbers 105100650 and 107140371 applied by the inventor of this case, or it is acquired from a professional surveying company. The present invention does not Self-limited tools and sources for creating 2D vertical site lines and 2D horizontal site lines.
以上依据图式所示的实施例详细说明了本发明的构造、特征及作用效果,以上所述仅为本发明的较佳实施例,但本发明不以图面所示限定实施范围,凡是依照本发明的构想所作的改变,或修改为等同变化的等效实施例,仍未超出说明书与图示所涵盖的精神时,均应在本发明的保护范围内。The structure, features and effects of the present invention have been described in detail based on the embodiments shown in the drawings. The above descriptions are only preferred embodiments of the present invention. However, the implementation scope of the present invention is not limited by the drawings. Any changes made to the concept of the present invention, or modifications to equivalent embodiments with equivalent changes, shall be within the protection scope of the present invention as long as they do not exceed the spirit covered by the description and drawings.
Claims (14)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| TW108118222 | 2019-05-27 | ||
| TW108121645A TWI695340B (en) | 2019-05-27 | 2019-06-21 | Method for architectural planning with 2D design interface |
| TW108121645 | 2019-06-21 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN112116712A CN112116712A (en) | 2020-12-22 |
| CN112116712B true CN112116712B (en) | 2023-11-24 |
Family
ID=72176083
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010167217.7A Active CN112116712B (en) | 2019-05-27 | 2020-03-11 | An approach to architectural planning using a 2D design interface |
Country Status (2)
| Country | Link |
|---|---|
| CN (1) | CN112116712B (en) |
| TW (1) | TWI695340B (en) |
Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20010007818A (en) * | 2000-04-27 | 2001-02-05 | 김승양 | System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface |
| CN102651146A (en) * | 2012-04-09 | 2012-08-29 | 铁道第三勘察设计院集团有限公司 | Three-dimensional multi-track railway cross section graphic display method |
| CN103049624A (en) * | 2013-01-04 | 2013-04-17 | 江西省交通设计研究院有限责任公司 | Control method of culvert visual design construction based on virtual reality modeling language (VRML) |
| CN108563847A (en) * | 2018-03-27 | 2018-09-21 | 上海市城市建设设计研究总院(集团)有限公司 | The method that three-dimensional bridge model is generated into two-dimensional arrangement figure with CATIA softwares |
Family Cites Families (7)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2014129998A (en) * | 2012-11-30 | 2014-07-10 | Akira Ishibashi | Wall, high-clean room system, manufacturing method thereof and architectural structure |
| CN104183016B (en) * | 2014-09-05 | 2017-08-15 | 山东省国土测绘院 | A kind of construction method of quick 2.5 dimension building model |
| CN104318607A (en) * | 2014-09-29 | 2015-01-28 | 陈奕 | Method for converting two-dimensional building image into three-dimensional structure |
| CN107146280B (en) * | 2017-05-09 | 2020-11-17 | 西安理工大学 | Point cloud building reconstruction method based on segmentation |
| CN107169673A (en) * | 2017-06-09 | 2017-09-15 | 上海嘉实(集团)有限公司 | Management system/method, computer-readable recording medium and the terminal of construction project |
| CN108089195A (en) * | 2017-12-30 | 2018-05-29 | 浙江维思无线网络技术有限公司 | A kind of object position estimation method and device |
| CN108595891B (en) * | 2018-05-11 | 2022-04-05 | 石家庄羚建工程技术咨询有限公司 | Two-dimensional BIM design method for temporary support structure for concrete bridge girder construction |
-
2019
- 2019-06-21 TW TW108121645A patent/TWI695340B/en active
-
2020
- 2020-03-11 CN CN202010167217.7A patent/CN112116712B/en active Active
Patent Citations (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20010007818A (en) * | 2000-04-27 | 2001-02-05 | 김승양 | System And Method For Estimate Bill Of Materials Using Two Dimensional CAD Interface |
| CN102651146A (en) * | 2012-04-09 | 2012-08-29 | 铁道第三勘察设计院集团有限公司 | Three-dimensional multi-track railway cross section graphic display method |
| CN103049624A (en) * | 2013-01-04 | 2013-04-17 | 江西省交通设计研究院有限责任公司 | Control method of culvert visual design construction based on virtual reality modeling language (VRML) |
| CN108563847A (en) * | 2018-03-27 | 2018-09-21 | 上海市城市建设设计研究总院(集团)有限公司 | The method that three-dimensional bridge model is generated into two-dimensional arrangement figure with CATIA softwares |
Non-Patent Citations (1)
| Title |
|---|
| 新建铁路线路计算机辅助设计研究与开发;王玉泽;;铁道工程学报(第07期);全文 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN112116712A (en) | 2020-12-22 |
| TW202044183A (en) | 2020-12-01 |
| TWI695340B (en) | 2020-06-01 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN112560154B (en) | Highway tunnel engineering BIM model dynamic creation method based on Unity platform | |
| KR101659779B1 (en) | Method for Constructing Three Dimentional Drawing of GIS | |
| CN101930623B (en) | Three-dimensional road modeling method and device | |
| US7830373B1 (en) | System and methods of civil engineering objects model | |
| CN101930624B (en) | Modeling method and device of three-dimensional road intersection | |
| KR101659780B1 (en) | Method for Representing Global Spherical Space of 2 Dimentional Drawing data in GIS | |
| CN101872376A (en) | True three-dimensional road intelligent design method and system | |
| CN106097450A (en) | Method and device for generating contour lines | |
| Hernández et al. | Application of digital 3D models on urban planning and highway design. | |
| CN101154295A (en) | Three-dimensional simulation electronic map for navigation channel | |
| Tanoli et al. | 3D design modeling application in machine guidance system for earthwork operations | |
| Palestini et al. | Integrated photogrammetric survey and BIM modelling for the protection of school heritage, applications on a case study | |
| CN107102991A (en) | A kind of shaft tower parametric modeling method in three-dimension GIS system | |
| CN119107423A (en) | A three-dimensional modeling method, system, device and storage medium for airport pavement engineering | |
| KR100777373B1 (en) | Implementation of 4-D construction work process management system of civil engineering works linking 3-D objects and schedule | |
| CN112116712B (en) | An approach to architectural planning using a 2D design interface | |
| CN118709265B (en) | Tunnel Portal Slope Protection Design Method | |
| KR102130922B1 (en) | 3D Solid Cut / Fill Terrain and Corridor Structure Objects by Station by Automatic Extraction of Station and Object Information by Location of 3D Surface Terrain and Corridor Structures Automatic conversion and quantity automatic generation system and method | |
| CN101281662A (en) | A three-dimensional stratigraphic subdivision method of triangular prism and excavation earthwork estimation method | |
| Tanoli et al. | PAD based 3D earthwork BIM design module for machine guidance | |
| JP3572253B2 (en) | Three-dimensional model generation method and apparatus, and recording medium recording execution program of this method | |
| JP3270319B2 (en) | Geological information processing system | |
| US20030193499A1 (en) | Object-oriented three-dimensional polygons for the surface modeling of civil engineering objects | |
| KR100329817B1 (en) | System For Extracting Shape And Location Information Of Two Dimension CAD And Method Thereof | |
| Ning | Roadway automation modeling |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant |