[go: up one dir, main page]

CN111294917A - Method, apparatus, storage medium and user equipment for estimating timing offset based on PDCCH - Google Patents

Method, apparatus, storage medium and user equipment for estimating timing offset based on PDCCH Download PDF

Info

Publication number
CN111294917A
CN111294917A CN201910645255.6A CN201910645255A CN111294917A CN 111294917 A CN111294917 A CN 111294917A CN 201910645255 A CN201910645255 A CN 201910645255A CN 111294917 A CN111294917 A CN 111294917A
Authority
CN
China
Prior art keywords
pdcch
reference signal
timing offset
demodulation reference
qcl
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201910645255.6A
Other languages
Chinese (zh)
Other versions
CN111294917B (en
Inventor
高泽庆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Spreadtrum Communications Shanghai Co Ltd
Original Assignee
Spreadtrum Communications Shanghai Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Spreadtrum Communications Shanghai Co Ltd filed Critical Spreadtrum Communications Shanghai Co Ltd
Priority to CN201910645255.6A priority Critical patent/CN111294917B/en
Publication of CN111294917A publication Critical patent/CN111294917A/en
Application granted granted Critical
Publication of CN111294917B publication Critical patent/CN111294917B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • HELECTRICITY
    • H04ELECTRIC COMMUNICATION TECHNIQUE
    • H04WWIRELESS COMMUNICATION NETWORKS
    • H04W56/00Synchronisation arrangements
    • H04W56/0055Synchronisation arrangements determining timing error of reception due to propagation delay

Landscapes

  • Engineering & Computer Science (AREA)
  • Computer Networks & Wireless Communication (AREA)
  • Signal Processing (AREA)
  • Mobile Radio Communication Systems (AREA)

Abstract

一种基于PDCCH估计定时偏差的方法、装置、存储介质及用户设备,基于PDCCH估计定时偏差的方法包括:接收PDCCH宽带解调参考信号的频域数据;将频域数据和UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;将频域信道估计值序列变换为时域信道估计值序列;基于时域信道估计值序列确定最终主径位置;将最终主径位置与目标定时进行比较而获得定时偏差。本发明技术方案能够更及时和更准确地估计定时偏差。

Figure 201910645255

A method, device, storage medium and user equipment for estimating timing offset based on PDCCH, the method for estimating timing offset based on PDCCH includes: receiving frequency domain data of a PDCCH wideband demodulation reference signal; The frequency domain channel estimation value sequence is obtained by performing correlation calculation on the signal sequence; the frequency domain channel estimation value sequence is transformed into a time domain channel estimation value sequence; the final main path position is determined based on the time domain channel estimation value sequence; the final main path position and the target The timing is compared to obtain the timing offset. The technical solution of the present invention can estimate the timing deviation more timely and accurately.

Figure 201910645255

Description

基于PDCCH估计定时偏差的方法、装置、存储介质及用户设备Method, apparatus, storage medium and user equipment for estimating timing offset based on PDCCH

技术领域technical field

本发明涉及通信技术领域,尤其涉及一种NR系统中基于PDCCH估计定时偏差的方法、装置、存储介质及设备。The present invention relates to the field of communication technologies, and in particular, to a method, device, storage medium and device for estimating timing offset based on PDCCH in an NR system.

背景技术Background technique

LTE(Long Term Evolution)系统指由3GPP主导的长期演进系统,其网络架构包括接入网(Evolved-UMTS Terrestrial Radio Access Network,简称为E-UTRAN)部分和核心网(Evolved Packet Core,简称为EPC)部分。NR(New Radio)系统指由3GPP主导的第五代移动通信系统,其网络架构包括接入网(Next-Generation Radio Access Network,简称为NG-RAN)部分和核心网(5G Core Network,简称为5GC)部分。The LTE (Long Term Evolution) system refers to a long-term evolution system dominated by 3GPP, and its network architecture includes an access network (Evolved-UMTS Terrestrial Radio Access Network, referred to as E-UTRAN) part and a core network (Evolved Packet Core, referred to as EPC) )part. The NR (New Radio) system refers to the fifth-generation mobile communication system dominated by 3GPP. Its network architecture includes an access network (Next-Generation Radio Access Network, referred to as NG-RAN) and a core network (5G Core Network, referred to as 5GC) section.

LTE系统和NR系统中都引入配置准共置(Quasi Co-Location,简称为QCL)概念。具体而言,如果一个天线端口与其它的天线端口配置为QCL,则指用户设备(User Equipment,简称为UE)可以假定从一个天线端口(或者与天线端口相对应的信道)接收到的信号的大尺度属性与从其它的天线端口(或者与天线端口相对应的信道)接收到的信号整体上或者部分地相同,大尺度属性包括多普勒扩展、多普勒移位、与时序偏移相关联的平均延迟、延迟扩展、平均增益等。Quasi Co-Location (Quasi Co-Location, QCL for short) concept is introduced in both the LTE system and the NR system. Specifically, if one antenna port and other antenna ports are configured as QCL, it means that user equipment (User Equipment, UE for short) can assume that the signal received from one antenna port (or the channel corresponding to the antenna port) is Large-scale properties are the same in whole or in part as signals received from other antenna ports (or channels corresponding to antenna ports). Large-scale properties include Doppler spread, Doppler shift, and timing offset correlation. Average delay, delay spread, average gain, etc.

在NR系统中,提供了四种类型的QCL,即QCL-TypeA、QCL-TypeB、QCL-TypeC和QCL-TypeD,其中,QCL-TypeA和QCL-TypeC中含有定时信息。例如,当物理下行控制信道(Physical Downlink Control Channel,简称为PDCCH)和某参考信号(Reference Signal,简称为RS)配置为QCL-TypeA或者QCL-TypeC时,则使用该参考信号估计出的定时偏差也适用于PDCCH。In the NR system, four types of QCLs are provided, namely QCL-TypeA, QCL-TypeB, QCL-TypeC and QCL-TypeD, wherein QCL-TypeA and QCL-TypeC contain timing information. For example, when the Physical Downlink Control Channel (PDCCH for short) and a reference signal (Reference Signal, RS for short) are configured as QCL-TypeA or QCL-TypeC, the timing offset estimated by the reference signal is used. Also applies to PDCCH.

但是,这些参考信号所估计的定时偏差的及时性和准确度在一些场景下会较差。However, the timeliness and accuracy of the timing offsets estimated by these reference signals may be poor in some scenarios.

发明内容SUMMARY OF THE INVENTION

本发明解决的技术问题是如何及时而准确地估计信道的定时偏差。The technical problem solved by the present invention is how to estimate the timing deviation of the channel timely and accurately.

为解决上述技术问题,本发明实施例提供一种NR系统中基于PDCCH估计定时偏差的方法,该方法包括:接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;将频域信道估计值序列变换为时域信道估计值序列;在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的定时偏差。In order to solve the above technical problem, an embodiment of the present invention provides a method for estimating timing offset based on PDCCH in an NR system. The method includes: receiving frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal. The frequency domain channel estimation value sequence is obtained by performing correlation calculation between the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal; domain channel estimation value sequence; in the time domain channel estimation value sequence, select the main path with the maximum received power of each receiving antenna at the UE, and determine the position with the most occurrences in the main path as the final main path position; the final main path position The difference obtained by comparing with the target timing saved at the UE is determined as the timing offset of the PDCCH.

可选的,基于PDCCH的定时偏差调整UE的定时。Optionally, the timing of the UE is adjusted based on the timing offset of the PDCCH.

可选的,在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径包括:通过每个接收天线各自的多径窗来选择每个接收天线各自接收功率最大的主径,多径窗为与IFFT点数有关的数值范围。Optionally, in the time-domain channel estimation value sequence, selecting the main path with the maximum received power of each receiving antenna at the UE includes: selecting the main path with the maximum received power of each receiving antenna through the respective multipath windows of each receiving antenna. The multipath window is a numerical range related to the number of IFFT points.

可选的,IFFT点数为256,多径窗的长度设置为64个点,数值范围为1与32之间和225与256之间的数值范围。Optionally, the number of IFFT points is 256, the length of the multipath window is set to 64 points, and the numerical range is between 1 and 32 and between 225 and 256.

可选的,通过将PDCCH的CORESET参数precoderGranularity设置为allContiguousRBs来将PDCCH解调参考信号配置为宽带解调参考信号。Optionally, the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal by setting the CORESET parameter precoderGranularity of the PDCCH to allContiguousRBs.

可选的,将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列为:通过相关公式将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行共轭相乘而得到频域信道估计值序列,该相关公式为:Optionally, the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal are correlated and calculated to obtain the frequency domain channel estimation value sequence: The data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal are conjugated multiplied to obtain the frequency domain channel estimation value sequence. The correlation formula is:

H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),

其中,H_cch_dmrs(l,rx,m)为频域信道估计值序列,R_cch_dmrs(l,rx,m)为所接收的频域数据,local(l,m)为UE本地PDCCH解调参考信号序列,l为符号,rx为接收天线参量,m为物理资源块参量。Among them, H_cch_dmrs(l,rx,m) is the frequency domain channel estimation value sequence, R_cch_dmrs(l,rx,m) is the received frequency domain data, local(l,m) is the UE local PDCCH demodulation reference signal sequence, l is a symbol, rx is a receiving antenna parameter, and m is a physical resource block parameter.

可选的,PDCCH所在的时隙中不存在与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号。Optionally, there is no reference signal with PDCCH QCL-TYPEA or QCL-TYPEC in the time slot where the PDCCH is located.

可选的,PDCCH所在的时隙中存在与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号,与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的周期为20毫秒、40毫秒或者80毫秒。Optionally, there is a reference signal with PDCCH QCL-TYPEA or QCL-TYPEC in the time slot where the PDCCH is located, and the period of the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC is 20 milliseconds, 40 milliseconds or 80 milliseconds.

可选的,与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号为SSB或者CSI-RS。Optionally, the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC is SSB or CSI-RS.

本发明实施例还提供另一种NR系统中基于PDCCH估计定时偏差的方法,该方法包括:接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;将频域信道估计值序列变换为时域信道估计值序列;在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的第一定时偏差;接收与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号;基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号而获得PDCCH的第二定时偏差;根据如下二者之一设置PDCCH的定时偏差,二者中的一者为:如果第一定时偏差的获得时刻不迟于第二定时偏差的获得时刻,则将第一定时偏差设置为PDCCH的定时偏差,否则将第二定时偏差设置为PDCCH的定时偏差;二者中的另一者为:根据PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率的比值设置第一定时偏差的权重和第二定时偏差的权重,对第一定时偏差和第二定时偏差进行加权求和而得到PDCCH的定时偏差。The embodiment of the present invention also provides another method for estimating timing offset based on PDCCH in an NR system, the method includes: receiving frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal; Perform correlation calculation between the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence; transform the frequency domain channel estimation value sequence into a time domain channel estimation value sequence; in the time domain channel estimation value sequence, select the main path with the maximum received power of each receiving antenna at the UE, and determine the position with the most occurrences in the main path as the final main path position; save the final main path position with the UE The difference obtained by comparing the target timing of the PDCCH is determined as the first timing deviation of the PDCCH; receiving the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC; based on the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC, obtain the PDCCH The second timing offset; the timing offset of the PDCCH is set according to one of the following two: if the acquisition time of the first timing offset is not later than the acquisition time of the second timing offset, then the first timing offset Set as the timing offset of PDCCH, otherwise set the second timing offset as the timing offset of PDCCH; the other of the two is: according to the sampling frequency of the PDCCH demodulation reference signal and the reference with PDCCH QCL-TYPEA or QCL-TYPEC The ratio of the sampling frequencies of the signals sets the weight of the first timing offset and the weight of the second timing offset, and the first timing offset and the second timing offset are weighted and summed to obtain the timing offset of the PDCCH.

可选的,基于PDCCH的定时偏差调整UE的定时。Optionally, the timing of the UE is adjusted based on the timing offset of the PDCCH.

可选的,在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径包括:Optionally, in the time-domain channel estimation value sequence, selecting the main path with the maximum received power of each receiving antenna at the UE includes:

通过每个接收天线各自的多径窗来选择每个接收天线各自接收功率最大的主径,多径窗为与IFFT点数有关的数值范围。The main path with the maximum received power of each receiving antenna is selected through the respective multipath window of each receiving antenna, and the multipath window is a numerical range related to the number of IFFT points.

可选的,IFFT点数为256,多径窗的长度设置为64个点,数值范围为1与32之间和225与256之间的数值范围。Optionally, the number of IFFT points is 256, the length of the multipath window is set to 64 points, and the numerical range is between 1 and 32 and between 225 and 256.

可选的,通过将PDCCH的CORESET参数precoderGranularity设置为allContiguousRBs来将PDCCH解调参考信号配置为宽带解调参考信号。Optionally, the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal by setting the CORESET parameter precoderGranularity of the PDCCH to allContiguousRBs.

可选的,将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列为:通过相关公式将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行共轭相乘而得到频域信道估计值序列,该相关公式为:Optionally, the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal are correlated and calculated to obtain the frequency domain channel estimation value sequence: The data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal are conjugated multiplied to obtain the frequency domain channel estimation value sequence. The correlation formula is:

H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),

其中,H_cch_dmrs(l,rx,m)为频域信道估计值序列,R_cch_dmrs(l,rx,m)为所接收的频域数据,local(l,m)为UE本地PDCCH解调参考信号序列,l为符号,rx为接收天线参量,m为物理资源块参量。Among them, H_cch_dmrs(l,rx,m) is the frequency domain channel estimation value sequence, R_cch_dmrs(l,rx,m) is the received frequency domain data, local(l,m) is the UE local PDCCH demodulation reference signal sequence, l is a symbol, rx is a receiving antenna parameter, and m is a physical resource block parameter.

可选的,与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的周期为10、20、40或者80毫秒。Optionally, the period of the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC is 10, 20, 40 or 80 milliseconds.

可选的,与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号为SSB或者CSI-RS。Optionally, the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC is SSB or CSI-RS.

本发明实施例还提供一种NR系统中基于PDCCH估计定时偏差的装置,该装置包括:接收模块,适于接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;计算模块,适于将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;变换模块,适于将频域信道估计值序列变换为时域信道估计值序列;选择模块,适于在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;确定模块,适于将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的定时偏差。An embodiment of the present invention further provides an apparatus for estimating timing offset based on PDCCH in an NR system, the apparatus includes: a receiving module adapted to receive frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation signal A modulation reference signal; a calculation module, adapted to perform correlation calculation between the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence; a transformation module, suitable for Transform the frequency domain channel estimation value sequence into the time domain channel estimation value sequence; the selection module is suitable for selecting the main path with the maximum received power of each receiving antenna at the UE in the time domain channel estimation value sequence, and the number of occurrences in the main path is calculated. The most position is determined as the final main path position; the determining module is adapted to determine the difference obtained by comparing the final main path position with the target timing saved at the UE as the timing deviation of the PDCCH.

可选的,该装置包括调整模块,调整模块适于基于PDCCH的定时偏差调整UE的定时。Optionally, the apparatus includes an adjustment module adapted to adjust the timing of the UE based on the timing offset of the PDCCH.

本发明实施例还提供另一种NR系统中基于PDCCH估计定时偏差的装置,该另一种装置包括:第一模块,第一模块包括第一接收子模块、计算子模块、变换子模块、选择子模块和确定子模块,第一接收子模块适于接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号,计算子模块适于将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列,变换子模块适于将频域信道估计值序列变换为时域信道估计值序列,选择子模块适于在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置,确定子模块适于将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的第一定时偏差;第二模块,第二模块包括第二接收子模块和获得子模块,第二接收子模块适于接收与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号,获得子模块适于基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号而获得PDCCH的第二定时偏差;第三模块,适于根据如下二者之一设置PDCCH的定时偏差,二者中的一者为:如果第一定时偏差的获得时刻不迟于第二定时偏差的获得时刻,则将第一定时偏差设置为PDCCH的定时偏差,否则将第二定时偏差设置为PDCCH的定时偏差;二者中的另一者为:根据PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率的比值设置第一定时偏差的权重和第二定时偏差的权重,对第一定时偏差和第二定时偏差进行加权求和而得到PDCCH的定时偏差。An embodiment of the present invention further provides another apparatus for estimating timing offset based on PDCCH in an NR system, the other apparatus includes: a first module, where the first module includes a first receiving sub-module, a calculating sub-module, a transforming sub-module, a selection sub-module, a Submodule and determination submodule, the first receiving submodule is adapted to receive frequency domain data of the PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal, and the calculation submodule is adapted to receive the received frequency domain data. The domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal are correlated to obtain the frequency domain channel estimation value sequence, and the transform sub-module is suitable for transforming the frequency domain channel estimation value sequence into the time domain channel estimation value. Sequence, the selection sub-module is suitable for selecting the main path with the maximum received power of each receiving antenna at the UE in the time-domain channel estimation value sequence, and determining the position with the most occurrences in the main path as the final main path position, and determining the sub-module suitable for the main path. The difference obtained by comparing the final primary path position with the target timing saved at the UE is determined as the first timing deviation of the PDCCH; the second module, the second module includes a second receiving submodule and an obtaining submodule, the second receiving The sub-module is adapted to receive a reference signal with PDCCH QCL-TYPEA or QCL-TYPEC, and the obtaining sub-module is adapted to obtain the second timing offset of the PDCCH based on the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC; the third module, adapted to The timing offset of the PDCCH is set according to one of the following two: if the acquisition moment of the first timing offset is not later than the acquisition moment of the second timing offset, then the first timing offset is set as the PDCCH timing offset. Timing deviation, otherwise the second timing deviation is set as the timing deviation of PDCCH; the other of the two is: according to the sampling frequency of the PDCCH demodulation reference signal and the sampling frequency of the reference signal of PDCCH QCL-TYPEA or QCL-TYPEC The ratio of , sets the weight of the first timing offset and the weight of the second timing offset, and performs weighted summation on the first timing offset and the second timing offset to obtain the timing offset of the PDCCH.

可选的,该另一种装置包括第四模块,第四模块适于基于PDCCH的定时偏差调整UE的定时。Optionally, the another apparatus includes a fourth module, and the fourth module is adapted to adjust the timing of the UE based on the timing offset of the PDCCH.

本发明实施例还公开了一种存储介质,其上存储有计算机指令,该计算机指令运行时执行所述一种NR系统中基于PDCCH估计定时偏差方法的步骤。The embodiment of the present invention also discloses a storage medium, on which computer instructions are stored, the computer instructions execute the steps of the method for estimating timing offset based on PDCCH in an NR system when the computer instructions are running.

本发明实施例还公开了另一种存储介质,其上存储有计算机指令,该计算机指令运行时执行所述另一种NR系统中基于PDCCH估计定时偏差方法的步骤。The embodiment of the present invention also discloses another storage medium on which computer instructions are stored, and when the computer instructions run, the steps of the method for estimating timing offset based on PDCCH in the another NR system are executed.

本发明实施例还公开了一种用户设备,包括存储器和处理器,存储器上存储有可在处理器上运行的计算机指令,处理器运行计算机指令时执行所述一种NR系统中基于PDCCH估计定时偏差方法的步骤。An embodiment of the present invention also discloses a user equipment, including a memory and a processor, the memory stores computer instructions that can be run on the processor, and when the processor runs the computer instructions, the processor executes the PDCCH-based estimation timing in the NR system The steps of the bias method.

本发明实施例还公开了另一种用户设备,包括存储器和处理器,存储器上存储有可在处理器上运行的计算机指令,处理器运行计算机指令时执行所述另一种NR系统中基于PDCCH估计定时偏差方法的步骤。The embodiment of the present invention also discloses another user equipment, including a memory and a processor, the memory stores computer instructions that can be run on the processor, and when the processor runs the computer instructions, the processor executes the PDCCH-based PDCCH in the other NR system. Steps of the estimation timing offset method.

与现有技术相比,本发明实施例的技术方案具有以下有益效果:Compared with the prior art, the technical solutions of the embodiments of the present invention have the following beneficial effects:

相比较于与PDCCH QCL-typeA或者QCL-typeC的参考信号的可能较长周期,当PDCCH解调参考信号(De-Modulate Reference Signal,简称为DM-RS)配置为宽带解调参考信号(wideband DM-RS)时,由于该参考信号的周期短,能有效适应变化较快的信道。Compared with the possibly longer period of the reference signal of PDCCH QCL-typeA or QCL-typeC, when the PDCCH demodulation reference signal (De-Modulate Reference Signal, referred to as DM-RS) is configured as a wideband demodulation reference signal (wideband DM -RS), since the period of the reference signal is short, it can effectively adapt to the channel that changes rapidly.

并且,相比较于与PDCCH QCL-typeA或者QCL-typeC的参考信号所配置的、可能较少的RS数目(则样本就少,从而影响到定时估计结果的准确度),当PDCCH DM-RS配置为wideband DM-RS时,PDCCH DM-RS的RS数目会大于参考信号所配置的RS数目,从而能更准确地估计出定时偏差。Moreover, compared with the possibly smaller number of RSs configured with the reference signal of PDCCH QCL-typeA or QCL-typeC (there are fewer samples, thus affecting the accuracy of the timing estimation result), when the PDCCH DM-RS is configured When it is a wideband DM-RS, the number of RSs in the PDCCH DM-RS will be greater than the number of RSs configured in the reference signal, so that the timing offset can be estimated more accurately.

附图说明Description of drawings

图1是本发明实施例一种NR系统中基于PDCCH估计定时偏差方法的流程图;1 is a flowchart of a method for estimating timing offset based on PDCCH in an NR system according to an embodiment of the present invention;

图2是本发明实施例另一种NR系统中基于PDCCH估计定时偏差方法的流程图;2 is a flowchart of a method for estimating timing offset based on PDCCH in another NR system according to an embodiment of the present invention;

图3是本发明实施例一种NR系统中基于PDCCH估计定时偏差装置的结构示意图。FIG. 3 is a schematic structural diagram of an apparatus for estimating timing offset based on PDCCH in an NR system according to an embodiment of the present invention.

图4是本发明实施例另一种NR系统中基于PDCCH估计定时偏差装置的结构示意图。FIG. 4 is a schematic structural diagram of an apparatus for estimating timing offset based on PDCCH in another NR system according to an embodiment of the present invention.

具体实施方式Detailed ways

现有技术利用与PDCCH QCL-typeA或者QCL-typeC的参考信号来对PDCCH进行定时调整,这些参考信号比如为信道状态信息参考信号(Channel State InformationReference Signal,简称为CSI-RS)(其配置了trs-Info或者没有配置trs-Info)、同步信号块(Synchronization signal block,简称为SSB)。但是,一方面,如果这些参考信号的周期较长,会导致在存在快变信道时,参考信号的定时不能够及时地跟上这些快变信道的变化;另一方面,这些参考信号在频域上占用的RS数目较少时,也会导致定时估计的准确度较差。The prior art utilizes the reference signal of PDCCH QCL-typeA or QCL-typeC to adjust the timing of the PDCCH, such as a channel state information reference signal (Channel State Information Reference Signal, referred to as CSI-RS) (which is configured with trs). -Info or not configured with trs-Info), synchronization signal block (Synchronization signal block, SSB for short). However, on the one hand, if the period of these reference signals is long, when there are fast-changing channels, the timing of the reference signals cannot keep up with the changes of these fast-changing channels in time; on the other hand, these reference signals are in the frequency domain. When the number of RSs occupied on the network is small, the accuracy of timing estimation is also poor.

例如,用于追踪的CSI-RS(CSI-RS for tracking)的周期可以配置为10、20、40、80毫秒(请参见3GPP协议TS 38.214的第5.1.6.1.1节),当该周期配置为较大周期(如40或80毫秒)时,在信道变化较快(比如变化的周期小于40或80毫秒)的情形下,会导致使用CSI-RS所估计的定时信息不及时;并且,如果用于追踪的CSI-RS配置了较少的RS数目,那么其采样的样本就会较少,从而会影响到定时偏差估计的准确度。For example, the period of CSI-RS for tracking can be configured as 10, 20, 40, 80 milliseconds (please refer to Section 5.1.6.1.1 of 3GPP protocol TS 38.214), when the period is configured When it is a large period (such as 40 or 80 milliseconds), in the case where the channel changes rapidly (for example, the period of change is less than 40 or 80 milliseconds), the timing information estimated by using CSI-RS will be untimely; and, if If the CSI-RS used for tracking is configured with a smaller number of RSs, the samples will be sampled less, which will affect the accuracy of timing offset estimation.

相对照地,本发明的技术方案中,当PDCCH DM-RS配置为wideband DM-RS(即,将PDCCH的控制资源集(Control Resource Set,简称为CORESET)的参数precoderGranularity设置为allContiguousRBs)时,一方面,该信号周期短,甚至每个下行时隙都会下发,使得能够调度更密集的PDCCH DM-RS来估计定时信息,从而能够更加及时地估计定时偏差,另一方面,PDCCH DM-RS的RS数目大于上述参考信号(如CSI-RS)的RS数目,其采样的样本也较高,从而提高了定时偏差估计的准确度。本发明的技术方案能够更及时并且更准确地估计定时偏差,从而能够更快速和更精确地纠正定时偏差,进而能够有效地提高后续各种下行信道的接收性能,后续的下行信道比如为物理下行共享信道(PhysicalDownlink Shared Channel,简称为PDSCH)、PDCCH等。In contrast, in the technical solution of the present invention, when the PDCCH DM-RS is configured as a wideband DM-RS (that is, the parameter precoderGranularity of the Control Resource Set (CORESET) of the PDCCH is set to allContiguousRBs), a On the one hand, the signal period is short, and even every downlink time slot is issued, so that more dense PDCCH DM-RS can be scheduled to estimate timing information, so that the timing deviation can be estimated in a more timely manner. The number of RSs is greater than the number of RSs of the above-mentioned reference signal (eg, CSI-RS), and the samples sampled are also higher, thereby improving the accuracy of timing offset estimation. The technical solution of the present invention can estimate the timing deviation in a more timely and accurate manner, so that the timing deviation can be corrected more quickly and accurately, thereby effectively improving the reception performance of various subsequent downlink channels, such as physical downlink channels. Shared Channel (PhysicalDownlink Shared Channel, PDSCH for short), PDCCH, etc.

本发明的技术方案实施于UE处,UE所接收的PDCCH DM-RS配置信息使用高层信令(例如,无线资源控制(Radio Resource Control,简称为RRC)信令)来设置。The technical solution of the present invention is implemented at the UE, and the PDCCH DM-RS configuration information received by the UE is set using high-layer signaling (eg, Radio Resource Control (RRC) signaling).

为使本发明的上述目的、特征和优点能够更为明显易懂,下面结合附图对本发明的具体实施例做详细的说明。In order to make the above objects, features and advantages of the present invention more clearly understood, the specific embodiments of the present invention will be described in detail below with reference to the accompanying drawings.

图1是本发明实施例一种NR系统中基于PDCCH估计定时偏差方法100的流程图,包括以下步骤:1 is a flowchart of a method 100 for estimating timing offset based on PDCCH in an NR system according to an embodiment of the present invention, including the following steps:

步骤S110:接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;Step S110: Receive frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal;

步骤S120:将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;Step S120: Perform correlation calculation between the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence;

步骤S130:将频域信道估计值序列变换为时域信道估计值序列;Step S130: Transform the frequency-domain channel estimation value sequence into a time-domain channel estimation value sequence;

步骤S140:在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;Step S140: Select the main path with the maximum received power of each receiving antenna at the UE in the time-domain channel estimation value sequence, and determine the position with the most occurrences in the main path as the final main path position;

步骤S150:将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的定时偏差。Step S150: Determine the difference obtained by comparing the final primary path position with the target timing saved at the UE as the timing offset of the PDCCH.

在步骤S110的实施中,UE接收PDCCH DM-RS,该PDCCH DM-RS配置为wideband DM-RS。In the implementation of step S110, the UE receives a PDCCH DM-RS, and the PDCCH DM-RS is configured as a wideband DM-RS.

具体而言,CORESET指示了PDCCH在频域上占用的资源块(Resource Block,简称为RB)数和在时域上占用的符号(Symbol)数,其中,占用的RB数由ControlResourceSetInformation Element(也称为ControlResourceSet IE)中的参数frequencyDomainResources来设置,占用的符号数由ControlResourceSet IE中的参数duration来设置,预编码属性由ControlResourceSet IE中的参数precoderGranularity来设置,该precoderGranularity可以设置为allContiguousRBs或者sameAsREG-bundle,当precoderGranularity设置为allContiguousRBs时,表征了PDCCH DM-RS为wideband DM-RS。ControlResourceSet IE在RRC层由基站经下行链路发送给UE(请参见3GPP协议TS38.211的第7.3.2.2节和TS 38.331的第6.3.2节)。Specifically, CORESET indicates the number of resource blocks (Resource Blocks, referred to as RBs) occupied by the PDCCH in the frequency domain and the number of symbols (Symbols) occupied in the time domain, where the number of occupied RBs is determined by ControlResourceSetInformation Element (also called It is set for the parameter frequencyDomainResources in ControlResourceSet IE). The number of occupied symbols is set by the parameter duration in ControlResourceSet IE. The precoding property is set by the parameter precoderGranularity in ControlResourceSet IE. The precoderGranularity can be set to allContiguousRBs or sameAsREG-bundle. When the precoderGranularity is set to allContiguousRBs, the PDCCH DM-RS is characterized as a wideband DM-RS. The ControlResourceSet IE is sent by the base station to the UE via the downlink at the RRC layer (see section 7.3.2.2 of 3GPP protocol TS38.211 and section 6.3.2 of TS 38.331).

CORESET概念在NR系统中引入,而在LTE系统中不涉及。在NR系统中,参数precoderGranularity用于配置预编码。但是,现有技术没有考虑到参数precoderGranularity用于配置预编码之外的其它应用。具体而言,现有技术没有考虑到参数precoderGranularity设置为allContiguousRBs时PDCCH DM-RS周期短而能够及时估计出定时信息的特性,也没有考虑到参数precoderGranularity设置为allContiguousRBs时PDCCH DM-RS的RS数目大于参考信号(如CSI-RS)的RS数目而能够提高定时偏差估计准确度的特性。The CORESET concept is introduced in the NR system, but not in the LTE system. In NR systems, the parameter precoderGranularity is used to configure precoding. However, the prior art does not consider that the parameter precoderGranularity is used to configure other applications than precoding. Specifically, the prior art does not take into account that when the parameter precoderGranularity is set to allContiguousRBs, the PDCCH DM-RS has a short period and can estimate timing information in time, nor does it take into account that when the parameter precoderGranularity is set to allContiguousRBs, the number of RSs in the PDCCH DM-RS is greater than The number of RSs for reference signals (eg, CSI-RS) can improve the accuracy of timing offset estimation.

在步骤S120的实施中,将UE接收的、PDCCH DM-RS的频域数据和与该PDCCH DM-RS对应的、保存于UE本地的PDCCH DM-RS序列进行相关计算,而得到频域信道估计值序列。In the implementation of step S120, correlation calculation is performed between the frequency domain data of the PDCCH DM-RS received by the UE and the PDCCH DM-RS sequence corresponding to the PDCCH DM-RS and stored locally in the UE to obtain a frequency domain channel estimate sequence of values.

在一个实施例中,通过相关公式将所接收的PDCCH DM-RS频域数据和与PDCCH DM-RS对应的UE本地PDCCH DM-RS序列进行共轭相乘而得到频域信道估计值序列,该相关公式为如下公式(1):In one embodiment, the received PDCCH DM-RS frequency domain data and the UE local PDCCH DM-RS sequence corresponding to the PDCCH DM-RS are conjugated multiplied by a correlation formula to obtain a frequency domain channel estimation value sequence, the The relevant formula is the following formula (1):

H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)) (1)H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)) (1)

其中,H_cch_dmrs(l,rx,m)为频域信道估计值序列,R_cch_dmrs(l,rx,m)为所接收的PDCCH DM-RS频域数据,local(l,m)为UE本地PDCCH DM-RS序列,conj()为共轭函数,l为符号(根据实际配置,l=l_start,或者l=l_start、l_start+1,或者l=l_start、l_start+1、l_start+2,l_start为PDCCH关联的CORESET的起始符号),rx为接收天线参量(rx为0,1,……,Rx_ant-1)(Rx_ant为接收天线数),m为物理资源块参量(m为0,1,2,……,Nprb*3-1,Nprb为PDCCH关联的CORESET所占用的物理资源块(Physical resource block,简称为PRB)个数)。Among them, H_cch_dmrs(l,rx,m) is the frequency domain channel estimation value sequence, R_cch_dmrs(l,rx,m) is the received PDCCH DM-RS frequency domain data, local(l,m) is the UE local PDCCH DM- RS sequence, conj() is the conjugate function, l is the symbol (according to the actual configuration, l=l_start, or l=l_start, l_start+1, or l=l_start, l_start+1, l_start+2, l_start is PDCCH associated The start symbol of CORESET), rx is the receiving antenna parameter (rx is 0, 1, ..., Rx_ant-1) (Rx_ant is the number of receiving antennas), m is the physical resource block parameter (m is 0, 1, 2, ... ..., Nprb*3-1, where Nprb is the number of physical resource blocks (Physical resource blocks, PRBs for short) occupied by the CORESET associated with the PDCCH.

通过该相关公式可以得到L_symb*Rx_ant个频域信道估计值,其中,L_symb为PDCCH中wideband DM-RS的符号个数。Through the correlation formula, L_symb*Rx_ant frequency-domain channel estimation values can be obtained, where L_symb is the number of symbols of the wideband DM-RS in the PDCCH.

在步骤S130的实施中,将频域信道估计值序列变换为时域信道估计值序列。In the implementation of step S130, the frequency-domain channel estimation value sequence is transformed into a time-domain channel estimation value sequence.

在一个实施例中,通过快速傅里叶反变换(Inverse Fast Fourier Transform,简称为IFFT)将频域信道估计值序列变换为时域信道估计值序列,请参见如下公式(2):In one embodiment, the frequency-domain channel estimation value sequence is transformed into a time-domain channel estimation value sequence through an inverse fast Fourier transform (Inverse Fast Fourier Transform, IFFT for short), please refer to the following formula (2):

h_cch_dmrs(l,rx,n)=ifft(H_cch_dmrs,Nfft) (2)h_cch_dmrs(l,rx,n)=ifft(H_cch_dmrs,Nfft) (2)

其中,h_cch_dmrs(l,rx,n)为时域信道估计值序列,H_cch_dmrs(l,rx,m)为频域信道估计值序列,ifft()为IFFT函数,l为符号(根据实际配置,l=l_start,或者l=l_start、l_start+1,或者l=l_start、l_start+1、l_start+2,l_start为PDCCH关联的CORESET的起始符号),rx为接收天线参量(rx为0,1,……,Rx_ant-1),n为PDCCH DM-RS所占用的资源元素(Resource Element,简称为RE)数目,具体数目取决于基站的配置,Nfft为log2(3*Nprb)向上取整的值。Among them, h_cch_dmrs(l,rx,n) is the time domain channel estimation value sequence, H_cch_dmrs(l,rx,m) is the frequency domain channel estimation value sequence, ifft() is the IFFT function, l is the symbol (according to the actual configuration, l =l_start, or l=l_start, l_start+1, or l=l_start, l_start+1, l_start+2, l_start is the start symbol of the CORESET associated with the PDCCH), rx is the receiving antenna parameter (rx is 0, 1, ... ..., Rx_ant-1), n is the number of resource elements (Resource Element, RE for short) occupied by the PDCCH DM-RS, the specific number depends on the configuration of the base station, Nfft is the value of log2(3*Nprb) rounded up.

在步骤S140的实施中,基于公式(2)所计算出的时域信道估计值序列确定最终主径位置。In the implementation of step S140, the final dominant path position is determined based on the time-domain channel estimation value sequence calculated by formula (2).

具体而言,公式(2)所计算出的时域信道估计值序列涉及UE处Rx_ant个接收天线,每个接收天线分别接收多径信号,通过设置每个接收天线各自的多径窗来确定每个接收天线各自有效的多径信号,并且将每个接收天线在其对应的多径窗中所接收的功率最大位置确定为该接收天线的主径。比较所有接收天线的主径,将这些主径中出现次数最多的位置确定为最终主径位置。Specifically, the time-domain channel estimation value sequence calculated by formula (2) involves Rx_ant receiving antennas at the UE, each receiving antenna receives multipath signals respectively, and each receiving antenna is determined by setting its own multipath window. The respective effective multipath signals of each receiving antenna, and the position of the maximum power received by each receiving antenna in its corresponding multipath window is determined as the main path of the receiving antenna. Compare the main diameters of all receiving antennas, and determine the position with the most occurrences among these main diameters as the final main diameter position.

更具体而言,公式(2)所计算出的时域信道估计值序列具有噪声,需要进行去噪声处理。多径窗将窗外的信号作为噪声径而置为零,将窗内的信号作为有效信号;多径窗为与IFFT点数有关的数值范围,其中,数值为i表示时域信道估计值序列的第i个值。可以根据多径时延扩展来确定需要多少个时域信道估计的样点来涵盖该时延扩展,即,多径窗可以动态调整以涵盖多径时延扩展。More specifically, the time-domain channel estimation value sequence calculated by formula (2) has noise and needs to be de-noised. The multipath window takes the signal outside the window as a noise path and sets it to zero, and takes the signal inside the window as an effective signal; the multipath window is a numerical range related to the number of IFFT points, where the value i represents the first channel estimation value sequence in the time domain. i values. How many samples of the time-domain channel estimate are needed to cover the delay spread can be determined from the multipath delay spread, ie, the multipath window can be dynamically adjusted to cover the multipath delay spread.

例如,子载波间隔为30Khz,采样频率为122.88Mhz,IFFT点数为256,在IFFT处理后时域信道估计值序列的时间分辨率为4/122.88μs。如果期望把主径调到1的位置,当接收的定时信号没有偏差时,主径会落在IFFT点数为1的位置,如果提前i个样点接收定时信号(表示定时向前偏移i*4/122.88μs),则主径会落在i+1的位置,如果滞后i个样点接收定时信号(表示定时向后偏移i*4/122.88μs),则主径会落在257-i的位置(IFFT具有循环移位特征);把主径调到其它期望位置的计算类似于上述期望把主径调到1的位置的计算。在一个实施例中,IFFT点数为256,多径窗的长度设置为64个点,多径窗的数值范围可以设置在1与32之间和225与256之间。For example, the subcarrier spacing is 30Khz, the sampling frequency is 122.88Mhz, the number of IFFT points is 256, and the time resolution of the time-domain channel estimation value sequence after IFFT processing is 4/122.88μs. If it is desired to adjust the main path to the position of 1, when the received timing signal has no deviation, the main path will fall at the position where the number of IFFT points is 1. If the timing signal is received i samples ahead (indicating that the timing is shifted forward by i* 4/122.88μs), the main diameter will fall at the position of i+1, if the timing signal is received with a lag of i samples (indicating that the timing is shifted backward by i*4/122.88μs), the main diameter will fall at 257- The position of i (IFFT has a cyclic shift feature); the calculation to adjust the major diameter to other desired positions is similar to the calculation described above for the position where the major diameter is expected to be adjusted to 1. In one embodiment, the number of IFFT points is 256, the length of the multipath window is set to 64 points, and the numerical range of the multipath window can be set between 1 and 32 and between 225 and 256.

关于确定最终主径位置,请参见如下公式(3):For determining the final major diameter position, please refer to the following formula (3):

Pos=PathSelect(Pos_h_pss) (3)Pos=PathSelect(Pos_h_pss) (3)

其中,Pos为最终主径位置,Pos_h_pss为各接收天线的主径,PathSelect为最终主径位置选择函数。Among them, Pos is the final main path position, Pos_h_pss is the main path of each receiving antenna, and PathSelect is the final main path position selection function.

本发明的技术方案不适用于将ControlResourceSet IE中的参数precoderGranularity设置为sameAsREG-bundle的情形。具体而言,在该情形下,由于预编码基于REG-bundle,则不同的REG-bundle可能存在不同的相位差,这会导致变换到时域后各接收天线所接收的最大功率(也称为该接收天线的主径功率)不明显,从而无法分辨出该接收天线的主径,进而无法计算出最终主径位置。因此,将ControlResourceSet IE中的参数precoderGranularity设置为sameAsREG-bundle的情形不能用于计算定时偏差。The technical solution of the present invention is not applicable to the situation where the parameter precoderGranularity in the ControlResourceSet IE is set to the sameAsREG-bundle. Specifically, in this case, since the precoding is based on REG-bundles, different REG-bundles may have different phase differences, which will lead to the maximum power received by each receiving antenna after transformation to the time domain (also referred to as The main diameter power of the receiving antenna is not obvious, so the main diameter of the receiving antenna cannot be distinguished, and the final main diameter position cannot be calculated. Therefore, setting the parameter precoderGranularity in ControlResourceSet IE to sameAsREG-bundle cannot be used to calculate timing offset.

在步骤S150的实施中,将公式(3)计算出的最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的定时偏差,请参见如下公式(4):In the implementation of step S150, the difference obtained by comparing the final primary path position calculated by the formula (3) with the target timing saved at the UE is determined as the timing deviation of the PDCCH, please refer to the following formula (4):

△t=Pos–Pos_target (4)△t=Pos–Pos_target (4)

其中,△t为定时偏差,Pos为最终主径位置,Pos_target为目标定时。Among them, Δt is the timing deviation, Pos is the final main diameter position, and Pos_target is the target timing.

在一个具体实施例中,基于所确定的定时偏差调整UE的定时。由此在UE处能够更快速和更精确地纠正定时偏差,进而有效地提高了后续各种下行信道的接收性能。In a specific embodiment, the timing of the UE is adjusted based on the determined timing offset. As a result, the timing deviation can be corrected more quickly and accurately at the UE, thereby effectively improving the reception performance of various subsequent downlink channels.

在本发明基于PDCCH中wideband DM-RS来确定定时偏差的一些技术方案中,PDCCH所在的时隙中不存在与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号。这可以在实施这些技术方案之前通过前置的条件判断来实现,该前置的条件判断包括判断是否为PDCCH所在的时隙和判断是否存在与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号(该参考信号比如为SSB或者CSI-RS)。通过结合该前置的条件判断来确定定时偏差,一方面可以在无法利用与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号来估计定时偏差的情形下,可以通过本发明基于PDCCH中wideband DM-RS的技术方案来确定定时偏差,另一方面可以在利用与PDCCHQCL-TYPEA或者QCL-TYPEC的参考信号来估计定时偏差的情形下,避免使用基于PDCCH的wideband DM-RS的技术方案,从而简化了估计定时偏差方案的设计和实施。In some technical solutions of the present invention for determining the timing offset based on the wideband DM-RS in the PDCCH, there is no reference signal with the PDCCH QCL-TYPEA or QCL-TYPEC in the time slot where the PDCCH is located. This can be achieved by judging preconditions before implementing these technical solutions. The precondition judgments include judging whether it is the time slot where the PDCCH is located and judging whether there is a reference signal with the PDCCH QCL-TYPEA or QCL-TYPEC (the The reference signal is, for example, SSB or CSI-RS). The timing offset is determined by combining the precondition judgment. On the one hand, in the case where the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC cannot be used to estimate the timing offset, the present invention can be based on the wideband DM-RS in the PDCCH. On the other hand, when the reference signal with PDCCH QCL-TYPEA or QCL-TYPEC is used to estimate the timing offset, the technical solution of using PDCCH-based wideband DM-RS can be avoided, thereby simplifying the estimation Design and implementation of timing offset schemes.

在本发明基于PDCCH中wideband DM-RS来确定定时偏差的另一些技术方案中,PDCCH所在的时隙中可以存在与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号,但是这些参考信号的周期较长(在具体的场景中,该较长的周期比如为20毫秒、40毫秒或者80毫秒)。这可以在实施这些技术方案之前通过前置的条件判断来实现,该前置的条件判断包括判断是否为PDCCH所在的时隙和判断是否存在与PDCCH QCL-TYPEA或者QCL-TYPEC的、周期较长的参考信号(该参考信号比如为SSB或者CSI-RS)。在即使可以利用与PDCCH QCL-TYPEA或者QCL-TYPEC的、周期较长的参考信号来估计定时偏差的情形下,考虑到周期较长的参考信号可能不能够及时地估计出特定场景下变化较快信道(如PDCCH)的定时偏差,而主动选择PDCCH中wideband DM-RS来更加及时地估计定时偏差。In other technical solutions of the present invention for determining the timing offset based on the wideband DM-RS in the PDCCH, the time slot where the PDCCH is located may have reference signals with the PDCCH QCL-TYPEA or QCL-TYPEC, but the period of these reference signals is relatively long (In a specific scenario, the longer period is, for example, 20 milliseconds, 40 milliseconds or 80 milliseconds). This can be achieved by judging the preconditions before implementing these technical solutions. The precondition judgments include judging whether it is the time slot where the PDCCH is located and judging whether there is a long period that is related to the PDCCH QCL-TYPEA or QCL-TYPEC. the reference signal (for example, the reference signal is SSB or CSI-RS). In the case where the timing offset can be estimated by using the reference signal with a longer period of the PDCCH QCL-TYPEA or QCL-TYPEC, considering that the reference signal with a longer period may not be able to estimate the fast change in a specific scenario in time The timing offset of the channel (such as PDCCH), and the wideband DM-RS in the PDCCH is actively selected to estimate the timing offset more timely.

图2是本发明实施例另一种NR系统中基于PDCCH估计定时偏差方法200的流程图,包括以下步骤:2 is a flowchart of a method 200 for estimating timing offset based on PDCCH in another NR system according to an embodiment of the present invention, including the following steps:

步骤S210:接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;Step S210: Receive frequency domain data of the PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal;

步骤S220:将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;Step S220: Perform correlation calculation between the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence;

步骤S230:将频域信道估计值序列变换为时域信道估计值序列;Step S230: Transform the frequency-domain channel estimation value sequence into a time-domain channel estimation value sequence;

步骤S240:在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;Step S240: Select the main path with the maximum received power of each receiving antenna at the UE in the time-domain channel estimation value sequence, and determine the position with the most occurrences in the main path as the final main path position;

步骤S250:将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的第一定时偏差;Step S250: The difference obtained by comparing the final primary path position with the target timing saved at the UE is determined as the first timing offset of the PDCCH;

步骤S260:接收与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号;Step S260: Receive a reference signal with PDCCH QCL-TYPEA or QCL-TYPEC;

步骤S270:基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号而获得PDCCH的第二定时偏差;Step S270: Obtain the second timing offset of the PDCCH based on the reference signal of the PDCCH QCL-TYPEA or QCL-TYPEC;

步骤S280:根据如下二者之一获得PDCCH的定时偏差,二者中的一者为:如果第一定时偏差的获得时刻不迟于第二定时偏差的获得时刻,则将第一定时偏差设置为PDCCH的定时偏差,否则将第二定时偏差设置为PDCCH的定时偏差;二者中的另一者为:根据PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率的比值设置第一定时偏差的权重和第二定时偏差的权重,对第一定时偏差和第二定时偏差进行加权求和而获得PDCCH的定时偏差。上述步骤包括获得第一定时偏差的第一获得步骤(包括步骤S210、S220、S230、S240和S250)和获得第二定时偏差的第二获得步骤(S260和S270),其中,第一获得步骤可以在第二获得步骤之前、之后或者同时执行。Step S280: Obtain the timing offset of the PDCCH according to one of the following two: if the acquisition moment of the first timing offset is not later than the acquisition moment of the second timing offset, set the first timing offset to The timing deviation of the PDCCH, otherwise the second timing deviation is set as the timing deviation of the PDCCH; the other of the two is: according to the sampling frequency of the PDCCH demodulation reference signal and the reference signal of the PDCCH QCL-TYPEA or QCL-TYPEC. The ratio of the sampling frequency sets the weight of the first timing offset and the weight of the second timing offset, and the first timing offset and the second timing offset are weighted and summed to obtain the timing offset of the PDCCH. The above steps include a first obtaining step (including steps S210, S220, S230, S240 and S250) of obtaining a first timing offset and a second obtaining step (S260 and S270) of obtaining a second timing offset, wherein the first obtaining step may be It is performed before, after or simultaneously with the second obtaining step.

关于步骤S210、S220、S230、S240和S250的更多内容,请分别参考步骤S110、S120、S130、S140和S150的上述描述。For more contents of steps S210 , S220 , S230 , S240 and S250 , please refer to the above descriptions of steps S110 , S120 , S130 , S140 and S150 , respectively.

在步骤S260的实施中,UE接收与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号。In the implementation of step S260, the UE receives a reference signal with PDCCH QCL-TYPEA or QCL-TYPEC.

具体而言,UE通过下行链路接收下行链路控制信息(Downlink ControlInformation,简称为DCI),DCI包括QCL指示信息,该QCL指示信息指示一个天线端口接收到的信号的大尺度属性(如定时偏差)与从其它的天线端口接收到的信号的整体上或者部分地相同。其中,QCL-TypeA和QCL-TypeC中含有定时信息。Specifically, the UE receives downlink control information (Downlink Control Information, referred to as DCI for short) through the downlink, and the DCI includes QCL indication information, the QCL indication information indicates the large-scale attributes (such as timing offset) of the signal received by one antenna port. ) are the same in whole or in part as the signals received from other antenna ports. Among them, QCL-TypeA and QCL-TypeC contain timing information.

在步骤S270的实施中,UE基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号而获得PDCCH的第二定时偏差。In the implementation of step S270, the UE obtains the second timing offset of the PDCCH based on the reference signal of the PDCCH QCL-TYPEA or QCL-TYPEC.

具体而言,当PDCCH和某参考信号(该参考信号比如为CSI-RS、SSB等,如前文所述)配置为QCL-TypeA或者QCL-TypeC时,则使用该参考信号所估计出的定时偏差也适用于PDCCH。Specifically, when the PDCCH and a certain reference signal (such as CSI-RS, SSB, etc., as described above) are configured as QCL-TypeA or QCL-TypeC, the timing offset estimated by the reference signal is used. Also applies to PDCCH.

在步骤S280的实施中,可以采取两种方式中的一种来获得PDCCH的定时偏差。In the implementation of step S280, one of two ways may be adopted to obtain the timing offset of the PDCCH.

一种方式为:如果第一定时偏差的获得时刻不迟于第二定时偏差的获得时刻,则将第一定时偏差设置为PDCCH的定时偏差,否则将第二定时偏差设置为PDCCH的定时偏差。具体而言,本发明的一些方面考虑到,在无法及时获得定时偏差时,下行信道的接收性能会受到严重影响。结合该方式的、本发明所提供的相应技术方案一方面同时采用两种定时偏差的估计手段(即基于PDCCH中wideband DM-RS来估计PDCCH定时偏差和基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号来估计PDCCH定时偏差);另一方面将这两种估计手段中在先时刻获得的定时偏差设置为PDCCH的定时偏差,使得所获得的该定时偏差更加及时,从而有效保障了后续下行信道的接收性能。One way is: if the acquisition time of the first timing offset is not later than the acquisition time of the second timing offset, set the first timing offset as the timing offset of the PDCCH; otherwise, set the second timing offset as the timing offset of the PDCCH. In particular, some aspects of the present invention take into account that the reception performance of the downlink channel can be severely affected when the timing offset cannot be obtained in time. In combination with this method, the corresponding technical solution provided by the present invention simultaneously adopts two timing offset estimation methods (that is, estimating the PDCCH timing offset based on the wideband DM-RS in the PDCCH and estimating the PDCCH timing offset based on the PDCCH QCL-TYPEA or QCL-TYPEC). On the other hand, the timing deviation obtained at the previous time in these two estimation methods is set as the timing deviation of the PDCCH, so that the obtained timing deviation is more timely, thus effectively guaranteeing the subsequent downlink channel. reception performance.

另一种方式为:根据PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率的比值设置第一定时偏差的权重和第二定时偏差的权重,对第一定时偏差和第二定时偏差进行加权求和而获得PDCCH的定时偏差。具体而言,将PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率进行比较而获得二者的比值(比如,该比值为1:3,则可以将第一定时偏差的权重设为1/4、第二定时偏差的权重设为3/4),接着将第一定时偏差和第二定时偏差分别乘以各自的权重再求和(即加权求和)而计算出PDCCH的定时偏差。结合该方式的、本发明所提供的相应技术方案一方面同时采用两种定时偏差的估计手段(即基于PDCCH中wideband DM-RS来估计PDCCH定时偏差和基于与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号来估计PDCCH定时偏差);另一方面将这两种估计手段所估计出的第一定时偏差和第二定时偏差加权求和而得到PDCCH的定时偏差,使得所获得的该定时偏差更加准确,从而有效保障了后续下行信道的接收性能。Another way is to set the weight of the first timing offset and the weight of the second timing offset according to the ratio of the sampling frequency of the PDCCH demodulation reference signal and the sampling frequency of the PDCCH QCL-TYPEA or QCL-TYPEC reference signal. The timing offset of the PDCCH is obtained by performing weighted summation of the certain timing offset and the second timing offset. Specifically, compare the sampling frequency of the PDCCH demodulation reference signal with the sampling frequency of the PDCCH QCL-TYPEA or QCL-TYPEC reference signal to obtain the ratio (for example, if the ratio is 1:3, then the ratio can be The weight of the first timing offset is set to 1/4, and the weight of the second timing offset is set to 3/4), and then the first timing offset and the second timing offset are multiplied by their respective weights and then summed (that is, the weighted summation ) to calculate the timing offset of the PDCCH. In combination with this method, the corresponding technical solution provided by the present invention simultaneously adopts two timing offset estimation methods (that is, estimating the PDCCH timing offset based on the wideband DM-RS in the PDCCH and estimating the PDCCH timing offset based on the PDCCH QCL-TYPEA or QCL-TYPEC). On the other hand, the first timing offset and the second timing offset estimated by these two estimation methods are weighted and summed to obtain the timing offset of the PDCCH, so that the obtained timing offset is more accurate , thereby effectively guaranteeing the reception performance of the subsequent downlink channel.

图3是本发明实施例一种NR系统中基于PDCCH估计定时偏差装置300的结构示意图。FIG. 3 is a schematic structural diagram of an apparatus 300 for estimating timing offset based on PDCCH in an NR system according to an embodiment of the present invention.

该一种装置300包括接收模块310、计算模块320、变换模块330、选择模块340和确定模块350。The apparatus 300 includes a receiving module 310 , a calculating module 320 , a transforming module 330 , a selecting module 340 and a determining module 350 .

具体而言,接收模块310适于接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;计算模块320适于将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;变换模块330适于将频域信道估计值序列变换为时域信道估计值序列;选择模块340,适于在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;确定模块350,适于将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的定时偏差。Specifically, the receiving module 310 is adapted to receive frequency domain data of the PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal; the calculation module 320 is adapted to combine the received frequency domain data with the PDCCH The UE local PDCCH demodulation reference signal sequence corresponding to the demodulation reference signal performs correlation calculation to obtain a frequency domain channel estimation value sequence; the transform module 330 is adapted to transform the frequency domain channel estimation value sequence into a time domain channel estimation value sequence; selection module 340 , which is suitable for selecting the main path with the maximum received power of each receiving antenna at the UE in the time-domain channel estimation value sequence, and determining the position with the most occurrences in the main path as the final main path position; the determining module 350 is suitable for determining the final main path position. The difference obtained by comparing the position of the primary path with the target timing stored at the UE is determined as the timing offset of the PDCCH.

在一个具体实施例中,该一种装置300包括调整模块,该调整模块适于基于PDCCH的定时偏差调整UE的定时。In a specific embodiment, the apparatus 300 includes an adjustment module adapted to adjust the timing of the UE based on the timing offset of the PDCCH.

关于一种NR系统中基于PDCCH估计定时偏差装置300的工作原理、工作方式的更多内容,可以参照上述关于一种NR系统中基于PDCCH估计定时偏差方法100的相关描述,这里不再赘述。For more details on the working principle and working mode of the apparatus 300 for estimating timing offset based on PDCCH in an NR system, reference may be made to the above-mentioned description of the method 100 for estimating timing offset based on PDCCH in an NR system, which will not be repeated here.

图4是本发明实施例另一种NR系统中基于PDCCH估计定时偏差装置400的结构示意图。FIG. 4 is a schematic structural diagram of an apparatus 400 for estimating timing offset based on PDCCH in another NR system according to an embodiment of the present invention.

该另一种装置包括第一模块410、第二模块420和第三模块430。The other apparatus includes a first module 410 , a second module 420 and a third module 430 .

具体而言,第一模块410包括第一接收子模块411、计算子模块412、变换子模块413、选择子模块414和确定子模块415,第一接收子模块411适于接收PDCCH解调参考信号的频域数据,其中,PDCCH解调参考信号配置为宽带解调参考信号;计算子模块412适于将所接收的频域数据和与PDCCH解调参考信号对应的UE本地PDCCH解调参考信号序列进行相关计算而得到频域信道估计值序列;变换子模块413适于将频域信道估计值序列变换为时域信道估计值序列;选择子模块414适于在时域信道估计值序列中选择UE处每个接收天线各自接收功率最大的主径,将主径中出现次数最多的位置确定为最终主径位置;确定子模块415适于将最终主径位置与UE处保存的目标定时进行比较而获得的差值确定为PDCCH的第一定时偏差。第二模块420包括第二接收子模块421和获得子模块422,第二接收子模块421适于接收与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号;获得子模块422适于基于与PDCCHQCL-TYPEA或者QCL-TYPEC的参考信号而获得PDCCH的第二定时偏差。第三模块430适于根据如下二者之一设置PDCCH的定时偏差,二者中的一者为:如果第一定时偏差的获得时刻不迟于第二定时偏差的获得时刻,则将第一定时偏差设置为PDCCH的定时偏差,否则将第二定时偏差设置为PDCCH的定时偏差;二者中的另一者为:根据PDCCH解调参考信号的采样频率和与PDCCH QCL-TYPEA或者QCL-TYPEC的参考信号的采样频率的比值设置第一定时偏差的权重和第二定时偏差的权重,对第一定时偏差和第二定时偏差进行加权求和而得到PDCCH的定时偏差。Specifically, the first module 410 includes a first receiving sub-module 411, a computing sub-module 412, a transforming sub-module 413, a selection sub-module 414 and a determining sub-module 415, and the first receiving sub-module 411 is adapted to receive the PDCCH demodulation reference signal The frequency domain data of , wherein the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal; the calculation sub-module 412 is adapted to combine the received frequency domain data and the UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal Perform correlation calculation to obtain a sequence of channel estimation values in the frequency domain; the transform submodule 413 is adapted to transform the sequence of channel estimation values in the frequency domain into a sequence of channel estimation values in the time domain; the selection submodule 414 is adapted to select UEs in the sequence of channel estimation values in the time domain The main path with the maximum received power of each receiving antenna at the location, and the position with the most occurrences in the main path is determined as the final main path position; the determination sub-module 415 is adapted to compare the final main path position with the target timing saved at the UE to determine The obtained difference is determined as the first timing offset of the PDCCH. The second module 420 includes a second receiving sub-module 421 and an obtaining sub-module 422. The second receiving sub-module 421 is adapted to receive a reference signal with PDCCH QCL-TYPEA or QCL-TYPEC; the obtaining sub-module 422 is adapted to Or the second timing offset of the PDCCH is obtained from the reference signal of QCL-TYPEC. The third module 430 is adapted to set the timing offset of the PDCCH according to one of the following two: if the acquisition moment of the first timing offset is not later than the acquisition moment of the second timing offset, then the first timing offset The deviation is set to the timing deviation of the PDCCH, otherwise the second timing deviation is set to the timing deviation of the PDCCH; the other of the two is: according to the sampling frequency of the PDCCH demodulation reference signal and the PDCCH QCL-TYPEA or QCL-TYPEC The ratio of the sampling frequency of the reference signal sets the weight of the first timing offset and the weight of the second timing offset, and the first timing offset and the second timing offset are weighted and summed to obtain the timing offset of the PDCCH.

在一个具体实施例中,该另一种装置400包括第四模块,该第四模块适于基于PDCCH的定时偏差调整UE的定时。In a specific embodiment, the further apparatus 400 includes a fourth module adapted to adjust the timing of the UE based on the timing offset of the PDCCH.

关于另一种NR系统中基于PDCCH估计定时偏差装置400的工作原理、工作方式的更多内容,可以参照上述关于另一种NR系统中基于PDCCH估计定时偏差方法200的相关描述,这里不再赘述。For more details on the working principle and working mode of the apparatus 400 for estimating timing offset based on PDCCH in another NR system, you can refer to the above related description about the method 200 for estimating timing offset based on PDCCH in another NR system, and details are not repeated here. .

本发明实施例公开了一种存储介质,其上存储有计算机指令,该计算机指令运行时执行上述一种NR系统中基于PDCCH估计定时偏差方法100的步骤。The embodiment of the present invention discloses a storage medium on which computer instructions are stored, and when the computer instructions run, the steps of the above-mentioned method 100 for estimating timing offset based on PDCCH in an NR system are performed.

本发明实施例公开了另一种存储介质,其上存储有计算机指令,该计算机指令运行时执行上述另一种NR系统中基于PDCCH估计定时偏差方法200的步骤。The embodiment of the present invention discloses another storage medium on which computer instructions are stored, and when the computer instructions run, the steps of the above-mentioned method 200 for estimating timing offset based on PDCCH in another NR system are executed.

存储介质包括只读存储器(Read-Only Memory,简称为ROM)、随机存取存储器(Random Access Memory,简称为RAM)、磁盘或者光盘等。存储介质还包括非挥发性存储器(Non-volatile)或者非瞬态(Non-transitory)存储器等。The storage medium includes a read-only memory (Read-Only Memory, ROM for short), a random access memory (Random Access Memory, RAM for short), a magnetic disk or an optical disk, and the like. The storage medium also includes a non-volatile memory (Non-volatile) or a non-transitory (Non-transitory) memory and the like.

本发明实施例公开了一种用户设备,用户设备包括存储器和处理器,存储器上存储有可在处理器上运行的计算机指令,处理器运行计算机指令时执行上述一种NR系统中基于PDCCH估计定时偏差方法100的步骤。An embodiment of the present invention discloses a user equipment. The user equipment includes a memory and a processor. The memory stores computer instructions that can be run on the processor. When the processor runs the computer instructions, the processor executes the PDCCH-based timing estimation in the above-mentioned NR system. Steps of Deviation Method 100 .

本发明实施例公开了另一种用户设备,用户设备包括存储器和处理器,存储器上存储有可在处理器上运行的计算机指令,处理器运行计算机指令时执行上述另一种NR系统中基于PDCCH估计定时偏差方法200的步骤。The embodiment of the present invention discloses another user equipment. The user equipment includes a memory and a processor. The memory stores computer instructions that can be run on the processor. When the processor runs the computer instructions, it executes the PDCCH-based PDCCH in the above-mentioned other NR system. The steps of estimating timing offset method 200 .

用户设备为应用于NR系统中的终端,该终端包括手机等移动终端设备。The user equipment is a terminal applied in the NR system, and the terminal includes mobile terminal equipment such as a mobile phone.

虽然本发明披露如上,但本发明并非限定于此。任何本领域技术人员,在不脱离本发明的精神和范围内,均可作各种更动与修改,因此本发明的保护范围应当以权利要求所限定的范围为准。Although the present invention is disclosed above, the present invention is not limited thereto. Any person skilled in the art can make various changes and modifications without departing from the spirit and scope of the present invention. Therefore, the protection scope of the present invention should be based on the scope defined by the claims.

Claims (25)

1. A method for estimating a timing offset based on a PDCCH in an NR system, the method comprising:
receiving frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a broadband demodulation reference signal;
performing correlation calculation on the received frequency domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence;
transforming the frequency domain channel estimation value sequence into a time domain channel estimation value sequence;
selecting a main path with the maximum receiving power of each receiving antenna at the UE in the time domain channel estimation value sequence, and determining the position with the maximum occurrence frequency in the main path as the final main path position;
and determining a difference value obtained by comparing the final main path position with a target timing saved at the UE as a timing deviation of the PDCCH.
2. The method of claim 1, wherein timing of the UE is adjusted based on a timing offset of the PDCCH.
3. The method of claim 1, wherein the selecting the main path with the maximum received power for each receiving antenna at the UE in the time domain channel estimation value sequence comprises:
and selecting a main path with maximum receiving power of each receiving antenna through a multipath window of each receiving antenna, wherein the multipath window is a numerical range related to the number of IFFT points.
4. The method according to claim 3, wherein the number of IFFT points is 256, the length of the multipath window is set to 64 points, and the value range is between 1 and 32 and between 225 and 256.
5. The method of claim 1, wherein the PDCCH demodulation reference signal is configured as the wideband demodulation reference signal by setting a CORESET parameter precoding granularity of the PDCCH to alloContiguousSRBs.
6. The method of claim 1, wherein the correlating the received frequency domain data with a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence is:
and performing conjugate multiplication on the received frequency domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal through a correlation formula to obtain a frequency domain channel estimation value sequence, wherein the correlation formula is as follows:
H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),
wherein, H _ cch _ dmrs (l, rx, m) is the frequency domain channel estimation value sequence, R _ cch _ dmrs (l, rx, m) is the received frequency domain data, local (l, m) is the UE local PDCCH demodulation reference signal sequence, l is a symbol, rx is a receiving antenna parameter, and m is a physical resource block parameter.
7. The method of claim 1, wherein the PDCCH does not have a reference signal QCL-TYPEA or QCL-TYPEC from the PDCCH in a time slot in which the PDCCH is located.
8. The method of claim 1, wherein the PDCCH is in a time slot in which a reference signal corresponding to the PDCCH QCL-TYPEA or QCL-TYPEC is present, and wherein the reference signal corresponding to the PDCCH QCL-TYPEA or QCL-TYPEC has a period of 20 ms, 40 ms, or 80 ms.
9. The method of claim 7 or 8, wherein the reference signal to the PDCCH QCL-TYPEA or QCL-TYPEC is SSB or CSI-RS.
10. A method for estimating a timing offset based on a PDCCH in an NR system, the method comprising:
receiving frequency domain data of a PDCCH demodulation reference signal, wherein the PDCCH demodulation reference signal is configured as a broadband demodulation reference signal;
performing correlation calculation on the received frequency domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence;
transforming the frequency domain channel estimation value sequence into a time domain channel estimation value sequence;
selecting a main path with the maximum receiving power of each receiving antenna at the UE in the time domain channel estimation value sequence, and determining the position with the maximum occurrence frequency in the main path as the final main path position;
determining a difference value obtained by comparing the final main path position with a target timing saved at the UE as a first timing deviation of the PDCCH;
receiving a reference signal with the PDCCH QCL-TYPEA or QCL-TYPEC;
obtaining a second timing offset for the PDCCH based on a reference signal to the PDCCH QCL-TYPEA or QCL-TYPEC;
obtaining a timing offset of the PDCCH according to one of: setting the first timing offset as the timing offset of the PDCCH if the obtaining time of the first timing offset is not later than the obtaining time of the second timing offset, otherwise setting the second timing offset as the timing offset of the PDCCH, wherein the other one of the two is as follows: and setting the weight of the first timing deviation and the weight of the second timing deviation according to the ratio of the sampling frequency of the PDCCH demodulation reference signal to the sampling frequency of the reference signal of the PDCCH QCL-TYPEA or QCL-TYPEC, and carrying out weighted summation on the first timing deviation and the second timing deviation to obtain the timing deviation of the PDCCH.
11. The method of claim 10, wherein timing of the UE is adjusted based on a timing offset of the PDCCH.
12. The method of claim 10, wherein the selecting the main path with the maximum received power for each receiving antenna at the UE in the time domain channel estimation value sequence comprises:
and selecting a main path with maximum receiving power of each receiving antenna through a multipath window of each receiving antenna, wherein the multipath window is a numerical range related to the number of IFFT points.
13. The method according to claim 12, wherein the number of IFFT points is 256, the length of the multipath window is set to 64 points, and the value range is between 1 and 32 and between 225 and 256.
14. The method of claim 10, wherein the PDCCH demodulation reference signal is configured as the wideband demodulation reference signal by setting a CORESET parameter precoding granularity of the PDCCH to alloconteguous rbs.
15. The method of claim 10, wherein the correlating the received frequency domain data with a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence is:
and performing conjugate multiplication on the received frequency domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal through a correlation formula to obtain a frequency domain channel estimation value sequence, wherein the correlation formula is as follows:
H_cch_dmrs(l,rx,m)=R_cch_dmrs(l,rx,m)*conj(local(l,m)),
wherein, H _ cch _ dmrs (l, rx, m) is the frequency domain channel estimation value sequence, R _ cch _ dmrs (l, rx, m) is the received frequency domain data, local (l, m) is the UE local PDCCH demodulation reference signal sequence, l is a symbol, rx is a receiving antenna parameter, and m is a physical resource block parameter.
16. The method of claim 10, wherein the reference signal associated with the PDCCH QCL-TYPEA or QCL-TYPEC has a period of 10, 20, 40, or 80 milliseconds.
17. The method of claim 10, wherein the reference signal to the PDCCH QCL-TYPEA or QCL-TYPEC is SSB or CSI-RS.
18. An apparatus for estimating a timing offset based on a PDCCH in an NR system, comprising:
the device comprises a receiving module, a transmitting module and a receiving module, wherein the receiving module is suitable for receiving frequency domain data of a PDCCH demodulation reference signal, and the PDCCH demodulation reference signal is configured to be a broadband demodulation reference signal;
the calculation module is suitable for carrying out correlation calculation on the received frequency domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency domain channel estimation value sequence;
a transformation module adapted to transform the frequency domain channel estimate sequence into a time domain channel estimate sequence;
a selection module, adapted to select a main path with the maximum receiving power of each receiving antenna at the UE in the time domain channel estimation value sequence, and determine a position with the maximum occurrence number in the main path as a final main path position;
a determining module, adapted to determine a difference obtained by comparing the final main path position with a target timing saved at the UE as a timing offset of the PDCCH.
19. The apparatus of claim 18, wherein the apparatus comprises an adjustment module adapted to adjust the timing of the UE based on a timing offset of the PDCCH.
20. An apparatus for estimating a timing offset based on a PDCCH in an NR system, comprising:
a first module, where the first module includes a first receiving submodule adapted to receive frequency-domain data of a PDCCH demodulation reference signal, where the PDCCH demodulation reference signal is configured as a wideband demodulation reference signal, a transforming submodule adapted to transform the frequency-domain channel estimation value sequence into a time-domain channel estimation value sequence, a selecting submodule adapted to select a main path with the maximum receiving power of each receiving antenna at a UE in the time-domain channel estimation value sequence, and determine a position with the maximum occurrence number in the main path as a final main path position, and a determining submodule, where the first receiving submodule is adapted to receive the frequency-domain data of the PDCCH demodulation reference signal, where the calculating submodule is adapted to perform correlation calculation on the received frequency-domain data and a UE local PDCCH demodulation reference signal sequence corresponding to the PDCCH demodulation reference signal to obtain a frequency-domain channel estimation value sequence, the determining submodule is suitable for determining a difference value obtained by comparing the final main path position with a target timing saved at the UE as a first timing deviation of the PDCCH;
a second module comprising a second receiving sub-module adapted to receive a reference signal from the PDCCH QCL-TYPEA or QCL-TYPEC, and an obtaining sub-module adapted to obtain a second timing offset for the PDCCH based on the reference signal from the PDCCH QCL-TYPEA or QCL-TYPEC;
a third module adapted to obtain a timing offset of the PDCCH according to one of: setting the first timing offset as the timing offset of the PDCCH if the obtaining time of the first timing offset is not later than the obtaining time of the second timing offset, otherwise setting the second timing offset as the timing offset of the PDCCH, wherein the other one of the two is as follows: and setting the weight of the first timing deviation and the weight of the second timing deviation according to the ratio of the sampling frequency of the PDCCH demodulation reference signal to the sampling frequency of the reference signal of the PDCCH QCL-TYPEA or QCL-TYPEC, and carrying out weighted summation on the first timing deviation and the second timing deviation to obtain the timing deviation of the PDCCH.
21. The apparatus of claim 20, wherein the apparatus comprises a fourth module adapted to adjust timing of the UE based on a timing offset of the PDCCH.
22. A storage medium having stored thereon computer instructions, wherein the computer instructions are operable to perform the steps of the PDCCH-based timing offset estimation method in an NR system according to any of claims 1 to 9.
23. A storage medium having stored thereon computer instructions, wherein the computer instructions are operable to perform the steps of the PDCCH-based timing offset estimation method in an NR system according to any of claims 10 to 17.
24. A user equipment comprising a memory and a processor, the memory having stored thereon computer instructions executable on the processor, wherein the processor, when executing the computer instructions, performs the steps of the PDCCH-based timing offset estimation method in the NR system of any one of claims 1 to 9.
25. A user equipment comprising a memory and a processor, the memory having stored thereon computer instructions executable on the processor, wherein the processor when executing the computer instructions performs the steps of the PDCCH-based timing offset estimation method in the NR system of any one of claims 10 to 17.
CN201910645255.6A 2019-07-17 2019-07-17 Method, device, storage medium and user equipment for estimating timing deviation based on PDCCH Active CN111294917B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910645255.6A CN111294917B (en) 2019-07-17 2019-07-17 Method, device, storage medium and user equipment for estimating timing deviation based on PDCCH

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910645255.6A CN111294917B (en) 2019-07-17 2019-07-17 Method, device, storage medium and user equipment for estimating timing deviation based on PDCCH

Publications (2)

Publication Number Publication Date
CN111294917A true CN111294917A (en) 2020-06-16
CN111294917B CN111294917B (en) 2021-08-27

Family

ID=71019960

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910645255.6A Active CN111294917B (en) 2019-07-17 2019-07-17 Method, device, storage medium and user equipment for estimating timing deviation based on PDCCH

Country Status (1)

Country Link
CN (1) CN111294917B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112702290A (en) * 2021-03-23 2021-04-23 新华三技术有限公司 Channel estimation method and device
CN115276890A (en) * 2021-04-30 2022-11-01 维沃移动通信有限公司 Transmission processing method, terminal and network side equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102215184A (en) * 2010-04-12 2011-10-12 电信科学技术研究院 Method and system for estimating uplink timing error
US20180206263A1 (en) * 2017-01-13 2018-07-19 Asustek Computer Inc. Method and apparatus for timing relationship between control channel and data channel in a wireless communication system
US20190190668A1 (en) * 2017-12-15 2019-06-20 Qualcomm Incorporated Subband-based random access and scheduling request for new-radio-spectrum sharing (nr-ss)

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102215184A (en) * 2010-04-12 2011-10-12 电信科学技术研究院 Method and system for estimating uplink timing error
US20180206263A1 (en) * 2017-01-13 2018-07-19 Asustek Computer Inc. Method and apparatus for timing relationship between control channel and data channel in a wireless communication system
US20190190668A1 (en) * 2017-12-15 2019-06-20 Qualcomm Incorporated Subband-based random access and scheduling request for new-radio-spectrum sharing (nr-ss)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
QUALCOMM INCORPORATED: "《Summary of Maintenance for PRACH procedure 》", 《3GPP TSG-RAN WG1 94 R1-1809845》 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112702290A (en) * 2021-03-23 2021-04-23 新华三技术有限公司 Channel estimation method and device
CN112702290B (en) * 2021-03-23 2021-06-29 新华三技术有限公司 Channel estimation method and device
CN115276890A (en) * 2021-04-30 2022-11-01 维沃移动通信有限公司 Transmission processing method, terminal and network side equipment

Also Published As

Publication number Publication date
CN111294917B (en) 2021-08-27

Similar Documents

Publication Publication Date Title
CN110830395B (en) Method, device and computer storage medium for data detection in communication system
US7907673B2 (en) Robust and low-complexity combined signal power estimation
US20220345336A1 (en) Reference signal channel estimation
TWI488467B (en) An up-link sdma receiver for wimax
US11616664B2 (en) Carrier frequency offset correction and doppler mitigation
CN102783062A (en) Receiver and signal received power estimation method
KR20140112905A (en) Apparatus and method for frequency synchronization in wireless communication system supporting device to deivce communication
CN107317779B (en) Frequency offset estimation method and device
CN111294917B (en) Method, device, storage medium and user equipment for estimating timing deviation based on PDCCH
US10148471B2 (en) Communication apparatus, communication method and communication system
US10212679B1 (en) Method and apparatus for delay spread estimation
CN104253771A (en) Multi-parameter joint estimation method and device
US12470450B2 (en) Method of large frequency offset estimation for an OFDM communications system using reference signals
CN114500187B (en) Method and device for estimating downlink terminal side channels of multiple receiving and transmitting nodes
CN108259395B (en) Channel estimation method and device
US20240323883A1 (en) Purpose-dependent determination of start of receiver symbol processing window
US9413563B2 (en) Method and apparatus for channel estimation using localized SINR in wireless communication systems
CN117676794A (en) Methods, network equipment, devices and storage media for estimating uplink timing advance
CN116686350B (en) Uplink-based and downlink-based positioning
KR102176992B1 (en) Method for estimating timing offset of a receiver in a mobile communication system and apparatus therefor
US12335004B2 (en) Sounding reference signal beamformer enhancement with timing correction
Song et al. Speed estimation in uplink frequency domain for mobile OFDM systems
CN118120278A (en) Channel State Information Error Compensation
CN121220011A (en) Frequency offset estimation
CN116325671A (en) A Large Frequency Offset Estimation Method for OFDM Communication System Using Reference Signal

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant