[go: up one dir, main page]

CN111844810A - Composite material prepreg laminate molding mechanism and molding method thereof - Google Patents

Composite material prepreg laminate molding mechanism and molding method thereof Download PDF

Info

Publication number
CN111844810A
CN111844810A CN202010600599.8A CN202010600599A CN111844810A CN 111844810 A CN111844810 A CN 111844810A CN 202010600599 A CN202010600599 A CN 202010600599A CN 111844810 A CN111844810 A CN 111844810A
Authority
CN
China
Prior art keywords
prepreg
elastic
frame
product
connecting rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010600599.8A
Other languages
Chinese (zh)
Inventor
韩宇
王志勇
刘含洋
金�一
季宝锋
唐占文
丁常方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Istar Aviation Technology Co ltd
Original Assignee
Suzhou Istar Aviation Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Istar Aviation Technology Co ltd filed Critical Suzhou Istar Aviation Technology Co ltd
Priority to CN202010600599.8A priority Critical patent/CN111844810A/en
Publication of CN111844810A publication Critical patent/CN111844810A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/40Shaping or impregnating by compression not applied
    • B29C70/42Shaping or impregnating by compression not applied for producing articles of definite length, i.e. discrete articles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/54Component parts, details or accessories; Auxiliary operations, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B29WORKING OF PLASTICS; WORKING OF SUBSTANCES IN A PLASTIC STATE IN GENERAL
    • B29CSHAPING OR JOINING OF PLASTICS; SHAPING OF MATERIAL IN A PLASTIC STATE, NOT OTHERWISE PROVIDED FOR; AFTER-TREATMENT OF THE SHAPED PRODUCTS, e.g. REPAIRING
    • B29C70/00Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts
    • B29C70/04Shaping composites, i.e. plastics material comprising reinforcements, fillers or preformed parts, e.g. inserts comprising reinforcements only, e.g. self-reinforcing plastics
    • B29C70/28Shaping operations therefor
    • B29C70/54Component parts, details or accessories; Auxiliary operations, e.g. feeding or storage of prepregs or SMC after impregnation or during ageing
    • B29C70/545Perforating, cutting or machining during or after moulding

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Composite Materials (AREA)
  • Mechanical Engineering (AREA)
  • Casting Or Compression Moulding Of Plastics Or The Like (AREA)

Abstract

The invention discloses a compression molding mechanism and a compression molding method for a composite prepreg laminated board, and belongs to the technical field of compression molding, curing and molding of thermosetting and thermoplastic composite laminated boards. The compression molding mechanism for the composite material prepreg laminated board comprises a fixed frame and an elastic frame; the fixed frame is arranged at the lower part of the press head of the punching machine, and the elastic frame is arranged in the fixed frame; the outer side end of the elastic frame is connected with the fixed frame, and the inner side end of the elastic frame is used for connecting the prepreg prefabricated body. The technical problem of the prior art that the position of the prepreg is not fixed firmly, and when a punch press is used for punch forming of the prepreg, a compression area of the prepreg is prone to wrinkling, so that products are scrapped is solved. The invention utilizes the elastic frame to maintain the tension, adjusts the tension applied to the prepreg and the tension angle during molding, ensures no wrinkling after molding and has high product qualification rate.

Description

复合材料预浸料层压板模压成型机构及其成型方法Composite material prepreg laminate molding mechanism and molding method thereof

技术领域technical field

本发明涉及热固性和热塑性复合材料层压板模压固化成型的技术领域,具体的涉及一种适用于钣金型材预浸料的复合材料预浸料层压板模压成型机构及其成型方法。The invention relates to the technical field of molding and curing of thermosetting and thermoplastic composite material laminates, in particular to a molding mechanism and a molding method of composite material prepreg laminates suitable for sheet metal profile prepregs.

背景技术Background technique

复合材料模压成型具有生产速度快,产品一致性好的优点。复合材料在成型的过程中,需要将预浸料直接放置在冲压机的压头下部位置,冲压机启动后,压头直接对下方位置的预浸料进行冲压成型。Composite molding has the advantages of fast production speed and good product consistency. During the molding process of the composite material, the prepreg needs to be placed directly at the lower position of the indenter of the punching machine. After the punching machine is started, the indenter directly punches the prepreg at the lower position.

现有技术中,预浸料的位置固定不牢固,冲压机压头在启动的过程中,速率不匹配时,极易造成预浸料的冲压变形,使预浸料的压缩区引起起皱,尤其是大转角和成型件的边缘区域,几乎不可避免,出现产品报废率高,生产效率低的问题。并且采用此种冲压成型的方法,工作效率低。In the prior art, the position of the prepreg is not firmly fixed. During the start-up process of the press head of the stamping machine, when the speed does not match, the stamping deformation of the prepreg is easily caused, and the compression area of the prepreg causes wrinkling. Especially in large corners and edge areas of molded parts, it is almost inevitable that there will be problems of high product scrapping rate and low production efficiency. And the use of this stamping forming method has low work efficiency.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种复合材料预浸料层压板模压成型机构,以解决现有技术中存在的,预浸料的位置固定不牢固,冲压机压头对其冲压成型时,容易导致预浸料的压缩区起皱,造成产品报废的技术问题。The purpose of the present invention is to provide a composite material prepreg laminated plate molding mechanism, so as to solve the problem in the prior art that the position of the prepreg is not fixed firmly, and when the press head of the punching machine presses it, it is easy to lead to prepreg. The compression zone of the impregnated material is wrinkled, causing technical problems with product scrap.

本发明提供的一种复合材料预浸料层压板模压成型机构,包括固定架和弹性架;The invention provides a composite material prepreg laminated plate molding mechanism, comprising a fixed frame and an elastic frame;

固定架设置在冲压机压头的下部,弹性架设置在固定架内;The fixing frame is arranged at the lower part of the pressing head of the punching machine, and the elastic frame is arranged in the fixing frame;

弹性架的外侧端连接固定架上,弹性架的内侧端用于连接预浸料预制体。The outer end of the elastic frame is connected to the fixing frame, and the inner end of the elastic frame is used for connecting the prepreg.

进一步的,固定架包括第一连接杆和第二连接杆;Further, the fixing frame includes a first connecting rod and a second connecting rod;

第一连接杆的数量至少为两个,第二连接杆的数量至少为两个;The number of the first connecting rods is at least two, and the number of the second connecting rods is at least two;

一个第一连接杆与一个第二连接杆交叉连接,连接为设有内部容置空间的架体结构,弹性架设置在内部容置空间内。A first connecting rod and a second connecting rod are cross-connected to form a frame structure with an internal accommodation space, and the elastic frame is arranged in the inner accommodation space.

进一步的,第一连接杆上设有第一连接孔,第二连接杆上设有第二连接孔;Further, the first connecting rod is provided with a first connecting hole, and the second connecting rod is provided with a second connecting hole;

第一连接孔与第二连接孔通过第一锁紧件连接,实现第一连接杆与第二连接杆连接。The first connecting hole and the second connecting hole are connected by a first locking piece, so as to realize the connection between the first connecting rod and the second connecting rod.

进一步的,第一连接孔的数量为多个,第二连接孔的数量为多个。Further, the number of the first connection holes is multiple, and the number of the second connection holes is multiple.

进一步的,弹性架包括第一弹性连接件和第二弹性连接件;Further, the elastic frame includes a first elastic connecting piece and a second elastic connecting piece;

第一弹性连接件的外侧端连接第一连接杆上,第一弹性连接件的内侧端连接预浸料预制体的第一夹持块上;第二弹性连接件的外侧端连接第二连接杆上,第二弹性连接件的内侧端连接预浸料预制体的第二夹持块上;The outer end of the first elastic connecting piece is connected to the first connecting rod, the inner end of the first elastic connecting piece is connected to the first clamping block of the prepreg preform; the outer end of the second elastic connecting piece is connected to the second connecting rod the inner end of the second elastic connector is connected to the second clamping block of the prepreg;

第一弹性连接件的结构与第二弹性连接件的结构相同。The structure of the first elastic connecting piece is the same as that of the second elastic connecting piece.

进一步的,第一弹性连接件包括固定件、弹性件和卡接件;Further, the first elastic connecting piece includes a fixing piece, an elastic piece and a clipping piece;

固定件的外侧端连接第一连接杆上,固定件的内侧端连接弹性件的外侧端,弹性件的内侧端连接卡接件,卡接件用于连接预浸料预制体。The outer end of the fixing piece is connected to the first connecting rod, the inner end of the fixing piece is connected with the outer end of the elastic piece, and the inner end of the elastic piece is connected with the clamping piece, and the clamping piece is used for connecting the prepreg.

进一步的,固定件上设有限位孔,弹性件的外侧端通过第二锁紧件连接限位孔内;Further, the fixing piece is provided with a limit hole, and the outer end of the elastic piece is connected to the limit hole through the second locking piece;

限位孔的数量为多个。The number of limit holes is multiple.

进一步的,卡接件设有卡槽,预浸料预制体通过第三锁紧件连接在卡槽内。Further, the clamping part is provided with a clamping groove, and the prepreg is connected in the clamping groove through a third locking part.

进一步的,还包括升降设备;Further, it also includes lifting equipment;

固定架连接在升降设备上,升降设备能够带动固定架沿着竖直方向往复运动,使固定架内的预浸料预制体靠近或者远离压机机头。The fixing frame is connected to the lifting device, and the lifting device can drive the fixing frame to reciprocate along the vertical direction, so that the prepreg in the fixing frame is close to or away from the press head.

本发明还提供一种复合材料预浸料层压板模压成型机构的成型方法,包括如下步骤:The present invention also provides a molding method for a composite material prepreg laminate molding mechanism, comprising the following steps:

a.裁切预浸料a. Cut the prepreg

根据产品尺寸,利用切割机对预浸料进行裁切,形成方形预浸料毛坯料,在预浸料毛坯料的四周预留出第一夹持块、第二夹持块,在预浸料毛坯料的非夹持区预留毛边余量,形成预浸料预制体;According to the product size, the prepreg is cut with a cutting machine to form a square prepreg blank, and the first clamping block and the second clamping block are reserved around the prepreg blank. A burr margin is reserved in the non-clamping area of the blank to form a prepreg;

b.铺层b. Laminate

按照产品结构的铺层设计,对预浸料预制体进行铺层配置;According to the layup design of the product structure, the prepreg prefabricated body is laid up;

c.固定预浸料预制体c. Fixed prepreg preform

利用裁切设备分别在第一夹持块、第二夹持块上打孔,利用第一弹性连接件对第一夹持块固定,利用第二弹性连接件对第二夹持块固定;Use cutting equipment to punch holes on the first clamping block and the second clamping block respectively, use the first elastic connecting piece to fix the first clamping block, and use the second elastic connecting piece to fix the second clamping block;

d.铺脱模材料d. Lay out the mold release material

分别在预浸料预制体的上、下表面铺贴一层脱模材料,然后利用压机驱动压头,对预浸料预制体进行合模模压;压力设置为0.1MPa-10MPa,根据材料和产品需求设置;Lay a layer of release material on the upper and lower surfaces of the prepreg, and then use the press to drive the indenter to mold the prepreg; the pressure is set to 0.1MPa-10MPa, depending on the material and product requirements setting;

e.加热固化e. Heat curing

预浸料预制体模压完毕后,在上下模具合模加压的同时,将预浸料预制体原位加热,对其进行加热加压固化,固化温度的取值范围在120℃~400℃之间,固化时间的取值范围在1h~20h之间;After the prepreg preform is molded, the prepreg preform is heated in situ while the upper and lower molds are clamped and pressurized, and the prepreg is heated and pressed to cure. The curing temperature ranges from 120 to 400 °C. The curing time ranges from 1h to 20h;

f.产品脱模f. Product demoulding

将固化后的产品进行降温处理,降温速率小于5℃/min;The cured product is subjected to cooling treatment, and the cooling rate is less than 5℃/min;

降温结束后,将产品放置在室内,使其降温至室温,直至产品表面的温度低于60℃,然后对产品进行脱模,形成完整的产品结构;After cooling, place the product indoors, let it cool down to room temperature, until the temperature of the product surface is lower than 60 °C, and then demold the product to form a complete product structure;

g.产品修整g. Product trimming

利用机床或者手工打磨对脱模后的产品的毛边进行打磨修整,形成合格产品。Use machine tools or manual grinding to grind and trim the burrs of the demolded products to form qualified products.

相对于现有技术,本发明的复合材料预浸料层压板模压成型机构具有以下优势:Compared with the prior art, the composite material prepreg laminate molding mechanism of the present invention has the following advantages:

本发明的固定架设置在冲压机的压头下部位置,对固定架的安装位置进行限定;弹性架设置在固定架内部,对弹性架的安装位置进行限定;弹性架的外侧端连接在固定架上,弹性架的内侧端用于连接预浸料预制体,以利用弹性架对预浸料预制体的连接位置进行限定;本发明利用弹性架固定预浸料预制体,通过弹性架的弹性力保持张力,利用弹性架调节三维进给量,从而调节施加的张力和产品成型时的张力角度,从而减少了成型过程中材料压缩区引起的起皱,提高了产品的合格率。The fixing frame of the present invention is arranged at the lower part of the pressing head of the punching machine to limit the installation position of the fixing frame; the elastic frame is arranged inside the fixing frame to limit the installation position of the elastic frame; the outer end of the elastic frame is connected to the fixing frame The inner end of the elastic frame is used to connect the prepreg, so that the connection position of the prepreg is limited by the elastic frame; the present invention uses the elastic frame to fix the prepreg, and the elastic force of the elastic frame is used to fix the prepreg. The tension is maintained, and the three-dimensional feed is adjusted by the elastic frame, so as to adjust the applied tension and the tension angle when the product is formed, thereby reducing the wrinkling caused by the compression area of the material during the forming process, and improving the qualified rate of the product.

附图说明Description of drawings

为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the specific embodiments of the present invention or the technical solutions in the prior art more clearly, the following briefly introduces the accompanying drawings that need to be used in the description of the specific embodiments or the prior art. Obviously, the accompanying drawings in the following description The drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.

图1为本发明实施例提供的复合材料预浸料层压板模压成型机构使用时的结构示意图;FIG. 1 is a schematic structural diagram of a composite material prepreg laminate molding mechanism when used in an embodiment of the present invention;

图2为本发明实施例提供的复合材料预浸料层压板模压成型机构的结构示意图;2 is a schematic structural diagram of a composite material prepreg laminate molding mechanism provided in an embodiment of the present invention;

图3为本发明实施例提供的第一弹性连接件的结构示意图;3 is a schematic structural diagram of a first elastic connector provided by an embodiment of the present invention;

图4为本发明实施例提供的预浸料预制体的结构示意图;4 is a schematic structural diagram of a prepreg preform provided by an embodiment of the present invention;

图5为本发明实施例提供的为第一连接杆与固定件之间的另一种连接方式示意图;FIG. 5 is a schematic diagram of another connection mode between the first connecting rod and the fixing member provided by the embodiment of the present invention;

图6为本发明实施例提供的复合材料预浸料层压板模压成型机构的成型方法流程图。6 is a flowchart of a molding method of a composite material prepreg laminate molding mechanism provided in an embodiment of the present invention.

附图标记说明:Description of reference numbers:

100-固定架; 200-弹性架;100-fixed frame; 200-flexible frame;

300-预浸料预制体; 101-第一连接杆;300-prepreg preform; 101-first connecting rod;

102-第二连接杆; 103-内部容置空间;102-the second connecting rod; 103-inner accommodation space;

104-第一连接孔; 105-第二连接孔;104-first connection hole; 105-second connection hole;

106-第一锁紧件; 201-第一弹性连接件;106-first locking piece; 201-first elastic connecting piece;

202-第二弹性连接件; 203-固定件;202-second elastic connecting piece; 203-fixing piece;

204-弹性件; 205-卡接件;204-elastic part; 205-clamping part;

206-限位孔; 207-第二锁紧件;206-limiting hole; 207-second locking piece;

208-卡槽; 209-第三锁紧件;208-card slot; 209-third locking piece;

301-第一夹持块; 302-第二夹持块。301 - the first clamping block; 302 - the second clamping block.

具体实施方式Detailed ways

需要说明的是,在不冲突的情况下,本发明中的实施例及实施例中的特征可以相互组合。It should be noted that the embodiments of the present invention and the features of the embodiments may be combined with each other under the condition of no conflict.

在本发明的描述中,需要理解的是,术语“中心”、“纵向”、“横向”、“上”、“下”、“前”、“后”、“左”、“右”、“竖直”、“水平”、“顶”、“底”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”等仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”等的特征可以明示或者隐含地包括一个或者更多个该特征。在本发明的描述中,除非另有说明,“多个”的含义是两个或两个以上。In the description of the present invention, it should be understood that the terms "center", "portrait", "horizontal", "top", "bottom", "front", "rear", "left", "right", " The orientation or positional relationship indicated by vertical, horizontal, top, bottom, inner, outer, etc. is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and The description is simplified rather than indicating or implying that the device or element referred to must have a particular orientation, be constructed and operate in a particular orientation, and therefore should not be construed as limiting the invention. In addition, the terms "first", "second", etc. are used for descriptive purposes only, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first", "second", etc., may expressly or implicitly include one or more of that feature. In the description of the present invention, unless otherwise specified, "plurality" means two or more.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以通过具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that the terms "installed", "connected" and "connected" should be understood in a broad sense, unless otherwise expressly specified and limited, for example, it may be a fixed connection or a detachable connection Connection, or integral connection; can be mechanical connection, can also be electrical connection; can be directly connected, can also be indirectly connected through an intermediate medium, can be internal communication between two elements. For those of ordinary skill in the art, the specific meanings of the above terms in the present invention can be understood through specific situations.

下面将参考附图并结合实施例来详细说明本发明。The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.

如图1~4所示,本发明提供的一种复合材料预浸料层压板模压成型机构,包括固定架100和弹性架200;As shown in Figures 1-4, a composite material prepreg laminate molding mechanism provided by the present invention includes a fixing frame 100 and an elastic frame 200;

固定架100设置在冲压机压头的下部,弹性架200设置在固定架100内;The fixing frame 100 is arranged at the lower part of the pressing head of the punching machine, and the elastic frame 200 is arranged in the fixing frame 100;

弹性架200的外侧端连接固定架100上,弹性架200的内侧端用于连接预浸料预制体300。The outer end of the elastic frame 200 is connected to the fixing frame 100 , and the inner end of the elastic frame 200 is used for connecting the prepreg 300 .

本发明的一个实施例中,如图1所示,固定架100采用多个螺栓固定连接在冲压机压头的下方位置,弹性架200设置在固定架100的内部,弹性架200的外侧端采用螺栓连接在固定架100上,弹性架200的内侧端采用螺栓连接预浸料预制体300四周的夹持块上,以对预浸料预制体300的位置进行固定。In one embodiment of the present invention, as shown in FIG. 1 , the fixing frame 100 is fixedly connected to the position below the pressing head of the punching machine by using a plurality of bolts, the elastic frame 200 is arranged inside the fixing frame 100 , and the outer end of the elastic frame 200 adopts The bolts are connected to the fixing frame 100 , and the inner end of the elastic frame 200 is bolted to the clamping blocks around the prepreg 300 to fix the position of the prepreg 300 .

使用时,利用弹性架200对预浸料预制体300进行固定,通过弹性架200的弹簧框架,使预浸料预制体300能够保持张力,并且弹簧框架还可以进行三维调节进给量,从而调节对预浸料预制体300施加的张力和成型时的张力角度,最终减少了预浸料预制体300在成形的过程中,材料压缩区引起的起皱。本申请弹性架200的弹簧型号、弹簧连接的位置和弹簧的张力都可以通过不同的预浸料预制体300进行模拟优化,冲压机压头冲压成型时,确保产品的合格率。During use, the prepreg 300 is fixed by the elastic frame 200, and the spring frame of the elastic frame 200 enables the prepreg 300 to maintain tension, and the spring frame can also adjust the feed amount three-dimensionally, thereby adjusting The tension applied to the prepreg 300 and the tension angle during forming ultimately reduce the wrinkling caused by the material compression area of the prepreg 300 during the forming process. The spring type of the elastic frame 200 of the present application, the position of the spring connection and the tension of the spring can be simulated and optimized by different prepregs 300, and the qualified rate of the product can be ensured when the stamping head of the stamping machine is stamped and formed.

进一步的,固定架100包括第一连接杆101和第二连接杆102;Further, the fixing frame 100 includes a first connecting rod 101 and a second connecting rod 102;

第一连接杆101的数量至少为两个,第二连接杆102的数量至少为两个;The number of the first connecting rods 101 is at least two, and the number of the second connecting rods 102 is at least two;

一个第一连接杆101与一个第二连接杆102交叉连接,连接为设有内部容置空间103的架体结构,弹性架200设置在内部容置空间103内。A first connecting rod 101 is cross-connected with a second connecting rod 102 , and connected to form a frame structure with an internal accommodating space 103 , and the elastic frame 200 is arranged in the internal accommodating space 103 .

在本实施例中,如图2所示,第一连接杆101为水平横杆,第二连接杆102为竖直杆,两个连接杆均采用方形管或者圆管。第一连接杆101、第二连接杆102的数量分别为两个,一个第一连接杆101与一个第二连接杆102交叉连接,连接后形成方形架体结构,方形架体结构设有方形的内部容置空间103,弹性架200设置在内部容置空间103内。In this embodiment, as shown in FIG. 2 , the first connecting rod 101 is a horizontal cross rod, the second connecting rod 102 is a vertical rod, and both of the two connecting rods use a square tube or a round tube. The number of the first connecting rod 101 and the number of the second connecting rod 102 is two respectively, and a first connecting rod 101 is cross-connected with a second connecting rod 102, and after the connection, a square frame structure is formed, and the square frame structure is provided with a square frame. In the inner accommodating space 103 , the elastic frame 200 is arranged in the inner accommodating space 103 .

在其他实施例中,第一连接杆101、第二连接杆102的数量还可以分别设置为三个,一个第一连接杆101与一个第二连接杆102交叉连接,连接后形成六边形架体结构,六边形架体结构设有六边形的内部容置空间103,弹性架200设置在内部容置空间103内。In other embodiments, the number of the first connecting rod 101 and the number of the second connecting rod 102 can also be set to three respectively, and one first connecting rod 101 and one second connecting rod 102 are cross-connected, and after the connection, a hexagonal frame is formed The hexagonal frame body structure is provided with a hexagonal inner accommodating space 103 , and the elastic frame 200 is arranged in the inner accommodating space 103 .

在具体的实施方式中,第一连接杆101、第二连接杆102还可以根据使用的需要设置为其他的数量。In a specific implementation manner, the first connecting rod 101 and the second connecting rod 102 can also be set to other numbers according to the needs of use.

进一步的,第一连接杆101上设有第一连接孔104,第二连接杆102上设有第二连接孔105;Further, the first connecting rod 101 is provided with a first connecting hole 104, and the second connecting rod 102 is provided with a second connecting hole 105;

第一连接孔104与第二连接孔105通过第一锁紧件106连接,实现第一连接杆101与第二连接杆102连接。The first connection hole 104 and the second connection hole 105 are connected by the first locking member 106 to realize the connection between the first connection rod 101 and the second connection rod 102 .

在本实施例中,如图2所示,第一连接孔104、第二连接孔105均为螺纹孔,第一锁紧件106为螺栓,两个连接杆进行定位后,采用螺栓连接两个连接孔固定,以使两个连接杆的连接位置牢固,并且采用螺栓连接的方式,便于根据需要进行拆装。In this embodiment, as shown in FIG. 2 , the first connection hole 104 and the second connection hole 105 are both threaded holes, and the first locking member 106 is a bolt. After the two connecting rods are positioned, bolts are used to connect the two The connection hole is fixed to make the connection position of the two connecting rods firm, and the bolt connection is adopted to facilitate disassembly and assembly as required.

进一步的,第一连接孔104的数量为多个,第二连接孔105的数量为多个。Further, the number of the first connection holes 104 is multiple, and the number of the second connection holes 105 is multiple.

在本实施例中,如图2所示,第一连接杆101上设置多个第一连接孔104,第二连接杆102上设置多个第二连接孔105,通过连接孔的位置,螺栓定位,能够对两个连接杆的连接位置进行调节,从而对预浸料预制体300的进给量进行调节。In this embodiment, as shown in FIG. 2 , the first connecting rod 101 is provided with a plurality of first connecting holes 104 , and the second connecting rod 102 is provided with a plurality of second connecting holes 105 , and the bolts are positioned according to the positions of the connecting holes. , the connection positions of the two connecting rods can be adjusted, so as to adjust the feeding amount of the prepreg 300 .

进一步的,弹性架200包括第一弹性连接件201和第二弹性连接件202;Further, the elastic frame 200 includes a first elastic connecting member 201 and a second elastic connecting member 202;

第一弹性连接件201的外侧端连接第一连接杆101上,第一弹性连接件201的内侧端连接预浸料预制体300的第一夹持块301上;第二弹性连接件202的外侧端连接第二连接杆102上,第二弹性连接件202的内侧端连接预浸料预制体300的第二夹持块302上;The outer end of the first elastic connector 201 is connected to the first connecting rod 101 , the inner end of the first elastic connector 201 is connected to the first clamping block 301 of the prepreg 300 ; the outer end of the second elastic connector 202 The end is connected to the second connecting rod 102, and the inner end of the second elastic connecting piece 202 is connected to the second clamping block 302 of the prepreg 300;

第一弹性连接件201的结构与第二弹性连接件202的结构相同。The structure of the first elastic connecting member 201 is the same as that of the second elastic connecting member 202 .

在本实施例中,如图1、图2、图4所示,第一弹性连接件201竖直设置,第二弹性连接件202水平设置;两个第一连接杆101、两个第二连接杆102连接后形成方形框架结构。在图4中,预浸料预制体300的上侧边、下侧边分别设置三个第一夹持块301,在图2中,上侧边采用三个第一弹性连接件201固定三个第一夹持块301,下侧边采用三个第一弹性连接件201固定三个第一夹持块301。在图4中,预浸料预制体300的左侧边、右侧边分别设置三个第二夹持块302,在图2中,左侧边采用三个第二弹性连接件202固定三个第二夹持块302,右侧边采用三个第二弹性连接件202固定三个第二夹持块302,完成对预浸料预制体300的位置固定。In this embodiment, as shown in FIG. 1 , FIG. 2 , and FIG. 4 , the first elastic connecting member 201 is arranged vertically, and the second elastic connecting member 202 is arranged horizontally; two first connecting rods 101 and two second connecting rods The rods 102 are connected to form a square frame structure. In FIG. 4 , the upper and lower sides of the prepreg 300 are respectively provided with three first clamping blocks 301 , and in FIG. 2 , the upper side is fixed with three first elastic connectors 201 The lower side of the first clamping block 301 adopts three first elastic connecting pieces 201 to fix the three first clamping blocks 301 . In FIG. 4 , the left side and the right side of the prepreg 300 are respectively provided with three second clamping blocks 302 , and in FIG. 2 , the left side is fixed with three second elastic connectors 202 for three For the second clamping block 302 , three second elastic connecting pieces 202 are used to fix the three second clamping blocks 302 on the right side to complete the position fixation of the prepreg 300 .

进一步的,第一弹性连接件201包括固定件203、弹性件204和卡接件205;Further, the first elastic connecting member 201 includes a fixing member 203, an elastic member 204 and a clamping member 205;

固定件203的外侧端连接第一连接杆101上,固定件203的内侧端连接弹性件204的外侧端,弹性件204的内侧端连接卡接件205,卡接件205用于连接预浸料预制体300。The outer end of the fixing member 203 is connected to the first connecting rod 101 , the inner end of the fixing member 203 is connected to the outer end of the elastic member 204 , and the inner end of the elastic member 204 is connected to the clamping member 205 , and the clamping member 205 is used for connecting the prepreg Preform 300.

在本实施例中,如图3所示,固定件203为条形板的结构,弹性件204为弹簧,卡接件205为方形块的结构。固定件203的外侧端采用螺栓连接在第一连接杆101上,螺栓能够对固定件203在第一连接杆101上的连接位置进行调节;固定件203的内侧端采用螺栓连接弹簧的外侧端,弹簧的内侧端采用螺栓连接卡接件205上,卡接件205采用螺栓固定预浸料预制体300的夹持块。In this embodiment, as shown in FIG. 3 , the fixing member 203 is a strip-shaped plate structure, the elastic member 204 is a spring, and the clamping member 205 is a square block structure. The outer end of the fixing member 203 is connected to the first connecting rod 101 by bolts, and the bolts can adjust the connection position of the fixing member 203 on the first connecting rod 101; the inner end of the fixing member 203 is connected with the outer end of the spring by bolts, The inner end of the spring is connected to the clip 205 by bolts, and the clip 205 is fixed to the clamping block of the prepreg 300 by bolts.

在另一个实施例中,如图5所示,第一连接杆101上设置卡槽,第一弹性连接件201的固定件203的下面设置卡块,利用卡块与卡槽之间卡合连接,对第一弹性连接件201在第一连接杆101上的连接位置进行固定;同理,第二连接杆102上也设置卡槽,第二弹性连接件202的固定件203的下面设置卡块,利用卡块与卡槽之间卡合连接,对第二弹性连接件202在第二连接杆102上的连接位置进行固定。采用此种方式连接,对预浸料预制体300固定后,两个弹性连接件上的弹簧呈拉伸状态,通过预浸料预制体300施加的压力,利用弹簧的拉伸力,即可对两个弹性连接件的连接位置进行固定。In another embodiment, as shown in FIG. 5 , the first connecting rod 101 is provided with a card slot, and the lower part of the fixing member 203 of the first elastic connecting member 201 is provided with a card block, and the card block and the card groove are snap-connected. , to fix the connection position of the first elastic connecting piece 201 on the first connecting rod 101 ; similarly, the second connecting rod 102 is also provided with a slot, and the lower part of the fixing piece 203 of the second elastic connecting piece 202 is provided with a blocking block , the connection position of the second elastic connecting piece 202 on the second connecting rod 102 is fixed by the snap connection between the locking block and the card slot. By connecting in this way, after the prepreg 300 is fixed, the springs on the two elastic connectors are in a stretched state, and the pressure exerted by the prepreg 300 and the tensile force of the spring can be used to The connection positions of the two elastic connectors are fixed.

进一步的,固定件203上设有限位孔206,弹性件204的外侧端通过第二锁紧件207连接限位孔206内;Further, the fixing member 203 is provided with a limiting hole 206, and the outer end of the elastic member 204 is connected to the limiting hole 206 through the second locking member 207;

限位孔206的数量为多个。The number of the limiting holes 206 is plural.

在本实施例中,如图3所示,限位孔206为螺纹孔,第二锁紧件207为螺栓,在固定件203上设置多个限位孔206,弹簧的外侧端能够连接固定在任意一个限位孔206内,从而直接对弹簧的伸缩量进行调节,最终对预浸料预制体300的进给量进行调节。In this embodiment, as shown in FIG. 3 , the limiting hole 206 is a threaded hole, the second locking member 207 is a bolt, a plurality of limiting holes 206 are provided on the fixing member 203, and the outer end of the spring can be connected and fixed to the In any limit hole 206, the expansion and contraction amount of the spring is directly adjusted, and finally the feeding amount of the prepreg 300 is adjusted.

进一步的,卡接件205设有卡槽208,预浸料预制体300通过第三锁紧件209连接在卡槽208内。Further, the clamping member 205 is provided with a clamping groove 208 , and the prepreg 300 is connected in the clamping groove 208 through a third locking member 209 .

在本实施例中,如图3所示,卡槽208是在卡接件205的外侧端沿着水平方向,向内凹陷形成的方形槽;在卡接件205的外侧端沿着竖直方向,贯穿方形槽形成螺纹通孔,第三锁紧件209为螺栓;预浸料预制体300的夹持块上沿着竖直方向设有通孔,夹持块卡入卡槽208后,利用螺栓穿过卡接件205外侧端的螺纹通孔,夹持块上的通孔,将夹持块固定在卡槽208内。In this embodiment, as shown in FIG. 3 , the clamping slot 208 is a square groove formed by inwardly recessing the outer end of the clamping element 205 along the horizontal direction; the outer end of the clamping element 205 is along the vertical direction. , a threaded through hole is formed through the square groove, and the third locking member 209 is a bolt; the clamping block of the prepreg 300 is provided with a through hole along the vertical direction. The bolts pass through the threaded through holes at the outer end of the clamping piece 205 and the through holes on the clamping block to fix the clamping block in the clamping slot 208 .

进一步的,还包括升降设备;Further, it also includes lifting equipment;

固定架100连接在升降设备上,升降设备能够带动固定架100沿着竖直方向往复运动,使固定架100内的预浸料预制体300靠近或者远离压机机头。The fixing frame 100 is connected to the lifting device, and the lifting device can drive the fixing frame 100 to reciprocate along the vertical direction, so that the prepreg 300 in the fixing frame 100 is close to or away from the press head.

在本申请的一个实施例中,升降设备采用液压缸,液压缸采用螺栓固定在冲压机的下方位置,固定架100采用螺栓连接在液压缸的输出端。使用时,液压缸在竖直方向带动固定架100向上伸出运动,带动预浸料预制体300向上靠近冲压机压头,此时即可启动冲压机进行冲压作业;冲压完毕后,再次启动液压缸,液压缸在竖直方向带动固定架100向下缩回运动,带动预浸料预制体300向下远离冲压机压头,对固定架100进行保护。In an embodiment of the present application, the lifting device adopts a hydraulic cylinder, the hydraulic cylinder is fixed at a position below the punching machine by bolts, and the fixing frame 100 is connected to the output end of the hydraulic cylinder by bolts. When in use, the hydraulic cylinder drives the fixing frame 100 to extend upward in the vertical direction, and drives the prepreg material 300 upward to approach the pressing head of the punching machine. At this time, the punching machine can be started for punching operation; after the punching is completed, the hydraulic pressure is started again. The hydraulic cylinder drives the fixing frame 100 to retract downward in the vertical direction, and drives the prepreg material 300 downward away from the pressing head of the punching machine, so as to protect the fixing frame 100 .

在其他实施例中,升降设备还可以采用驱动电机、蜗轮蜗杆相连接的结构,只要能够带动固定架100做靠近或者远离冲压机压头即可。In other embodiments, the lifting device may also adopt a structure in which a driving motor and a worm gear are connected, as long as the fixing frame 100 can be driven to move closer to or away from the pressing head of the punching machine.

如图6所示,本发明还提供一种复合材料预浸料层压板模压成型机构的成型方法,包括如下步骤:As shown in Figure 6, the present invention also provides a molding method for a composite material prepreg laminate molding mechanism, comprising the following steps:

a.裁切预浸料a. Cut the prepreg

根据产品尺寸,利用切割机对预浸料毛坯料进行裁切,形成方形预浸料毛坯料,在预浸料毛坯料的四周预留出第一夹持块301、第二夹持块302,在预浸料毛坯料的非夹持区预留毛边余量,形成预浸料预制体300;According to the product size, the prepreg blank is cut with a cutting machine to form a square prepreg blank, and the first clamping block 301 and the second clamping block 302 are reserved around the prepreg blank. A burr margin is reserved in the non-clamping area of the prepreg blank to form a prepreg preform 300;

在本实施例中,对夹持块设置的尺寸为5cm-15cm的方形块,本实施方式采用10cm的方形块,实际使用的尺寸按照产品的厚度,预设弹簧张力设置来调整。预浸料预制体300的上侧边、下侧边分别预留三个第一夹持块301,预浸料预制体300的左侧边、右侧边分别预留三个第二夹持块302。In this embodiment, a square block with a size of 5cm-15cm is set for the clamping block. In this embodiment, a square block of 10cm is used. The actual size is adjusted according to the thickness of the product and the preset spring tension setting. Three first clamping blocks 301 are reserved on the upper side and the lower side of the prepreg preform 300 respectively, and three second clamping blocks are reserved on the left side and the right side of the prepreg preform 300 respectively 302.

b.铺层b. Laminate

按照产品结构的铺层设计,对预浸料预制体300进行铺层配置;According to the layup design of the product structure, the prepreg prefab 300 is laid up and configured;

c.固定预浸料预制体c. Fixed prepreg preform

利用裁切设备,例如:剪刀、冲孔机等,分别在第一夹持块301、第二夹持块302上打孔,利用第一弹性连接件201对第一夹持块301固定,利用第二弹性连接件202对第二夹持块302固定;Use cutting equipment, such as scissors, punching machine, etc., to punch holes on the first clamping block 301 and the second clamping block 302 respectively, and use the first elastic connector 201 to fix the first clamping block 301. The second elastic connecting member 202 is fixed to the second clamping block 302;

具体的,上部的三个第一弹性连接件201分别对预浸料预制体300上侧边的三个第一夹持块301固定,下部的三个第一弹性连接件201分别对预浸料预制体300下侧边的三个第一夹持块301固定,第一弹性连接件201的第三锁紧件209将第一夹持块301固定在卡槽208内。左侧边的三个第二弹性连接件202分别对预浸料预制体300左侧边的三个第二夹持块302固定,右侧边的三个第二弹性连接件202分别对预浸料预制体300右侧边的三个第二夹持块302固定,第二弹性连接件202的第三锁紧件209将第二夹持块302固定在卡槽208内。Specifically, the three first elastic connectors 201 on the upper part are respectively fixed to the three first clamping blocks 301 on the upper side of the prepreg 300, and the three first elastic connectors 201 on the lower part are respectively fixed to the prepreg The three first clamping blocks 301 on the lower side of the preform 300 are fixed, and the third locking member 209 of the first elastic connecting member 201 fixes the first clamping blocks 301 in the clamping slot 208 . The three second elastic connectors 202 on the left side are respectively fixed to the three second clamping blocks 302 on the left side of the prepreg 300, and the three second elastic connectors 202 on the right side are respectively fixed to the prepreg 300. The three second clamping blocks 302 on the right side of the preform 300 are fixed, and the second clamping blocks 302 are fixed in the clamping slot 208 by the third locking member 209 of the second elastic connecting member 202 .

d.铺脱模材料d. Lay out the mold release material

分别在预浸料预制体300的上、下表面铺贴一层脱模材料,如脱模布,然后利用压机驱动压头,对预浸料预制体300进行合模模压;压力设置为0.1MPa-10MPa,根据材料和产品需求设置。A layer of mold release material, such as mold release cloth, is respectively laid on the upper and lower surfaces of the prepreg 300, and then the press is used to drive the indenter to mold the prepreg 300; the pressure is set to 0.1 MPa-10MPa, set according to material and product requirements.

在此过程中,也可以利用升降设备对固定架100在竖直方向的位置进行调节,待固定架100的位置移动至冲压机压头的下方指定位置后,启动冲压机进行合模模压。During this process, the vertical position of the fixing frame 100 can also be adjusted by means of a lifting device. After the position of the fixing frame 100 is moved to a designated position below the pressing head of the punching machine, the punching machine is started for clamping and moulding.

e.加热固化e. Heat curing

预浸料预制体300模压完毕后,在上下模具合模加压的同时,将预浸料预制体300原位加热,此时,可以通过模具自加热或者在烘箱环境下加热,对预浸料预制体300进行加热加压固化,固化温度的取值范围在120℃~400℃之间,固化时间的取值范围在1h~20h之间;After the prepreg 300 is molded, the prepreg 300 is heated in-situ while the upper and lower molds are clamped and pressurized. The preform 300 is heated and pressurized for curing, the curing temperature ranges from 120°C to 400°C, and the curing time ranges from 1h to 20h;

在本实施例中,固化温度的取值为150℃,固化时间的取值为15h。In this embodiment, the value of curing temperature is 150° C., and the value of curing time is 15h.

f.产品脱模f. Product demoulding

将固化后的产品进行降温处理,降温速率小于5℃/min;The cured product is subjected to cooling treatment, and the cooling rate is less than 5℃/min;

降温结束后,将产品放置在室内,使其降温至室温,直至产品表面的温度低于60℃,然后对产品进行脱模,形成完整的产品结构;在本实施例中,固化后的产品可以直接放置在室内进行自然降温,也可以采用制冷设备进行降温,在制冷设备内降温时间为2h。After the cooling is completed, the product is placed in the room to cool down to room temperature until the temperature of the product surface is lower than 60°C, and then the product is demolded to form a complete product structure; in this embodiment, the cured product can be It can be directly placed indoors for natural cooling, or cooling equipment can be used for cooling, and the cooling time in the cooling equipment is 2h.

g.产品修整g. Product trimming

利用机床或者手工打磨对脱模后的产品的毛边进行打磨修整,形成合格产品。Use machine tools or manual grinding to grind and trim the burrs of the demolded products to form qualified products.

以上所述仅为本发明的较佳实施例而已,并不用以限制本发明,凡在本发明的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本发明的保护范围之内。The above descriptions are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the scope of the present invention. within the scope of protection.

Claims (10)

1. The compression molding mechanism for the composite material prepreg laminated board is characterized by comprising a fixed frame (100) and an elastic frame (200);
the fixing frame (100) is arranged at the lower part of the press head of the punching machine, and the elastic frame (200) is arranged in the fixing frame (100);
the outer side end of the elastic frame (200) is connected to the fixing frame (100), and the inner side end of the elastic frame (200) is used for being connected with the prepreg prefabricated body (300).
2. A composite prepreg laminate press moulding mechanism as claimed in claim 1 wherein the mounting bracket (100) comprises a first connecting bar (101) and a second connecting bar (102);
the number of the first connecting rods (101) is at least two, and the number of the second connecting rods (102) is at least two;
the first connecting rod (101) and the second connecting rod (102) are connected in a cross mode and are of a frame body structure provided with an inner accommodating space (103), and the elastic frame (200) is arranged in the inner accommodating space (103).
3. A composite prepreg laminate press moulding mechanism as claimed in claim 2 wherein a first connection hole (104) is provided on the first connection bar (101) and a second connection hole (105) is provided on the second connection bar (102);
the first connecting hole (104) is connected with the second connecting hole (105) through a first locking piece (106), so that the first connecting rod (101) is connected with the second connecting rod (102).
4. A composite prepreg laminate press moulding mechanism as claimed in claim 3 wherein the first connection holes (104) are plural in number and the second connection holes (105) are plural in number.
5. A composite prepreg laminate press moulding mechanism as claimed in claim 4 wherein the resilient frame (200) comprises first (201) and second (202) resilient connecting members;
the outer end of the first elastic connecting piece (201) is connected to the first connecting rod (101), and the inner end of the first elastic connecting piece (201) is connected to a first clamping block (301) of the prepreg prefabricated body (300); the outer end of the second elastic connecting piece (202) is connected to the second connecting rod (102), and the inner end of the second elastic connecting piece (202) is connected to a second clamping block (302) of the prepreg preform (300);
The structure of the first elastic connecting piece (201) is the same as that of the second elastic connecting piece (202).
6. A composite prepreg laminate press moulding mechanism as claimed in claim 5 wherein the first resilient connecting member (201) comprises a fixed member (203), a resilient member (204) and a snap member (205);
the outside end of mounting (203) is connected on first connecting rod (101), the medial extremity of mounting (203) is connected the outside end of elastic component (204), the medial extremity of elastic component (204) is connected joint spare (205), joint spare (205) are used for connecting prepreg preform (300).
7. The compression molding mechanism for the composite material prepreg laminate plate according to claim 6, wherein the fixing piece (203) is provided with a limiting hole (206), and the outer end of the elastic piece (204) is connected into the limiting hole (206) through a second locking piece (207);
the number of the limiting holes (206) is multiple.
8. A compression moulding mechanism for a composite prepreg laminate according to claim 7, wherein the snap-in connection (205) is provided with a snap-in slot (208), and the prepreg preform (300) is connected in the snap-in slot (208) by a third locking member (209).
9. The composite prepreg laminate press molding mechanism of claim 8, further comprising a lifting device;
the fixing frame (100) is connected to the lifting device, and the lifting device can drive the fixing frame (100) to reciprocate along the vertical direction, so that the prepreg prefabricated body (300) in the fixing frame (100) is close to or far away from a press machine head.
10. A molding method of a compression molding mechanism of a composite material prepreg laminated board is characterized by comprising the following steps:
a. cutting prepreg
Cutting the prepreg by using a cutting machine according to the size of a product to form a square prepreg blank, reserving a first clamping block (301) and a second clamping block (302) at the periphery of the prepreg blank, and reserving a burr allowance in a non-clamping area of the prepreg blank to form a prepreg preform (300);
b. ply
According to the laying design of a product structure, laying and configuring a prepreg prefabricated body (300);
c. fixed prepreg preform
Punching holes on a first clamping block (301) and a second clamping block (302) by using cutting equipment respectively, fixing the first clamping block (301) by using a first elastic connecting piece (201), and fixing the second clamping block (302) by using a second elastic connecting piece (202);
d. Paving demoulding material
Respectively paving a layer of demolding material on the upper surface and the lower surface of the prepreg prefabricated body (300), and then driving a pressure head by a press to carry out die assembly and die pressing on the prepreg prefabricated body (300); the pressure is set to be 0.1MPa-10MPa according to the requirements of materials and products;
e. heat curing
After the prepreg preform (300) is molded, heating the prepreg preform (300) in situ while closing and pressurizing an upper mold and a lower mold, and heating, pressurizing and curing the prepreg preform, wherein the curing temperature ranges from 120 ℃ to 400 ℃, and the curing time ranges from 1h to 20 h;
f. product demoulding
Cooling the cured product at a cooling rate of less than 5 ℃/min;
after the temperature reduction is finished, the product is placed indoors and is cooled to the room temperature until the temperature of the surface of the product is lower than 60 ℃, and then the product is demoulded to form a complete product structure;
g. product finishing
And grinding and trimming the rough edges of the demoulded product by utilizing a machine tool or manually grinding to form a qualified product.
CN202010600599.8A 2020-09-03 2020-09-03 Composite material prepreg laminate molding mechanism and molding method thereof Pending CN111844810A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010600599.8A CN111844810A (en) 2020-09-03 2020-09-03 Composite material prepreg laminate molding mechanism and molding method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010600599.8A CN111844810A (en) 2020-09-03 2020-09-03 Composite material prepreg laminate molding mechanism and molding method thereof

Publications (1)

Publication Number Publication Date
CN111844810A true CN111844810A (en) 2020-10-30

Family

ID=72988631

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010600599.8A Pending CN111844810A (en) 2020-09-03 2020-09-03 Composite material prepreg laminate molding mechanism and molding method thereof

Country Status (1)

Country Link
CN (1) CN111844810A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113276435A (en) * 2021-05-31 2021-08-20 济南大学 Carbon-fibre composite hot-pressing sintering equipment can be regulated and control to structural gradient
CN117067634A (en) * 2023-09-26 2023-11-17 常州碳科智能装备有限公司 Composite material battery cover molding device, method and equipment
CN118906499A (en) * 2024-10-11 2024-11-08 歌尔股份有限公司 Composite material preparation method, composite material and electronic equipment

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030146543A1 (en) * 2002-01-17 2003-08-07 National Research Council Of Canada Molding method and support system for thermoformable sheet material
CN103057029A (en) * 2011-10-21 2013-04-24 日本碍子株式会社 Carbon fiber-containing resin sheet carrying apparatus
KR20150001756U (en) * 2013-10-30 2015-05-08 대우조선해양 주식회사 Lifting jig
CN107443771A (en) * 2017-06-28 2017-12-08 北京博简复才技术咨询有限公司 The shaping system and method for a kind of prepreg
CN209001419U (en) * 2018-09-25 2019-06-18 佛山市顺原电力设备有限公司 The distribution box of construction site installs chassis
CN110281549A (en) * 2019-06-25 2019-09-27 泰安市捷宜复合材料科技有限公司 A kind of prepreg shaping system, method and its application
CN209818967U (en) * 2019-03-15 2019-12-20 中建一局集团第五建筑有限公司 Pipe connection flange
CN110636932A (en) * 2017-03-17 2019-12-31 沙特基础工业全球技术公司 Tool with one or more sheets and related methods for use in forming laminates using a press
CN110757834A (en) * 2018-07-27 2020-02-07 福建海源自动化机械股份有限公司 Fiber preforming automatic production line
CN210113488U (en) * 2019-07-03 2020-02-25 刘瑞鹏 Fixing equipment for laying heating and ventilation pipeline
KR102124857B1 (en) * 2019-07-19 2020-06-19 주식회사 성우하이텍 Thermoplastic prepreg manufacturing device and method
CN212528773U (en) * 2020-09-03 2021-02-12 天津爱思达航天科技有限公司 Compression molding mechanism for composite prepreg laminated board

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030146543A1 (en) * 2002-01-17 2003-08-07 National Research Council Of Canada Molding method and support system for thermoformable sheet material
CN103057029A (en) * 2011-10-21 2013-04-24 日本碍子株式会社 Carbon fiber-containing resin sheet carrying apparatus
KR20150001756U (en) * 2013-10-30 2015-05-08 대우조선해양 주식회사 Lifting jig
CN110636932A (en) * 2017-03-17 2019-12-31 沙特基础工业全球技术公司 Tool with one or more sheets and related methods for use in forming laminates using a press
CN107443771A (en) * 2017-06-28 2017-12-08 北京博简复才技术咨询有限公司 The shaping system and method for a kind of prepreg
CN110757834A (en) * 2018-07-27 2020-02-07 福建海源自动化机械股份有限公司 Fiber preforming automatic production line
CN209001419U (en) * 2018-09-25 2019-06-18 佛山市顺原电力设备有限公司 The distribution box of construction site installs chassis
CN209818967U (en) * 2019-03-15 2019-12-20 中建一局集团第五建筑有限公司 Pipe connection flange
CN110281549A (en) * 2019-06-25 2019-09-27 泰安市捷宜复合材料科技有限公司 A kind of prepreg shaping system, method and its application
CN210113488U (en) * 2019-07-03 2020-02-25 刘瑞鹏 Fixing equipment for laying heating and ventilation pipeline
KR102124857B1 (en) * 2019-07-19 2020-06-19 주식회사 성우하이텍 Thermoplastic prepreg manufacturing device and method
CN212528773U (en) * 2020-09-03 2021-02-12 天津爱思达航天科技有限公司 Compression molding mechanism for composite prepreg laminated board

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113276435A (en) * 2021-05-31 2021-08-20 济南大学 Carbon-fibre composite hot-pressing sintering equipment can be regulated and control to structural gradient
CN117067634A (en) * 2023-09-26 2023-11-17 常州碳科智能装备有限公司 Composite material battery cover molding device, method and equipment
CN117067634B (en) * 2023-09-26 2025-12-19 常州碳科智能装备有限公司 Compression molding device, method and equipment for composite battery cover
CN118906499A (en) * 2024-10-11 2024-11-08 歌尔股份有限公司 Composite material preparation method, composite material and electronic equipment

Similar Documents

Publication Publication Date Title
EP3115185B1 (en) Reducing wrinkling of contoured hat stiffeners formed from a single composite charge
CN111844810A (en) Composite material prepreg laminate molding mechanism and molding method thereof
CN113415001B (en) Forming tool, forming method and hat-shaped rib wall panel
CN111993682B (en) Forming tool and manufacturing method for composite material corner strip structural part
CN212528773U (en) Compression molding mechanism for composite prepreg laminated board
JP6845318B2 (en) Composite material forming and cutting tools
CN116713363A (en) Longitudinal beam forming device and method
CN110103488B (en) Continuous die pressing manufacturing process of fan blade thermoplastic composite material beam cap
CN113997606B (en) Prepreg forming process for special-shaped beam product
WO2020122260A1 (en) Production method for fiber-reinforced resin molded article
CN115151354A (en) Apparatus and method for manufacturing drawn product
JP4448823B2 (en) Method for manufacturing sandwich panel cores from composite materials
CN215620123U (en) Forming tool
JP6923870B1 (en) Manufacturing method of formwork and plate products used in press processing machines
JP5362596B2 (en) Paste composition method, pasting composite mold and pasting device
CN213564478U (en) Composite material product hot pressing die for aviation
CN212603540U (en) Simple pre-setting die for aramid fiber paper honeycomb with special-shaped curved surface
KR100465198B1 (en) Press apparatus
CN211662461U (en) Vulcanizing machine
CN223803130U (en) Hot die molding device
JP7515219B1 (en) Manufacturing device and manufacturing method for drawn products
CN222271005U (en) Pressing mechanism for silk flower setting machine
CN216032238U (en) Quick orthopedic and punching device
CN223173625U (en) A carbon fiber compression molding device for manufacturing drone parts
CN219213837U (en) Hot-press forming device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20201030

RJ01 Rejection of invention patent application after publication