CN111566294A - Scaffolding pipe clamp assembly - Google Patents
Scaffolding pipe clamp assembly Download PDFInfo
- Publication number
- CN111566294A CN111566294A CN201980007613.9A CN201980007613A CN111566294A CN 111566294 A CN111566294 A CN 111566294A CN 201980007613 A CN201980007613 A CN 201980007613A CN 111566294 A CN111566294 A CN 111566294A
- Authority
- CN
- China
- Prior art keywords
- scaffold
- hook
- pipe
- clamp
- clamping
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G7/00—Connections between parts of the scaffold
- E04G7/02—Connections between parts of the scaffold with separate coupling elements
- E04G7/06—Stiff scaffolding clamps for connecting scaffold members of common shape
- E04G7/12—Clamps or clips for crossing members
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
Description
技术领域technical field
本发明涉及脚手架管用夹组件,具体是,使将交叉设置的脚手架管固定住的夹具的结构及连结通过改进变得简便的脚手架管用夹组件。The present invention relates to a clip assembly for scaffolding pipes, and more particularly, to a clipping assembly for scaffolding pipes, which improves the structure and connection of a clip for fixing the scaffolding pipes arranged in a crosswise manner.
背景技术Background technique
所谓的脚手架是,对建筑物或桥梁等土木及建筑结构物进行施工时,为了设置安全网防止用于构筑结构物的支承模具或者外部施工作业通道以及作业中异物或作业工具等掉落,将以金属材料构成的脚手架管从垂直方向和水平方向保持一定间隔安装的叫做脚手架,所述脚手架管是使用夹组件相互绑扎固定住。The so-called scaffolding refers to the construction of buildings, bridges and other civil engineering and architectural structures, in order to set up a safety net to prevent the support molds used to construct the structure or the external construction work passages, as well as foreign objects or work tools. Scaffolding tubes made of metal materials that are installed at a certain interval from the vertical direction and the horizontal direction are called scaffolding, and the scaffold tubes are tied and fixed to each other using clip components.
现有的夹组件的结构包括:相面对设置于两侧,内部呈曲线,两端分别设有第一铰链和第二铰链的一对主体和;一端可转动地连结于所述各主体的第一铰链,内部呈曲线,另一端设有拧结槽的盖子和;一端可旋转地连结于所述各主体的第二铰链,螺母通过螺纹拧结于另一端上,进而插进盖子的拧结槽被拧结的螺栓。就是说,一对夹具可转动地相面对结合的结构。The structure of the existing clip assembly includes: a pair of main bodies and a pair of main bodies arranged opposite to each other on both sides, the interior is curved, and the two ends are respectively provided with a first hinge and a second hinge; one end is rotatably connected to the main bodies; The first hinge is curved inside, and the other end is provided with a cover and a twisting groove; one end is rotatably connected to the second hinge of each main body, and the nut is screwed on the other end by thread, and then inserted into the screw of the cover. Knot grooves are twisted bolts. That is, a pair of clamps rotatably face the combined structure.
根据这种夹组件在韩国专利厅公开专利公报第10-2014-0020584号(先有文献1)“脚手架管的防滑用夹具”中公开的技术,施工临时设置物即脚手架时,用夹具将多个管子以相互交叉的形态绑扎,而且为了解决外力或者施工中脚手架受力过大时因传递于相互交叉连接的多个管子的剪切力而管子在夹具上滑的现象,管子上设有插入孔,管子被绑扎的夹具底座上设有插入凸块,被插进管子的插入孔,抵抗作用到相互交叉连接的多个管的剪切力,从而防止管子滑的现象,进一步防止脚手架的结构变形,确保脚手架的安全性。According to the technique disclosed in Korean Patent Office Laid-Open Patent Publication No. 10-2014-0020584 (Prior Document 1) "Anti-slip jig for scaffolding pipe" of this type of clip assembly, when constructing a temporary installation, that is, a scaffold, many jigs are used. The pipes are bound in the form of crossing each other, and in order to solve the phenomenon that the pipe slips on the fixture due to the shear force transmitted to the multiple pipes that are cross-connected when the external force or the scaffolding is overstressed during construction, the pipe is provided with an insert. There are insertion bumps on the base of the fixture where the pipes are bound, which are inserted into the insertion holes of the pipes to resist the shearing force acting on the multiple pipes that are cross-connected to each other, thereby preventing the pipes from slipping and further preventing the structure of the scaffolding. Deformation to ensure the safety of the scaffolding.
韩国专利厅注册专利公报第10-1582617号“脚手架管用夹具”(先有文献2)曾经公开了一种技术,即增加安全功能,防止夹具因负荷或冲击等向下滑或者偏斜于一侧的现象,从而预防安全事故的危险,确保安全性。Korean Patent Office Registered Patent Gazette No. 10-1582617 "Clamp for Scaffolding Pipe" (Prior Document 2) once disclosed a technology that adds a safety function to prevent the clamp from sliding down or deflecting to one side due to load or impact. phenomenon, thereby preventing the risk of safety accidents and ensuring safety.
但先有文献1、2的夹组件以与现有相互面对的主体铰接转动的各个盖子构成,将主体和盖子的另一侧用螺栓拧结而成的结构,需在脚手架管上分别拧结,因此施工比较繁琐和不方便。However, the clip assemblies of the
而且现有的夹组件是,以旋转支撑轴将主体压紧旋转地设置,结合主体和盖子的铰链部的强度弱,因此将承受的荷重限制在1.5吨左右,承受不住其以上荷重时,会发生铰链部破裂等大型事故。In addition, the existing clip assembly is installed to press and rotate the main body with a rotating support shaft, and the strength of the hinge part connecting the main body and the cover is weak, so the load it can bear is limited to about 1.5 tons, and when it cannot bear the load above it, Large-scale accidents such as hinge breakage may occur.
发明内容SUMMARY OF THE INVENTION
技术问题technical problem
本发是是为解决上述现有技术上存在的问题而创造的新型技术,其目的在于提供一种对现有的一对夹具相面对构成的结构积极改进,使交叉的脚手架管的连结一次性形成而易于安装和拆卸,安装简便而大幅提升施工现场的施工便利性,以简单结构降低制造成本,减少脚手架设施所需费用的脚手架管用夹组件。The present invention is a new technology created to solve the above-mentioned problems existing in the prior art. It is easy to install and disassemble, easy to install and greatly improves the convenience of construction on the construction site, reduces the manufacturing cost with a simple structure, and reduces the cost of scaffolding facilities.
技术方案Technical solutions
为解决所述问题,本发明所采用的技术方案是,包括:加压夹,其具备为了在脚手架管的交叉处装配固定住而支撑部向钩部的两端延伸并折曲成U状的扣合钩,并以与所述扣合钩结合将脚手架管加压固定的管夹构成;固定支架,其被夹进脚手架管之间支撑脚手架管的同时,与加压夹结合将设置位置固定住。所述扣合钩的支撑部的一端设有卡钩部,另一端设有螺栓连接部,所述管夹上设有脚手架管被插入的弧形折曲部,所述折曲部的两端设有第一、二卡合片而被扣合钩的卡钩部约束的状态下结合于螺栓连接部,将所述加压夹和固定支架组装成套并装配在脚手架管以后,通过一次螺栓连接即可将脚手架管固定住。In order to solve the above problem, the technical solution adopted in the present invention is to include: a pressurizing clip, which is provided with a support portion extending to both ends of the hook portion and being bent into a U shape in order to be assembled and fixed at the intersection of the scaffold pipes. The buckle hook is composed of a pipe clamp which is combined with the buckle hook to press and fix the scaffold pipe; the fixing bracket is clamped between the scaffold pipes to support the scaffold pipe, and is combined with the pressure clamp to fix the setting position live. One end of the support part of the snap hook is provided with a hook part, the other end is provided with a bolt connection part, the pipe clip is provided with an arc-shaped bending part into which the scaffolding pipe is inserted, and the two ends of the bending part are provided with an arc-shaped bending part. The first and second engaging pieces are provided with the first and second engaging pieces and are combined with the bolt connection part in the state where they are restrained by the hook part of the snap hook. The scaffolding tube can be fixed.
优选地,扣合钩上还设有与钩部接合成一体而在脚手架管上装配时既可防滑又容易紧贴的接触诱导片。所述接触诱导片的结构包括:向钩部内侧紧贴于脚手架管的接触片和;向所述接触片的内侧方向紧贴脚手架管时为防滑而凸出的多个接触凸块和;钩部向所述接触片的外侧方向进入内部并接合成一体的内入槽。Preferably, the snap hook is also provided with a contact inducing piece which is integrated with the hook part and can be slip-resistant and easy to fit when assembled on the scaffold pipe. The structure of the contact inducing piece includes: a contact piece that is close to the scaffold tube to the inner side of the hook portion; a plurality of contact bumps that protrude for anti-slip when it is close to the scaffold tube in the inner direction of the contact piece; a hook The part enters into the outer direction of the contact piece and joins into an integrated inner groove.
优选地,卡钩部呈圆盘状或螺栓头状,使得管夹的第一卡合片在扣合钩的卡钩部上被约束结合,第一卡合片是可选设有插孔的结构,或者卡钩部上设有第一卡合圈,第一卡合片结合于第二卡合圈的卡钩结构构成。Preferably, the hook portion is in the shape of a disc or a bolt head, so that the first engaging piece of the pipe clamp is constrained and combined on the hook portion of the snap hook, and the first engaging piece is optionally provided with an insertion hole structure, or the hook portion is provided with a first engaging ring, and the first engaging piece is combined with the hook structure of the second engaging ring.
优选地,固定支架具备主体块,使其夹进交叉的脚手架管之间时使脚手架管进入内部,而且垂直内入部和水平内入部相面对地设在所述主体块的前后侧,所述一侧边角辐射状上凸出构成连结杆,将扣合钩的一端支撑部贯通连接而与加压夹组装成套。Preferably, the fixing bracket is provided with a main body block, so that the scaffolding pipe enters the interior when it is sandwiched between the crossed scaffolding pipes, and the vertical inward part and the horizontal inward part are arranged on the front and rear sides of the main body block so as to face each other, the One side corner radially protrudes to form a connecting rod, and one end support part of the buckle hook is penetratingly connected to be assembled with the pressurizing clip.
优选地,管夹、接触诱导片、固定支架的垂直内入槽和水平内入槽是紧贴于脚手架管的面上设有防滑的滚花部。Preferably, the pipe clamp, the contact inducing sheet, the vertical inner groove and the horizontal inner groove of the fixing bracket are provided with anti-slip knurled parts on the surface of the scaffold pipe.
有益效果beneficial effect
根据本发明的脚手架管用夹组件,其有益效果在于,According to the scaffold pipe clamp assembly of the present invention, the beneficial effects are:
临时安装脚手架时,以交叉的固定支架对脚手架管之间实施固定和支撑,将以连结钩和管夹构成的加压夹装配到脚手架管用螺栓连接固定住,使其结构变得简便而降低制造成本,提升脚手架设施费用的经济性,将交叉的脚手架管可以一次性连结固定住而施工也变得非常便利;When temporary scaffolding is installed, the scaffolding tubes are fixed and supported with crossed fixing brackets, and the pressurized clips composed of connecting hooks and tube clips are assembled to the scaffolding tubes and fixed with bolts, making the structure simple and reducing manufacturing. Cost, improve the economy of scaffolding facilities, the cross scaffolding pipes can be connected and fixed at one time, and the construction is also very convenient;
此外,通过所述脚手架管用夹组件,用一个连结钩一次性发挥固定力,与通常的脚手架管相比,可支承荷重达两倍,从而提供安全性更高的夹组件。In addition, the clip assembly for scaffolding pipe can exert a fixing force at one time with one connecting hook, and can support twice the load as compared with a normal scaffolding pipe, thereby providing a clip assembly with higher safety.
附图说明Description of drawings
图1是本发明的脚手架管用夹组件的分离透视图;Fig. 1 is the separated perspective view of the clip assembly for scaffold pipe of the present invention;
图2是本发明的脚手架管用夹组件的结合透视图;Figure 2 is a combined perspective view of the scaffold pipe clamp assembly of the present invention;
图3是图1的结构中夹组件的另一实施例的透视图;Figure 3 is a perspective view of another embodiment of a clip assembly in the structure of Figure 1;
图4是本发明的脚手架管用夹组件结构中固定支架的透视图;4 is a perspective view of a fixed bracket in the structure of the scaffold pipe clip assembly of the present invention;
图5是图4的另一实施例的透视图;Figure 5 is a perspective view of another embodiment of Figure 4;
图6是将本发明的脚手架管用夹组件组装成套的状态的透视图;6 is a perspective view of a state in which the scaffolding pipe clip assembly of the present invention is assembled into a set;
图7是本发明的脚手架管用夹组件的设置状态的剖视图。Fig. 7 is a cross-sectional view of the installation state of the scaffold pipe clip assembly of the present invention.
具体实施方式Detailed ways
下面将结合本发明实施例中的附图,对本发明实施例中的技术方案详细进行描述,本发明结构实施例的附图用以阐述结构和作用效果,并不是对本发明的技术方案范围进行限定或者变更。本领域普通技术人员可以基于所述实施例得出各种变形实施例,但在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions in the embodiments of the present invention will be described in detail below with reference to the drawings in the embodiments of the present invention. The drawings in the structural embodiments of the present invention are used to illustrate the structure and effects, and not to limit the scope of the technical solutions of the present invention. or change. Those of ordinary skill in the art can derive various modified embodiments based on the described embodiments, but all other embodiments obtained without creative work fall within the protection scope of the present invention.
本说明书中使用的技术用语是根据实施例中的功能选用,其用语所具意义会根据本发明的具体实施例有所变化。后述的实施例中使用的用语是,本说明书中有具体定义时以该定义为准,没有具体定义的是根据普通技术人员普遍认可的技术用语意义来解释。The technical terms used in this specification are selected according to the functions in the embodiments, and the meanings of the terms may vary according to the specific embodiments of the present invention. The terms used in the embodiments to be described later are, when there are specific definitions in this specification, the definitions shall prevail, and those without specific definitions shall be interpreted according to the meanings of technical terms generally recognized by those of ordinary skill.
图1是图示本发明的脚手架管用夹组件的分离透视图,图2是图示本发明的脚手架管用夹组件的结合透视图。1 is a separate perspective view illustrating the clip assembly for a scaffold pipe of the present invention, and FIG. 2 is a combined perspective view illustrating the clip assembly for a scaffold tube of the present invention.
本发明的脚手架管用夹组件包括:装配于一对脚手架管交叉处的加压夹具(10)和,夹进所述脚手架管(1,2)之间将加压夹具(10)的设置位置固定住的固定支架(20)。The scaffolding pipe clamp assembly of the present invention comprises: a pressurizing clamp (10) assembled at the intersection of a pair of scaffolding pipes and clamped between the scaffolding pipes (1, 2) to fix the setting position of the pressurizing clamp (10) the fixing bracket (20).
所述加压夹具(10)的结构包括:折曲包住一对脚手架管(1、2)交叉部位的扣合钩(11)和,与所述扣合钩(11)结合将脚手架管(1,2)加压固定的管夹(12)。The structure of the pressurizing fixture (10) comprises: a snap hook (11) which is bent and wraps around the intersecting part of a pair of scaffold pipes (1, 2); 1, 2) Pressure-fixed pipe clamp (12).
所述扣合钩(11)呈现支撑部(102)延伸至钩部(101)两端而成的U状,所述支撑部(102)的一端设有卡钩部(103),另一端设有螺栓连接部(104),而且为了在脚手架管(1,2)上装配时既能防滑又容易紧贴固定,在后侧脚手架管(1)被钩住的钩部(101)的内侧方向上将接触诱导片(13)接合成一体。The snap hook (11) presents a U shape in which a support portion (102) extends to both ends of the hook portion (101), one end of the support portion (102) is provided with a hook portion (103), and the other end is provided with a hook portion (103). There is a bolt connection part (104), and in order to be able to prevent slipping and easy to fix tightly when assembling on the scaffolding pipe (1, 2), the inner direction of the hook part (101) where the rear side scaffolding pipe (1) is hooked The contact inducing sheet (13) is joined into one body.
所述接触诱导片(13)是向钩部(101)的内侧沿着曲率半径设有紧贴于脚手架管(1)外周面的接触片(111),所述接触片(111)的内侧方向上凸出与脚手架管(1)紧贴防滑的多个接触凸块(112),所述接触片(111)的外侧方向上设有使钩部进入内部接合成一体的内入槽(113)。The contact inducing piece (13) is provided with a contact piece (111) close to the outer peripheral surface of the scaffold tube (1) along the radius of curvature inward of the hook portion (101), and the inner direction of the contact piece (111) is There are a plurality of contact bumps (112) protruding from the top that are in close contact with the scaffolding tube (1) and non-slip, and the outer direction of the contact piece (111) is provided with an inner slot (113) that allows the hook portion to enter the interior and join into one body .
所述扣合钩(11)的卡钩部(103)是呈现以比扣合钩(11)直径相对大的直径凸出成辐射状的圆盘状或螺栓头形状。The hook portion (103) of the fastening hook (11) is in the shape of a radially protruding disc or bolt head with a diameter relatively larger than the diameter of the fastening hook (11).
所述管夹(12)是脚手架管(2)被插入的弧形折曲部(105)和所述折曲部(105)的两端上设有与扣合钩(11)的卡钩部(103)结合于螺栓连接部(104)的第一、二卡合片(106,107),所述折曲部(105)是减轻构件的负担,降低其应力,或者为了减少畸变或变形,向外侧方向凸出形成一个以上的加强筋(108)。The pipe clamp (12) is an arc-shaped bending part (105) into which the scaffold pipe (2) is inserted, and the two ends of the bending part (105) are provided with hook parts for engaging with the hooks (11). (103) The first and second engaging pieces (106, 107) are combined with the bolt connection part (104), and the folded part (105) is used to reduce the burden on the member, reduce its stress, or to reduce distortion or deformation, More than one reinforcing rib (108) is formed protruding outwardly.
所述第一卡合片(106)是设有插孔(106a),结合于卡钩部(103)受到约束,第二卡合片(107)是设有在前侧或后侧开口的连结槽(107a),并插进插入孔,使第一卡合片在卡钩部(103)结合成一体,被卡钩部(103)约束以后,在扣合钩(11)的上部方向上将管夹(12)的连结槽(107a)用螺栓连接部(104)拧结,使螺母被简单拧紧,进而将一对脚手架管(1,2)牢固地固定住。The first engaging piece (106) is provided with an insertion hole (106a), which is constrained by being combined with the hook portion (103), and the second engaging piece (107) is provided with a connection opening on the front side or the rear side. The slot (107a) is inserted into the insertion hole, so that the first engaging piece is integrated with the hook portion (103), and after being restrained by the hook portion (103), the upper direction of the hook (11) The connecting groove (107a) of the pipe clamp (12) is screwed with the bolt connection part (104), so that the nut can be easily tightened, and the pair of scaffold pipes (1, 2) are firmly fixed.
还可以设置使脚手架管(1,2)紧贴到所述接触凸块(112)和加强筋(108)的相反面时可以防滑的滚花部(112a,108a),加强筋(108)之间还可以接合防止应力下降的圆条(110)。A knurled portion (112a, 108a) that can prevent slippage when the scaffold tube (1, 2) is in close contact with the contact bump (112) and the opposite surface of the reinforcing rib (108) can also be provided, and the reinforcing rib (108) A round bar (110) for preventing stress reduction can also be joined between them.
所述扣合钩(11)上以管夹(12)的第一卡合片(106)扣合成一体的状态使管夹(12)转动的结合结构是如图3所示,是将脚手架管(1,2)连结时通过一次螺栓连接即可装配的结构,因此可以变形成卡钩(109)结构实施。The coupling structure in which the first engaging piece (106) of the pipe clip (12) is fastened into one body on the snap hook (11) to rotate the pipe clip (12) is as shown in FIG. (1, 2) The structure can be assembled by one bolt connection when connecting, so it can be transformed into a hook (109) structure and implemented.
为此可以设置第一、二卡合圈(109a,109b),替代扣合钩(11)的卡钩部(103)和管夹(12)的第一卡合片(106)For this purpose, first and second snap rings (109a, 109b) can be provided to replace the snap hook portion (103) of the snap hook (11) and the first snap piece (106) of the pipe clip (12).
所述管夹(12)是包住脚手架管(1,2)设置时,扣合钩(11)在脚手架管(1,2)上交叉处向斜线方向钩住,因此折曲部(105)以弯曲成既定角度的角度构成为宜。When the pipe clamps (12) are arranged to cover the scaffolding pipes (1, 2), the snap hooks (11) are hooked in the diagonal direction at the intersection of the scaffolding pipes (1, 2), so that the bent portion (105) ) is preferably formed at an angle bent to a predetermined angle.
所述固定支架(20)是夹进交叉的脚手架管(1,2)之间时,为了脚手架管(1,2)进入内部,主体框架(21)前后侧上设有相面对的垂直内入槽(22)和水平内入槽(23),而且为了扣合钩(11)的一侧支撑部(102)被贯通结合组装成套,在所述一侧边角辐射状上凸出设有前端具备贯通孔(24a)的连结杆(24)。When the fixing bracket (20) is sandwiched between the crossed scaffold tubes (1, 2), in order for the scaffold tubes (1, 2) to enter the interior, the front and rear sides of the main frame (21) are provided with facing vertical inner tubes. The inlet slot (22) and the horizontal inner inlet slot (23), and in order that the one side support portion (102) of the buckle hook (11) is penetratingly combined and assembled into a set, a radially protruding part is provided on the one side corner. A connecting rod (24) having a through hole (24a) is provided at the front end.
根据图4,优选地,所述垂直内入槽(22)和水平内入槽(23)是设有滚花部(22a,23a)而夹进脚手架管(1,2)之间时可以紧贴。According to Fig. 4, preferably, the vertical inner groove (22) and the horizontal inner groove (23) are provided with knurled parts (22a, 23a) and can be tightly clamped when sandwiched between the scaffold pipes (1, 2). paste.
所述垂直内入槽(22)和水平内入槽(23)是如图5所示具备:设有弧形的垂直接触面(31)并将垂直接触面(31)的两端边部向相反侧折曲而形成左右接合片(32)的第一板状体(33)和,设有弧形的水平接触面(34)并将水平接触面(34)的上下边部向相反侧折曲而形成上下接合片(35)的第二板状体(36),进而可以变形成将所述左右接合片(32)和上下接合片(35)接合的一体式结构实施。The vertical inner slot (22) and the horizontal inner slot (23) are equipped as shown in FIG. 5: an arc-shaped vertical contact surface (31) is provided, and the two end edges of the vertical contact surface (31) are directed toward the vertical contact surface (31). The first plate-shaped body (33), which is bent on the opposite side to form the left and right joint pieces (32), is provided with an arc-shaped horizontal contact surface (34), and the upper and lower sides of the horizontal contact surface (34) are folded to the opposite side. The second plate-shaped body (36) that is bent to form the upper and lower joint pieces (35) can be transformed into an integrated structure that joins the left and right joint pieces (32) and the upper and lower joint pieces (35).
所述垂直接触面(31)和水平接触面(34)上具有防滑的滚花部(31a,34a)。The vertical contact surface (31) and the horizontal contact surface (34) are provided with anti-slip knurled parts (31a, 34a).
下面阐述脚手架管用夹组件的安装及其作用。The following describes the installation and function of the scaffolding pipe clamp assembly.
本发明的脚手架管用夹组件是,将管夹(12)的一侧第一卡合片(106)的插孔(106a)插入扣合钩(11)的螺栓连接部(104),使管夹(12)的第一卡合片(106)被扣合钩(11)的钩部(101)约束而组装加压夹(10),将固定支架(20)的连结杆(24)插入扣合钩(11)的螺栓连接部(104),被支撑部(102)约束,进而如图6所示,使加压夹(10)和固定支架(20)配置成套。In the scaffold pipe clamp assembly of the present invention, the insertion hole (106a) of the first engaging piece (106) on one side of the pipe clamp (12) is inserted into the bolt connection part (104) of the snap hook (11), so that the pipe clamp The first engaging piece (106) of (12) is restrained by the hook portion (101) of the snap hook (11) to assemble the pressure clip (10), and insert the connecting rod (24) of the fixing bracket (20) into the snap fit The bolt connection part (104) of the hook (11) is restrained by the support part (102), and as shown in FIG.
根据图7,将脚手架管(1,2)连结固定时,在脚手架管(1,2)交叉之处将扣合钩(11)向对角线方向插入同时,将固定支架(20)夹进脚手架管(1,2)之间支撑之后,将管夹(12)的第二卡合片(107)在螺栓连接部(104)连结后用螺母(104a)拧紧而完成装配。According to Fig. 7, when the scaffolding tubes (1, 2) are connected and fixed, the snap hooks (11) are inserted diagonally at the intersection of the scaffolding tubes (1, 2), and the fixing bracket (20) is clamped into the After the scaffolding pipes (1, 2) are supported, the second engaging piece (107) of the pipe clamp (12) is connected to the bolt connection part (104) and then tightened with a nut (104a) to complete the assembly.
在此将螺栓连接部(104)拧紧后,夹进脚手架管(1,2)之间的固定支架(20)支撑在脚手架管(1,2)之间的状态下,扣合钩(11)的钩部(101)和管夹(12)的折曲部(105)加压一对脚手架管(1,2)前后侧的同时固定住。Here, after the bolt connection part (104) is tightened, the fixing bracket (20) sandwiched between the scaffold tubes (1, 2) is supported between the scaffold tubes (1, 2), and the hook (11) is engaged. The hook part (101) and the bending part (105) of the pipe clamp (12) are fixed while pressing the front and rear sides of a pair of scaffold pipes (1, 2).
此时,与扣合钩(11)的内侧结合为一体的接触诱导片(13)和管夹(12)的折曲部(105)将脚手架管(1,2)紧贴的状态下加压而发生牢固的固定力,而且接触诱导片(13)的多个接触凸块(112)和管夹(112)的折曲部(105)的下部面以及固定支架(20)的垂直内入槽(22)和水平内入槽(23)接触到设有滚花部(108a,112a,22a,23a)的脚手架管(1,2)时既能防滑又能紧贴,进而固定状态变得更加牢固。At this time, the contact-inducing piece (13) integrated with the inner side of the snap hook (11) and the bending part (105) of the pipe clamp (12) press the scaffolding pipes (1, 2) in close contact with each other. A firm fixing force is generated, and the plurality of contact bumps (112) of the induction sheet (13) and the lower surface of the bent portion (105) of the pipe clamp (112) and the vertical inner groove of the fixing bracket (20) are contacted When the (22) and the horizontal inner groove (23) contact the scaffolding pipes (1, 2) provided with the knurled parts (108a, 112a, 22a, 23a), they can not only prevent slipping but also adhere closely, and the fixed state becomes more firm.
使用如上所述的本发明的脚手架管用夹组件,施工人员将加压夹(10)和固定支架(20)连结到脚手架管(1,2)的状态下使螺栓连接作业一次性形成,因此不仅脚手架安装变得简便,还可以迅速完成。Using the scaffolding pipe clip assembly of the present invention as described above, the construction worker can perform the bolting work in a state where the pressurizing clip (10) and the fixing bracket (20) are connected to the scaffolding pipes (1, 2) at one time, so not only Scaffolding installation is easy and can be done quickly.
而且固定支架(20)支撑在交叉的脚手架管(1,2)之间的状态下,用一个扣合钩(11)将脚手架管(1,2)固定连结而均匀地支撑载荷,而且与现有的一对分离的脚手架管的结构相比,载荷的支撑效果达两倍,使脚手架施工变得更加稳定。同时提供结构简单,不仅降低制造成本,安全性也进一步得到提升的脚手架管连结用夹。In addition, in the state where the fixed bracket (20) is supported between the crossed scaffold pipes (1, 2), the scaffold pipes (1, 2) are fixedly connected with a snap hook (11) to support the load evenly, and it is also compatible with the existing Compared with the structure of a pair of separate scaffolding tubes, the load supporting effect is twice as high, making the scaffolding construction more stable. At the same time, a simple structure is provided, which not only reduces the manufacturing cost, but also further improves the safety of the scaffold pipe connecting clip.
以上最优选实施例仅用以说明本发明的技术方案,而非对其限制;本领域的普通技术人员依然可以对前述各实施例所述的技术方案进行修改或者等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例所述技术方案的范围。The most preferred embodiments above are only used to illustrate the technical solutions of the present invention, but not to limit them; those of ordinary skill in the art can still modify or equivalently replace the technical solutions described in the foregoing embodiments; and these modifications or replacements , does not make the essence of the corresponding technical solutions depart from the scope of the technical solutions described in the embodiments of the present invention.
Claims (5)
Applications Claiming Priority (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| KR1020180006742A KR102052171B1 (en) | 2018-01-18 | 2018-01-18 | Clamp assembly for scaffolding pipe |
| KR10-2018-0006742 | 2018-01-18 | ||
| PCT/KR2019/000429 WO2019143069A1 (en) | 2018-01-18 | 2019-01-11 | Clamp assembly for scaffolding pipes |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN111566294A true CN111566294A (en) | 2020-08-21 |
Family
ID=67301073
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201980007613.9A Pending CN111566294A (en) | 2018-01-18 | 2019-01-11 | Scaffolding pipe clamp assembly |
Country Status (3)
| Country | Link |
|---|---|
| KR (1) | KR102052171B1 (en) |
| CN (1) | CN111566294A (en) |
| WO (1) | WO2019143069A1 (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113914192A (en) * | 2021-09-28 | 2022-01-11 | 中交四航局第四工程有限公司 | Bailey beam and distribution beam connecting device suitable for multiple occasions |
Families Citing this family (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| KR20240013333A (en) | 2022-07-22 | 2024-01-30 | 조인형 | Apparatus for connecting piller and level beam in pipe installations |
| KR102811150B1 (en) * | 2024-09-02 | 2025-05-26 | 주식회사 우리이엔씨 | Scaffolding support device for buildings |
Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08128195A (en) * | 1994-10-31 | 1996-05-21 | Kunimoto Shokai:Kk | Temporary steel pipe clamp device |
| JP2006322156A (en) * | 2005-05-17 | 2006-11-30 | Joint Kogyo:Kk | Crossing part binding metal fitting of mutually contacting pipes |
| CN201095862Y (en) * | 2007-09-05 | 2008-08-06 | 姜中璋 | Steel pipe scaffold lapping lock piece |
| CN201250506Y (en) * | 2008-08-28 | 2009-06-03 | 何勇 | Steel tube scaffold transversely-inserting wedging rectangular fastener |
| CN202969903U (en) * | 2012-12-19 | 2013-06-05 | 黑龙江工程学院 | Scaffold fastener capable of being fastened quickly |
Family Cites Families (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH03101745U (en) * | 1990-02-06 | 1991-10-23 | ||
| JP2011026816A (en) * | 2009-07-24 | 2011-02-10 | Moriyama Boring Kk | Pipe connecting clamp |
| KR20140020581A (en) | 2012-08-09 | 2014-02-19 | (주)에이원알폼 | Clamp for preventing slipping of scaffolding pipe |
| KR101691168B1 (en) * | 2014-09-01 | 2016-12-29 | (주)창신아그멕 | Wire-clamp for cross pipe |
| KR101582617B1 (en) | 2015-04-08 | 2016-01-05 | 이준수 | Clamp for scaffold pipe |
-
2018
- 2018-01-18 KR KR1020180006742A patent/KR102052171B1/en active Active
-
2019
- 2019-01-11 WO PCT/KR2019/000429 patent/WO2019143069A1/en not_active Ceased
- 2019-01-11 CN CN201980007613.9A patent/CN111566294A/en active Pending
Patent Citations (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH08128195A (en) * | 1994-10-31 | 1996-05-21 | Kunimoto Shokai:Kk | Temporary steel pipe clamp device |
| JP2006322156A (en) * | 2005-05-17 | 2006-11-30 | Joint Kogyo:Kk | Crossing part binding metal fitting of mutually contacting pipes |
| CN201095862Y (en) * | 2007-09-05 | 2008-08-06 | 姜中璋 | Steel pipe scaffold lapping lock piece |
| CN201250506Y (en) * | 2008-08-28 | 2009-06-03 | 何勇 | Steel tube scaffold transversely-inserting wedging rectangular fastener |
| CN202969903U (en) * | 2012-12-19 | 2013-06-05 | 黑龙江工程学院 | Scaffold fastener capable of being fastened quickly |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN113914192A (en) * | 2021-09-28 | 2022-01-11 | 中交四航局第四工程有限公司 | Bailey beam and distribution beam connecting device suitable for multiple occasions |
| CN113914192B (en) * | 2021-09-28 | 2024-02-06 | 中交四航局第四工程有限公司 | Bailey beam and distribution beam connecting device suitable for multiple occasions |
Also Published As
| Publication number | Publication date |
|---|---|
| WO2019143069A1 (en) | 2019-07-25 |
| KR102052171B1 (en) | 2019-12-04 |
| KR20190088324A (en) | 2019-07-26 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| US5961248A (en) | Structural member connection and method | |
| CN111566294A (en) | Scaffolding pipe clamp assembly | |
| CN201095862Y (en) | Steel pipe scaffold lapping lock piece | |
| US3694012A (en) | Reinforcing bar coupling | |
| EA037541B1 (en) | Connector for joining bars | |
| CN110714603A (en) | Steel pipe and steel rope composite scaffold system and construction method thereof | |
| CN109989533A (en) | A kind of building construction steel bar connecting structure | |
| CN201326269Y (en) | Diagonal stay for diagonal connection of frame structure | |
| KR102097007B1 (en) | A modular rebar coupler | |
| KR101931581B1 (en) | Pipe connector and pipe additional strengthening for vinyl house using the same | |
| JP2017078301A (en) | Construction method of brace connecting metal fitting | |
| KR200452023Y1 (en) | Scaffolding Clamp Assembly | |
| KR101747625B1 (en) | Agricultural equipment frame and clamp for clamping vinyl fixing pads | |
| JP4908362B2 (en) | Joint | |
| JP3223321U (en) | Combination of slider, storage and mounting support | |
| KR101575091B1 (en) | Bracing for system support | |
| KR20070056757A (en) | Scaffolding Clamps | |
| CN216109737U (en) | Multifunctional lock catch | |
| KR101454975B1 (en) | Clamp Embeded Pipe | |
| KR200176353Y1 (en) | Scaffolding Clamps | |
| US12392135B2 (en) | Self-gripping, no-slip rebar coupler | |
| JP3110388U (en) | Clamp for pipe installation | |
| KR200234943Y1 (en) | Connector easily connected for steel reinforcing | |
| US20260035919A1 (en) | Self-Gripping, No-Slip Rebar Coupler | |
| KR200292597Y1 (en) | A post jig for the hand rail |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| PB01 | Publication | ||
| PB01 | Publication | ||
| SE01 | Entry into force of request for substantive examination | ||
| SE01 | Entry into force of request for substantive examination | ||
| WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20200821 |
|
| WD01 | Invention patent application deemed withdrawn after publication |