[go: up one dir, main page]

CN111877713A - A liner for floor tile paving and floor tile paving structure - Google Patents

A liner for floor tile paving and floor tile paving structure Download PDF

Info

Publication number
CN111877713A
CN111877713A CN202010726554.5A CN202010726554A CN111877713A CN 111877713 A CN111877713 A CN 111877713A CN 202010726554 A CN202010726554 A CN 202010726554A CN 111877713 A CN111877713 A CN 111877713A
Authority
CN
China
Prior art keywords
plate body
liner
floor tile
connecting piece
leveling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010726554.5A
Other languages
Chinese (zh)
Inventor
何成
张竞兰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Hongjing Decoration Engineering Co ltd
Original Assignee
Shenzhen Hongjing Decoration Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Hongjing Decoration Engineering Co ltd filed Critical Shenzhen Hongjing Decoration Engineering Co ltd
Priority to CN202010726554.5A priority Critical patent/CN111877713A/en
Publication of CN111877713A publication Critical patent/CN111877713A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F21/00Implements for finishing work on buildings
    • E04F21/20Implements for finishing work on buildings for laying flooring
    • E04F21/22Implements for finishing work on buildings for laying flooring of single elements, e.g. flooring cramps ; flexible webs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Floor Finish (AREA)
  • Road Paving Structures (AREA)

Abstract

本申请涉及一种地砖铺贴用衬垫及地砖铺贴结构,包括板体、若干连接在板体下侧的支撑体以及设置在板体上的调平机构,所述板体上开设有若干注孔;所述板体的两相侧邻边处均设有有公连接件,另外两相邻边处均设有母连接部,所述公连接件与所述母连接部卡接配合。本申请具有地砖铺贴后不易产生空鼓现象,施工周期短的效果。

Figure 202010726554

The present application relates to a liner for floor tile paving and a floor tile paving structure, comprising a board body, a plurality of support bodies connected to the lower side of the board body, and a leveling mechanism arranged on the board body, and the board body is provided with a plurality of Injection holes; male connectors are provided on the adjacent sides of the two phase sides of the plate body, and female connectors are provided on the other two adjacent edges, and the male connectors are snap-fitted with the female connectors. The present application has the effects that the hollowing phenomenon is not easily generated after the floor tiles are laid and the construction period is short.

Figure 202010726554

Description

一种地砖铺贴用衬垫及地砖铺贴结构A liner for floor tile paving and floor tile paving structure

技术领域technical field

本申请涉及地砖铺贴领域,尤其是涉及一种地砖铺贴用衬垫及地砖铺贴结构。The present application relates to the field of floor tile paving, and in particular, to a liner for floor tile paving and a floor tile paving structure.

背景技术Background technique

地砖是一种地面装饰材料,也叫地板砖,一般采用黏土烧制而成,多用于公共建筑和民用建筑的底面与楼面。当前,地砖的铺贴是依靠水泥砂浆将其糊贴到地面上。Floor tiles are a kind of floor decoration material, also called floor tiles, which are generally made of clay and are mostly used for the bottom and floors of public buildings and civil buildings. At present, the paving of floor tiles relies on cement mortar to paste them to the ground.

针对上述中的相关技术,发明人认为存在有地砖铺贴后容易产生空鼓现象的缺陷。In view of the above-mentioned related art, the inventor believes that there is a defect that the hollowing phenomenon is easy to occur after the floor tiles are laid.

发明内容SUMMARY OF THE INVENTION

为了在地砖铺贴后不易产生空鼓现象,本申请提供一种地砖铺贴用衬垫及地砖铺贴结构。In order to prevent the hollowing phenomenon after the floor tiles are laid, the present application provides a liner for the floor tiles and a floor tile paving structure.

第一方面,本申请提供一种地砖铺贴用衬垫,采用如下的技术方案:In the first aspect, the application provides a liner for floor tile paving, which adopts the following technical solutions:

一种地砖铺贴用衬垫,包括板体、若干连接在板体下侧的支撑体以及设置在板体上的调平机构,所述板体上开设有若干注孔;所述板体的两相侧邻边处均设有有公连接件,另外两相邻边处均设有母连接部,所述公连接件与所述母连接部卡接配合。A liner for paving floor tiles, comprising a plate body, a plurality of supports connected to the lower side of the plate body, and a leveling mechanism arranged on the plate body, the plate body is provided with a plurality of injection holes; The adjacent sides of the two phases are provided with male connectors, and the other two adjacent edges are provided with female connectors, and the male connectors are snap-fitted with the female connectors.

通过采用上述技术方案,在铺贴地砖前,先在地面上铺上一层衬垫,并使相邻衬垫上的公连接件与母连接部卡接形成垫层;然后经注孔向板体与地面之间的空隙中注入填充胶,然后便可使用胶粘剂将地砖粘接到沉淀上。在地砖铺贴完成后,衬垫能够对地砖进行很好的支撑,而且衬垫与地砖之间也不会出现空鼓的现象,因此,地砖在使用过程中也不易出现受重断裂的现象。在粘接剂的作用下地砖与衬垫能够稳定结合,不易分离,而且即使地砖出现了松动,维修人员也可轻松将地砖撬起,然后再使用胶粘剂将地砖重新固定到衬垫上。工作人员在将衬垫铺到底面上后,可使用调平机构来对衬垫进行调平,从而使地砖能够铺贴平整。公连接件与母连接件能够将相邻衬垫牢固的拼接起来,避免在向衬垫上铺贴地砖的过程中垫层散开的情况出现。通过注孔向板体与地面之间的空隙中注入填充胶,能够使得衬垫与地面稳定连接;而且在拆除时也易于清理。By adopting the above technical scheme, before laying the floor tiles, a layer of pad is laid on the ground, and the male connector on the adjacent pad is clamped with the female connector to form a pad; Filling glue is injected into the space between the body and the ground, and then the floor tile can be bonded to the deposit with the adhesive. After the floor tiles are laid, the liner can support the floor tiles well, and there will be no hollowing phenomenon between the liner and the floor tiles. Therefore, the floor tiles are not prone to breaking under heavy load during use. Under the action of the adhesive, the floor tile and the liner can be stably combined, and it is not easy to separate, and even if the floor tile is loose, the maintenance personnel can easily pry the floor tile up, and then use the adhesive to re-fix the floor tile to the liner. After laying the liner on the bottom, the staff can use the leveling mechanism to level the liner, so that the floor tiles can be laid flat. The male connector and the female connector can firmly splicing the adjacent pads together, so as to avoid the situation that the pads are scattered during the process of laying the floor tiles on the pads. Filling glue is injected into the gap between the board body and the ground through the injection hole, so that the gasket and the ground can be stably connected; and it is easy to clean up when dismantling.

优选的,所述支撑体为杆状物,其在板体下侧相对两边之间间隔设置;所述板体与所述支撑体一体成型;所述注孔位于相邻支撑体之间。Preferably, the support body is a rod-shaped object, which is arranged at intervals between two opposite sides of the lower side of the plate body; the plate body and the support body are integrally formed; the injection holes are located between adjacent support bodies.

通过采用上述技术方案,杆状的支撑体能够为板体提供良好的支撑,使得板体以及地砖不易在承受大压力的情况下发生断裂。By adopting the above technical solution, the rod-shaped support body can provide good support for the plate body, so that the plate body and the floor tiles are not easily broken under the condition of being subjected to large pressure.

优选的,所述调平机构包括至少三个调平器,所述调平器包括调平螺丝和套设在调平螺栓上并与调平螺丝螺纹连接的调平螺母;所述衬垫上开设有用于安装调平器的调平孔,所述调平螺母固定在调平孔中。Preferably, the leveling mechanism includes at least three levelers, and the levelers include a leveling screw and a leveling nut sleeved on the leveling bolt and threadedly connected with the leveling screw; A leveling hole for installing the leveler is opened, and the leveling nut is fixed in the leveling hole.

通过采用上述技术方案,工作人员可以通过旋拧调平螺母,来对衬垫进行调平。By adopting the above technical solution, the staff can level the gasket by screwing the leveling nut.

优选的,所述公连接件包括沿板体周侧面通长方向连接在板体周侧面中部的卡接片,所述卡接片远离板体的一边向上或向下弯折;Preferably, the male connector comprises a clip connected to the middle of the peripheral side of the plate along the lengthwise direction of the plate, the clip is bent upward or downward from one side away from the plate;

所述母连接部包括开设在板体周侧面上的与卡接片适配的插槽。The female connecting portion includes a slot which is provided on the peripheral side surface of the plate body and is adapted to the clip.

通过采用上述技术方案,公连接件与母连接件能够将相邻衬垫牢固的拼接起来,避免在向衬垫上铺贴地砖的过程中垫层散开的情况出现。By adopting the above technical solution, the male connector and the female connector can firmly splicing the adjacent pads together, so as to avoid the situation that the pads are scattered during the process of laying the floor tiles on the pads.

优选的,所述板体和所述支撑体采用木塑复合材料一体制造成型。Preferably, the board body and the support body are integrally formed by using wood-plastic composite materials.

通过采用上述技术方案,木塑复合材料制成的板体和支撑体,质地坚硬,耐潮湿、不易被虫蛀,容易降解,吸音效果好。By adopting the above technical solution, the board body and the support body made of the wood-plastic composite material are hard in texture, resistant to moisture, not easily moth-eaten, easily degraded, and have good sound absorption effect.

优选的,所述板体设有母连接部的周侧面上间隔开设有若干贯通板体上侧面与插槽的缺口。Preferably, a plurality of notches penetrating the upper side surface of the plate body and the slot are spaced on the peripheral side surface of the plate body provided with the female connecting portion.

通过采用上述技术方案,缺口的设置使得板体更加易于变形,从而便于工作人员将连接片插入到插槽中。By adopting the above technical solution, the arrangement of the notch makes the plate body more easily deformed, so that it is convenient for the worker to insert the connecting piece into the slot.

优选的,所述卡接片上侧间隔固定有若干用于填补缺口的凸块。Preferably, a plurality of bumps for filling gaps are fixed at intervals on the upper side of the clip.

通过采用上述技术方案,凸块的设置可以对缺口进行补充,从而使得衬垫能够对地砖进行充分支撑。By adopting the above technical solution, the arrangement of the bumps can supplement the gap, so that the pad can fully support the floor tiles.

优选的,所述公连接件包括连接片和设置在连接片一侧端部并通过销轴与连接片转动连接的拉紧凸轮,所述销轴上设有便于人转动拉紧凸轮的旋拧部;所述连接片远离拉紧凸轮的一端固定连接有与其互相垂直的钩挂片;所述板体与公连接件连接的一边上侧开设有圆孔以及圆孔连通并可供连接片嵌入的第一嵌槽,所述拉紧凸轮插接在圆孔中;Preferably, the male connector includes a connecting piece and a tensioning cam arranged at one end of the connecting piece and rotatably connected to the connecting piece through a pin, and the pin is provided with a screw that is convenient for people to rotate the tensioning cam one end of the connecting piece away from the tensioning cam is fixedly connected with a hooking piece perpendicular to it; the upper side of the side where the plate body is connected with the male connector is provided with a circular hole and the circular hole is connected and can be inserted into the connecting piece The first insert groove of the cam, the tension cam is inserted into the circular hole;

所述母连接部包括开设在板体上侧供钩挂板插入的钩挂孔以及与钩挂孔连通并可供连接片嵌入的第二嵌槽。The female connecting portion includes a hooking hole opened on the upper side of the plate body for the hooking plate to be inserted into, and a second inserting groove which is communicated with the hooking hole and can be inserted into the connecting piece.

通过采用上述技术方案,公连接件与母连接件能够将相邻衬垫牢固的连接起来,避免在向衬垫上铺贴地砖的过程中垫层散开的情况出现。By adopting the above technical solution, the male connector and the female connector can firmly connect the adjacent pads, so as to avoid the situation that the pads are scattered during the process of laying the floor tiles on the pads.

优选的,所述钩挂片为弧形片,其以弧形边与连接片连接。Preferably, the hooking piece is an arc-shaped piece, which is connected with the connecting piece with an arc-shaped edge.

通过采用上述技术方案,使得钩挂片不易变形,不易损坏。By adopting the above technical scheme, the hooking piece is not easily deformed and damaged.

优选的,所述销轴固定连接在拉紧凸轮朝向连接片的一侧,所述销轴贯穿连接片并与连接片转动配合,所述销轴远离拉紧凸轮的一端上固定有防脱件;所述旋拧部为六角盲孔,其开设在销轴远离拉紧凸轮一端的端面上。Preferably, the pin shaft is fixedly connected on the side of the tensioning cam facing the connecting piece, the pin shaft penetrates the connecting piece and is rotatably matched with the connecting piece, and an anti-falling piece is fixed on the end of the pin shaft away from the tensioning cam ; The screwing part is a hexagonal blind hole, which is opened on the end face of the pin shaft away from one end of the tensioning cam.

通过采用上述技术方案,六角盲孔的设置便于工作人员转动拉紧凸轮。By adopting the above technical solution, the setting of the hexagonal blind hole is convenient for the staff to rotate and tighten the cam.

第二方面,本申请提供一种地砖铺贴结构,采用如下的技术方案:Second aspect, the application provides a kind of floor tile paving structure, adopts following technical scheme:

一种地砖铺贴结构,包括由衬垫铺设而成的垫层、铺设在垫层上的地砖层以及设置在垫层与地砖层之间的胶粘层,所述板体与地面之间设有填充层;所述垫层中相邻两衬垫中的公连接件与母连接部卡接。A floor tile paving structure includes a cushion layer laid with a cushion, a floor brick layer laid on the cushion layer, and an adhesive layer arranged between the cushion layer and the floor brick layer, and a floor is provided between the plate body and the ground. There is a filling layer; the male connector in the two adjacent pads in the pad layer is clamped with the female connector.

通过采用上述技术方案,衬垫能够对地砖进行很好的支撑,而且衬垫与地砖之间也不会出现空鼓的现象,因此,地砖在使用过程中也不易出现受重断裂的现象。在粘接剂的作用下地砖与衬垫能够稳定结合,不易分离,而且即使地砖出现了松动,维修人员也可轻松将地砖撬起,然后再使用胶粘剂将地砖重新固定到衬垫上。By adopting the above technical solution, the liner can support the floor tiles well, and there is no hollowing phenomenon between the liner and the floor tiles, so the floor tiles are not prone to breaking under heavy loads during use. Under the action of the adhesive, the floor tile and the liner can be stably combined, and it is not easy to separate, and even if the floor tile is loose, the maintenance personnel can easily pry the floor tile up, and then use the adhesive to re-fix the floor tile to the liner.

附图说明Description of drawings

图1是本申请实施例一的衬垫的整体结构示意图。FIG. 1 is a schematic diagram of the overall structure of the gasket according to the first embodiment of the present application.

图2是本申请实施例一的衬垫的剖视图,以体现调平器的结构。FIG. 2 is a cross-sectional view of the gasket according to the first embodiment of the present application, to illustrate the structure of the leveler.

图3是图2中A处的放大示意图。FIG. 3 is an enlarged schematic view of A in FIG. 2 .

图4是四个本申请实施例一的衬垫拼接后所呈状态的示意图。FIG. 4 is a schematic diagram of the state of the four pads of the first embodiment of the present application after splicing.

图5是本申请实施例二的衬垫的整体结构示意图。FIG. 5 is a schematic diagram of the overall structure of the gasket according to the second embodiment of the present application.

图6是四个本申请实施例三的衬垫拼接后所呈状态的示意图。FIG. 6 is a schematic diagram of the state of the four pads according to the third embodiment of the present application after splicing.

图7是为体现本申请实施例三中的公连接件与母连接部的结构所做的局部剖视图;FIG. 7 is a partial cross-sectional view of the structure of the male connector and the female connector in Embodiment 3 of the present application;

图8是本申请实施例三中的公连接件的整体结构示意图。FIG. 8 is a schematic diagram of the overall structure of the male connector in the third embodiment of the present application.

图9是本申请的地砖铺贴结构的整体结构示意图。FIG. 9 is a schematic diagram of the overall structure of the floor tile paving structure of the present application.

附图标记说明:1、板体;11、圆孔;12、第一嵌槽;2、支撑体;3、调平器;31、调平螺丝;32、调平螺母;33、调平孔;4、公连接件;41、卡接片;42、凸块;43、连接片;44、拉紧凸轮;45、销轴;46、钩挂片;47、防脱件;48、旋拧部;5、母连接部;51、插槽;52、缺口;53、钩挂孔;54、第二嵌槽;6、注孔;7、垫层;8、地砖层;9、胶粘层;10、填充层。Description of reference numerals: 1. Plate body; 11. Round hole; 12. First insert groove; 2. Support body; 3. Leveling device; 31. Leveling screw; 32. Leveling nut; 33. Leveling hole 4, male connector; 41, clip; 42, bump; 43, connecting piece; 44, tensioning cam; 45, pin; 46, hooking piece; part; 5, female connection part; 51, slot; 52, notch; 53, hook hole; 54, the second slot; 6, injection hole; 7, cushion layer; 8, floor tile layer; 9, adhesive layer ; 10. Filling layer.

具体实施方式Detailed ways

以下结合附图1-9对本申请作进一步详细说明。The present application will be further described in detail below in conjunction with accompanying drawings 1-9.

本申请实施例公开一种地砖铺贴用衬垫。The embodiment of the present application discloses a liner for paving floor tiles.

实施例一:Example 1:

参照图1,一种地砖铺贴用衬垫,包括板体1、若干连接在板体1下侧的支撑体2以及设置在板体1上的调平机构,在板体1的两相邻侧边处连接有公连接件4,另外两相邻侧壁上设有母连接部5,公连接件4与母连接部5卡接配合。在板体1上开设有若干贯通板体1相对两侧面的消音孔。Referring to FIG. 1 , a liner for floor tile laying includes a board body 1 , a plurality of support bodies 2 connected to the lower side of the board body 1 , and a leveling mechanism arranged on the board body 1 . A male connector 4 is connected to the side, and a female connector 5 is provided on the other two adjacent side walls. The male connector 4 is snap-fitted with the female connector 5 . The plate body 1 is provided with a number of muffler holes penetrating through opposite sides of the plate body 1 .

参照图1和图2,支撑体2为截面呈矩形的杆状物,其在板体1下侧相对两边之间等间距设置,板体1和支撑体2采用木塑复合材料一体制造成型。在板体1上均匀开设有若干注孔6,注孔6处于两相邻支撑体2之间。在将衬垫放置在地面上后,支撑体2与地面接触并对板体1进行支撑,使得板体1不易在承受大压力的情况下断裂。1 and 2 , the support body 2 is a rod-shaped object with a rectangular cross-section, which is arranged at equal intervals between opposite sides of the lower side of the plate body 1 , and the plate body 1 and the support body 2 are integrally made of wood-plastic composite materials. Several injection holes 6 are evenly opened on the plate body 1 , and the injection holes 6 are located between two adjacent support bodies 2 . After the pad is placed on the ground, the support body 2 is in contact with the ground and supports the board body 1, so that the board body 1 is not easily broken under the condition of bearing a large pressure.

参照图1,调平机构包括至少三个调平器3(本实施例以二十七个为例)。参照图2和图3,调平器3包括调平螺丝31和套设在调平螺栓上并与调平螺栓螺纹连接的调平螺母32。为安装调平器3,在衬垫上开设有二十七个调平孔33,调平孔33均匀分布在沉淀上且调平孔33贯穿板体1与支撑体2,值得注意的上,调平孔33为沉头孔;调平器3分别设置于各个调平孔33中,且调平螺母32固定连接在调平孔33底部。在将衬垫放置到地面上后,工作人员可以通过旋拧调平螺母32来对衬垫进行调平。Referring to FIG. 1 , the leveling mechanism includes at least three levelers 3 (twenty-seven are taken as an example in this embodiment). 2 and 3, the leveler 3 includes a leveling screw 31 and a leveling nut 32 sleeved on the leveling bolt and threadedly connected with the leveling bolt. In order to install the leveler 3, twenty-seven leveling holes 33 are opened on the gasket. The leveling holes 33 are evenly distributed on the sediment and the leveling holes 33 pass through the plate body 1 and the support body 2. It is worth noting that, The leveling holes 33 are countersunk holes; the levelers 3 are respectively arranged in each leveling hole 33 , and the leveling nut 32 is fixedly connected to the bottom of the leveling hole 33 . After placing the pad on the ground, the worker can level the pad by turning the leveling nut 32 .

参照1和图2,公连接件4包括沿板体1周侧面长度方向一体成型在板体1周侧面中部的卡接片41,卡接片41的纵截面呈弧形,卡接片41由靠近板体1的一边至远离板体1的一边逐渐向上或向下弯折(本实施例以向下弯折为例)。母连接部5包括开设在板体1周侧面上的与卡接片41适配的插槽51,板体1设有插槽51的周侧面上间隔开设有若干贯通板体1上侧面与插槽51的缺口52。在需要将两块衬垫连接到一起时,只需将一个板体1上的卡接片41插入到另一板体1上的插槽51中便可,卡接片41与插槽51配合能够将相邻衬垫牢固的拼接起来。Referring to 1 and FIG. 2 , the male connector 4 includes a clamping piece 41 integrally formed in the middle of the peripheral side surface of the plate body 1 along the length direction of the circumferential side surface of the plate body 1. The longitudinal section of the clamping piece 41 is arc-shaped, and the clamping piece 41 is formed by The side close to the board body 1 to the side far from the board body 1 is gradually bent upward or downward (this embodiment takes the downward bending as an example). The female connecting portion 5 includes a slot 51 which is opened on the peripheral side of the board body 1 and is adapted to the clip 41. The peripheral side of the board body 1 with the slot 51 is spaced apart from a plurality of through the upper side of the board body 1 and the insertion slot. Notch 52 of groove 51 . When the two gaskets need to be connected together, it is only necessary to insert the clip 41 on one board 1 into the slot 51 on the other board 1, and the clip 41 is matched with the slot 51. Adjacent pads can be spliced together firmly.

参照图1和图4,实施例一的实施原理为:在铺贴地砖前,先在地面上铺上一层衬垫,并使相邻衬垫上的卡接片41与插槽51卡接,在衬垫铺放过程中因当使用调平器3对衬垫进行调平。衬垫铺放完成后,经注孔6向板体1与地面之间的空隙中注入填充胶,然后便可使用胶粘剂将地砖粘接到沉淀上。Referring to FIGS. 1 and 4 , the implementation principle of the first embodiment is as follows: before laying the floor tiles, a layer of pad is laid on the ground, and the clips 41 on the adjacent pads are snapped into the slots 51 , and use the leveler 3 to level the liner during the liner laying process. After the liner is laid, the filler glue is injected into the gap between the board body 1 and the ground through the injection hole 6, and then the floor tile can be bonded to the deposit with the adhesive.

在地砖铺贴完成后,衬垫能够对地砖进行很好的支撑,而且衬垫与地砖之间也不会出现空鼓的现象,因此,地砖在使用过程中也不易出现受重断裂的现象。在通过注孔6向板体1与地面之间的空隙中注入填充胶,能够使得衬垫与地面稳定连接;而且在拆除时也易于清理。After the floor tiles are laid, the liner can support the floor tiles well, and there will be no hollowing phenomenon between the liner and the floor tiles. Therefore, the floor tiles are not prone to breaking under heavy load during use. Filling glue is injected into the gap between the board body 1 and the ground through the injection hole 6, so that the gasket and the ground can be stably connected; and it is easy to clean up when dismantling.

实施例二:Embodiment 2:

参照图5,本实施例与实施例一的不同之处在于,在卡接片41上侧间隔设置有若干用于填补缺口52的凸块42,凸块42与卡接片41一体成型。Referring to FIG. 5 , the difference between this embodiment and the first embodiment is that a plurality of bumps 42 for filling the gaps 52 are provided at intervals on the upper side of the engaging piece 41 , and the bumps 42 and the engaging piece 41 are integrally formed.

实施例二的实施原理为:当相邻两块衬垫拼接到一起后,凸块42会对缺口52进行填补,从而使得衬垫能够更好的对地砖进行支撑。The implementation principle of the second embodiment is as follows: when two adjacent pads are spliced together, the bump 42 will fill the gap 52, so that the pad can better support the floor tiles.

实施例三:Embodiment three:

参照图6和图7,本实施例与实施例一的不同之处在于,公连接件4包括连接片43、拉紧凸轮44、销轴45以及钩挂片46。参照图7和图8,其中,拉紧凸轮44设置在连接片43一侧端部。销轴45固定连接在拉紧凸轮44朝向连接片43一侧,且销轴45轴线与拉紧凸轮44的轴线重合,销轴45贯穿连接片43并与连接片43转动配合,在销轴45远离拉紧凸轮44的一端一体成型有环形的防脱件47;在销轴45背向拉紧凸轮44一端的端面上设有便于工作人员旋拧销轴45的旋拧部48,在本实施例中,旋拧部48为六角盲孔。钩挂片46与拉紧凸轮44处于连接片43的同一侧,且钩挂片46焊接在连接片43远离拉紧凸轮44的一端,值得注意的是,钩挂片46为弧形片,其以弧形边与连接片43连接。6 and 7 , the difference between this embodiment and the first embodiment is that the male connector 4 includes a connecting piece 43 , a tensioning cam 44 , a pin shaft 45 and a hooking piece 46 . 7 and 8 , the tensioning cam 44 is provided at one end of the connecting piece 43 . The pin shaft 45 is fixedly connected on the side of the tensioning cam 44 facing the connecting piece 43, and the axis of the pin shaft 45 coincides with the axis of the tensioning cam 44. The pin shaft 45 penetrates through the connecting piece 43 and rotates with the connecting piece 43. One end away from the tensioning cam 44 is integrally formed with a ring-shaped anti-falling member 47; the end face of the pin shaft 45 facing away from the tensioning cam 44 is provided with a screwing portion 48 that is convenient for the staff to screw the pin shaft 45. In this embodiment In the example, the screw portion 48 is a hexagonal blind hole. The hooking piece 46 and the tensioning cam 44 are on the same side of the connecting piece 43, and the hooking piece 46 is welded on the end of the connecting piece 43 away from the tensioning cam 44. It is worth noting that the hooking piece 46 is an arc-shaped piece, which is It is connected with the connecting piece 43 with an arc edge.

参照图7和图8,在板体1与公连接件4连接的一边上侧开设有圆孔11以及圆孔11连通并可供连接片43嵌入的第一嵌槽12。Referring to FIGS. 7 and 8 , a circular hole 11 and a first insertion groove 12 in which the circular hole 11 communicates and can be inserted into the connecting piece 43 are opened on the upper side of the side where the plate body 1 is connected with the male connector 4 .

参照图6和图7,母连接部5包括开设在板体1上侧供钩挂板插入的钩挂孔53以及与钩挂孔53连通并可供连接片43嵌入的第二嵌槽54。6 and 7 , the female connecting portion 5 includes a hooking hole 53 opened on the upper side of the plate body 1 for the hooking plate to be inserted and a second inserting groove 54 communicating with the hooking hole 53 and into which the connecting piece 43 can be inserted.

实施例三的实施原理为:在施工时,首先将衬垫逐个铺放到地面上,在铺放衬垫的过程中,使用调平器3对衬垫进行调平,并使用公连接件4配合板体1上的母连接部5将相邻衬垫连接到一起。衬垫铺放完成后,经注孔6向板体1与地面之间的空隙中注入填充胶,然后便可使用胶粘剂将地砖粘接到沉淀上。The implementation principle of the third embodiment is as follows: during construction, first lay the liners on the ground one by one, and use the leveler 3 to level the liners during the process of laying the liners, and use the male connector 4 to level the liners. The female connectors 5 on the mating plate body 1 connect adjacent pads together. After the liner is laid, the filler glue is injected into the gap between the board body 1 and the ground through the injection hole 6, and then the floor tile can be bonded to the deposit with the adhesive.

在使用公连接件4配合母连接部5将相邻衬垫连接到一起时,首先将公连接件4的钩挂片46插到钩挂孔53中,将拉紧凸轮44插入到圆孔11中,此时拉紧凸轮44的近休止端与圆孔11靠近钩挂孔53的侧壁抵接;然后通过使用六角扳手转动销轴45和拉紧凸轮44,从而使得拉紧凸轮44的远休止端与圆孔11靠近钩挂孔53的侧壁抵接,从而使得公连接件4配合母连接件将相邻两衬垫连接并拉紧到一起。When using the male connector 4 to cooperate with the female connector 5 to connect the adjacent pads together, firstly insert the hooking piece 46 of the male connector 4 into the hooking hole 53 and insert the tension cam 44 into the round hole 11 At this time, the near rest end of the tensioning cam 44 is in contact with the side wall of the round hole 11 near the hooking hole 53; then the pin shaft 45 and the tensioning cam 44 are rotated by using a hexagonal wrench, so that the farther end of the tensioning cam 44 is The rest end abuts against the side wall of the round hole 11 near the hooking hole 53 , so that the male connector 4 cooperates with the female connector to connect and tighten the two adjacent pads together.

另外,由于衬垫一般都是在工厂中按照固定规格制造出来的。因此,在施工时,衬垫一般都是从房间的一边向另一边成排(或列)逐步铺放,当衬垫铺放到最后一排(或列)的时候,总是会出现倒数第二排(或列)衬垫与墙面之间的间隙不足以放置一块衬垫的情况。这时,工作人员就需要对衬垫进行裁剪,以使得最后一排(或列)衬垫能够铺放到倒数第二排(或列)衬垫与墙面之间。这里需要注意的是,如果对衬垫进行了裁剪,裁剪后的衬垫上如果不具备或缺少圆孔11与第一嵌槽12或钩挂孔53与第二嵌槽54,则需使用工具在衬垫上开设圆孔11与第一嵌槽12或钩挂孔53与第二嵌槽54,以便于使用公连接件4对相邻衬垫进行连接。In addition, since gaskets are generally manufactured to fixed specifications in the factory. Therefore, during construction, the pads are generally laid out in rows (or columns) from one side of the room to the other side. When the pads are laid in the last row (or column), there will always be a penultimate When the gap between the second row (or column) of pads and the wall is not sufficient to place a pad. At this time, the staff needs to cut the pads so that the last row (or column) of pads can be laid between the penultimate row (or column) of pads and the wall. It should be noted here that if the liner is cut, if the cut liner does not have or lacks the round hole 11 and the first insert groove 12 or the hook hole 53 and the second insert groove 54, you need to use a tool The circular holes 11 and the first inserting grooves 12 or the hooking holes 53 and the second inserting grooves 54 are opened on the gasket, so that the male connector 4 can be used to connect the adjacent gaskets.

本申请实施例还公开一种地砖铺贴结构。The embodiment of the present application also discloses a floor tile paving structure.

参照图9,地砖铺贴结构包括由衬垫铺设而成的垫层7、铺设在垫层7上的地砖层8以及设置在垫层7与地砖层8之间的胶粘层9,板体1与地面之间设有填充层10,填充层10为泡沫填充胶填充而成;垫层7中相邻两衬垫中的公连接件4与母连接部5卡接。Referring to FIG. 9 , the floor tile paving structure includes a cushion layer 7 laid with a cushion, a floor tile layer 8 laid on the cushion layer 7 and an adhesive layer 9 arranged between the cushion layer 7 and the floor tile layer 8. The board body A filling layer 10 is arranged between 1 and the ground, and the filling layer 10 is filled with foam filler;

本申请实施例一种地砖铺贴结构的实施原理为:在地砖铺贴完成后,衬垫能够对地砖进行很好的支撑,而且衬垫与地砖之间也不会出现空鼓的现象,因此,地砖在使用过程中也不易出现受重断裂的现象。The implementation principle of a floor tile paving structure in the embodiment of the present application is as follows: after the floor tile paving is completed, the liner can support the floor tile well, and there will be no hollowing phenomenon between the liner and the floor tile, so , The floor tiles are not prone to the phenomenon of heavy fracture during use.

以上均为本申请的较佳实施例,并非依此限制本申请的保护范围,故:凡依本申请的结构、形状、原理所做的等效变化,均应涵盖于本申请的保护范围之内。The above are all preferred embodiments of the present application, and are not intended to limit the protection scope of the present application. Therefore: all equivalent changes made according to the structure, shape and principle of the present application should be covered within the scope of the present application. Inside.

Claims (10)

1.一种地砖铺贴用衬垫,其特征是:包括板体(1)、若干连接在板体(1)下侧的支撑体(2)以及设置在板体(1)上的调平机构,所述板体(1)上开设有若干注孔(6);所述板体(1)的两相侧邻边处均设有有公连接件(4),另外两相邻边处均设有母连接部(5),所述公连接件(4)与所述母连接部(5)卡接配合。1. A liner for floor tile paving, characterized in that it comprises a plate body (1), a plurality of supports (2) connected to the lower side of the plate body (1), and a leveling device arranged on the plate body (1). The plate body (1) is provided with a number of injection holes (6); the adjacent sides of the two phase sides of the plate body (1) are provided with male connectors (4), and the other two adjacent sides are provided with male connectors (4). Each is provided with a female connecting portion (5), and the male connecting piece (4) is snap-fitted with the female connecting portion (5). 2.根据权利要求1所述的一种地砖铺贴用衬垫,其特征是:所述支撑体(2)为杆状物,其在板体(1)下侧相对两边之间间隔设置;所述板体(1)与所述支撑体(2)一体成型;所述注孔(6)位于相邻支撑体(2)之间。2. The liner for paving floor tiles according to claim 1, characterized in that: the support body (2) is a rod-shaped object, which is arranged at intervals between opposite sides of the lower side of the plate body (1); The plate body (1) and the support body (2) are integrally formed; the injection hole (6) is located between adjacent support bodies (2). 3.根据权利要求1所述的一种地砖铺贴用衬垫,其特征是:所述调平机构包括至少三个调平器(3),所述调平器(3)包括调平螺丝(31)和套设在调平螺栓上并与调平螺丝(31)螺纹连接的调平螺母(32);所述衬垫上开设有用于安装调平器(3)的调平孔(33),所述调平螺母(32)固定在调平孔(33)中。3. The liner for paving floor tiles according to claim 1, wherein the leveling mechanism comprises at least three levelers (3), and the levelers (3) comprise leveling screws (31) and a leveling nut (32) sleeved on the leveling bolt and threadedly connected with the leveling screw (31); the gasket is provided with a leveling hole (33) for installing the leveler (3) ), the leveling nut (32) is fixed in the leveling hole (33). 4.根据权利要求1所述的一种地砖铺贴用衬垫,其特征是:所述板体和所述支撑体采用木塑复合材料一体制造成型。4 . The liner for paving floor tiles according to claim 1 , wherein the plate body and the support body are integrally formed with wood-plastic composite materials. 5 . 5.根据权利要求1所述的一种地砖铺贴用衬垫,其特征是:所述公连接件(4)包括沿板体(1)周侧面通长方向连接在板体(1)周侧面中部的卡接片(41),所述卡接片(41)远离板体(1)的一边向上或向下弯折;5. A liner for floor tile laying according to claim 1, characterized in that: the male connector (4) comprises a perimeter of the plate body (1) connected to the circumference of the plate body (1) along the lengthwise direction of the peripheral side surface of the plate body (1). a snap-fit piece (41) in the middle of the side surface, the side of the snap-fit piece (41) away from the plate body (1) is bent upwards or downwards; 所述母连接部(5)包括开设在板体(1)周侧面上的与卡接片(41)适配的插槽(51)。The female connecting portion (5) includes a slot (51) which is provided on the peripheral side surface of the plate body (1) and is adapted to the clip (41). 6.根据权利要求5所述的一种地砖铺贴用衬垫,其特征是:所述板体(1)设有母连接部(5)的周侧面上间隔开设有若干贯通板体(1)上侧面与插槽(51)的缺口(52);所述卡接片(41)上侧间隔固定有若干用于填补缺口(52)的凸块(42)。6. A liner for floor tile laying according to claim 5, characterized in that: a plurality of through-board bodies (1) are spaced on the peripheral side surface of the plate body (1) provided with the female connecting portion (5). ) a gap (52) between the upper side and the slot (51); a plurality of bumps (42) for filling the gap (52) are fixed at intervals on the upper side of the clip (41). 7.根据权利要求1所述的一种地砖铺贴用衬垫,其特征是:所述公连接件(4)包括连接片(43)和设置在连接片(43)一侧端部并通过销轴(45)与连接片(43)转动连接的拉紧凸轮(44),所述销轴(45)上设有便于人转动拉紧凸轮(44)的旋拧部(48);所述连接片(43)远离拉紧凸轮(44)的一端固定连接有与其互相垂直的钩挂片(46);所述板体(1)与公连接件(4)连接的一边上侧开设有圆孔(11)以及圆孔(11)连通并可供连接片(43)嵌入的第一嵌槽(12),所述拉紧凸轮(44)插接在圆孔(11)中;7. A liner for floor tile laying according to claim 1, characterized in that: the male connector (4) comprises a connecting piece (43) and one end of one side of the connecting piece (43) and passing through the connecting piece (43) A tightening cam (44) in which the pin shaft (45) is rotatably connected with the connecting piece (43), the pin shaft (45) is provided with a screwing portion (48) that is convenient for people to rotate the tightening cam (44); the One end of the connecting piece (43) away from the tensioning cam (44) is fixedly connected with a hooking piece (46) that is perpendicular to each other; the upper side of the side where the plate body (1) is connected with the male connector (4) is provided with a circle The hole (11) and the circular hole (11) communicate with the first insert groove (12) into which the connecting piece (43) can be embedded, and the tensioning cam (44) is inserted into the circular hole (11); 所述母连接部(5)包括开设在板体(1)上侧供钩挂板插入的钩挂孔(53)以及与钩挂孔(53)连通并可供连接片(43)嵌入的第二嵌槽(54)。The female connecting portion (5) includes a hooking hole (53) opened on the upper side of the plate body (1) for the hooking plate to be inserted into, and a third connecting hole (53) that communicates with the hooking hole (53) and can be inserted into the connecting piece (43). Two insert grooves (54). 8.根据权利要求7所述的一种地砖铺贴用衬垫,其特征是:所述钩挂片(46)为弧形片,其以弧形边与连接片(43)连接。8 . The liner for laying floor tiles according to claim 7 , wherein the hooking piece ( 46 ) is an arc-shaped piece, which is connected with the connecting piece ( 43 ) by an arc-shaped edge. 9 . 9.根据权利要求7所述的一种地砖铺贴用衬垫,其特征是:所述销轴(45)固定连接在拉紧凸轮(44)朝向连接片(43)的一侧,所述销轴(45)贯穿连接片(43)并与连接片(43)转动配合,所述销轴(45)远离拉紧凸轮(44)的一端上固定有防脱件(47);所述旋拧部(48)为六角盲孔,其开设在销轴(45)远离拉紧凸轮(44)一端的端面上。9 . The liner for floor tile laying according to claim 7 , wherein the pin shaft ( 45 ) is fixedly connected to the side of the tension cam ( 44 ) facing the connecting piece ( 43 ), and the The pin shaft (45) penetrates through the connecting piece (43) and is rotatably matched with the connecting piece (43), and a disengagement prevention member (47) is fixed on the end of the pin shaft (45) away from the tensioning cam (44); The screwing part (48) is a hexagonal blind hole, which is opened on the end face of the pin shaft (45) away from the end of the tension cam (44). 10.一种地砖铺贴结构,其特征是:包括由权利要求1-9中任意一项所述的衬垫铺设而成的垫层(7)、铺设在垫层(7)上的地砖层(8)以及设置在垫层(7)与地砖层(8)之间的胶粘层(9),所述板体(1)与地面之间设有填充层(10);所述垫层(7)中相邻两衬垫中的公连接件(4)与母连接部(5)卡接。10. A floor tile paving structure, characterized in that it comprises a cushion layer (7) formed by laying the cushion according to any one of claims 1 to 9, and a floor tile layer laid on the cushion layer (7). (8) and an adhesive layer (9) arranged between the cushion layer (7) and the floor tile layer (8), a filling layer (10) is arranged between the plate body (1) and the ground; the cushion layer The male connectors (4) in the two adjacent pads in (7) are snap-connected to the female connector (5).
CN202010726554.5A 2020-07-25 2020-07-25 A liner for floor tile paving and floor tile paving structure Pending CN111877713A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010726554.5A CN111877713A (en) 2020-07-25 2020-07-25 A liner for floor tile paving and floor tile paving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010726554.5A CN111877713A (en) 2020-07-25 2020-07-25 A liner for floor tile paving and floor tile paving structure

Publications (1)

Publication Number Publication Date
CN111877713A true CN111877713A (en) 2020-11-03

Family

ID=73202021

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010726554.5A Pending CN111877713A (en) 2020-07-25 2020-07-25 A liner for floor tile paving and floor tile paving structure

Country Status (1)

Country Link
CN (1) CN111877713A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114412123A (en) * 2022-02-15 2022-04-29 黄细军 Novel floor tile pasting process

Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86101562A (en) * 1986-02-25 1987-09-09 奥托扣件系统公司 The connector of structural element
CN202450750U (en) * 2012-02-28 2012-09-26 柯清海 Convenient quick-mounting paving backing plate
CN203081935U (en) * 2012-12-20 2013-07-24 深圳市易尚展示股份有限公司 Plate connection device
CN106481049A (en) * 2016-12-02 2017-03-08 周美亮 A kind of floor base plate and the floor panel structure using this substrate and its installation method
CN207660261U (en) * 2017-12-28 2018-07-27 广东鹏美森木业科技有限公司 A kind of floor tile place mat equipment
CN208918217U (en) * 2018-08-16 2019-05-31 徐淑君 Dry type paving ceramic tile combines adjustable module
CN110107050A (en) * 2019-04-26 2019-08-09 陈婉群 A kind of assembled wood-plastic board
CN110894749A (en) * 2018-09-12 2020-03-20 徐学庆 Mortar cake forming template and floor tile paving construction method
CN111155737A (en) * 2020-01-15 2020-05-15 沈天赐 A kind of tile paving rack and construction method thereof
CN212295542U (en) * 2020-07-25 2021-01-05 深圳市弘景装饰工程有限公司 Liner for paving floor tiles and floor tile paving structure

Patent Citations (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN86101562A (en) * 1986-02-25 1987-09-09 奥托扣件系统公司 The connector of structural element
CN202450750U (en) * 2012-02-28 2012-09-26 柯清海 Convenient quick-mounting paving backing plate
CN203081935U (en) * 2012-12-20 2013-07-24 深圳市易尚展示股份有限公司 Plate connection device
CN106481049A (en) * 2016-12-02 2017-03-08 周美亮 A kind of floor base plate and the floor panel structure using this substrate and its installation method
CN207660261U (en) * 2017-12-28 2018-07-27 广东鹏美森木业科技有限公司 A kind of floor tile place mat equipment
CN208918217U (en) * 2018-08-16 2019-05-31 徐淑君 Dry type paving ceramic tile combines adjustable module
CN110894749A (en) * 2018-09-12 2020-03-20 徐学庆 Mortar cake forming template and floor tile paving construction method
CN110107050A (en) * 2019-04-26 2019-08-09 陈婉群 A kind of assembled wood-plastic board
CN111155737A (en) * 2020-01-15 2020-05-15 沈天赐 A kind of tile paving rack and construction method thereof
CN212295542U (en) * 2020-07-25 2021-01-05 深圳市弘景装饰工程有限公司 Liner for paving floor tiles and floor tile paving structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114412123A (en) * 2022-02-15 2022-04-29 黄细军 Novel floor tile pasting process

Similar Documents

Publication Publication Date Title
US9353515B2 (en) Masonry tie
US9045892B2 (en) Brick veneer header bracket
US20180135309A1 (en) Panel veneer systems
US20080222986A1 (en) Exterior wall structure of a building
US20120198789A1 (en) Tile spacer
US20130167463A1 (en) Composite tile product
US20140144092A1 (en) System and apparatus for installation of tile floor
US8984832B2 (en) Flooring, deck and patio surface system and method of use
CN111877713A (en) A liner for floor tile paving and floor tile paving structure
US10435893B2 (en) Method for laying tiles
CN212295542U (en) Liner for paving floor tiles and floor tile paving structure
JP2009035934A (en) Tile panel
US20110094177A1 (en) Tiling system
US11293189B2 (en) Flooring system for use in a sloped floor
US10815673B2 (en) Flooring support system
CN215907287U (en) Assembled terrace
JP5317272B2 (en) Tile panel construction method
AU748628B2 (en) Movement joint
US10815678B2 (en) Flooring support system
US10947739B2 (en) Flooring support system
KR102856996B1 (en) Metal Exterior Finishing Connector with Earthquake Resistance and Workability and Exterior Finishing Structure using the same
CN112647705B (en) Opposite-pulling screw rod for building brick-concrete composite wall, mold system and method
KR100722866B1 (en) Prefabricated boiler hypocaust panel
IL320324A (en) Construction of walls with cladding and insulation
CA1109690A (en) Shrinkage joint unit for construction slabs

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination