CN111928817B - 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 - Google Patents
采用多环撑沉降水平监测点的深坑基工程监测系统与方法 Download PDFInfo
- Publication number
- CN111928817B CN111928817B CN202010998263.1A CN202010998263A CN111928817B CN 111928817 B CN111928817 B CN 111928817B CN 202010998263 A CN202010998263 A CN 202010998263A CN 111928817 B CN111928817 B CN 111928817B
- Authority
- CN
- China
- Prior art keywords
- horizontal
- settlement
- steel cable
- pit
- axial
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C5/00—Measuring height; Measuring distances transverse to line of sight; Levelling between separated points; Surveyors' levels
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Foundations (AREA)
Abstract
Description
Claims (9)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010998263.1A CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN202010998263.1A CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| CN111928817A CN111928817A (zh) | 2020-11-13 |
| CN111928817B true CN111928817B (zh) | 2021-01-29 |
Family
ID=73334905
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN202010998263.1A Active CN111928817B (zh) | 2020-09-22 | 2020-09-22 | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN111928817B (zh) |
Families Citing this family (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN112902913B (zh) * | 2021-01-13 | 2022-04-19 | 中国矿业大学(北京) | 一种采空区沉降监测系统与方法 |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104404979A (zh) * | 2014-11-28 | 2015-03-11 | 中铁二十三局集团有限公司 | H型桩板墙施工方法 |
| CN105043344A (zh) * | 2015-07-10 | 2015-11-11 | 镇江绿材谷新材料科技有限公司 | 一种基于连续纤维复合型材的沉降分布监测系统及监测方法 |
| CN106522235A (zh) * | 2016-11-01 | 2017-03-22 | 中化二建集团有限公司 | 狭小场地深基坑开挖支护施工方法 |
| CN109944255A (zh) * | 2019-05-06 | 2019-06-28 | 重庆建工市政交通工程有限责任公司 | 无支撑双层弧形钻孔灌注深基坑围护结构及开挖施工方法 |
| CN111593773A (zh) * | 2020-05-15 | 2020-08-28 | 中建二局第一建筑工程有限公司 | 一种深基坑的监测方法及系统、可读存储介质 |
Family Cites Families (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| US20180202281A1 (en) * | 2015-08-12 | 2018-07-19 | Halliburton Energy Services Inc. | Locating wellbore flow paths behind drill pipe |
-
2020
- 2020-09-22 CN CN202010998263.1A patent/CN111928817B/zh active Active
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN104404979A (zh) * | 2014-11-28 | 2015-03-11 | 中铁二十三局集团有限公司 | H型桩板墙施工方法 |
| CN105043344A (zh) * | 2015-07-10 | 2015-11-11 | 镇江绿材谷新材料科技有限公司 | 一种基于连续纤维复合型材的沉降分布监测系统及监测方法 |
| CN106522235A (zh) * | 2016-11-01 | 2017-03-22 | 中化二建集团有限公司 | 狭小场地深基坑开挖支护施工方法 |
| CN109944255A (zh) * | 2019-05-06 | 2019-06-28 | 重庆建工市政交通工程有限责任公司 | 无支撑双层弧形钻孔灌注深基坑围护结构及开挖施工方法 |
| CN111593773A (zh) * | 2020-05-15 | 2020-08-28 | 中建二局第一建筑工程有限公司 | 一种深基坑的监测方法及系统、可读存储介质 |
Non-Patent Citations (1)
| Title |
|---|
| 动载频率对土工格栅加筋土挡墙动力特性的影响;王家全 等;《振动工程学报》;20191031;第32卷(第5期);第898-906页 * |
Also Published As
| Publication number | Publication date |
|---|---|
| CN111928817A (zh) | 2020-11-13 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| Roboski et al. | Distributions of ground movements parallel to deep excavations in clay | |
| CN103352455B (zh) | 开挖基坑坑底土体隆起的监测方法 | |
| CN115167212A (zh) | 基于监测平台的基坑动态施工控制系统及方法 | |
| CN111998825B (zh) | 隧道浅埋段监控量测方法 | |
| CN107288115A (zh) | 软弱地层基坑深层水平位移监测方法 | |
| CN111928817B (zh) | 采用多环撑沉降水平监测点的深坑基工程监测系统与方法 | |
| Hsu et al. | Normalized analysis of deformation for deep excavation diaphragm walls under different neighboring building conditions | |
| CN105809610A (zh) | 一种基坑支撑拆除对周边地层影响的评估方法 | |
| CN201901875U (zh) | 一种大规模超深基坑开挖环境控制与保护监测装置 | |
| CN112177061B (zh) | 复杂地质构造下的微观水平变形监测系统与方法 | |
| CN101319894A (zh) | 地下空间开挖引起的地面沉降测试方法 | |
| CN100564697C (zh) | 水平顶管地基处理工法 | |
| CN115928722A (zh) | 一种黄泛平原桩基施工中预制桩桩长优化方法 | |
| CN113006084A (zh) | 一种无支撑基坑支档系统的施工方法及其动态设计方法 | |
| CN112344983B (zh) | 软土基环境下的沉降施工水平监测方法与系统 | |
| CN117249767A (zh) | 基坑围护结构位移检测系统、方法、装置、计算机设备 | |
| Gorska et al. | Analysis of displacement of excavation based on inclinometer measurements | |
| CN118036371A (zh) | 地质灾害下高压输电线路铁塔失效模型构建方法及系统 | |
| CN117385943A (zh) | 一种基坑防变形结构及参数设计方法 | |
| CN112343098B (zh) | 用于围护结构顶部的水平监测系统与方法 | |
| CN114707225A (zh) | 考虑水位波动及支护时效的基坑支护性能评估方法及装置 | |
| Xin et al. | Study on the design calculation method and construction control method of suction drum foundation for guided frame platform | |
| CN114593711B (zh) | 非接触地下管道二维毫米级沉降实时监控方法 | |
| CN219547755U (zh) | 一种坑底回弹测量装置 | |
| CN120296853B (zh) | 基于多模态传感数据的深基坑变形趋势预测方法 |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information |
Inventor after: Jiang Meng Inventor after: Zhang Huai Inventor after: Wang He Inventor after: Gao Yuliang Inventor after: Gao Fei Inventor after: Dong Jianhua Inventor after: Ding Haiyou Inventor after: Kang Qiujing Inventor after: Huang Yujun Inventor before: Jiang Meng Inventor before: Huang Yujun Inventor before: Zhang Huai Inventor before: Zhong Wenqing Inventor before: Wang He Inventor before: Gao Yuliang Inventor before: Gao Fei Inventor before: Dong Jianhua Inventor before: Ding Haiyou Inventor before: Kang Qiujing |
|
| CB03 | Change of inventor or designer information | ||
| CP03 | Change of name, title or address |
Address after: B713 (Changping Demonstration Park), Building 8, No. 97, Changping Road, Shahe Town, Changping District, Beijing, 102206 Patentee after: Beijing Dacheng Guoce Technology Co.,Ltd. Address before: 102206 room 503, building 6, No.97, Changping Road, Changping District, Beijing Patentee before: BEIJING DACHENG GUOCE SCIENCE AND TECHNOLOGY CO.,LTD. |
|
| CP03 | Change of name, title or address |