CN111576146A - Construction device and construction method for road vibration and noise reduction - Google Patents

Construction device and construction method for road vibration and noise reduction Download PDF

Info

Publication number
CN111576146A
CN111576146A CN202010459661.6A CN202010459661A CN111576146A CN 111576146 A CN111576146 A CN 111576146A CN 202010459661 A CN202010459661 A CN 202010459661A CN 111576146 A CN111576146 A CN 111576146A
Authority
CN
China
Prior art keywords
vibration
construction
noise reduction
road
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN202010459661.6A
Other languages
Chinese (zh)
Other versions
CN111576146B (en
Inventor
彭小英
宋军伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi University of Technology
Original Assignee
Jiangxi University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi University of Technology filed Critical Jiangxi University of Technology
Priority to CN202010459661.6A priority Critical patent/CN111576146B/en
Publication of CN111576146A publication Critical patent/CN111576146A/en
Application granted granted Critical
Publication of CN111576146B publication Critical patent/CN111576146B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • E01C19/238Wetting, cleaning or heating rolling elements, e.g. oiling, wiping, scraping
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/10Paving elements having build-in shock absorbing devices

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Cleaning By Liquid Or Steam (AREA)

Abstract

本发明涉及一种公路减振降噪的施工装置及其施工方法,该装置包括车体,所述车体的底部连接有车轮,在车体的一侧安装有横杆,横杆的另一端连接有固定架,横杆的底部安装有降噪机构,降噪机构包括有电动推杆,电动推杆的底端与车体的外壁相连接,电动推杆通过活动轴与横杆相连接。本发明提出的公路减振降噪的施工装置,通过对电动推杆、横杆、活动轴和压轮等的合理设置,当该施工装置进行移动操作,且处于非施工时,能够启动电动推杆,使得其推动横杆,则与车体之间为活动连接的横杆带动压轮升起,减少与路面的接触面积,故而减小其直接接触路面造成的噪音污染,以达到降噪的目的。

Figure 202010459661

The invention relates to a construction device for vibration reduction and noise reduction on a highway and a construction method thereof. The device comprises a vehicle body, the bottom of the vehicle body is connected with wheels, a cross bar is installed on one side of the vehicle body, and the other end of the cross bar is installed A fixed frame is connected, and a noise reduction mechanism is installed at the bottom of the crossbar. The noise reduction mechanism includes an electric push rod. The bottom end of the electric push rod is connected with the outer wall of the vehicle body. The construction device for road vibration reduction and noise reduction proposed by the present invention, through the reasonable arrangement of electric push rods, cross bars, movable shafts and pressure rollers, etc., when the construction device is moving and is not under construction, the electric push rod can be started. rod, so that it pushes the cross rod, and the cross rod that is movably connected with the car body drives the pressure roller to rise, reducing the contact area with the road surface, thus reducing the noise pollution caused by its direct contact with the road surface, so as to achieve noise reduction. Purpose.

Figure 202010459661

Description

一种公路减振降噪的施工装置及其施工方法Construction device and construction method for road vibration and noise reduction

技术领域technical field

本发明涉及公路施工设备技术领域,特别涉及一种公路减振降噪的施工装置及其施工方法。The invention relates to the technical field of highway construction equipment, in particular to a construction device for vibration and noise reduction of highways and a construction method thereof.

背景技术Background technique

随着科学技术的发展及社会时代的进步,公路的兴起是随着社会进步的步伐同步的,故公路建设尤为重要,在对公路进行建设施工工作时,需要用于公路施工的施工装置的参与,其每项施工装置对应一套施工方法,其方法的便捷能够使得施工装置进行施工工作的效率达到最大化。With the development of science and technology and the progress of social times, the rise of highways is synchronized with the pace of social progress, so highway construction is particularly important. When carrying out construction work on highways, the participation of construction devices for highway construction is required. , each construction device corresponds to a set of construction methods, and the convenience of the method can maximize the efficiency of construction work performed by the construction device.

现有的公路减振降噪的施工装置在处于移动时,其不能够对压轮进行托起式的降噪操作,造成噪音大的问题,并且不易通过对压轮进行定点清洁操作,使得压轮的施工效果低下。When the existing road vibration and noise reduction construction device is in motion, it cannot perform a lifting-type noise reduction operation on the pressing wheel, which causes the problem of large noise, and it is not easy to perform a fixed-point cleaning operation on the pressing wheel, so that the pressing The construction effect of the wheel is low.

发明内容SUMMARY OF THE INVENTION

本发明的目的在于提供一种公路减振降噪的施工装置,以解决上述的技术问题。The purpose of the present invention is to provide a construction device for vibration reduction and noise reduction for highways, so as to solve the above-mentioned technical problems.

为实现上述目的,本发明提供如下技术方案:To achieve the above object, the present invention provides the following technical solutions:

一种公路减振降噪的施工装置,包括车体,所述车体的底部连接有车轮,且车体的一侧安装有横杆,所述横杆的另一端连接有固定架,且横杆的底部安装有降噪机构,所述降噪机构包括有电动推杆,且电动推杆的底端与车体的外壁相连接,所述电动推杆通过活动轴与横杆相连接,且横杆与车体之间为活动连接,所述横杆之间横向贯穿有连接轴,且连接轴的外侧安装有压轮,所述固定架的一侧安装有清洁机构,且固定架的另一侧连接有第二箱体,所述压轮的外壁两侧均安置有减振机构,且减振机构包括有减振带,所述减振带与压轮之间为套接连接。A construction device for vibration and noise reduction of highways, comprising a vehicle body, a wheel is connected to the bottom of the vehicle body, a cross bar is installed on one side of the vehicle body, the other end of the cross bar is connected with a fixing frame, and the horizontal A noise reduction mechanism is installed at the bottom of the rod, the noise reduction mechanism includes an electric push rod, and the bottom end of the electric push rod is connected with the outer wall of the vehicle body, and the electric push rod is connected with the cross bar through the movable shaft, and There is a movable connection between the cross bar and the vehicle body, a connecting shaft is transversely penetrated between the cross bars, and a pressing wheel is installed on the outer side of the connecting shaft, a cleaning mechanism is installed on one side of the fixing frame, and the other side of the fixing frame is installed. One side is connected with the second box body, and both sides of the outer wall of the pressing wheel are provided with a damping mechanism, and the damping mechanism includes a damping belt, and the damping belt and the pressing wheel are in a sleeve connection.

可选的,所述电动推杆通过活动轴与横杆构成活动结构,且横杆通过连接轴与压轮构成旋转结构。Optionally, the electric push rod forms a movable structure through a movable shaft and a cross bar, and the cross bar forms a rotating structure through a connecting shaft and a pressing wheel.

可选的,所述清洁机构包括有第一箱体,且第一箱体的顶端连接有水箱,所述第一箱体的外壁连接有排水口,所述第一箱体的内部一侧安装有第一滚筒,且第一箱体的内部另一侧连接有框架,所述框架的内侧贯穿有水管,且水管的外壁安装有出水口,所述出水口的外壁连接有连接条,且连接条的另一端连接有活动杆,所述框架的边缘处内侧开设有滑槽,且滑槽与活动杆之间为滑动连接,所述活动杆的外壁连接有弹簧,且弹簧的另一端安装有固定块,所述固定块与滑槽之间为固定连接。Optionally, the cleaning mechanism includes a first box, the top of the first box is connected with a water tank, the outer wall of the first box is connected with a water outlet, and an inner side of the first box is installed There is a first drum, and the other side of the inside of the first box is connected with a frame, the inner side of the frame is penetrated with a water pipe, and the outer wall of the water pipe is installed with a water outlet, and the outer wall of the water outlet is connected with a connecting bar, and is connected The other end of the bar is connected with a movable rod, the inner side of the edge of the frame is provided with a chute, and there is a sliding connection between the chute and the movable rod, the outer wall of the movable rod is connected with a spring, and the other end of the spring is installed with a spring. A fixed block is fixedly connected between the fixed block and the chute.

可选的,所述框架的内侧为镂空状结构,且框架与第一箱体之间为固定连接。Optionally, the inner side of the frame is a hollow structure, and the frame and the first box are fixedly connected.

可选的,所述出水口通过连接条、活动杆与滑槽构成滑动结构,且活动杆通过弹簧与固定块构成弹性结构。Optionally, the water outlet forms a sliding structure through a connecting bar, a movable rod and a chute, and the movable rod forms an elastic structure through a spring and a fixed block.

可选的,所述第一滚筒的外壁缠绕有清洁带,且清洁带的内壁另一侧连接有第二滚筒,所述第二滚筒的顶端安装有电动机。Optionally, a cleaning tape is wound around the outer wall of the first drum, and a second drum is connected to the other side of the inner wall of the cleaning tape, and a motor is installed on the top of the second drum.

可选的,所述清洁带的横轴线与固定架的横轴线相持平,且清洁带与固定架之间呈包裹状分布,并且固定架呈工字状结构。Optionally, the transverse axis of the cleaning belt is equal to the transverse axis of the fixing frame, and the cleaning belt and the fixing frame are distributed in a wrapping shape, and the fixing frame has an I-shaped structure.

可选的,所述减振带关于压轮的中轴线对称,且减振带之间通过螺栓构成可拆卸结构。Optionally, the vibration-damping belts are symmetrical with respect to the central axis of the pressure roller, and a detachable structure is formed between the vibration-damping belts by bolts.

一种公路减振降噪的施工方法,包括如下步骤:A construction method for road vibration and noise reduction, comprising the following steps:

步骤一:施工前,需要调节降噪机构,使得其内部组件带动横杆下移,对压轮进行增大压力操作;Step 1: Before construction, it is necessary to adjust the noise reduction mechanism, so that its internal components drive the cross bar down and increase the pressure on the pressure roller;

步骤二:施工时,当压轮表面附着大量公路碾压时的碎料后,影响其后续的施工效果,故在压轮进行施工工作时,人工通过调整清洁带的张紧程度,便于清洁带贴近于压轮的外壁进行刮除操作,再通过启动水阀,便于水箱内部的水流经出水口处,溢至清洁带,完成压轮清洁工作;Step 2: During construction, when a large amount of debris from road rolling is attached to the surface of the pinch roller, the subsequent construction effect will be affected. Therefore, during the construction work of the pinch roller, manually adjust the tension of the cleaning belt to facilitate the cleaning of the belt. The scraping operation is performed close to the outer wall of the pressure roller, and then by starting the water valve, it is convenient for the water inside the water tank to flow through the water outlet and overflow to the cleaning belt to complete the cleaning of the pressure roller;

步骤三:施工后,对该装置进行移动操作,则需要通过人工安装减振带,使得减振带分布于压轮的两侧,便于压轮行走于路面上的震动效果小,达到减振的效果。Step 3: After construction, to move the device, it is necessary to manually install the damping belt, so that the damping belt is distributed on both sides of the pressure roller, so that the vibration effect of the pressure roller on the road is small, and the vibration reduction is achieved. Effect.

可选的,所述步骤二中调整清洁带的张紧程度方法可由人工在固定架的内部开设多组槽孔,再在槽孔中安置有两段式的螺纹连接的杆体,使得人工转动杆体,则杆体延伸,故能够对清洁带与压轮的接触位置进行调整处理,便于清洁带对压轮进行定点刮除工作。Optionally, the method of adjusting the degree of tension of the cleaning belt in the second step may be to manually open multiple sets of slotted holes in the interior of the fixing frame, and then place a two-stage threaded rod body in the slotted hole, so that the rod body is manually rotated. , the rod body is extended, so the contact position of the cleaning belt and the pressure roller can be adjusted, which is convenient for the cleaning belt to scrape the pressure roller at a fixed point.

本发明提供了一种公路减振降噪的施工装置及其施工方法,具备以下有益效果:The invention provides a construction device and a construction method for road vibration and noise reduction, which have the following beneficial effects:

1、该公路减振降噪的施工装置及其施工方法,通过对电动推杆、横杆、活动轴和压轮等的设置,当该施工装置进行移动操作,且处于非施工时,能够启动电动推杆,使得其推动横杆,则与车体之间为活动连接的横杆带动压轮升起,减少与路面的接触面积,故而减小其直接接触路面造成的噪音污染,达到降噪的目的。1. The construction device for vibration and noise reduction of the highway and its construction method, through the setting of electric push rods, cross bars, movable shafts and pressure rollers, etc., when the construction device is moving and is not under construction, it can be started The electric push rod makes it push the cross rod, and the cross rod that is movably connected to the car body drives the pressure roller to rise, reducing the contact area with the road surface, thus reducing the noise pollution caused by its direct contact with the road surface and achieving noise reduction. the goal of.

2、该公路减振降噪的施工装置及其施工方法,通过对清洁带、固定架、水管和出水口等的设置,人工在固定架的内部的槽孔中安置有两段式的螺纹连接的杆体,使得人工转动杆体,则杆体延伸,故能够对清洁带与压轮的接触位置进行调整处理,便于清洁带对压轮进行定点刮除工作,避免压轮自身出现局部磨损,造成施工效果不佳的现象。2. The construction device for vibration and noise reduction of the highway and its construction method, by setting the cleaning belt, the fixing frame, the water pipe and the water outlet, etc., manually place a two-stage threaded connection in the slot hole inside the fixing frame Therefore, the contact position between the cleaning belt and the pressure roller can be adjusted, which is convenient for the cleaning belt to scrape the pressure roller at a fixed point, so as to avoid the local wear of the pressure roller itself, resulting in the construction effect. bad phenomenon.

3、该公路减振降噪的施工装置及其施工方法,通过对出水口、连接条、活动杆和滑槽的设置,人工转动水阀,使得水箱内部的水流流入水管,并流至出水口处,且水管的中部为橡胶材质,其随着水流愈发的充入,则进行膨胀,使得出水口朝向清洁带处贴近,便于其对清洁带表面的碎料进行冲洗处理。3. The construction device for vibration and noise reduction of the highway and its construction method, through the arrangement of the water outlet, the connecting bar, the movable rod and the chute, the water valve is manually rotated, so that the water flow inside the water tank flows into the water pipe and flows to the water outlet The middle part of the water pipe is made of rubber material, which expands as the water flow becomes more and more filled, so that the water outlet is close to the cleaning belt, which is convenient for it to wash the debris on the surface of the cleaning belt.

4、该公路减振降噪的施工装置及其施工方法,通过对活动杆、弹簧、固定块和滑槽的设置,清洁带清洗后,关闭水阀,则水管内部的水流速度减小,故水管的中部不再膨胀,使得出水口复位,同时,活动杆在弹簧的弹性作用下进行同步复位,且在对多组活动杆的设置作用下,使得活动杆能够对水管进行限定操作,避免水管过度膨胀,造成损坏。4. The construction device for vibration and noise reduction of the highway and its construction method, through the setting of the movable rod, spring, fixed block and chute, after cleaning the cleaning belt, close the water valve, the water flow speed inside the water pipe is reduced, so The middle part of the water pipe is no longer expanded, so that the water outlet is reset. At the same time, the movable rod is synchronously reset under the elastic action of the spring, and under the action of the setting of multiple groups of movable rods, the movable rod can limit the operation of the water pipe to avoid the water pipe. Excessive expansion can cause damage.

5、该公路减振降噪的施工装置及其施工方法,通过对减振带、压轮和螺栓的设置,人工将静置的压轮与减振带进行安装操作,则将减振带缠绕连接于压轮的两侧,并通过螺栓对减振带进行连接处理,使得压轮在非工作区域进行滚动时,减振带接触地面,起到减振的目的。5. The construction device for vibration and noise reduction of the highway and its construction method, through the setting of the vibration reduction belt, the pressure roller and the bolts, the static pressure roller and the vibration reduction belt are manually installed, and then the vibration reduction belt is wound. It is connected to both sides of the pressure roller, and the vibration reduction belt is connected by bolts, so that when the pressure roller rolls in the non-working area, the vibration reduction belt touches the ground, which achieves the purpose of vibration reduction.

本公开的其他特征和优点将在随后的说明书中阐述,或者,部分特征和优点可以从说明书推知或毫无疑义地确定,或者通过实施本公开的上述技术即可得知。Additional features and advantages of the present disclosure will be set forth in the description that follows, or some may be inferred or unambiguously determined from the description, or may be learned by practicing the above-described techniques of the present disclosure.

为使本发明的上述目的、特征和优点能更明显易懂,下文特举较佳实施例,并配合所附附图,作详细说明如下。In order to make the above-mentioned objects, features and advantages of the present invention more obvious and easy to understand, preferred embodiments are given below, and are described in detail as follows in conjunction with the accompanying drawings.

附图说明Description of drawings

图1为本发明提出的公路减振降噪的施工装置的结构示意图;1 is a schematic structural diagram of a construction device for road vibration and noise reduction proposed by the present invention;

图2为本发明提出的公路减振降噪的施工装置中固定架的正面结构示意图;Fig. 2 is the front structure schematic diagram of the fixed frame in the construction device for road vibration and noise reduction proposed by the present invention;

图3为本发明提出的公路减振降噪的施工装置中框架的正面结构示意图;Fig. 3 is the front structure schematic diagram of the frame in the construction device for road vibration and noise reduction proposed by the present invention;

图4为本发明提出的公路减振降噪的施工装置中框架的边缘内侧结构示意图;4 is a schematic diagram of the inner edge structure of the frame in the construction device for road vibration and noise reduction proposed by the present invention;

图5为本发明提出的公路减振降噪的施工装置中压轮的正面结构示意图。FIG. 5 is a schematic view of the front structure of the pressure roller in the construction device for vibration and noise reduction of highways proposed by the present invention.

主要符号说明:Description of main symbols:

Figure BDA0002510108900000041
Figure BDA0002510108900000041

Figure BDA0002510108900000051
Figure BDA0002510108900000051

具体实施方式Detailed ways

为了便于理解本发明,下面将参照相关附图对本发明进行更全面的描述。附图中给出了本发明的首选实施例。但是,本发明可以以许多不同的形式来实现,并不限于本文所描述的实施例。相反地,提供这些实施例的目的是使对本发明的公开内容更加透彻全面。In order to facilitate understanding of the present invention, the present invention will be described more fully hereinafter with reference to the related drawings. Preferred embodiments of the invention are shown in the accompanying drawings. However, the present invention may be embodied in many different forms and is not limited to the embodiments described herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete.

除非另有定义,本文所使用的所有的技术和科学术语与属于本发明的技术领域的技术人员通常理解的含义相同。本文中在本发明的说明书中所使用的术语只是为了描述具体的实施例的目的,不是旨在于限制本发明。本文所使用的术语“及/或”包括一个或多个相关的所列项目的任意的和所有的组合。Unless otherwise defined, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs. The terms used herein in the description of the present invention are for the purpose of describing specific embodiments only, and are not intended to limit the present invention. As used herein, the term "and/or" includes any and all combinations of one or more of the associated listed items.

请参阅图1至图5,本发明提供一种公路减振降噪的施工装置:Please refer to Fig. 1 to Fig. 5, the present invention provides a construction device for road vibration and noise reduction:

一种公路减振降噪的施工装置,包括车体1、车轮2、横杆3、压轮4、降噪机构5、电动推杆501、活动轴502、连接轴6、固定架7、清洁机构8、第一箱体801、排水口802、第一滚筒803、框架804、水管805、活动杆806、连接条807、出水口808、滑槽809、固定块810、弹簧811、水箱9、清洁带10、第二滚筒11、电动机12、第二箱体13、减振机构14和减振带1401。A construction device for road vibration and noise reduction, comprising a vehicle body 1, a wheel 2, a cross bar 3, a pressure roller 4, a noise reduction mechanism 5, an electric push rod 501, a movable shaft 502, a connecting shaft 6, a fixed frame 7, a cleaning Mechanism 8, first box 801, water outlet 802, first roller 803, frame 804, water pipe 805, movable rod 806, connecting bar 807, water outlet 808, chute 809, fixed block 810, spring 811, water tank 9, The cleaning belt 10 , the second roller 11 , the motor 12 , the second box 13 , the vibration damping mechanism 14 and the vibration damping belt 1401 .

具体的,车体1的底部连接有车轮2,在车体1的一侧安装有横杆3。在该横杆3的另一端连接有固定架7,且横杆3的底部安装有降噪机构5。Specifically, a wheel 2 is connected to the bottom of the vehicle body 1 , and a crossbar 3 is installed on one side of the vehicle body 1 . A fixing frame 7 is connected to the other end of the horizontal bar 3 , and a noise reduction mechanism 5 is installed on the bottom of the horizontal bar 3 .

对该降噪机构5而言,该降噪机构5包括电动推杆501,电动推杆501的底端与车体1的外壁相连接。电动推杆501通过活动轴502与横杆3相连接,且横杆3与车体1之间为活动连接。For the noise reduction mechanism 5 , the noise reduction mechanism 5 includes an electric push rod 501 , and the bottom end of the electric push rod 501 is connected with the outer wall of the vehicle body 1 . The electric push rod 501 is connected with the crossbar 3 through the movable shaft 502 , and the crossbar 3 and the vehicle body 1 are movably connected.

在横杆3之间横向贯穿有连接轴6,且连接轴6的外侧安装有压轮4。在固定架7的一侧安装有清洁机构8,且固定架7的另一侧连接有第二箱体13。压轮4的外壁两侧均安置有减振机构14,该减振机构14包括减振带1401,减振带1401与压轮4之间为套接连接。A connecting shaft 6 is transversely penetrated between the cross bars 3 , and a pressing wheel 4 is installed on the outer side of the connecting shaft 6 . The cleaning mechanism 8 is installed on one side of the fixing frame 7 , and the second box body 13 is connected to the other side of the fixing frame 7 . Both sides of the outer wall of the pressure roller 4 are provided with a damping mechanism 14 , and the damping mechanism 14 includes a damping belt 1401 , and the damping belt 1401 and the pressure roller 4 are in a socket connection.

进一步的,电动推杆501通过活动轴502与横杆3构成活动结构,且横杆3通过连接轴6与压轮4构成旋转结构。在实际使用时,启动电动推杆501,该电动推杆501能够拉动横杆3,使得其下压压轮4,以调整压轮4与施工区域的贴合度,从而增强该装置的施工效果。Further, the electric push rod 501 forms a movable structure with the cross bar 3 through the movable shaft 502 , and the cross bar 3 forms a rotating structure through the connecting shaft 6 and the pressing wheel 4 . In actual use, the electric push rod 501 is activated, and the electric push rod 501 can pull the cross bar 3 so that it presses down the pressing wheel 4 to adjust the fit of the pressing wheel 4 and the construction area, thereby enhancing the construction effect of the device .

进一步的,清洁机构8包括第一箱体801,在第一箱体801的顶端连接有水箱9。第一箱体801的外壁连接有排水口802,第一箱体801的内部一侧安装有第一滚筒803,且第一箱体801的内部另一侧连接有框架804。Further, the cleaning mechanism 8 includes a first box body 801 , and a water tank 9 is connected to the top of the first box body 801 . A drain port 802 is connected to the outer wall of the first box body 801 , a first roller 803 is installed on one side of the inside of the first box body 801 , and a frame 804 is connected to the other side of the inside of the first box body 801 .

在框架804的内侧贯穿有水管805,且水管805的外壁安装有出水口808。出水口808的外壁连接有连接条807,且连接条807的另一端连接有活动杆806。框架804的边缘处内侧开设有滑槽809,且滑槽809与活动杆806之间为滑动连接。活动杆806的外壁连接有弹簧811,且弹簧811的另一端安装有固定块810,固定块810与滑槽809之间为固定连接。A water pipe 805 runs through the inner side of the frame 804 , and a water outlet 808 is installed on the outer wall of the water pipe 805 . A connecting bar 807 is connected to the outer wall of the water outlet 808 , and a movable rod 806 is connected to the other end of the connecting bar 807 . The inner side of the edge of the frame 804 is provided with a chute 809 , and the chute 809 and the movable rod 806 are slidably connected. A spring 811 is connected to the outer wall of the movable rod 806 , and a fixing block 810 is installed on the other end of the spring 811 , and the fixing block 810 and the chute 809 are fixedly connected.

进一步的,框架804的内侧为镂空状结构,且框架804与第一箱体801之间为固定连接。在本实施例中中,框架804能够对中部为橡胶材质的水管805进行膨胀预留空间,便于出水口808更贴近清洁带10进行清洗工作。Further, the inner side of the frame 804 is a hollow structure, and the frame 804 and the first box body 801 are fixedly connected. In this embodiment, the frame 804 can reserve space for the expansion of the water pipe 805 whose middle part is made of rubber material, so that the water outlet 808 can be closer to the cleaning belt 10 for cleaning.

进一步的,出水口808通过连接条807、活动杆806与滑槽809构成滑动结构,且活动杆806通过弹簧811与固定块810构成弹性结构。在实际使用时,关闭水阀,则水管805内部的水流速度减小,故水管805的中部不再膨胀,使得出水口808复位。Further, the water outlet 808 forms a sliding structure through the connecting bar 807 , the movable rod 806 and the chute 809 , and the movable rod 806 forms an elastic structure through the spring 811 and the fixed block 810 . In actual use, when the water valve is closed, the water flow velocity inside the water pipe 805 is reduced, so the middle of the water pipe 805 is no longer expanded, so that the water outlet 808 is reset.

与此同时,活动杆806在弹簧811的弹性作用下进行同步复位,且在对多组活动杆806的设置作用下,使得活动杆806能够对水管805进行限定操作,避免水管805过度膨胀而造成损坏。At the same time, the movable rod 806 is synchronously reset under the elastic action of the spring 811, and under the action of the multiple sets of movable rods 806, the movable rod 806 can limit the operation of the water pipe 805 to avoid the excessive expansion of the water pipe 805. damage.

在本实施例中,作为补充的,第一滚筒803的外壁缠绕有清洁带10,且清洁带10的内壁另一侧连接有第二滚筒11,第二滚筒11的顶端安装有电动机12。In this embodiment, as a supplement, the cleaning tape 10 is wound around the outer wall of the first drum 803 , the second drum 11 is connected to the other side of the inner wall of the cleaning tape 10 , and the motor 12 is installed on the top of the second drum 11 .

具体的,清洁带10的横轴线与固定架7的横轴线相持平,且清洁带10与固定架7之间呈包裹状分布,并且固定架7呈工字状结构。可以理解的,在实际使用中,工作人员可在固定架7的内部开设多组槽孔,再在槽孔中安置有两段式的螺纹连接的杆体,使得人工转动杆体,则杆体延伸,故能够对清洁带10与压轮4的接触位置进行调整处理。Specifically, the transverse axis of the cleaning belt 10 is flush with the transverse axis of the fixing frame 7 , and the cleaning belt 10 and the fixing frame 7 are distributed in a wrapping shape, and the fixing frame 7 has an I-shaped structure. It can be understood that in actual use, the staff can open multiple sets of slot holes in the interior of the fixing frame 7, and then place a two-stage threaded rod body in the slot hole, so that the rod body is manually rotated, and the rod body extends, so The contact position of the cleaning belt 10 and the pinch roller 4 can be adjusted.

进一步的,减振带1401关于压轮4的中轴线对称,且减振带1401之间通过螺栓构成可拆卸结构,将减振带1401缠绕连接于压轮4的两侧,并通过螺栓对减振带1401进行连接处理,使得压轮4在非工作区域进行滚动时,减振带1401接触地面,起到减振的目的。Further, the damping belt 1401 is symmetrical about the central axis of the pressure roller 4, and the detachable structure is formed by bolts between the damping belts 1401. The vibration belts 1401 are connected, so that when the pressure roller 4 rolls in the non-working area, the vibration reduction belts 1401 contact the ground for the purpose of vibration reduction.

本发明还提出一种公路减振降噪的施工方法,包括如下步骤:The present invention also proposes a construction method for road vibration reduction and noise reduction, comprising the following steps:

步骤一:施工前,需要调节降噪机构5,使得其内部组件带动横杆3下移,对压轮4进行增大压力操作;Step 1: Before construction, it is necessary to adjust the noise reduction mechanism 5, so that its internal components drive the cross bar 3 to move down, and the pressure roller 4 is operated to increase the pressure;

步骤二:施工时,当压轮4表面附着大量公路碾压时的碎料后,影响其后续的施工效果,故在压轮4进行施工工作时,人工通过调整清洁带10的张紧程度,便于清洁带10贴近于压轮4的外壁进行刮除操作,再通过启动水阀,便于水箱9内部的水流经出水口808处,溢至清洁带10,完成压轮4清洁工作;Step 2: During construction, when a large amount of debris from road rolling is attached to the surface of the pinch roller 4, the subsequent construction effect will be affected. It is convenient for the cleaning belt 10 to be close to the outer wall of the pressure roller 4 to perform the scraping operation, and then by starting the water valve, it is convenient for the water inside the water tank 9 to flow through the water outlet 808 and overflow to the cleaning belt 10 to complete the cleaning of the pressure roller 4;

步骤三:施工后,对该装置进行移动操作,则需要通过人工安装减振带1401,使得减振带1401分布于压轮4的两侧,便于压轮4行走于路面上的震动效果小,达到减振的效果。Step 3: After construction, to move the device, it is necessary to manually install the vibration-damping belts 1401, so that the vibration-damping belts 1401 are distributed on both sides of the pressure roller 4, so that the vibration effect of the pressure roller 4 walking on the road surface is small, achieve the effect of vibration reduction.

具体的,在步骤二中,调整清洁带10的张紧程度方法包括如下步骤:Specifically, in step 2, the method for adjusting the tension of the cleaning belt 10 includes the following steps:

可由人工在固定架7的内部开设多组槽孔,再在槽孔中安置有两段式的螺纹连接的杆体,使得人工转动杆体,则杆体延伸,故能够对清洁带10与压轮4的接触位置进行调整处理,便于清洁带10对压轮4进行定点刮除工作。Multiple groups of slot holes can be manually opened in the interior of the fixing frame 7, and then a two-stage threaded rod body is arranged in the slot hole, so that the rod body is manually rotated, and the rod body extends, so the cleaning belt 10 and the pressure roller 4 can be adjusted. The contact position is adjusted, which is convenient for the cleaning belt 10 to perform fixed-point scraping work on the pressure roller 4 .

综上所述,该公路减振降噪的施工装置,在使用时:To sum up, the construction device for road vibration and noise reduction, when in use:

首先通过工作人员将该车体1启动,并通过车轮2的滚动,带动该装置移动至施工区域;First, the car body 1 is started by the staff, and the rolling of the wheels 2 drives the device to move to the construction area;

随后,启动电动推杆501,其能够拉动横杆3,使得与车体1活动连接的横杆3下移,并下压压轮4,完成调整压轮4与施工区域的贴合度工作,并通过车体1的继续行进操作,便于压轮4围绕连接轴6旋转,进行对施工路段的施工工作;Then, start the electric push rod 501, which can pull the cross bar 3, so that the cross bar 3 movably connected with the vehicle body 1 moves down, and presses the pressing wheel 4 down to complete the work of adjusting the fit of the pressing wheel 4 and the construction area, And through the continuous running operation of the vehicle body 1, it is convenient for the pressing wheel 4 to rotate around the connecting shaft 6 to carry out the construction work on the construction road section;

其间,当压轮4表面附着大量公路碾压时的碎料后,影响其后续的施工效果,故在压轮4进行施工工作时,人工通过在固定架7的内部开设多组槽孔,再在槽孔中安置有两段式的螺纹连接的杆体,使得人工转动杆体,则杆体延伸,故能够对清洁带10与压轮4的接触位置进行调整处理,完成调整清洁带10的张紧程度工作,便于清洁带10贴近于压轮4的外壁进行刮除操作;In the meantime, when a large amount of debris from road rolling is attached to the surface of the pressing roller 4, the subsequent construction effect will be affected. Therefore, when the pressing roller 4 performs construction work, manually open multiple groups of slot holes in the interior of the fixing frame 7, A two-stage threaded rod body is arranged in the slot hole, so that the rod body is extended by manually rotating the rod body, so the contact position of the cleaning belt 10 and the pressure roller 4 can be adjusted, and the tension degree of the cleaning belt 10 can be adjusted. work, it is convenient for the cleaning belt 10 to be close to the outer wall of the pressing wheel 4 for scraping operation;

再通过启动水阀,便于水箱9内部的水流经出水口808处,溢至清洁带10,完成压轮4清洁工作;Then, by starting the water valve, it is convenient for the water inside the water tank 9 to flow through the water outlet 808 and overflow to the cleaning belt 10 to complete the cleaning of the pressure roller 4;

最后,对该装置进行移动操作,则需要通过人工安装减振带1401,使得减振带1401分布于压轮4的两侧,便于压轮4行走于路面上的震动效果小,达到减振的效果。Finally, to move the device, it is necessary to manually install the vibration-damping belts 1401, so that the vibration-damping belts 1401 are distributed on both sides of the pressure roller 4, so that the vibration effect of the pressure roller 4 walking on the road surface is small, and the vibration reduction is achieved. Effect.

最后应说明的是:以上所述实施例,仅为本发明的具体实施方式,用以说明本发明的技术方案,而非对其限制,本发明的保护范围并不局限于此,尽管参照前述实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:任何熟悉本技术领域的技术人员在本发明揭露的技术范围内,其依然可以对前述实施例所记载的技术方案进行修改或可轻易想到变化,或者对其中部分技术特征进行等同替换;而这些修改、变化或者替换,并不使相应技术方案的本质脱离本发明实施例技术方案的精神和范围,都应涵盖在本发明的保护范围之内。因此,本发明的保护范围应以所述权利要求的保护范围为准。Finally, it should be noted that the above-mentioned embodiments are only specific implementations of the present invention, and are used to illustrate the technical solutions of the present invention, but not to limit them. The protection scope of the present invention is not limited thereto, although referring to the foregoing The embodiment has been described in detail the present invention, those of ordinary skill in the art should understand: any person skilled in the art who is familiar with the technical field within the technical scope disclosed by the present invention can still modify the technical solutions described in the foregoing embodiments. Or can easily think of changes, or equivalently replace some of the technical features; and these modifications, changes or replacements do not make the essence of the corresponding technical solutions deviate from the spirit and scope of the technical solutions of the embodiments of the present invention, and should be covered in the present invention. within the scope of protection. Therefore, the protection scope of the present invention should be based on the protection scope of the claims.

Claims (10)

1. The utility model provides a construction equipment that highway damping was fallen and is made an uproar, includes automobile body (1), its characterized in that, the bottom of automobile body (1) is connected with wheel (2) horizontal pole (3) are installed to one side of automobile body (1), the other end of horizontal pole (3) is connected with mount (7) noise reduction mechanism (5) are installed to the bottom of horizontal pole (3), noise reduction mechanism (5) include electric putter (501), the bottom of electric putter (501) with the outer wall of automobile body (1) is connected, electric putter (501) through loose axle (502) with horizontal pole (3) are connected, horizontal pole (3) with be swing joint between automobile body (1), transversely run through between horizontal pole (3) has connecting axle (6) pinch roller (4) are installed in the outside of connecting axle (6), clean mechanism (8) are installed to one side of mount (7), the other side of the fixed frame (7) is connected with a second box body (13), vibration reduction mechanisms (14) are arranged on two sides of the outer wall of the pressing wheel (4), each vibration reduction mechanism (14) comprises a vibration reduction belt (1401), and the vibration reduction belts (1401) are connected with the pressing wheel (4) in a sleeved mode.
2. The construction device for vibration and noise reduction of the road as claimed in claim 1, wherein the electric push rod (501) forms a movable structure with the cross rod (3) through the movable shaft (502), and the cross rod (3) forms a rotating structure with the pressure wheel (4) through the connecting shaft (6).
3. The construction device for vibration and noise reduction of the road according to claim 1, wherein the cleaning mechanism (8) comprises a first box body (801), a water tank (9) is connected to the top end of the first box body (801), a water outlet (802) is connected to the outer wall of the first box body (801), a first roller (803) is installed on one side of the inside of the first box body (801), a frame (804) is connected to the other side of the inside of the first box body (801), a water pipe (805) penetrates through the inner side of the frame (804), a water outlet (808) is installed on the outer wall of the water pipe (805), a connecting strip (807) is connected to the outer wall of the water outlet (808), a movable rod (806) is connected to the other end of the connecting strip (807), a chute (809) is formed on the inner side of the edge of the frame (804), and the chute (809) is in sliding connection with the movable rod (806), the outer wall of movable rod (806) is connected with spring (811), fixed block (810) are installed to the other end of spring (811), fixed block (810) with be fixed connection between spout (809).
4. The construction device for reducing vibration and noise of the road as claimed in claim 3, wherein the inner side of the frame (804) is a hollow structure, and the frame (804) is fixedly connected with the first box body (801).
5. A construction device for vibration and noise reduction of a road according to claim 3, wherein the water outlet (808) forms a sliding structure through a connecting strip (807), a movable rod (806) and a sliding groove (809), and the movable rod (806) forms an elastic structure through a spring (811) and a fixed block (810).
6. A construction device for reducing vibration and noise of road according to claim 3, wherein the outer wall of the first roller (803) is wound with a cleaning belt (10), the other side of the inner wall of the cleaning belt (10) is connected with a second roller (11), and the top end of the second roller (11) is provided with a motor (12).
7. The construction device for vibration and noise reduction of the road as claimed in claim 6, wherein the transverse axis of the cleaning belt (10) is the same as the transverse axis of the fixing frame (7), the cleaning belt (10) and the fixing frame (7) are distributed in a wrapping manner, and the fixing frame (7) is in an I-shaped structure.
8. The construction device for reducing vibration and noise of the road according to claim 1, wherein the vibration reduction bands (1401) are symmetrical about the central axis of the pressing wheel (4), and the vibration reduction bands (1401) form a detachable structure through bolts.
9. A construction method for vibration and noise reduction of a road, which is characterized by applying the construction device for vibration and noise reduction of the road as claimed in any one of the claims 1 to 8, and comprises the following steps:
the method comprises the following steps: before construction, adjusting the noise reduction mechanism (5) to enable the internal components to drive the cross rod (3) to move downwards so as to increase the pressure of the pressing wheel (4);
step two: during construction, after crushed aggregates generated during road rolling are attached to the surface of the pressing wheel (4), the cleaning belt (10) is close to the outer wall of the pressing wheel (4) to carry out scraping operation by adjusting the tensioning degree of the cleaning belt (10), and then water inside the water tank (9) overflows to the cleaning belt (10) through the water outlet (808) by starting the water valve, so that the cleaning work of the pressing wheel (4) is completed;
step three: after construction, the device is moved, vibration reduction belts (1401) are installed manually and distributed on two sides of the pinch roller (4), so that the vibration effect of the pinch roller (4) walking on a road surface is small, and the vibration reduction effect is achieved.
10. The construction method for reducing vibration and noise of the road according to claim 9, wherein in the second step, the method for adjusting the tension of the cleaning belt (10) comprises the following steps:
a plurality of groups of slotted holes are formed in the fixing frame (7) manually, and two-section type rod bodies in threaded connection are arranged in the slotted holes, so that the rod bodies extend when the rod bodies are rotated manually, the contact positions of the cleaning belt (10) and the pressing wheel (4) are adjusted, and the cleaning belt (10) can conveniently scrape the pressing wheel (4) at fixed points.
CN202010459661.6A 2020-05-27 2020-05-27 Construction device for vibration and noise reduction of highway and construction method thereof Active CN111576146B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010459661.6A CN111576146B (en) 2020-05-27 2020-05-27 Construction device for vibration and noise reduction of highway and construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010459661.6A CN111576146B (en) 2020-05-27 2020-05-27 Construction device for vibration and noise reduction of highway and construction method thereof

Publications (2)

Publication Number Publication Date
CN111576146A true CN111576146A (en) 2020-08-25
CN111576146B CN111576146B (en) 2024-05-28

Family

ID=72123480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010459661.6A Active CN111576146B (en) 2020-05-27 2020-05-27 Construction device for vibration and noise reduction of highway and construction method thereof

Country Status (1)

Country Link
CN (1) CN111576146B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138554A (en) * 2005-11-18 2007-06-07 Taisei Rotec Corp Self-propelled roller and pavement construction method
WO2009158016A1 (en) * 2008-06-26 2009-12-30 Sampson Russel H Roller drum assembly for packing a surface
CN102392408A (en) * 2011-11-07 2012-03-28 长沙理工大学 Mud scraping and cleaning device for pressing wheel of road roller
EP3073013A1 (en) * 2015-03-27 2016-09-28 Wacker Neuson Production Americas LLC Vibratory compaction roller
WO2018019407A1 (en) * 2016-07-26 2018-02-01 Bomag Gmbh Soil-compacting roller having a sensor device on the roller lining, and method for determining soil stiffness
CN210439105U (en) * 2019-05-16 2020-05-01 邰莹 Traffic engineering highway construction extrusion device
CN212270598U (en) * 2020-05-27 2021-01-01 江西科技学院 A construction device for road vibration and noise reduction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007138554A (en) * 2005-11-18 2007-06-07 Taisei Rotec Corp Self-propelled roller and pavement construction method
WO2009158016A1 (en) * 2008-06-26 2009-12-30 Sampson Russel H Roller drum assembly for packing a surface
CN102392408A (en) * 2011-11-07 2012-03-28 长沙理工大学 Mud scraping and cleaning device for pressing wheel of road roller
EP3073013A1 (en) * 2015-03-27 2016-09-28 Wacker Neuson Production Americas LLC Vibratory compaction roller
WO2018019407A1 (en) * 2016-07-26 2018-02-01 Bomag Gmbh Soil-compacting roller having a sensor device on the roller lining, and method for determining soil stiffness
CN210439105U (en) * 2019-05-16 2020-05-01 邰莹 Traffic engineering highway construction extrusion device
CN212270598U (en) * 2020-05-27 2021-01-01 江西科技学院 A construction device for road vibration and noise reduction

Also Published As

Publication number Publication date
CN111576146B (en) 2024-05-28

Similar Documents

Publication Publication Date Title
CN107663829B (en) Painting zebra crossing device for road facilities
CN206680973U (en) A kind of water conservancy water channel garbage cleaning device
CN212270598U (en) A construction device for road vibration and noise reduction
CN204570592U (en) Shovel is rolled in a kind of snow pushing of opening ice be arranged on baby tractor
CN111576146A (en) Construction device and construction method for road vibration and noise reduction
CN103625438A (en) Tunnel type car washer
CN204486397U (en) Calking cover cleaning machine
CN221950847U (en) Intelligent water spraying device on sanitation vehicle
CN218756900U (en) Highway engineering is with spreading membrane device
CN218947682U (en) All-terrain explosion-proof robot
CN205205746U (en) Multifunctional cleaning machine
CN218842966U (en) Cleaning device for expressway guardrail
CN205205741U (en) Multi -functional washing car
CN115973300A (en) Hydraulic tensioning device of mountain crawler tractor
CN221681719U (en) A water accumulation treatment and maintenance device for highway maintenance
CN213173237U (en) Highway engineering construction extrusion device
CN202038281U (en) Cleaning box body provided with driving rollers and used for tyre cleaning machine
CN205916613U (en) Town road garbage recycling device
CN110820698A (en) Solar powered flat flip gate
CN205530639U (en) A water drainage tank for car wash
CN104442734A (en) Adjustable crawler type high-speed rail train roof cleaning machine
CN216445737U (en) A pavement leveling device for highway construction
CN221855763U (en) A rainwater and sewage pipe damage detection device
CN222573982U (en) A construction device for mechanical and electrical pipelines of a building
CN119121712B (en) A concrete leveling robot for track pouring

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant