CN111927137A - Installation method of double-layer power distribution room - Google Patents

Installation method of double-layer power distribution room Download PDF

Info

Publication number
CN111927137A
CN111927137A CN202010801202.1A CN202010801202A CN111927137A CN 111927137 A CN111927137 A CN 111927137A CN 202010801202 A CN202010801202 A CN 202010801202A CN 111927137 A CN111927137 A CN 111927137A
Authority
CN
China
Prior art keywords
floor
power distribution
distribution room
corridor
steel beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010801202.1A
Other languages
Chinese (zh)
Inventor
黄辉骏
钟朝晖
邓丽文
何泳洪
陈星燃
韩畅
卢文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Original Assignee
Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd filed Critical Guangzhou Power Supply Bureau of Guangdong Power Grid Co Ltd
Priority to CN202010801202.1A priority Critical patent/CN111927137A/en
Publication of CN111927137A publication Critical patent/CN111927137A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • E04G23/0266Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H5/00Buildings or groups of buildings for industrial or agricultural purposes
    • E04H5/02Buildings or groups of buildings for industrial purposes, e.g. for power-plants or factories
    • E04H5/04Transformer houses; Substations or switchgear houses

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Power Engineering (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Roof Covering Using Slabs Or Stiff Sheets (AREA)

Abstract

本申请涉及房屋安装技术领域,特别涉及一种双层配电房的安装方法,适用于已经建造好的一楼配电房,包括以下步骤:S1、拆除一楼配电房的屋檐;S2、在一楼配电房的四角处安装第一立柱,第一立柱与一楼配电房连接固定,第一立柱的底端与地面连接固定,第一立柱的顶端向上延伸超出一楼配电房;S3、安装二楼楼层的第一横梁和二楼屋顶的第二横梁;S4、安装二楼楼层的第一纵梁和二楼屋顶的第二纵梁;S5、在第一钢梁网上安装二楼底板;S6、在第二钢梁网上安装二楼顶板;S7、在二楼底板和二楼顶板之间安装二楼墙板;S8、在二楼墙板上安装二楼房门。本申请有效地解决现有技术中由于城中村不能提供新增用地,导致配电房扩建项目开展困难的技术问题。

Figure 202010801202

The present application relates to the technical field of house installation, and in particular, to a method for installing a double-layer power distribution room, which is suitable for an already constructed first-floor power distribution room, and includes the following steps: S1, removing the eaves of the first-floor power distribution room; S2, Install the first column at the four corners of the power distribution room on the first floor, the first column is connected and fixed with the first floor power distribution room, the bottom end of the first column is connected and fixed with the ground, and the top of the first column extends upward beyond the first floor power distribution room ; S3, install the first beam of the second floor floor and the second beam of the second floor roof; S4, install the first longitudinal beam of the second floor floor and the second longitudinal beam of the second floor roof; S5, install on the first steel beam net The second floor bottom plate; S6, install the second floor top plate on the second steel beam network; S7, install the second floor wall plate between the second floor bottom plate and the second floor top plate; S8, install the second floor door on the second floor wall plate . The present application effectively solves the technical problem in the prior art that the expansion project of the power distribution room is difficult to carry out because the urban village cannot provide new land.

Figure 202010801202

Description

一种双层配电房的安装方法A kind of installation method of double-layer power distribution room

技术领域technical field

本申请涉及房屋安装技术领域,特别涉及一种双层配电房的安装方法。The present application relates to the technical field of house installation, and in particular, to an installation method of a double-layer power distribution room.

背景技术Background technique

随着城市的迅猛发展,大量外来人口迁入城中村,导致城中村用电负荷暴增,大量变压器重过载运行,使得城中村用电陷入频繁停电的困局。新增城中村配电房的需求已迫在眉睫,但城中村不能提供新增用地,存在着电房选址难的问题。配电房扩建选址难,配电房扩建项目多位于城中村,用电负荷区人口密集,不能提供新建配电房位置。不仅如此,配电房扩建选址还受到市政、交通、水务等规定的限制。With the rapid development of cities, a large number of migrants have moved into urban villages, resulting in a sharp increase in the electricity load of urban villages, and a large number of transformers are overloaded, making urban villages fall into the dilemma of frequent power outages. The demand for new power distribution rooms in urban villages is imminent, but urban villages cannot provide new land, and there is a problem of difficult site selection for power plants. It is difficult to select the location for power distribution room expansion. Most of the power distribution room expansion projects are located in urban villages, and the electricity load area is densely populated, so the location of new power distribution rooms cannot be provided. Not only that, the site selection for the expansion of the power distribution room is also restricted by the regulations of municipal, transportation, and water affairs.

发明内容SUMMARY OF THE INVENTION

有鉴于此,本申请的目的在于提供一种双层配电房的安装方法,有效地解决现有技术中由于城中村不能提供新增用地,导致配电房扩建项目开展困难的技术问题。In view of this, the purpose of the present application is to provide an installation method for a double-layer power distribution room, which effectively solves the technical problem in the prior art that the expansion project of the power distribution room is difficult to carry out because the urban village cannot provide new land.

为达到上述目的,本申请提供以下技术方案:In order to achieve the above purpose, the application provides the following technical solutions:

一种双层配电房的安装方法,适用于已经建造好的一楼配电房,包括以下步骤:An installation method for a double-layer power distribution room, which is suitable for an already constructed first-floor power distribution room, includes the following steps:

S1、拆除一楼配电房的屋檐;S1. Remove the eaves of the power distribution room on the first floor;

S2、在一楼配电房的四角处安装第一立柱,第一立柱与一楼配电房连接固定,第一立柱的底端与地面连接固定,第一立柱的顶端向上延伸超出一楼配电房;S2. Install the first column at the four corners of the power distribution room on the first floor, the first column is connected and fixed with the first floor power distribution room, the bottom end of the first column is connected and fixed with the ground, and the top of the first column extends upward beyond the first floor distribution room. Electric Room;

S3、在相邻两个第一立柱之间安装二楼楼层的第一横梁和二楼屋顶的第二横梁,第一横梁和第二横梁均与第一立柱连接固定;S3, install the first beam of the second floor floor and the second beam of the second floor roof between two adjacent first columns, and both the first beam and the second beam are connected and fixed with the first column;

S4、安装二楼楼层的第一纵梁和二楼屋顶的第二纵梁,使得第一横梁和第一纵梁形成第一钢梁网,第二横梁和第二纵梁形成第二钢梁网;S4. Install the first longitudinal beam of the second floor floor and the second longitudinal beam of the second floor roof, so that the first transverse beam and the first longitudinal beam form a first steel beam network, and the second transverse beam and the second longitudinal beam form a second steel beam network;

S5、在第一钢梁网上安装二楼底板,二楼底板与第一钢梁网连接固定;S5. Install the second floor bottom plate on the first steel beam net, and the second floor bottom plate is connected and fixed with the first steel beam net;

S6、在第二钢梁网上安装二楼顶板,二楼顶板与第二钢梁网连接固定;S6. Install the second floor roof on the second steel beam net, and connect and fix the second floor roof with the second steel beam net;

S7、在二楼底板和二楼顶板之间安装二楼墙板,墙板与第一立柱、第一钢梁网、第二钢梁网均连接固定;S7. Install the second floor wall panel between the second floor bottom plate and the second floor top plate, and the wall panel is connected and fixed with the first column, the first steel beam net, and the second steel beam net;

S8、在二楼墙板上安装二楼房门,完成二楼配电房的安装。S8. Install the door of the second floor on the wall panel of the second floor, and complete the installation of the power distribution room on the second floor.

优选地,在上述的一种双层配电房的安装方法中,在S2之后,S3之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S2 and before S3, the following steps are further included:

S201、在相邻两个第一立柱之间安装第二立柱,第二立柱与一楼配电房连接固定,第二立柱的底端与地面连接固定,第二立柱的顶端向上延伸超出一楼配电房。S201. Install a second column between two adjacent first columns, the second column is connected and fixed with the power distribution room on the first floor, the bottom end of the second column is connected and fixed with the ground, and the top of the second column extends upward beyond the first floor Power distribution room.

优选地,在上述的一种双层配电房的安装方法中,在S4之后,S5之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S4 and before S5, the following steps are further included:

S401、在第一钢梁网的外围安装走廊钢梁,走廊钢梁与第一钢梁网、第一立柱连接固定。S401. Install corridor steel beams on the periphery of the first steel beam net, and the corridor steel beams are connected and fixed with the first steel beam net and the first column.

优选地,在上述的一种双层配电房的安装方法中,在S401之后,S5之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S401 and before S5, the following steps are further included:

S402、在一楼配电房的侧壁安装二楼楼梯,二楼楼梯的底端与地面连接固定,二楼楼梯的顶端与走廊钢梁连接固定。S402. Install stairs on the second floor on the side wall of the power distribution room on the first floor. The bottom end of the stairs on the second floor is connected and fixed with the ground, and the top of the stairs on the second floor is connected and fixed with the steel beams in the corridor.

优选地,在上述的一种双层配电房的安装方法中,在S5之后,S6之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S5 and before S6, the following steps are further included:

S501、在走廊钢梁上安装走廊底板,走廊底板与走廊钢梁、第一立柱均连接固定。S501. Install a corridor bottom plate on the corridor steel beam, and the corridor bottom plate is connected and fixed with the corridor steel beam and the first column.

优选地,在上述的一种双层配电房的安装方法中,在S6之后,S7之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S6 and before S7, the following steps are further included:

S601、在二楼顶板的外围安装屋檐板,屋檐板位于走廊底板和二楼楼梯的上方,屋檐板与二楼顶板、第一立柱均连接固定。S601, install eaves board on the periphery of the second floor roof, the eaves board is located above the corridor bottom plate and the second floor stairs, and the eaves board is connected and fixed with the second floor roof board and the first column.

优选地,在上述的一种双层配电房的安装方法中,在S7之后,S8之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S7 and before S8, the following steps are further included:

S701、在二楼楼梯的外侧和走廊钢梁的外侧分别安装楼梯护栏和走廊护栏,楼梯护栏与二楼楼梯连接固定,走廊护栏与走廊钢梁连接固定。S701. Install a stair guardrail and a corridor guardrail on the outer side of the stairs on the second floor and the outer side of the corridor steel beam respectively. The stair guardrail is connected and fixed with the stairs on the second floor, and the corridor guardrail is connected and fixed with the corridor steel beam.

优选地,在上述的一种双层配电房的安装方法中,在S701之后,S8之前,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S701 and before S8, the following steps are further included:

S702、在一楼配电房的外围和二楼配电房的外围安装外墙挂板,外墙挂板与一楼配电房、二楼配电房均连接固定。S702, install external wall hanging boards on the periphery of the power distribution room on the first floor and the power distribution room on the second floor, and the external wall hanging boards are connected and fixed with the power distribution room on the first floor and the power distribution room on the second floor.

优选地,在上述的一种双层配电房的安装方法中,在S8之后,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S8, the following steps are further included:

S801、在二楼顶板的底部、走廊底板的底部和二楼楼梯的底部安装收口底板,收口底板分别与二楼顶板、走廊底板、二楼楼梯连接固定。S801. Install a closing bottom plate at the bottom of the second floor top plate, the bottom of the corridor bottom plate and the bottom of the second floor stairs, and the closing bottom plate is respectively connected and fixed with the second floor top plate, the corridor bottom plate and the second floor stairs.

优选地,在上述的一种双层配电房的安装方法中,在S8之后,还包括以下步骤:Preferably, in the above-mentioned installation method of a double-layer power distribution room, after S8, the following steps are further included:

S802、在二楼墙板上安装风机。S802. Install a fan on the wall panel on the second floor.

与现有技术相比,本申请的有益效果是:Compared with the prior art, the beneficial effects of the present application are:

本申请提供的一种双层配电房的安装方法,通过在一楼配电房的四角处新增第一立柱,以便在一楼配电房的上方搭建二楼的第一钢梁网和第二钢梁网,接着在第一钢梁网、第二钢梁网和第一立柱上安装二楼底板、二楼顶板和二楼墙板,最后在二楼墙板上安装房门,即可完成二楼配电房的安装,从而实现在原有的单层配电房的基础上,新建钢结构基础,将钢结构框架直接搭建在原有电房的上方,从而将单层配电房改造成双层配电房,不仅可以在施工改造过程中不影响原有单层配电房的供电连续性,而且二楼配电房是在原有配电房的上方改造而成,无需重新选址,以便配电房扩建项目在城中村内正常开展,有利于保证城中村的供电需求,有效地解决现有技术中由于城中村不能提供新增用地,导致配电房扩建项目开展困难的技术问题。The application provides a method for installing a double-layer power distribution room. By adding a first column at the four corners of the power distribution room on the first floor, the first steel beam network and the second floor can be built above the power distribution room on the first floor. The second steel beam net, then install the second floor bottom plate, the second floor top plate and the second floor wall panel on the first steel beam net, the second steel beam net and the first column, and finally install the door on the second floor wall panel, The installation of the power distribution room on the second floor can be completed, so that a new steel structure foundation can be built on the basis of the original single-story power distribution room, and the steel structure frame is directly built on the top of the original power distribution room, thereby transforming the single-story power distribution room into a new one. The construction of a double-layer power distribution room not only does not affect the power supply continuity of the original single-storey power distribution room during the construction and renovation process, but also the second-floor power distribution room is transformed above the original power distribution room, so there is no need to relocate , so that the power distribution room expansion project can be carried out normally in the urban village, which is beneficial to ensure the power supply demand of the urban village, and effectively solve the technical problem that the expansion project of the power distribution room is difficult to carry out because the urban village cannot provide new land in the existing technology. .

附图说明Description of drawings

为了更清楚地说明本申请实施例或现有技术中的技术方案,下面将对实施例或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本申请的实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据提供的附图获得其他的附图。In order to more clearly illustrate the embodiments of the present application or the technical solutions in the prior art, the following briefly introduces the accompanying drawings required for the description of the embodiments or the prior art. Obviously, the drawings in the following description are only It is an embodiment of the present application. For those of ordinary skill in the art, other drawings can also be obtained according to the provided drawings without any creative effort.

图1为本申请实施例提供的一种双层配电房的安装方法的步骤流程图;1 is a flow chart of steps of a method for installing a double-layer power distribution room provided by an embodiment of the present application;

图2为本申请实施例提供的一种双层配电房的安装方法的详细流程图;2 is a detailed flowchart of an installation method of a double-layer power distribution room provided by an embodiment of the present application;

图3为本申请实施例提供的一种已经建造好的一楼配电房的结构图;3 is a structural diagram of a built first-floor power distribution room provided by an embodiment of the present application;

图4为本申请实施例拆除一楼配电房的屋檐和雨棚时的结构示意图;4 is a schematic structural diagram when the eaves and the canopy of the first-floor power distribution room are removed according to an embodiment of the application;

图5为本申请实施例安装第一立柱和第二立柱时的结构示意图;FIG. 5 is a schematic structural diagram of an embodiment of the present application when a first column and a second column are installed;

图6为本申请实施例安装第一横梁和第二横梁时的结构示意图;6 is a schematic structural diagram of an embodiment of the present application when the first beam and the second beam are installed;

图7为本申请实施例安装第一钢梁网、第二钢梁网、走廊钢梁和二楼楼梯时的结构示意图;Fig. 7 is the structural representation when installing the first steel girder net, the second steel girder net, the corridor steel girder and the stairs of the second floor according to the embodiment of the application;

图8为本申请实施例安装二楼底板和二楼顶板时的结构示意图;Fig. 8 is the structural schematic diagram when the second floor bottom plate and the second floor top plate are installed in the embodiment of the application;

图9为本申请实施例安装二楼墙板时的结构示意图;Fig. 9 is the structural schematic diagram when installing the second floor wall panel according to the embodiment of the application;

图10为本申请实施例安装走廊护栏和楼梯护栏时的结构示意图;10 is a schematic structural diagram of installing corridor guardrails and stair guardrails according to an embodiment of the application;

图11为本申请实施例安装外墙挂板的钢梁网时的结构示意图;Fig. 11 is the structural schematic diagram when the steel beam net of the outer wall hanging board is installed in the embodiment of the application;

图12为本申请实施例安装外墙挂板时的结构示意图;FIG. 12 is a schematic structural diagram of an embodiment of the present application when an outer wall hanging board is installed;

图13为本申请实施例安装收口底板时的结构示意图。FIG. 13 is a schematic structural diagram of installing a closing bottom plate according to an embodiment of the present application.

图中:In the picture:

11为一楼配电房、111为屋檐、12为二楼配电房、21为第一立柱、22为第二立柱、31为第一钢梁网、311为第一横梁、32为第二钢梁网、321为第二横梁、41为二楼顶板、42为二楼墙板、5为走廊钢梁、6为二楼楼梯、7为外墙挂板、8为收口底板。11 is the power distribution room on the first floor, 111 is the eaves, 12 is the power distribution room on the second floor, 21 is the first column, 22 is the second column, 31 is the first steel beam net, 311 is the first beam, 32 is the second Steel beam net, 321 is the second beam, 41 is the top plate of the second floor, 42 is the wall plate of the second floor, 5 is the corridor steel beam, 6 is the stairs of the second floor, 7 is the outer wall hanging plate, and 8 is the closing bottom plate.

具体实施方式Detailed ways

下面将结合本申请实施例中的附图,对本申请实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本申请一部分实施例,而不是全部的实施例。基于本申请中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本申请保护的范围。The technical solutions in the embodiments of the present application will be clearly and completely described below with reference to the drawings in the embodiments of the present application. Obviously, the described embodiments are only a part of the embodiments of the present application, but not all of the embodiments. Based on the embodiments in the present application, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present application.

在本申请实施例的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本申请实施例和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本申请实施例的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the embodiments of the present application, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" The orientation or positional relationship indicated by ” etc. is based on the orientation or positional relationship shown in the accompanying drawings, which is only for the convenience of describing the embodiments of the present application and simplifying the description, rather than indicating or implying that the indicated device or element must have a specific orientation, It is constructed and operated in a specific orientation, and therefore should not be construed as a limitation on the embodiments of the present application. Furthermore, the terms "first", "second", and "third" are used for descriptive purposes only and should not be construed to indicate or imply relative importance.

在本申请实施例的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可更换连接,或一体地连接,可以是机械连接,也可以是电连接,可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本申请实施例中的具体含义。In the description of the embodiments of the present application, it should be noted that, unless otherwise expressly specified and limited, the terms "installed", "connected" and "connected" should be understood in a broad sense, for example, it may be a fixed connection or a The interchangeable connection, or the integral connection, can be a mechanical connection, an electrical connection, a direct connection, an indirect connection through an intermediate medium, or an internal communication between two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the embodiments of the present application in specific situations.

随着城市的迅猛发展,大量外来人口迁入城中村,导致城中村用电负荷暴增,大量变压器重过载运行,使得城中村用电陷入频繁停电的困局。新增城中村配电房的需求已迫在眉睫,但城中村不能提供新增用地,存在着电房选址难的问题。配电房扩建选址难,配电房扩建项目多位于城中村,用电负荷区人口密集,不能提供新建配电房位置。不仅如此,配电房扩建选址还受到市政、交通、水务等规定的限制。本实施例提供了一种双层配电房的安装方法,有效地解决现有技术中由于城中村不能提供新增用地,导致配电房扩建项目开展困难的技术问题。With the rapid development of cities, a large number of migrants have moved into urban villages, resulting in a sharp increase in the electricity load of urban villages, and a large number of transformers are overloaded, making urban villages fall into the dilemma of frequent power outages. The demand for new power distribution rooms in urban villages is imminent, but urban villages cannot provide new land, and there is a problem of difficult site selection for power plants. It is difficult to select the location for power distribution room expansion. Most of the power distribution room expansion projects are located in urban villages, and the electricity load area is densely populated, so the location of new power distribution rooms cannot be provided. Not only that, the site selection for the expansion of the power distribution room is also restricted by the regulations of municipal, transportation, and water affairs. This embodiment provides an installation method for a double-layer power distribution room, which effectively solves the technical problem in the prior art that the expansion project of the power distribution room is difficult to carry out because the urban village cannot provide new land.

请参阅图1-图13,本申请实施例提供了一种双层配电房的安装方法,适用于已经建造好的一楼配电房,包括以下步骤:Please refer to FIG. 1-FIG. 13, an embodiment of the present application provides an installation method for a double-layer power distribution room, which is suitable for an already constructed first-floor power distribution room, including the following steps:

S1、拆除一楼配电房的屋檐;S1. Remove the eaves of the power distribution room on the first floor;

S2、在一楼配电房的四角处安装第一立柱,第一立柱与一楼配电房连接固定,第一立柱的底端与地面连接固定,第一立柱的顶端向上延伸超出一楼配电房;S2. Install the first column at the four corners of the power distribution room on the first floor, the first column is connected and fixed with the first floor power distribution room, the bottom end of the first column is connected and fixed with the ground, and the top of the first column extends upward beyond the first floor distribution room. Electric Room;

S3、在相邻两个第一立柱之间安装二楼楼层的第一横梁和二楼屋顶的第二横梁,第一横梁和第二横梁均与第一立柱连接固定;S3, install the first beam of the second floor floor and the second beam of the second floor roof between two adjacent first columns, and both the first beam and the second beam are connected and fixed with the first column;

S4、安装二楼楼层的第一纵梁和二楼屋顶的第二纵梁,使得第一横梁和第一纵梁形成第一钢梁网,第二横梁和第二纵梁形成第二钢梁网;S4. Install the first longitudinal beam of the second floor floor and the second longitudinal beam of the second floor roof, so that the first transverse beam and the first longitudinal beam form a first steel beam network, and the second transverse beam and the second longitudinal beam form a second steel beam network;

S5、在第一钢梁网上安装二楼底板,二楼底板与第一钢梁网连接固定;S5. Install the second floor bottom plate on the first steel beam net, and the second floor bottom plate is connected and fixed with the first steel beam net;

S6、在第二钢梁网上安装二楼顶板,二楼顶板与第二钢梁网连接固定;S6. Install the second floor roof on the second steel beam net, and connect and fix the second floor roof with the second steel beam net;

S7、在二楼底板和二楼顶板之间安装二楼墙板,墙板与第一立柱、第一钢梁网、第二钢梁网均连接固定;S7. Install the second floor wall panel between the second floor bottom plate and the second floor top plate, and the wall panel is connected and fixed with the first column, the first steel beam net, and the second steel beam net;

S8、在二楼墙板上安装二楼房门,完成二楼配电房的安装。S8. Install the door of the second floor on the wall panel of the second floor, and complete the installation of the power distribution room on the second floor.

更具体地说,一楼配电房如若有雨棚,也需要对一楼配电房的雨棚进行拆除;第一立柱的高度不小于一楼配电房的高度的两倍;第一纵梁和第二纵梁的数量不小于三根,三根均匀分布在一楼配电房的上方的同一平面上;同一平面上的第一纵梁和第一横梁共同形成第一钢梁网,同一平面上的第二纵梁和第二横梁共同形成第二钢梁网;二楼底板、二楼顶板和二楼墙板均采用ALC板。More specifically, if there is a canopy in the power distribution room on the first floor, the canopy of the power distribution room on the first floor also needs to be removed; the height of the first column is not less than twice the height of the power distribution room on the first floor; The number of beams and second longitudinal beams is not less than three, and the three are evenly distributed on the same plane above the power distribution room on the first floor; the first longitudinal beam and the first transverse beam on the same plane together form the first steel beam network, and the same plane The second longitudinal beam and the second transverse beam on the upper floor together form the second steel beam network; the second floor bottom plate, the second floor top plate and the second floor wall plate are all made of ALC plates.

本实施例提供的一种双层配电房的安装方法,通过在一楼配电房的四角处新增第一立柱,以便在一楼配电房的上方搭建二楼的第一钢梁网和第二钢梁网,接着在第一钢梁网、第二钢梁网和第一立柱上安装二楼底板、二楼顶板和二楼墙板,最后在二楼墙板上安装房门,即可完成二楼配电房的安装,从而实现在原有的单层配电房的基础上,新建钢结构基础,将钢结构框架直接搭建在原有电房的上方,从而将单层配电房改造成双层配电房,不仅可以在施工改造过程中不影响原有单层配电房的供电连续性,而且二楼配电房是在原有配电房的上方改造而成,无需重新选址,以便配电房扩建项目在城中村内正常开展,有利于保证城中村的供电需求,有效地解决现有技术中由于城中村不能提供新增用地,导致配电房扩建项目开展困难的技术问题。This embodiment provides a method for installing a double-layer power distribution room. By adding a first column at the four corners of the power distribution room on the first floor, the first steel beam network on the second floor can be built above the power distribution room on the first floor. And the second steel beam net, then install the second floor bottom plate, the second floor top plate and the second floor wall panel on the first steel beam net, the second steel beam net and the first column, and finally install the door on the second floor wall panel , the installation of the power distribution room on the second floor can be completed, so that a new steel structure foundation can be built on the basis of the original single-storey power distribution room, and the steel structure frame is directly built on the top of the original power distribution room, so that the single-storey power distribution room can be The room is transformed into a double-layer power distribution room, which not only does not affect the power supply continuity of the original single-storey power distribution room during the construction and renovation process, but also the second-floor power distribution room is transformed above the original power distribution room, so there is no need to re-select the power distribution room. Therefore, the power distribution room expansion project can be carried out normally in the urban village, which is conducive to ensuring the power supply demand of the urban village, and effectively solves the technical problem that the expansion project of the power distribution room is difficult to carry out because the urban village cannot provide new land in the existing technology. question.

进一步地,在本实施例中,在S2之后,S3之前,还包括以下步骤:Further, in this embodiment, after S2 and before S3, the following steps are also included:

S201、在相邻两个第一立柱之间安装第二立柱,第二立柱与一楼配电房连接固定,第二立柱的底端与地面连接固定,第二立柱的顶端向上延伸超出一楼配电房。S201. Install a second column between two adjacent first columns, the second column is connected and fixed with the power distribution room on the first floor, the bottom end of the second column is connected and fixed with the ground, and the top of the second column extends upward beyond the first floor Power distribution room.

更具体地说,第二立柱可以适用于占地面积较大的一楼配电房,通过第二立柱的设置可以增加二楼配电房的支撑结构,有利于保证二楼配电房的稳定性;当一楼配电房的长度较长时,可以在一楼的配电房的前端面和后端面均设置至少一根的第二立柱;当一楼配电房的长度和宽度均较长时,可以在一楼的配电房的前后左右端面均设置至少一根的第二立柱,第二立柱的具体位置和数量根据实际需要而设计。More specifically, the second column can be applied to the power distribution room on the first floor with a large area. The setting of the second column can increase the support structure of the power distribution room on the second floor, which is beneficial to ensure the stability of the power distribution room on the second floor. When the length of the power distribution room on the first floor is long, at least one second column can be set on the front and rear faces of the power distribution room on the first floor; when the length and width of the power distribution room on the first floor are shorter In the long run, at least one second column can be provided on the front, rear, left, and right end faces of the power distribution room on the first floor, and the specific position and number of the second column are designed according to actual needs.

进一步地,在本实施例中,在S4之后,S5之前,还包括以下步骤:Further, in this embodiment, after S4 and before S5, the following steps are also included:

S401、在第一钢梁网的外围安装走廊钢梁,走廊钢梁与第一钢梁网、第一立柱连接固定。S401. Install corridor steel beams on the periphery of the first steel beam net, and the corridor steel beams are connected and fixed with the first steel beam net and the first column.

更具体地说,走廊钢梁设置在二楼房门的前方,当二楼配电房上设有多个房间时,通过走廊钢梁可以方便工作人员在二楼配电房的房间随意走动;走廊钢梁与第一钢梁网位于同一平面上。More specifically, the corridor steel beam is set in front of the door on the second floor. When there are multiple rooms in the power distribution room on the second floor, the corridor steel beam can facilitate the staff to walk freely in the room of the power distribution room on the second floor; Corridor steel beams and the first steel beam network are located on the same plane.

进一步地,在本实施例中,在S401之后,S5之前,还包括以下步骤:Further, in this embodiment, after S401 and before S5, the following steps are also included:

S402、在一楼配电房的侧壁安装二楼楼梯,二楼楼梯的底端与地面连接固定,二楼楼梯的顶端与走廊钢梁连接固定。S402. Install stairs on the second floor on the side wall of the power distribution room on the first floor. The bottom end of the stairs on the second floor is connected and fixed with the ground, and the top of the stairs on the second floor is connected and fixed with the steel beams in the corridor.

更具体地说,通过二楼楼梯可以方便工作人员从一楼移动到二楼,也方便工作人员将材料通过二楼楼梯运送到二楼上。More specifically, through the stairs on the second floor, it is convenient for the staff to move from the first floor to the second floor, and it is also convenient for the staff to transport materials to the second floor through the stairs on the second floor.

进一步地,在本实施例中,在S5之后,S6之前,还包括以下步骤:Further, in this embodiment, after S5 and before S6, the following steps are also included:

S501、在走廊钢梁上安装走廊底板,走廊底板与走廊钢梁、第一立柱均连接固定。S501. Install a corridor bottom plate on the corridor steel beam, and the corridor bottom plate is connected and fixed with the corridor steel beam and the first column.

更具体地说,通过走廊底板的设置可以增加走廊的落脚面积,方便工作人员在二楼走廊更安全地移动。More specifically, the setting of the corridor bottom plate can increase the footing area of the corridor, which is convenient for the staff to move more safely in the corridor on the second floor.

进一步地,在本实施例中,在S6之后,S7之前,还包括以下步骤:Further, in this embodiment, after S6 and before S7, the following steps are also included:

S601、在二楼顶板的外围安装屋檐板,屋檐板位于走廊底板和二楼楼梯的上方,屋檐板与二楼顶板、第一立柱均连接固定。S601, install eaves board on the periphery of the second floor roof, the eaves board is located above the corridor bottom plate and the second floor stairs, and the eaves board is connected and fixed with the second floor roof board and the first column.

更具体地说,屋檐板用于遮挡走廊底板和二楼楼梯的雨水,有利于避免在走廊和二楼楼梯上走动的工作人员被淋湿。More specifically, the eaves are used to block the rainwater from the corridor floor and the stairs on the second floor, which is beneficial to avoid the staff walking on the corridor and the stairs on the second floor from getting wet.

进一步地,在本实施例中,在S7之后,S8之前,还包括以下步骤:Further, in this embodiment, after S7 and before S8, the following steps are further included:

S701、在二楼楼梯的外侧和走廊钢梁的外侧分别安装楼梯护栏和走廊护栏,楼梯护栏与二楼楼梯连接固定,走廊护栏与走廊钢梁连接固定。S701. Install a stair guardrail and a corridor guardrail on the outer side of the stairs on the second floor and the outer side of the corridor steel beam respectively. The stair guardrail is connected and fixed with the stairs on the second floor, and the corridor guardrail is connected and fixed with the corridor steel beam.

更具体地说,通过楼梯护栏和走廊护栏的设置可以避免工作人员在二楼楼梯和二楼走廊上移动不小心跌落,有利于保证工作人员在二楼楼梯和二楼走廊上移动的安全性。More specifically, the setting of stair guardrails and corridor guardrails can prevent staff from accidentally falling on the stairs and corridors on the second floor, which is beneficial to ensure the safety of staff moving on the stairs and corridors on the second floor.

进一步地,在本实施例中,在S701之后,S8之前,还包括以下步骤:Further, in this embodiment, after S701 and before S8, the following steps are further included:

S702、在一楼配电房的外围和二楼配电房的外围安装外墙挂板,外墙挂板与一楼配电房、二楼配电房均连接固定。S702, install external wall hanging boards on the periphery of the power distribution room on the first floor and the power distribution room on the second floor, and the external wall hanging boards are connected and fixed with the power distribution room on the first floor and the power distribution room on the second floor.

更具体地说,外墙挂板采用KTC外墙挂板;在安装外墙挂板之前需要在一楼配电房的墙面和二楼配电房的墙面上安装外墙挂板的钢梁网,然后再将外墙挂板固定连接到钢梁网,通过外墙挂板的设置可以增加一楼配电房和二楼配电房的外观美观性,方便配电房不会太过突兀地融入到当地环境中。More specifically, the exterior wall siding adopts KTC exterior siding; before installing the exterior siding, it is necessary to install the steel of the exterior siding on the wall of the power distribution room on the first floor and the wall of the power distribution room on the second floor. Beam net, and then fixedly connect the external wall hanging plate to the steel beam net. The setting of the external wall hanging plate can increase the appearance of the power distribution room on the first floor and the power distribution room on the second floor, so that the power distribution room will not be too much. It blends abruptly into the local environment.

进一步地,在本实施例中,在S8之后,还包括以下步骤:Further, in this embodiment, after S8, the following steps are also included:

S801、在二楼顶板的底部、走廊底板的底部和二楼楼梯的底部安装收口底板,收口底板分别与二楼顶板、走廊底板、二楼楼梯连接固定。S801. Install a closing bottom plate at the bottom of the second floor top plate, the bottom of the corridor bottom plate and the bottom of the second floor stairs, and the closing bottom plate is respectively connected and fixed with the second floor top plate, the corridor bottom plate and the second floor stairs.

更具体地说,通过收口底板也可以增加双层配电房的外观美观性,方便双层配电房不会太过突兀地融入到当地环境中。More specifically, the appearance of the double-layer power distribution room can also be increased by closing the bottom plate, so that the double-layer power distribution room will not be too abruptly integrated into the local environment.

进一步地,在本实施例中,在S8之后,还包括以下步骤:Further, in this embodiment, after S8, the following steps are also included:

S802、在二楼墙板上安装风机。S802. Install a fan on the wall panel on the second floor.

更具体地说,安装风机可以与安装二楼房门同时进行;由于配电房工作时往往产生大量的热量,过多热量堆积到配电房内容易干扰配电房正常工作,通过风机的设置可以加快配电房里面热量散发,使得配电房内的热量快速排到外部,保证配电房可以持续正常工作。More specifically, the installation of the fan can be carried out at the same time as the installation of the door on the second floor; because the power distribution room often generates a lot of heat when it is working, the accumulation of excessive heat in the power distribution room will easily interfere with the normal operation of the power distribution room. It can speed up the heat dissipation in the power distribution room, so that the heat in the power distribution room can be quickly discharged to the outside, so that the power distribution room can continue to work normally.

本说明书中各个实施例采用递进的方式描述,每个实施例重点说明的都是与其他实施例的不同之处,各个实施例之间相同相似部分互相参见即可。The various embodiments in this specification are described in a progressive manner, and each embodiment focuses on the differences from other embodiments, and the same and similar parts between the various embodiments can be referred to each other.

对所公开的实施例的上述说明,使本领域专业技术人员能够实现或使用本申请。对这些实施例的多种修改对本领域的专业技术人员来说将是显而易见的,本文中所定义的一般原理可以在不脱离本申请的精神或范围的情况下,在其它实施例中实现。因此,本申请将不会被限制于本文所示的这些实施例,而是要符合与本文所公开的原理和新颖特点相一致的最宽的范围。The above description of the disclosed embodiments enables any person skilled in the art to make or use the present application. Various modifications to these embodiments will be readily apparent to those skilled in the art, and the generic principles defined herein may be implemented in other embodiments without departing from the spirit or scope of the present application. Therefore, this application is not intended to be limited to the embodiments shown herein, but is to be accorded the widest scope consistent with the principles and novel features disclosed herein.

Claims (10)

1. The installation method of the double-layer power distribution room is characterized by being suitable for a built first-floor power distribution room and comprising the following steps of:
s1, dismantling the eaves of the first-floor power distribution room;
s2, mounting first stand columns at four corners of the first-floor power distribution room, wherein the first stand columns are fixedly connected with the first-floor power distribution room, the bottom ends of the first stand columns are fixedly connected with the ground, and the top ends of the first stand columns extend upwards to exceed the first-floor power distribution room;
s3, mounting a first cross beam of a second floor and a second cross beam of a second floor roof between two adjacent first upright posts, wherein the first cross beam and the second cross beam are fixedly connected with the first upright posts;
s4, mounting a first longitudinal beam of a second floor and a second longitudinal beam of a second roof, so that a first beam and the first longitudinal beam form a first steel beam net, and a second beam and the second longitudinal beam form a second steel beam net;
s5, mounting a second floor bottom plate on the first steel beam net, and connecting and fixing the second floor bottom plate and the first steel beam net;
s6, mounting a second floor top plate on the second steel beam net, and connecting and fixing the second floor top plate and the second steel beam net;
s7, mounting a second floor wallboard between a second floor bottom plate and a second floor top plate, wherein the wallboard is fixedly connected with the first upright post, the first steel beam net and the second steel beam net;
and S8, installing a second floor door on the second floor wallboard to finish the installation of the second floor power distribution room.
2. The double-layer power distribution room installation method of claim 1, further comprising the following steps after S2 and before S3:
s201, a second upright column is installed between two adjacent first upright columns, the second upright column is fixedly connected with a first-floor power distribution room, the bottom end of the second upright column is fixedly connected with the ground, and the top end of the second upright column extends upwards to exceed the first-floor power distribution room.
3. The double-layer power distribution room installation method of claim 1, further comprising the following steps after S4 and before S5:
s401, installing corridor steel beams at the periphery of the first steel beam net, wherein the corridor steel beams are fixedly connected with the first steel beam net and the first stand columns.
4. The double-layer power distribution room installation method according to claim 3, further comprising the following steps after S401 and before S5:
s402, installing second-floor stairs on the side wall of the first-floor power distribution room, wherein the bottom ends of the second-floor stairs are fixedly connected with the ground, and the top ends of the second-floor stairs are fixedly connected with corridor steel beams.
5. The double-layer power distribution room installation method of claim 4, wherein after S5 and before S6, the method further comprises the following steps:
s501, installing a corridor bottom plate on the corridor steel beam, and fixedly connecting the corridor bottom plate with the corridor steel beam and the first stand column.
6. The double-layer power distribution room installation method of claim 5, wherein after S6 and before S7, the method further comprises the following steps:
s601, installing an eave plate at the periphery of the second floor top plate, wherein the eave plate is located above the corridor bottom plate and the second floor stairs, and the eave plate is fixedly connected with the second floor top plate and the first upright post.
7. The double-layer power distribution room installation method of claim 6, further comprising the following steps after S7 and before S8:
s701, respectively installing a stair guardrail and a corridor guardrail on the outer side of the second-floor stair and the outer side of the corridor steel beam, wherein the stair guardrail is fixedly connected with the second-floor stair, and the corridor guardrail is fixedly connected with the corridor steel beam.
8. The double-layer power distribution room installation method according to claim 7, further comprising the following steps after S701 and before S8:
and S702, installing an outer wall hanging plate at the periphery of the first-floor power distribution room and the periphery of the second-floor power distribution room, and fixedly connecting the outer wall hanging plate with the first-floor power distribution room and the second-floor power distribution room.
9. The double-layer power distribution room installation method of claim 8, further comprising the following steps after S8:
s801, installing a closing-in bottom plate at the bottom of the second-floor top plate, the bottom of the corridor bottom plate and the bottom of the second-floor stair, and respectively fixedly connecting the closing-in bottom plate with the second-floor top plate, the corridor bottom plate and the second-floor stair.
10. A method of installing a double-deck electricity distribution room according to any one of claims 1 to 9, further comprising the following steps after S8:
and S802, installing a fan on the second floor wallboard.
CN202010801202.1A 2020-08-11 2020-08-11 Installation method of double-layer power distribution room Pending CN111927137A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010801202.1A CN111927137A (en) 2020-08-11 2020-08-11 Installation method of double-layer power distribution room

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010801202.1A CN111927137A (en) 2020-08-11 2020-08-11 Installation method of double-layer power distribution room

Publications (1)

Publication Number Publication Date
CN111927137A true CN111927137A (en) 2020-11-13

Family

ID=73310251

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010801202.1A Pending CN111927137A (en) 2020-08-11 2020-08-11 Installation method of double-layer power distribution room

Country Status (1)

Country Link
CN (1) CN111927137A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022174985A1 (en) * 2021-02-16 2022-08-25 Sms Group Gmbh Industrial building

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739258Y (en) * 2004-06-07 2005-11-09 佛山市耀达建材贸易有限公司 Two-storey movable dwelling building structure
CN104405155A (en) * 2014-11-28 2015-03-11 伯恩太阳能科技有限公司 Substation room
CN105518812A (en) * 2013-07-26 2016-04-20 Abb技术股份公司 Prefabricated substation
CN107882182A (en) * 2017-12-10 2018-04-06 柳州市雅泰活动板房厂 Reusable movable plank house
CN110259170A (en) * 2019-05-27 2019-09-20 北京华正弘远工程技术有限公司 A kind of existing building adding storey structure
CN110512911A (en) * 2019-09-05 2019-11-29 吴玉 Method and device for prefabricating interlayer in data center computer room

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2739258Y (en) * 2004-06-07 2005-11-09 佛山市耀达建材贸易有限公司 Two-storey movable dwelling building structure
CN105518812A (en) * 2013-07-26 2016-04-20 Abb技术股份公司 Prefabricated substation
CN104405155A (en) * 2014-11-28 2015-03-11 伯恩太阳能科技有限公司 Substation room
CN107882182A (en) * 2017-12-10 2018-04-06 柳州市雅泰活动板房厂 Reusable movable plank house
CN110259170A (en) * 2019-05-27 2019-09-20 北京华正弘远工程技术有限公司 A kind of existing building adding storey structure
CN110512911A (en) * 2019-09-05 2019-11-29 吴玉 Method and device for prefabricating interlayer in data center computer room

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2022174985A1 (en) * 2021-02-16 2022-08-25 Sms Group Gmbh Industrial building

Similar Documents

Publication Publication Date Title
CN103046755B (en) The construction method of the light steel integrated house of pastoral area assembling
AU2011235588B2 (en) Expandable flat pack dwelling module
CN205444446U (en) Assembled industrialization steel construction house
EA028086B1 (en) Preformed formwork for forming concrete floor slab for a height adjustable shipping container building structure
WO1995002097A1 (en) Prefabricated building systems
CN106639045A (en) Prefabricated assembly type steel plate-concrete composite shear wall structure system and construction method thereof
CN101775896B (en) Rigid suspended scaffold for installing pipeline of steel roof equipment
CN111927137A (en) Installation method of double-layer power distribution room
CN104641048A (en) Waffle Box Building Techniques
CN209508978U (en) A foundation pit structure and its external elevator
CN112031495A (en) Prefabricated cabin transformer substation assembled steel structure foundation and construction splicing method thereof
CN110306664B (en) Prefabricated low-rise residential structure system and construction method
CN209114648U (en) A kind of assembling type outer wall structure
CN110965808A (en) Construction method of externally hung stair and packway of fabricated building
CN217439693U (en) Install and remove fast and to have enough to meet need electronic box protection canopy
CN218467052U (en) Auxiliary frame for climbing frame
CN110565956A (en) Assembled steel structure system and construction method thereof
CN212358796U (en) An emergency engineering combined roof
CN210738134U (en) Modular hoistway with additional elevator in existing building
CN209261251U (en) A multi-storey house structure based on an existing building
RU2336399C1 (en) Method for rebuilding of large-panel apartment house
CN113279556A (en) A assembled hangs slidable scaffold frame subassembly for old house transformation
CN209703936U (en) A kind of floor ground structure suitable for information system computer floor in building
CN217680372U (en) Movable scaffold subassembly is used in building construction
CN206769249U (en) Set up the structure of fire-fighting steel stair

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20201113